This is a pre-proposal conference presentation document prepared by the Texas Parks and Wildlife Department (TPWD) Infrastructure Division for the Centennial Park Development - Phase 2 at Post Oak Ridge State Park construction management procurement. The project involves Construction Manager-at-Risk (CMR) services for a 3,000-acre park development located at 4136 County Road 105 in Lampasas, Texas, spanning Lampasas and Burnet Counties. The scope of work encompasses comprehensive infrastructure and facilities development including park entry infrastructure, roadways, operational facilities (park headquarters, staff residences, maintenance yards), day-use amenities (trails, picnic areas, Nature Center, restrooms), overnight facilities (camping areas, mini-cabins, screened shelters), site utilities (water systems, wastewater treatment, electrical and telecommunications infrastructure), sustainable systems, site demolition, and renovation of existing structures. The solicitation was posted on May 5, 2026, with proposals due electronically through TPWD's CobbleStone Vendor Gateway system by June 30, 2026. All proposals must be submitted through the Vendor Gateway portal, with alternative submission methods not accepted. Prospective offerors must create or utilize existing accounts within the Vendor Gateway portal to access detailed solicitation documents.
The CMR contractor must establish a Guaranteed Maximum Price (GMP) within contract-specified limits based on an estimated construction cost of $30 million for the overall project. During the pre-construction phase, the selected contractor will collaborate with TPWD, architects, and engineers on design development, cost estimating, value engineering, constructability reviews, and permitting coordination. The procurement includes requirements for good faith efforts to engage Veteran Heroes United in Businesses during subcontractor selection, though no specific set-aside percentages are detailed in the available solicitation notice. The complete solicitation documents, including comprehensive bid requirements, evaluation criteria, technical specifications, and required qualifications, are available through the TPWD Vendor Gateway portal. The solicitation documents do not specify contract term length, renewal options, incumbent contractors, incumbent disadvantaged enterprise designations, or specific funding sources.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Conference May 19, 2026 at 10:00am
Texas Parks & Wildlife Department; Project No. 1112552 Centennial Park Development – Phase 2
Post Oak Ridge State Park Lampasas and Burnet Counties, Texas
Everyone will be on mute.
Use the chat box for questions
INTRODUCTIONS
Mandy Holcomb, TPWD Contract Manager
Single Point of Contact
Christy Seals, Architecture Program Manager for Centennial Parks
Andrew Duggan, Studio Outside LLC. (AE of Record)
Kacey Sloan, Site Superintendent
AGENDA
Communications and General Information Scope of the Project (Christy Seals) Construction Manager at-Risk Access Solicitation Solicitation & Submission Documents Submit Proposal Conditions of the Contract Site Visit Information
COMMUNICATIONS
and
GENERAL INFORMATION
TPWD does not allow verbal questions and answer exchanges during the procurement.
***The procurements period includes this Pre-Proposal Conference, the Site Visit opportunities, and any other potential exchanges between Contractors and Owners.
This is to ensure all potential Offerors are receive the same information… and to ensure all information released about the solicitation is reviewed by our subject experts for accuracy….
COMMUNICATIONS
RFP Section 1.6: Questions and Addenda
Contractors can submit questions during the procurement period!
• Questions regarding the RFP must be submitted to TPWD through our Vendor Gateway through the Q&A function.
• QUESTION DEADLINE: Questions must be submitted by 10:00am on Friday, June 5, 2026.
TPWD will address all questions through a formal addendum. We anticipate issuing this addendum within seven (7) days following the Question Deadline.
All addenda will be posted on the Vendor Gateway. It is the Contractor’s responsibility to monitor the Vendor Gateway for any issued addenda.
nt
QUESTIONS
RFP Section 1.3: Project Introduction and RFP Deadlines, Question Deadline RFP Section 1.6: Questions and Addenda
Contractors must sign in or create a Vendor Gateway account to access solicitation documents and participate in the submission process.
• All questions must be submitted through the Vendor Gateway
• All proposals must be submitted electronically through the Vendor
Gateway on or before the Submission Deadline.
Submissions sent by mail, telephone, fax, email, or any method other than the
Vendor Gateway will not be accepted.
Vendor Gateway Sign In/Create Account:
https://tpwd.cobblestone.software/Gateway/Default.aspx
VENDOR GATEWAY
RFP Section 1.2 Vendor Gateway Mandatory
TPWD uses an online e-bid system called CobbleStone, known as the “Vendor Gateway,” for all solicitations.
https://tpwd.cobblestone.software/Gateway/Default.aspx
VENDOR GATEWAY
CREATE ACCOUNT
CREATE ACCOUNT
ACCOUNT VERIFICATIONS
NOTE: Account creation is not instantaneous or automated.
Please allow 1-2 days for your Cobblestone Vendor Gateway account to be created.
Please create your account ahead of time;
don’t wait until the last minute…
Scope of the Project
– Christy Seals
Facilitated Public Day Use Public hunts, guided tours, special events
Within 12 months – March 2026
Within 18 months – September 2026
Within 48 months – March 2029
Expanded Public Day Use Trailhead, restroom, trails, parking
Park Open Including roads, utilities, overnight facilities and park amenities
Development Timeline
Already happening…
Under construction now…
THIS PROJECT!
Additional Development as needed to implement the Public Use Plan
Future Phases
CRITICAL
ENVIRONMENTAL
FEATURES
HYDROLOGY
SOILS
OVER HALF OF SITE HAS HIGH SENSITIVITY TO DEVELOPMENT
GEOLOGY
TOPOGRAPHY
VEGETATION
Site Analysis to date
1" = 2,000’
COLORADO BEND STATE
PARK
LAMPASAS COUNTY
BURNET COUNTY
SAN SABA
COUNTY ACCESS POINT AT
COUNTY RD 105
LEGEND
Colorado Bend State Park Roads
– Roads 6-8 miles
Trails – 20-25 miles
Trails – 3-5 miles
Group Lodge
Scenic Overlook
Wildlife Viewing
Parking
OPERATIONS
Staff Residence
Maintenance
DAY USE
Scenic Overlook
Point of Interest Historic Feature Wildlife Viewing Headquarters Parking Star Gazing
Nature Center Playground Group Pavilion Bridge
Low Water Crossing
OVERNIGHT
RV Campsites - Water & Electric
RV
Tent Campsite - Drive-Up - Water & Electric
Tent Campsite - Walk-In - Water Tent Campsites - Hike-In Backcountry
- Primitive
Group Camp
Cabins w/o Bathrooms
SPECIAL USE RESERVATION ONLY
Draft Public Use Plan - 60% Post Oak Ridge State Park is a sanctuary where adventure and conservation meet.
It will inspire visitor connection to the land through stewardship of relict Post Oak woodlands and Yancey Creek, unique karst features, and the legacy of first peoples, historic ranching and recreation, and Operation Long Horn.
We will restore impacted habitats and historic landscapes while providing recreation and interpretation.
Draft Project Scope
• Day Use Parking and Trailhead(s)
• Multi-use trails with scenic overlooks
• Group Pavilion
• Overnight Camping
• Headquarters
• Maintenance Yard
• Supporting Roads and Utilities
Construction Manager at Risk
(CMR)
As authorized under Texas Government Code 2269.253, TPWD may procure Construction Manager-at-Risk services using either a one-step or two-step selection process.
TPWD has selected to use the One-Step Construction Manager at-Risk selection process for the new Centennial Park at Post Oak Ridge State Park.
One-Step CMR (Construction Manager at Risk) A single procurement step where all offerors will submit all the required document at the same time for one consolidated
RFP response.
CONSTRUCTION
MANAGER AT-RISK
Category One-Step CMR Two-Step CMR
Procurement Structure
Single submission from all proposers including qualifications and pricing
Two phases: Step 1 qualifications;
Step 2 pricing from shortlisted firms
Documents Required
All required documents submitted at once
Step 1: Qualifications only; Step 2: Pricing proposals from short-listed firms
In a CMR contract, the Owner hires a Construction Manager to provide both Preconstruction and Construction services. Below is a high-level summary of deliverables found in the RFP:
Preconstruction Phase:
The CM provides cost estimating, value engineering, design-assistance (if needed) constructability reviews, scheduling input, and overall guidance to keep the design aligned with the project’s budget and schedule objectives.
Construction Phase:
When construction begins, the CM assumes the “at-risk” role by committing to deliver the project within a Guaranteed Maximum Price (GMP). The CM manages subcontractor procurement, oversees construction activities, monitors safety and quality, controls costs and schedule, and keeps the Owner informed balancing cost, schedule, risk, and quality through project completion.
CMR
PROJECT DELIVERABLES
RFP Section 3.6: Scope of PreCon & Construction Project Deliverables
CONTRACT DURATION
For our Centennial Program, the governing body of TPWD has established policy regarding durations for developing new park properties. In applying these policies to this project, TPWD is required to open the park with appropriate roads, utilities, and communications and facility infrastructure within 48 months following the full acquisition and assemblage of the land.
Therefore, the estimated date for Post Oak Ridge State Park Opening to Public:
03/2029
• Expected Substantial Completion Date of the Project: 01/25/2029
• Expected Final Completion Date of the Project: 02/25/2029
The total contract performance period is estimated to be eight hundred and five (805) calendar days commencing upon the date indicated in the initial Notice to Proceed. Within this total contract performance period, TPWD estimates:
• Preconstruction Phase: 240 calendar days
• Construction Phase: 565 calendar days
CONSTRUCTION COST
ESTIMATE
The awarded CMR will assist the TPWD with the finalization of the Cost of the Work and the Guaranteed Maximum Price. However, as initial information, the Proposers should consider the current estimate for Guaranteed Maximum Price (GMP) of the Project to be $30 Million.
This estimate represents the total project including the estimated:
Cost of the Work, General Conditions Fee, the Construction Manager (CM) Fee, and any approved amounts for Contingencies, Allowances, and Alternates
SOLICITATION DATES
RFP Section 1.3: Project Introduction and RFP Deadlines
Site Visits (Options): May 27, 2026, at 1:00 PM (CT) or May 28, 2026, at 10:00 AM (CT).
TPWD is offering two (2) separate site visit opportunities on different days. Proposers may attend whichever option best fits their schedule.
Question Deadline: June 5, 2026, at 10:00 AM (CT). TPWD anticipates responding to questions via an addendum within seven days of the Question Deadline.
Submission Deadline: June 30, 2026, at 2:00 PM (CT).
All proposals shall be received exactly as described herein through the Vendor Gateway by the submission deadline.
Public Unsealing and Announcing: June 30, 2026, at 2:30 PM (CT). Proposers may attend the meeting to observe the opening of the proposals. Registration is required:
https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c- 85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/db804590-3da6-46db-ad3c-85508dec8875@7864fda7-62ad-47ec-81ec-323266e3a35f
ANTICIPATED SCHEDULE
RFP Section 1.3 Project Introduction and RFP Deadlines
Ranking of Proposals: Estimated - July 2026 (CT) The scoring committee shall rank the firms and select the Proposer that provides the best value for the TPWD based on the published criteria.
Discretionary Interviews of Short-Listed Firms, if any: Estimated - August 2026 (CT) At TPWD’s sole discretion, based upon initial ranking, TPWD may determine the Proposals that are within the competitive range and that offer the “best value”, and may qualify (short-list) up to five (5) Proposers to be engaged in interviews for the State to allow Proposers the opportunity to highlight the strengths and unique aspects of their proposals and provide answers to clarification questions TPWD may have regarding the proposals.
Notification of Selected CMR Firm: Estimated - September/October 2026 (CT)
TPWD Award of Contract: Estimated - November 2026 (CT)
Agency are In accordance the TGC 2269.253, ACCESS
SOLICITATION
Post Oak Ridge CMR solicitation documents are ONLY accessible through TPWD’s Vendor Gateway (Cobblestone) at the following link:
https://tpwd.cobblestone.software/Gateway/SolicitationDet ails.aspx?rid=54
Information regarding the solicitation can be found on our TPWD website under Construction Bid Opportunities and in the state’s Electronic State Business Daily or “ESBD.
Construction and Professional Services - Bids and Vendor Opportunities –
TPWD
Texas SmartBuy https://tpwd.cobblestone.software/Gateway/SolicitationDetails.aspx?rid=54 https://tpwd.cobblestone.software/Gateway/SolicitationDetails.aspx?rid=54 https://tpwd.texas.gov/business/bidops/current_bid_opportunities/construction/ https://tpwd.texas.gov/business/bidops/current_bid_opportunities/construction/ https://tpwd.texas.gov/business/bidops/current_bid_opportunities/construction/ https://tpwd.texas.gov/business/bidops/current_bid_opportunities/construction/ https://tpwd.texas.gov/business/bidops/current_bid_opportunities/construction/ https://www.txsmartbuy.gov/ https://www.txsmartbuy.gov/
SOLICITATION DOCUMENTS
To Upload Submission Files
Change View Files to Public Files
REQUEST FOR PROPOSAL
FOR CMR
ATTACHMENTS:
Required Submittals
EXHIBITS:
Draft Agreement, Conditions of the Contract
& NDA
SAVE TO “MY SOLICITATIONS”
Add Response Status
QUESTIONS
Questions are due by June 5, 2026 at 10:00 AM through the Vendor Gateway.
SOLICITATION &
SUBMISSION DOCUMENTS
Contains all background, scope information, deliverables, submission instructions, scoring and selection information.
REQUEST FOR
PROPOSALS
RFP: CRITERIA AND ASSOCIATED POINTS
RFP Section 4: Criteria and Points
Essential Clauses, Affirmations & Additional Contract Requirements
Captures all state, agency and construction required contract clauses.
Signature on this document certifies the submitted proposal constitutes the company’s truthful offer.
Complete and Upload the entire document (11 pages) in the Vendor Gateway
ATTACHMENT A
11-page document
ATTACHMENT B
COMPANY INFORMATION AND
CONTRACTORS’ QUALIFICATIONS
FORM
Complete All Sections of these Forms and all Attachments and Submit with Response in the Vendor Gateway.
All fields must be completed. If a field does not apply, enter “N/A.”
Failure to sign and return this document in its entirety may result in proposal being considered non-responsive. If you do not utilize this provided form, document(s) submitted must be numbered to exactly match the sections and titles. Use of this form is strongly encouraged. You may attach supporting documentation, but you must clearly identify which response it is supporting.
32-page document
ATTACHMENT B -
CONTINUED
CRITERIA ITEM 1.1
COMPANY INFORMATION
MUST provide
ATTACHMENT B -
CRITERIA ITEM 1.2:
FINANCIAL CAPABILITIES
AND BONDING
INFORMATION
Must provide Letter from Surety confirming bonding capacity for the full $30M project estimate
ATTACHMENT B –
CRITERIA ITEM 1.3: WORK
HISTORY
• Five (5) example projects that are either completed or at least 80% complete.
• These projects must have been undertaken within the past ten (10) years.
• Of these project examples, at least two (2) must have been CMR projects.
• At least one (1) of these CMR projects must have been completed within the last five (5) years.
***Project Examples should highlight relevant qualifications, offerors should list the project in order of priority, with most relevant first.
CRITERIA ITEM 1.3: WORK
HISTORY -CONTINUED
VERIFICATIONS, SATISFACTION SURVEYS…
PLEASE INSTRUCT ALL REFERENCES THAT THEY HAVE
BEEN LISTED AND THEIR RESPONSE TO TPWD’S WRITTEN
AND TELEPHONE INQUIRIES IS NECESSARY.
In conducting investigations, TPWD will reach out to example project contacts and Reference Letter contacts by email and request participation in a survey to substantiate the Proposer’s described experience. References will be asked to respond within five business days.
Please notify your provided contacts that they are expected to timely respond. Failure by your references to timely respond could negatively impact your proposal evaluation. TPWD may use the survey to verify any information submitted in the example project reports
CRITERIA ITEM 1.3: WORK
HISTORY CONTINUED
Project Examples
• Complete all information
• If you attach supporting document – Cleary identify which response, it’s supporting.
Criteria Item 1.3: Work History – Project Examples continued
CRITERIA ITEM 1.3: WORK HISTORY
CONCLUDED
CRITERIA ITEM 1.4:
PRE-CONSTRUCTION
CRITERIA ITEM 1.5:
CONSTRUCTION MANAGEMENT
CRITERIA ITEM 1.6:
QUALITY ASSURANCE
Failure to complete, sign, and upload this document in the Vendor Gateway in its entirety may result in proposal being considered non-responsive.
ATTACHMENT C
CONSTRUCTION MANAGER AT
RISK FORM
9-page document
ATTACHMENT C
CMR FORM - CONTINUED
CRITERIA 2.1 CMR FEE
PROPOSAL
One-Step CMR: A single consolidated RFP submission that includes all required documents, such as Qualifications and Pricing.
• Lump Sum Pre-Con Fee
• CM Fee – as a Percent of the Cost of work
• Construction GC CAP – Actual Cost Capped as a Percent of the Cost of work.
Provide a response to the following Criteria.
Make sure to label your response accordingly
CMR FORM - CONCLUDED
MUST complete, sign, and upload this entire submission in the Vendor Gateway may result in proposal being considered non-responsive.
ATTACHMENT D
HUB SUBCONTRACTING PLAN (HSP)
PASS/FAIL: PROPOSERS MUST
COMPLETE, SIGN AND RETURN THE HSP
WITH THEIR PROPOSAL.
NOTE: Questions regarding HSP or any HUB-related matters, Proposers may contact the TPWD HUB Staff directly at 512-389-4784 or HUB@tpwd.texas.gov mailto:HUB@tpwd.texas.gov
ATTACHMENT E
CONTRACT ACKNOWLEDGMENT AND DEVIATION
PASS/FAIL : Proposers must complete, sign and return this form with their proposal.
NOTES:
Only One (1) Option can be checked.
If submitting deviations, please review the draft CMR Agreement to identify all non-negotiable articles/sections prior to your submission.
***TPWD will not issue formal responses during the solicitation or evaluation phase. The information will be reviewed and finalized during negotiations with the selected CMR firm.
SUBMIT PROPOSAL
SUBMISSION
DOCUMENTS
Create and finalize all of your required submissions.
The RFP does not mandate specific naming conventions, but does ask to clearly label the required attachments.
EXAMPLE
SUBMISSION PORTAL
SUBMISSION PORTAL
‘;/kj
Go to File & Attachments
Drag & Drop
VIEW SUBMITTED FILES
UPDATE STATUS TO FINALIZE BID
CONDITIONS
of the CONTRACT
CMR AGREEMENT
TPWD includes the proposed CMR Contract Agreement document with the solicitation files.
Proposers should review the Agreement document in detail to understand how the contract will be administered.
UNIFORM
GENERAL
CONDITIONS
Included in the solicitation as the “Exhibit 2” document.
DIVISION 1-
SPECIAL
CONDITIONS
Included in the solicitation as the “Exhibit 2” document.
(Section 01000, Special Conditions, Paragraph 1.07 and Article 9, UGC)
LIQUIDATED DAMAGES
Section 2.7 of the RFP
Uniform General Conditions, Article 5
Division 1 – Special Conditions, 1.08
INSURANCE
REQUIREMENTS
BONDS
CONSTRUCTION
MANAGEMENT
SYSTEM
TPWD uses a cloud-based Construction Management Software System to manage projects.
The system is accessible anywhere with a web connection. TPWD, Outside Architect/Engineer, Testing Firms, and Contractor are all required to use the system when participating on a project.
The system is used for multiple processes, including but not limited to:
• Contractor Application for Payment
• Submittals
• Request for Information (RFI)
• Construction Reports (daily/monthly)
• Engineer Supplemental Instruction (ASI)
• Change Order processing
• Progress Meeting Minutes
• Site Observation Reports
• Inspection Reports
• Outsourced (3rd party) Testing Reports
• General Correspondence
• Any other Contractor or Owner requested tasks and/or documents
Site Visits
SITE VISIT OPPORTUNITIES
TPWD is offering two (2) separate site visit opportunities on different days.
Proposers may attend whichever option best fits their schedule.
May 27, 2026, at 1:00 PM (CT)
May 28, 2026, at 10:00 AM (CT)
Meeting Location: Post Oak Ridge State Park – Entrance Gate Address: 4136 CR 105 Lampasas, TX 76550
*Any oral instructions or responses are non-binding.
Reminder: All questions must be submitted in writing through the Vendor Gateway by June 5 at 10AM.
| Slide Number 1 |
| INTRODUCTIONS |
| AGENDA |
| COMMUNICATIONS �and �GENERAL INFORMATION |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Scope of the Project – Christy Seals |
| Development �Timeline |
| Site Analysis to date |
| Draft Public Use Plan - 60% |
| Draft Project Scope |
| Construction Manager at Risk�(CMR) |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| ACCESS SOLICITATION |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| SOLICITATION & SUBMISSION DOCUMENTS |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| Slide Number 41 |
| Slide Number 42 |
| Slide Number 43 |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Slide Number 47 |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Slide Number 54 |
| SUBMIT PROPOSAL |
| Slide Number 56 |
| Slide Number 57 |
| Slide Number 58 |
| Slide Number 59 |
| Slide Number 60 |
| CONDITIONS �of the CONTRACT |
| CMR AGREEMENT |
| UNIFORM GENERAL CONDITIONS |
| Slide Number 64 |
| Slide Number 65 |
| Slide Number 66 |
| Slide Number 67 |
| CONSTRUCTION �MANAGEMENT �SYSTEM |
| Site Visits |
| Slide Number 70 |
| Slide Number 71 |
File details come from the government source that posted it. Updated .