ESBD_497193_1775881617000_717-26-735 Addendum 5 Q A .pdf
PDF 148 KB Posted
- Attached to
- Hot Water/Steam Boiler Remove/Replace
- Solicitation number
- 717-26-735
- Issued by
- Harris County, Texas
About this file
This is an Addendum 5 Questions & Answers document issued by Texas Southern University Procurement Services for ITB #717-26-735 regarding the removal and replacement of three boilers—two hot water boilers and one steam boiler—currently located in the Satellite Plant and New Science Center Building. The project involves disconnection, demolition, and removal of existing Sellers Model S-300-W hot water boilers and a Sellers Model 125HP steam boiler, followed by installation of three new Sellers brand boilers or equivalent models with all associated piping, flue vents, gas systems, electrical components, and a replacement 3-way mixing valve. The addendum clarifies key project requirements through bidder questions, including that no temporary hot water or steam is required during construction, crane work and offloading/staging may be performed during school hours, all three existing flue vents will be reused rather than removed, the existing boilers must be removed from the premises, and the three-way mixing valve size and actuator specifications will be provided by Monday, April 20. A mandatory walkthrough was scheduled for Monday, March 30, 2026, at 9:00 a.m. at the General Services Building, with the bid submission deadline of 11:00 a.m. Central Time on Thursday, April 2, 2026.
The addendum confirms that Building Automation System (BAS) wiring is present for control and monitoring functions, interconnecting piping requires demolition and replacement per new installation specifications, flue piping insulation will be repaired as required, and all additional wiring required for the new installation will be provided. The University anticipates replacement with original equipment manufacturer (OEM) units to minimize piping modifications rather than accepting alternative Scotch Marine boilers. Bidders must sign and return the addendum acknowledging receipt. Award will be made based on best value considering proposed costs, contractor stability, quality and reliability of goods and services, delivery terms, and indicators of probable contractor performance, with prices guaranteed as firm for ninety days from the bid deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Services - Purchasing
Addendum 5
Questions & Answers
ITB # 717-26-735
Hot Water/Steam Boiler Removal and Replacement
• Does any temporary HW or steam need to be provided during construction phase?
Answer: No
• Can crane work be performed during school hours?
Answer: Yes
• Can offloading and staging be performed during school hours?
Answer: Yes
• Is there a TSU project manual that will supersede the scope of work
Answer: No
Work scope listed is not all inclusive:
• Disconnect Electrical
Please indicate if there is any BAS wiring.
If so, What function does this wiring serve.
Answer: There is BAS wiring. Wiring is for control and monitoring of units.
• Demo Necessary Interconnecting Piping
Answer: Yes, as required. Replace per new installation.
• Demo the existing Flue Vents
Confirm that ALL (3) stacks are NOT to be removed.
Answer: Flue vents are not removed. Will need support until new boiler is installed.
• Demo the Existing Sellers Boilers
Confirm contractor is to remove from premesis.
Answer: Yes
• Clean and Prep Area for the New Equipment
• Set the (3) New Sellers Boiler in Place
• Install the (3) New Flue Vents to Existing Penetration
Confirm that ALL (3) stacks are NOT to be removed.
Answer: Flue piping is to be reused. See answer above.
• Install Insulation and Metal Jacketing on New Flue Vents
See Above
Answer: Repair insulation as required.
• Install Supply and Return Piping to New Boilers from Header
• Insulation to Insulation to New Supply and return Piping
• Install Gas Piping to Existing Gas Connections
• Install Relief Valve and Drain Piping
• Fill System and Check for Leaks
• Reconnect Electrical to Boilers
Indicate if any additional wiring is required
Answer: As required for new install.
• Replace 3-way mixing valve on Hot Water Line
Confirm size of 3-Way Valve.
Please provide actuator information.
Drive signal & power if required
Answer: Will respond with this information by Monday, April 20.
• Startup Boiler to Manufacturers Specifications
• Will the University accept scotch marine boilers for the two (2) 300 BHP boilers?
Answer: Anticipate replacement with OEM to minimize piping modifications.
*Please sign this Addendum and include it in your response. Your signature will signify your acknowledgement / receipt of this addendum.