ESBD_492722_1774032802373_Attachment D – Full-sized printable Architectural Plan .pdf

PDF 7 MB Posted

Attached to
Giddings Heating, Ventilation, and Air Conditioning (HVAC) Project
Solicitation number
644-26-02012026
Issued by
Kleberg County, Texas

About this file

This is a full-sized architectural plan document for the TJJD Giddings HVAC Replacement project located at Giddings State School in Giddings, Texas (Project No. 25-0040-00). The scope of work includes replacing direct expansion (DX) split HVAC systems across five buildings: Dorm 1 (2 systems), Dorm 5 (2 systems), Dorm 7 (2 systems), Dorm 9/10 (5 systems), and the Gymnasium (1 system), totaling 12 DX split system replacements. The project is designed in accordance with applicable codes including the 2021 International Building Code, 2023 National Electrical Code with Texas amendments, NFPA Life Safety Code 101-2021, and other relevant standards. The architectural plans were issued for permit and pricing on November 13, 2025, with a revision dated December 9, 2025. The engineering consultant is Johnston LLC, located in Houston, Texas.

The project documents include comprehensive mechanical and electrical plans with detailed specifications for equipment installation, ductwork modifications, condensate drainage systems, and control integration. New equipment specified includes Carrier air-cooled condensing units, Carrier air handling units with cooling coils, Allstyle Coil Company DX coils, Carrier natural gas furnaces, and Greenheck intake louvers. The mechanical systems include vibration isolation provisions, condensate overflow protection with shut-off switches, smoke detectors in ductwork for units exceeding 2000 CFM, and motorized outside air dampers with interlock controls. Electrical work encompasses new branch circuits, disconnect switches, and reconnection of existing electrical infrastructure to accommodate the new HVAC equipment. The project specifies that all existing refrigerant lines shall be removed and new lines installed per manufacturer specifications, with all system components balanced to specified airflow rates and subjected to testing, adjusting, and balancing per AABC or NEBB standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT & CODE SUMMARY

1. OWNER:

GIDDINGS STATE SCHOOL

2261 JAMES TURMAN RD

GIDDINGS, TX 78942

2. PROJECT SUMMARY

DORM 1: DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 2 DX SPLIT SYSTEMS.

DORM 5: DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 2 DX SPLIT SYSTEMS.

DORM 7: DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 2 DX SPLIT SYSTEMS.

DORM 9 / 10:DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 5 DX SPLIT

SYSTEMS.

GYMNASIUM: INDOOR EXERCISE AND GYMNASIUM BUILDING. SCOPE OF WORK INCLUDES

REPLACING 1 DX SPLIT SYSTEM.

3. APPLICABLE CODES & ORDINANCES

NFPA LIFE SAFETY CODE 101-2021 (TAC 28.1.34.C.1-34.303)

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL FIRE CODE WITH STATE OF TEXAS AMENDMENTS

2018 INTERNATIONAL MECHANICAL CODE OR UNIFORM MECHANICAL CODE WITH STATE OF

TEXAS AMENDMENTS

2023 NATIONAL ELECTRICAL CODE WITH STATE OF TEXAS AMENDMENTS

2018 INTERNATIONAL PLUMBING CODE AND 2018 UNIFORM PLUMBING CODE WITH STATE OF

TEXAS AMENDMENTS

2018 INTERNATIONAL FUEL GAS CODE WITH STATE OF TEXAS AMENDMENTS

2018 ENERGY CONSERVATION CODE OR ANSI/ASHRAE/IED STANDARD 90.1-2016, WITH STATE OF

TEXAS AMENDMENTS

PROJECT NO. :

DATE ISSUED:

CONSULTANTS:

MEP:

Johnston, LLC 2603 Augusta Dr., Suite 1500 Houston, TX 77057

PERMIT AND

PRICING

11/13/2025

TJJD Giddings HVAC Replacement

TJJD Giddings HVAC Replacement

25-0040-00

GIDDINGS STATE SCHOOL

2261 JAMES TURMAN RD

GIDDINGS, TX 78942

SHEET INDEX1

DISCIPLINE Sheet Name 2

I S

S U

E F

O R

P E

R M

IT

A

N D

P R

IC

IN

G

R

E V

IS

IO

N

Designer

G0.00 COVER SHEET

A1.01 ARCHITECTURAL PLAN - DORM 7

M0.00 MECHANICAL LEGEND INDEX AND NOTES

M0.01 MECHANICAL SCHEDULES

M1.00 MECHANICAL SITE PLAN

MD2.01 MECHANICAL DEMOLITION PLAN - DORM 1

MD2.02 MECHANICAL DEMOLITION PLAN - DORM 5

MD2.03 MECHANICAL DEMOLITION PLAN - DORM 7

MD2.04 MECHANICAL DEMOLITION PLAN - DORM 9/10

MD2.05 MECHANICAL DEMOLITION PLAN - GYM

M2.01 MECHANICAL PLAN - DORM 1

M2.02 MECHANICAL PLAN - DORM 5

M2.03 MECHANICAL PLAN - DORM 7

M2.04 MECHANICAL PLAN - DORM 9/10

M2.05 MECHANICAL PLAN - GYM

M3.01 MECHANICAL SECTIONS

M4.01 MECHANICAL DETAILS

M5.01 MECHANICAL CONTROLS

E0.00 ELECTRICAL LEGEND INDEX AND NOTES

E0.01 ELECTRICAL SPECIFICATIONS

ED1.01 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1 -

TYPICAL DORM 1, 5 & 7

ED1.02 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1 -

DORM 9 / 10

ED1.03 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1 - GYM

E3.01 ELECTRICAL POWER PLAN - LEVEL 1 - TYPICAL DORM 1,

5 & 7

E3.02 ELECTRICAL POWER PLAN - LEVEL 1 - DORM 9 / 10

E3.03 ELECTRICAL POWER PLAN - LEVEL 1 - GYM

Attachment D – Full-sized printable Architectural Plan

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

WARD

BED

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

BE

D

WA

RD

BE

D

WA

RD

BE

D

BE

DR

OO

M

MECH

T V

CO

UC

H

CHAIR

CO

UC

H

C H A

IR

C O U C H

C O U C H

DE

SK

C O U C H

T V

CH

AIR

C O U C H

C O U C H

C O U C H

COUCH

C H A

IR

COUCH

DESK

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRY

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

ND

RY STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

SNACK

AREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SN

AC

K

AR

EA

BED

WARDWARD

WARD

BED

BED

BED

BED

WARD

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

MECH

EXIT

STAIRS

40' - 0"

A1

A2

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/9 /2

:2

:3

A

M

ARCHITECTURAL

PLAN - DORM 7

A1.01

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1 Revision 1 2025/12/09

NTS3

FENCE DETAIL

1/16" = 1'-0"1

ARCHITECTURAL PLAN - LEVEL 1 - DORM 7

1/2" = 1'-0"2

ENLARGED ARCHITECTURAL PLAN - LEVEL 1 - DORM 7

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

ARCHITECTURAL KEY NOTES

A1 PROVIDE NEW FENCE AND GATE AROUND ALL EQUIPMENT OUTSIDE DORM 7. FENCE TO BE 8

FEET TALL WITH 3 WIRES OF BARBWIRE ON ANGLED TOP. GATE TO BE MINIMUM 54 INCH WIDTH.

REFER TO 3/A1.01 FOR FENCE DETAIL.

A2 REFER TO MD2.03 AND M2.03 FOR MECHANICAL INFORMATION.

INTERIM REVIEW

Architect:

License No.:

Date:

JOHNSTON LLC,

TBPE FIRM REGISTRATION NO. F-421

Not for regulatory approval, permitting or construction

State of Texas

David Austin Butler

25257

11/13/2025

DN

UP

SYMBOL DESCRIPTION

MECHANICAL SYMBOL LEGEND

18/14 SA

18∅ SA

18x14 RA

24/18

SUPPLY CEILING DIFFUSER

RETURN CEILING GRILLE / REGISTER

FLEXIBLE DUCT

EXHAUST CEILING GRILLE / REGISTER

90° ELBOW W/ TURNING VANES

45° MITERED ELBOW W/ TURNING

90° LONG RADIUS ELBOW

45° LONG RADIUS ELBOW

CONCENTRIC TRANSITION

ECCENTRIC TRANSITION

RECTANGULAR BRANCH TAP

CONICAL BRANCH TAP

DUCT CAP

DUCT PENETRATION THROUGH WALL

SUPPLY / MAKEUP DUCT (UP / DOWN)

RETURN DUCT (UP / DOWN)

ROUND DUCT SIZE (DIAMETER) AND

SYSTEM

RECTANGULAR DUCT SIZE

SLOT OR LINEAR DIFFUSER

DIFFUSER FLOW ARROWS

(IF NO ARROWS ARE SHOWN,

DIFFUSER IS 4-WAY THROW)

SIDEWALL REGISTER TAP

DUCT MOUNTED HUMIDIFIER

RETURN AIR SLOT DEVICE

DUCT WITH INTERNAL LINER

FLEXIBLE DUCT CONNECTION

INCLINED DROP IN DUCT

INCLINED RISE IN DUCT

IN-LINE 90 DEGREE DROP (RISE)

FLAT OVAL DUCT SIZE

LOUVER W/ SCREEN (IN WALL)

SIDEWALL RETURN GRILLE / REGISTER

SIDEWALL SUPPLY GRILLE / REGISTER

TRANSFER BOOT (WIDTH x HEIGHT)

RECTANGULAR TO ROUND TRANSITION

SUPPLY / MAKEUP ROUND DUCT

(UP / DOWN)

EXHAUST DUCT (UP / DOWN)

IN DUCT (HIDDEN LINE INDICATES

(TYP. FOR ALL UNLESS OTHERWISE

VANES (TYP. FOR ALL UNLESS

HIDDEN ELBOW)

(SMACNA 45)

(W/ VOLUME DAMPER)

(WIDTH x HEIGHT) AND SYSTEM

(WIDTH x HEIGHT) AND SYSTEM

OTHERWISE NOTED)

NOTED)

SYMBOLSYMBOL

VFD

CP

NEW EQUIPMENT

(SIZE, SHAPE WILL VARY)

(SIZE, SHAPE WILL VARY)

EQUIPMENT TO REMAIN

EXISTING DUCT TO BE REMOVED

EXISTING DUCT TO REMAIN

VARIABLE FREQUENCY DRIVE

CONTROLLER OR CONTROL PANEL

NEW DUCT

MECHANICAL EQUIPMENTDUCTWORK PIPING

NOTE: NOT ALL SYMBOLS TABULATED ABOVE ARE NECESSARILY USED ON THE DRAWINGS.

TEMPERATURE SENSOR/THERMOSTAT

HUMIDITY SENSOR/HUMIDISTAT

SMOKE DETECTOR

AIR FLOW MONITORING STATION

CONTROL INSTRUMENTS

KEYED NOTE

REVISION

EQUIPMENT TAGAHU-1

AIR DEVICE TAG - DEVICE TYPE /

AIRFLOW (CFM)

POINT OF CONNECTION

AIR FLOW INDICATOR

(NEW TO EXISTING)

POINT OF DISCONNECTION

TYPICAL LEADERS

MISCELLANEOUS

SHEET SYMBOLS

RETURN ROUND DUCT (UP / DOWN)

EXHAUST ROUND DUCT (UP / DOWN)

MANUAL DAMPER

MOTORIZED DAMPER

M

FIRE DAMPER

FD

SMOKE DAMPER

SD

COMBINATION FIRE/SMOKE DAMPER

FSD

(SIZE, SHAPE WILL VARY)

EQUIPMENT TO BE REMOVED

VIEW NUMBER

SHEET NUMBER

M1.01

VIEW NUMBER

SHEET NUMBER

M1.01

A

1/8" = 1'-0"

TITLE

VIEW TITLE

VIEW SCALE

VIEW TITLE

VIEW NUMBER

SECTION REFERENCE

SHEET REFERENCE

H

SD

A

DP

SD

CO2

DIFFERENTIAL PRESSURE SENSOR

STATIC PRESSURE SENSOR

CO2 SENSOR

SINGLE LINE PIPE REDUCER

PIPING SERVICE HIDDEN OR

UNDERGROUND

SINGLE LINE TEE OUTLET UP OR COMING

TOWARD YOU IN SECTION

SINGLE LINE TEE OUTLET DOWN OR

TURNING AWAY FROM YOU IN SECTION

SINGLE LINE PIPE UP OR COMING

TOWARD YOU IN SECTION

SINGLE LINE PIPE DOWN OR TURNING

AWAY FROM YOU IN SECTION

PIPING PITCH (IN/FT)

1/8" / 1'-0"

PIPING FLOW DIRECTION)

SINGLE LINE PIPE CAP

DOUBLE LINE BLIND FLANGE

SINGLE LINE FLEXIBLE CONNECTION

DOUBLE LINE FLEXIBLE CONNECTION

DESCRIPTION DESCRIPTION

EXISTING PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN

6" NAME

NEW SINGLE LINE PIPING WITH SIZE

AND SERVICE INDICATED (SEE PIPING

SYSTEM ABBREVIATIONS)

6" NAME NEW DOUBLE LINE PIPING WITH SIZE

AND SERVICE INDICATED (SEE PIPING

SYSTEM ABBREVIATIONS)

6" NAME

6" NAME

6" NAME

6" NAME

SINGLE LINE BLIND FLANGE

DOUBLE LINE PIPE CAP

PIPE PENETRATION THROUGH WALL

CEILING ACCESS DOOR/PANEL

M6.01

1 VIEW NUMBER

SHEET NUMBER

ELEVATION REFERENCE

T

H

DUCT TEE

SINGLE LINE PIPE TEE

SINGLE LINE PIPE ELBOW

SINGLE LINE PIPE CROSS

DOUBLE LINE PIPE ELBOW

FLANGED AND THREADED/WELDED

DOUBLE LINE PIPE TEE

FLANGED AND THREADED/WELDED

DOUBLE LINE PIPE CROSS

FLANGED AND THREADED/WELDED

DOUBLE LINE CONCENTRIC REDUCER

FLANGED AND THREADED/WELDED

DOUBLE LINE ECCENTRIC REDUCER

FLANGED AND THREADED/WELDED

DOUBLE LINE PIPE UP OR COMING

TOWARD YOU IN SECTION

DOUBLE LINE PIPE DOWN OR TURNING

AWAY FROM YOU IN SECTION

DOUBLE LINE TEE OUTLET UP OR

COMING TOWARD YOU IN SECTION

DOUBLE LINE TEE OUTLET DOWN OR

TURNING AWAY FROM YOU IN SECTION

SINGLE LINE SHUT-OFF VALVE

DOUBLE LINE SHUT-OFF VALVE

FLANGED AND THREADED/WELDED

M10

M

SINGLE LINE CHECK VALVE

DOUBLE LINE CHECK VALVE

FLANGED AND THREADED/WELDED

SINGLE LINE STRAINER

DOUBLE LINE STRAINER

FLANGED AND THREADED/WELDED

SINGLE LINE CONTROL VALVE

DOUBLE LINE CONTROL VALVE

FLANGED AND THREADED/WELDED

SINGLE LINE FLOWMETER

DOUBLE LINE FLOWMETER

FLANGED AND THREADED/WELDED

MECHANICAL GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND EQUIPMENT AS WELL AS PERFORM ALL THE

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS

INDICATED ON THE DRAWINGS, AND AS SPECIFIED AND REQUIRED BY CODE.

2. THE DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY

SCOPE AND GENERAL AGREEMENT ONLY.

3. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS'

CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS

REQUIRED FOR FINAL EQUIPMENT CONNECTIONS. FIELD VERIFY AND COORDINATE ALL DUCT

AND PIPING DIMENSIONS BEFORE FABRICATION.

4. WHEN ALL TRADE WORK (HVAC, PLUMBING, AND FIRE PROTECTION) IS SUBCONTRACTED, IT

SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE HIS

SUBCONTRACTORS AND THEIR ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE

PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE WORK OR WHICH

CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THE CONTRACT, IT

SHALL BE BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR, WHOSE DECISION

SHALL BE FINAL.

5. SIZE AND LOCATION OF EQUIPMENT SHOWN ON PLANS ARE APPROXIMATE. REFER TO

MANUFACTURER'S LITERATURE FOR EXACT DIMENSIONS AND FIELD COORDINATE EXACT

LOCATION.

6. ALL EQUIPMENT AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE

MANUFACTURERS' RECOMMENDATIONS, CONTRACT DOCUMENTS AND APPLICABLE

CODES/REGULATIONS.

7. VIBRATION ISOLATION FOR ALL EQUIPMENT SHALL BE PROVIDED TO PREVENT TRANSMISSION

OF VIBRATION TO BUILDING STRUCTURE AS SPECIFIED.

8. PROVIDE VIBRATION ISOLATION FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50'-0"

OF ISOLATED EQUIPMENT (EXCEPT AT BASE BELOW SUPPORTS AND ANCHOR POINTS)

THROUGHOUT THE EQUIPMENT ROOMS.

9. CONTRACTORS SHALL MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS, CONDUITS AND SUSPENDED EQUIPMENT IN MECHANICAL ROOMS.

10. ALL TESTS SHALL BE COMPLETED BEFORE ANY EQUIPMENT, DUCT OR PIPING INSULATION IS

APPLIED.

11. CONTRACTOR SHALL LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES

IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM OR

DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER.

12. ANY TESTING, ADJUSTING AND BALANCING AGENCY CONSIDERED FOR THE PROJECT SHALL BE

A MEMBER OF THE ASSOCIATED BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL

BALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN

ACCORDANCE WITH THEIR STANDARDS AND THE PROJECT SPECIFICATIONS.

13. WHERE TWO OR MORE ITEMS OF THE SAME TYPE ARE REQUIRED, THE PRODUCTS OF ONE

MANUFACTURER SHALL BE USED.

14. ALL CONTROL WIRING AND CONDUITS SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE

AND THE DIVISION 26 SERIES OF THE CONTRACT SPECIFICATIONS.

15. CONTRACTOR SHALL COORDINATE OPENINGS THROUGH STRUCTURAL ELEMENTS WITH

STRUCTURAL ENGINEER PRIOR TO EXECUTION. MODIFY LOCATION OF DUCTWORK AND PIPING

AS REQUIRED TO ACCOMMODATE LOCATION OF OPENINGS.

16. UNLESS OTHERWISE INDICATED ON ARCHITECTURAL OR MECHANICAL DRAWINGS,

CONTRACTOR SHALL PROVIDE A MINIMUM 12X12 INCHES ACCESS PANEL OR DOOR THROUGH

WALLS AND CEILINGS FOR ANY EQUIPMENT, WHICH REQUIRES ACCESS SUCH AS DAMPERS,

VALVES, SMOKE DETECTORS, ETC. SEE SPECIFICATINS FOR ADDITIONAL REQUIREMENTS.

17. ALL DUCTWORK, PIPING AND EQUIPMENT SHALL BE SUPPORTED FROM THE SURROUNDING

STRUCTURAL ELEMENTS AND COORDINATED THROUGH THE GENERAL CONTRACTOR. ANY

ATTACHMENT TO STEEL BAR JOISTS, TRUSSES OR JOIST GIRDERS SHALL BE AT PANEL POINTS.

CONTRACTOR SHALL PROVIDE BEAM CLAMPS MEETING MSS STANDARDS. ANY WELDING TO

STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE

PERMITTED.

18. ALL LOCATIONS AND SIZES OF ALL FLOOR, WALL AND ROOF OPENINGS SHALL BE

COORDINATED WITH ALL OTHER TRADES.

19. COOLING COIL CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET WITH A "P" TRAP AND PIPED TO THE NEAREST DRAIN.

COORDINATE WITH PLUMBING.

20. CONTRACTOR SHALL ERECT AND MAINTAIN THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD

A SECURE BARRIER TO ENSURE THE SEPARATION OF THE CONSTRUCTION AREA AND

CONSTRUCTION WORKERS FROM STUDENTS ENSURING STUDENTS WILL NOT BE ABLE TO

ENTER THE CONSTRUCTION AREA. THE CONSTRUCTION BARRIER SHALL CONSIST OF A 6’-0”

TALL (MIN.) CHAIN-LINK (9 GA. X 2” MESH) METAL FENCE PANELS CLAMPED TOGETHER AND

MOUNTED TO METAL BASE PLATES AT EACH PANEL CONNECTION. CONTRACTOR SHALL

PROVIDE ACCESS SWING GATES FOR EQUIPMENT AND PERSONNEL EQUIPPED WITH PADLOCK

HASPS. SIZE AND LOCATION OF GATES TO BE DETERMINED AT THE PRE-CONSTRUCTION

MEETING. PADLOCKS TO BE SUPPLIED BY TJJD. THE FENCE IS TO BE RELOCATED AS WORK

ACTIVITIES MOVE FROM ONE BUILDING TO THE OTHER.

MECHANICAL PIPING NOTES

1. ALL OVERHEAD PIPING INSTALLATIONS SHALL BE HELD TIGHT TO STRUCTURE OR SLAB WITH

THE REQUIRED SPACE PROVIDED FOR INSULATION INSTALLATION.

2. CONTRACTOR SHALL INSTALL ALL PIPING SYSTEMS SO THAT ANY VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER APPURTENANCES ARE ACCESSIBLE.

3. CONTRACTOR SHALL INSTALL ALL VALVES SO THAT SAID VALVE OR VALVES CAN REMAIN IN

SERVICE WHEN ITS ASSOCIATED EQUIPMENT OR PIPING IS REMOVED. ALL VALVES SHALL BE

ADJUSTED FOR EASY AND SMOOTH OPERATION.

4. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE SUPPLIED AND INSTALLED

FULL SIZE OF PIPE BEFORE ANY REDUCTION IN SIZE TO MAKE CONNECTIONS TO EQUIPMENT

AND CONTROLS.

5. FLANGED CONNECTIONS OR UNIONS SHALL BE SUPPLIED AND INSTALLED AT THE CONNECTION TO EACH PIECE OF EQUIPMENT, IN ANY BYPASS LINE, AND IN LONG PIPING RUNS 75 FEET OR

MORE, TO ALLOW SYSTEM DISASSEMBLY FOR ANY FUTURE ALTERATIONS AND/OR REPAIRS.

6. ALL PIPING SHALL BE COORDINATED WITH ALL TRADES. ANY OFFSET REQUIRED AROUND

OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE

CONTRACT.

HVAC / SHEET METAL NOTES

1. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL

ARRANGEMENT ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING THEIR

WORKING KNOWLEDGE OF THEIR SPECIFIC DISCIPLINES TO AUGMENT THE SCOPE DOCUMENT.

2. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED

AND AS REQUIRED BY CODE.

3. CERTAIN ITEMS SUCH AS RISERS AND DROPS IN DUCTWORK, ACCESS DOORS AND VOLUME

DAMPERS ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A

SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE

REQUIREMENTS FOR THESE ITEMS.

4. ALL DUCTWORK DIMENSIONS AS SHOWN ON THE DRAWINGS ARE INTERNAL. CLEAR

DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING

THICKNESS.

5. PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS

OTHERWISE INDICATED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH TURNING

VANES.

6. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH EXISTING CONDITIONS AND

MAKE MINOR DUCT MODIFICATIONS TO SUIT.

7. UNLESS OTHERWISE SHOWN, LOCATE ALL NEW ROOM THERMOSTATS 4'-0" (CENTERLINE)

ABOVE FINISHED FLOOR. NOTIFY THE ARCHITECT OF ANY ROOMS WHERE THE ABOVE

LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.

8. LOCATE ALL MECHANICAL EQUIPMENT (VARIABLE VOLUME, CONSTANT VOLUME AND FAN

POWERED BOXES, FAN COIL UNITS, UNIT VENTILATORS AND COILS) FOR UNOBSTRUCTED

ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.

9. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, RELIEF, AND

EXHAUST) CONNECTED TO AIR HANDLING UNITS, FAN AND OTHER EQUIPMENT WHICH REQUIRE

VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF

CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.

10. RUNS OF LOW PRESSURE FLEXIBLE DUCT SHALL NOT EXCEED 6'-0" IN LENGTH. RUNS OF

MEDIUM PRESSURE FLEXIBLE DUCT SHALL NOT EXCEED 3'-0" IN LENGTH.

11. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED

AT NO ADDITIONAL COST TO THE OWNER.

12. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS,

FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, COILS, AND OTHER ITEMS LOCATED IN

THE DUCTWORK, WHICH REQUIRE SERVICE AND/ OR INSPECTION.

13. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND MAINTENANCE

OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.

14. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER

GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO BOTH THE

EQUIPMENT AND THE DUCT.

15. SMOKE DETECTORS SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND WIRED BY

THE ELECTRICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOUNTING THE SMOKE DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN

ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS.

MECHANICAL ABBREVIATIONS

DEFINITIONABBR. DEFINITIONABBR.

AC AIR CURTAIN

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

ADS AIR DIRT SEPARATOR

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR HANDLING UNIT

AP ACCESS PANEL

AS AIR SEPARATOR

B BOILER

BAS BUILDING AUTOMATION SYSTEM

BCU BLOWER COIL UNIT

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BIW BACKWARD INCLINED WHEEL (FAN)

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOS BOTTOM OF STEEL

BSC BIOLOGICAL SAFETY CABINET

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CA COMBUSTION AIR

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CF COOLER FILTER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHP CHILLED WATER PUMP

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CM CARBON MONOXIDE

CO2 CARBON DIOXIDE

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CV CONTROL VALVE

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN

(TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY

(FROM COOLING TOWER)

(D) DEMO

DB DRY-BULB TEMPERATURE

DB DECIBELS

DEF DRYER EXHAUST FAN

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DIA DIAMETER

DP DEW POINT TEMPERATURE

DV DRYER VENT

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

(E) EXISTING

EA EXHAUST AIR

EAH EXHAUST AIR HOOD

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ERC ELECTRIC REHEAT COIL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FCU FAN COIL UNIT

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN-POWERED TERMINAL UNIT

FS FLOW SWITCH

FSD COMBINATION FIRE-SMOKE DAMPER

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FV FACE VELOCITY

G GAS

GAL GALLONS

GH GRAVITY HOOD

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

H HUMIDIFIER

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HVLS HIGH-VOLUME LOW-SPEED FAN

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

PIPING SYSTEM ABBREVIATIONS

BBD BOILER BLOW DOWN

BFW BOILER FEED WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CLPS CLEAN LOW PRESSURE STEAM

CMPS CLEAN MEDIUM PRESSURE STEAM

CTWR COOLING TOWER WATER RETURN

CTWS COOLING TOWER WATER SUPPLY

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN LINE

GR GLYCOL RETURN

GS GLYCOL SUPPLY

H/C R DUAL TEMPERATURE RETURN

H/C S DUAL TEMPERATURE SUPPLY

HPC HIGH PRESSURE STEAM CONDENSATE

HPS HIGH PRESSURE STEAM

HPWR HEAT PUMP WATER RETURN

HPWS HEAT PUMP WATER SUPPLY

HWR HOT WATER RETURN (HEATING)

HWS HOT WATER SUPPLY (HEATING)

LPC LOW PRESSURE STEAM CONDENSATE

LPS LOW PRESSURE STEAM

MPC MEDIUM PRESSURE STEAM

CONDENSATE

MPS MEDIUM PRESSURE STEAM

NPW NON-POTABLE WATER

PC PUMPED CONDENSATE

RD REFRIGERANT DISCHARGE (HOT GAS)

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RLR REFRIGERANT LIQUID OVERFEED

RETURN

RS REFRIGERANT SUCTION

S(PSI) STEAM WITH PRESSURE INDICATED

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ID INSIDE DIAMETER

IEER INTEGRATED ENERGY EFFICIENCY RATIO

IN INCHES

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LPR LOW PRESSURE RETURN

(STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN

(CLEAN)

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M FLOW METER

MA MIXED AIR

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH 1,000 BTUH (BRITISH THERMAL UNITS

PER HOUR)

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MZ MULTI-ZONE

N.C. NORMALLY OPEN

N.O. NORMALLY CLOSED

N/A NOT APPLICABLE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH-ABSOLUTE

PSIG POUNDS PER SQUARE INCH- GAGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

RA RETURN AIR

RAF RELIEF AIR FAN

REA RELIEF AIR

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SMOKE DAMPER

SEER SEASONAL ENERGY EFFICIENCY RATIO

SEN SENSIBLE HEAT

SF SUPPLY FAN

SHC STEAM HEATING COIL

SP STATIC PRESSURE

SPRV STEAM PRESSURE REDUCING VALVE

SQ FT SQUARE FOOT (FEET)

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TOD TOP OF DUCT

TOS TOP OF STEEL

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TYP TYPICAL

UC UNDERCUT

UN UNIT HEATER

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VI VIBRATION ISOLATOR

W WATTS

WB WET-BULB (TEMPERATURE)

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WG WATER GAGE

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:4

A

M

MECHANICAL

LEGEND INDEX AND

NOTES

M0.00

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

SHEET NUMBER SHEET NAME

MECHANICAL SHEET INDEX

M0.00 MECHANICAL LEGEND INDEX AND NOTES

M0.01 MECHANICAL SCHEDULES

M1.00 MECHANICAL SITE PLAN

MD2.01 MECHANICAL DEMOLITION PLAN - DORM 1

MD2.02 MECHANICAL DEMOLITION PLAN - DORM 5

MD2.03 MECHANICAL DEMOLITION PLAN - DORM 7

MD2.04 MECHANICAL DEMOLITION PLAN - DORM 9/10

MD2.05 MECHANICAL DEMOLITION PLAN - GYM

M2.01 MECHANICAL PLAN - DORM 1

M2.02 MECHANICAL PLAN - DORM 5

M2.03 MECHANICAL PLAN - DORM 7

M2.04 MECHANICAL PLAN - DORM 9/10

M2.05 MECHANICAL PLAN - GYM

M3.01 MECHANICAL SECTIONS

M4.01 MECHANICAL DETAILS

M5.01 MECHANICAL CONTROLS

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL

SCHEDULES

M0.01

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

DX SPLIT OUTDOOR UNIT SCHEDULE

MARK SERVICE MBH

AMBIENT

TEMPERATURE (°F)

# OF

COMPRESSORS

KW PER

COMPRESSOR # OF FANS HP PER FAN VOLTS/PHASE/HZ MCA

MOP

(AMPS) EER / IEER

BASIS OF DESIGN

NOTESMANUFACTURER MODEL

ACCU-1E DXC-1E 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-1W DXC-1W 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-5E DXC-5E 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-5W DXC-5W 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-7E DXC-7E 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-7W DXC-7W 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-D1 AHU-D1 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-D2 AHU-D2 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-D3 AHU-D3 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-D4 AHU-D4 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5

ACCU-D5 DXC-D5 36 115 1 2.96 1 1/3 240/1/60 20.9 35 12.5 / 16.3 CARRIER 26TPA836W003 1,2,3,4,5

ACCU-G2 AHU-G2 240 115 2 21.4 4 1/4 240/3/60 79 100 10.6/13.6 CARRIER 38AXZN25A0M5-0A2A0 1,2,3,4,5

DX SPLIT INDOOR UNIT SCHEDULE

MARK SERVICE

FAN DATA COOLING COIL

MCA MOP

BASIS OF DESIGN

NOTESTOTAL CFM

OUTSIDE

AIR CFM

MOTOR

(HP)

EXT. SP

(in. WG)

TOTAL SP (IN.

W.G.)

MIN. FAN

EFFICIENCY (%) VOLTS/PHASE/HZ

TOTAL COOLING

CAPACITY (MBH)

SENSIBLE COOLING

CAPACITY (MBH) # OF ROWS

EAT (°F DB/ °F

WB)

LAT (°F DB/

°F WB) MANUFACATURER MODEL

AHU-D1 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6

AHU-D2 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6

AHU-D3 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6

AHU-D4 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6

AHU-G2 GYMNASIUM 8,000 1,660 7.5 1.67 2.5 89.5 240/3/60 252 195 4 77/66 55/54 31 50 CARRIER 40RLAA25T3A5-UA0A0 1,2,3,4,5,6

NOTES:

1. PROVIDE UNIT WIT CRANK CASE HEATER, SITE GLASS, HIGH & LOW LIMIT SWITCHES, TIME GUARD RELAY, LIQUID LINE FILTER DRYER AND CONVENIENT OUTLET.

2. PROVIDE UNIT WITH SINGLE POINT ELECTRICAL CONNECTION WITH DISCONNECT SWITCH.

3. INSTALL UNITS ON CONCRETE PAD. CONCRETE PADS ARE EXISTING.

4. PROVIDE FACTORY APPLIED EPOXY COATING (OR ANTI-CORROSION COATING) TO CODENSER COIL.

5. PROVIDE WITH HAIL GUARD.

NOTES:

1. PROVIDE UNIT WITH FLOOR MOUNTED STEEL PLATFORM.

2. PROVIDE UNIT WITH SINGLE POINT ELECTRICAL CONNECTION WITH DISCONNECT SWITCH.

3. PROVIDE FLOAT SWITCH AT THE PRIMARY DRAIN PAN. FLOAT SWITCH SHALL TURN OFF UNIT WHEN PRIMARY DRAIN IS BLOCKED.

4. PROVIDE UNIT WITH ECM MOTOR.

5. PROVIDE WITH 2" THICK MERV 8 FILTERS. FILTERS SHALL HAVE MERV STAMP RATING.

6. EXTERNAL STATIC PRESSURE INCLUDE DUCTWORK, AIR DEVICES AND DIRTY FILTERS ONLY AND DOES NOT INCLUDE COIL AND CASING LOSES.

DX COIL SCHEDULE

MARK TOTAL CFM

OUTSIDE AIR

CFM

COOLING COIL

REFRIGERANT FURNACE Manufacturer Model NOTES

TOTAL COOLING

CAPACITY (MBH)

SENSIBLE COOLING

CAPACITY (MBH)

EAT (°F DB/ °F

WB)

LAT (°F DB/

°F WB)

DXC-1E 4,490 450 134 122 76/65 55/54 R-454B GF-1E-A & GF-1E-B ALLSTYLE COIL COMPANY ABM 120 1

DXC-1W 4,490 450 134 122 76/65 55/54 R-454B GF-1W-A & GF-1W-B ALLSTYLE COIL COMPANY ABM 120 1

DXC-5E 4,490 450 134 122 76/65 55/54 R-454B GF-5E-A & GF-5E-B ALLSTYLE COIL COMPANY ABM 120 1

DXC-5W 4,490 450 134 122 76/65 55/54 R-454B GF-5W-A & GF-5W-B ALLSTYLE COIL COMPANY ABM 120 1

DXC-7E 4,490 450 134 122 76/65 55/54 R-454B GF-7E-A & GF-7E-B ALLSTYLE COIL COMPANY ABM 120 1

DXC-7W 4,490 450 134 122 76/65 55/54 R-454B GF-7W-A & GF-7W-B ALLSTYLE COIL COMPANY ABM 120 1

DXC-D5 1,200 140 34.6 26.6 75/65 55/54 R-454B GF-D5 CARRIER CAAMP3617AMA 1,2

NOTES:

1. PROVIDE WITH CONDENSATE OVERFLOW SHUT-OFF SWITCH (ALL-ACCESS AA2-FS OR EQUIVALENT) AT SECONDARY DRAIN CONNECTION. SWITCH SHALL SHUT OFF ASSOCIATED CONDENSING UNIT, FURNACE AND

BLOWER WHEN CONDENSATE IS DETECTED IN SECONDARY DRAIN.

2. DX COIL SHALL HAVE CONDENSATE DRAIN CONNECTIONS FOR HORIZONTAL COIL CONFIGURATION.

NOTES:

1. PROVIDE CONSENSATE NEUTRALIZER KIT: CARRIER P908-0001 OR EQUAL.

2. INSTALL UNIT, FLUE VENT AND COMBUSTION AIR PIPING PER MANUFACTURER INSTRUCTIONS.

3. PROVIDE CONTROL RELAYS.

4. PROVIDE TRANSFORMER IF NEEDED.

5. PROVIDE UNIT WITH EXTERNAL FILTER RACK AND MERV 8 FILTERS.

6. PROVIDE TWINNING KIT PER MANUFACTURER'S INSTRUCTIONS.

NATURAL GAS FURNACE SCHEDULE

MARK SERVICE

FAN DATA NATURAL GAS FURNACE

MCA MOP

BASIS OF DESIGN

NOTESTOTAL CFM

EXT. SP

(in. WG)

TOTAL SP (IN.

W.G.) VOLTS/PHASE/HZ

HEATING INPUT

MBH

HEATING EAT/LAT

(°F DB)

EFFICIENCY

(%) FLUE SIZE MANUFACATURER MODEL

GF-1E-A DORM 1 2,245 0.5 0.8 115/1/60 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-1E-B DORM 1 2,245 0.5 0.8 FROM GF-1E-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-1W-A DORM 1 2,245 0.5 0.8 115/1/60 120 50 / 100 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-1W-B DORM 1 2,245 0.5 0.8 FROM GF-1W-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-5E-A DORM 5 2,245 0.5 0.8 115/1/60 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-5E-B DORM 5 2,245 0.5 0.8 FROM GF-5E-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-5W-A DORM 5 2,245 0.5 0.8 115/1/60 120 50 / 100 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-5W-B DORM 5 2,245 0.5 0.8 FROM GF-5W-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-7E-A DORM 7 2,245 0.5 0.8 115/1/60 120 50 / 100 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-7E-B DORM 7 2,245 0.5 0.8 FROM GF-7E-A 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-7W-A DORM 7 2,245 0.5 0.8 115/1/60 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-7W-B DORM 7 2,245 0.5 0.8 FROM GF-7W-A 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6

GF-D5 DORM 9/10 1,200 0.5 0.8 115/1/60 66 50 / 90 80 4 10.5 15 CARRIER 58SP0B070V17--16 1,2,3,4,5

LOUVER SCHEDULE

MARK SERVICE TYPE MIN. FREE AREA DIMENSIONS SHAPE HEIGHT MANUFACTURER MODEL NOTES

L-1E DORM 1 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5

L-1W DORM 1 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5

L-5E DORM 5 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5

L-5W DORM 5 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5

L-7E DORM 7 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5

L-7W DORM 7 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5

NOTES:

1. LOUVER SHALL BE DRAINABLE.

2. INCLUDE ALUMINUM BIRD SCREEN.

3. LOUVER SHALL BE AMCA CERTIFIED AND UL LISTED.

4. COORDINATE EXACT HEIGHT WITH EXISTING CONDITIONS.

5. VERIFY EXISTING CONDITIONS BEFORE FURNISHING FINAL SIZE OF LOUVER.

DORM 1

DORM 5

DORM 7

DORM 9/10

GYMNASIUM

M16

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL SITE

PLAN

M1.00

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1" = 80'-0"1

MECHANICAL SITE PLAN

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M16 PROVIDE NEW FENCE AND GATE AROUND ALL EQUIPMENT OUTSIDE DORM 7. FENCE TO BE 8 FEET TALL WITH 3 WIRES OF BARBWIRE ON ANGLED TOP. GATE TO BE 80 INCHES HEIGHT, WITH

MINIMUM 54 INCH WIDTH. FENCE AND BARBWIRE TO EXTEND OVER TOP OF GATE.

T

S D

S D

S D

S D

T T

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRYCORRIDOR

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

NDR

Y STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

CO

RRI

DOR

SNACKAREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SNA

CK

ARE

A

T V

CO

UC

H

C H A

IR

C O U C H

C O U C H

C O U C H

DE

SKCHAIR

CO

UC

H

C O U C H

C O U C H

COUCH

C H A

IR T

V

CH

AIR COUCH

DESK

C O U C H

MECH

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

M13M13

ACCU-1W ACCU-1E

GF-1E

DXC-1E

GF-1W

DXC-1W

M1

M3

M5

M1

M3

M5

M2

M3

M4

M11

M2

M3

M4

M11

M26 M26

M9 M9

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL

DEMOLITION PLAN -

DORM 1

MD2.01

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN - LEVEL 1 - DORM 1

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED

ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT

EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.

M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO

EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR

PLENUM EXISTING TO REMAIN.

M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED

ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.

M4 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO DUAL GAS

FURNACE, HORIZONTAL COOLING COIL, AND RETURN AND SUPPLY TRANSITIONS. RETURN AIR

PLENUM BOX AND UNIT SUPPORT EXISTING TO REMAIN. INTAKE AND COMBUSTION DUCT

CONNECTIONS TO BE DISCONNECTED AND PENETRATIONS ARE TO REMAIN. DISPOSE OF DEMO

MATERIALS AS DIRECTED BY OWNER.

M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.

M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR

AIR HANDLER.

M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND

CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.

M13 VERIFY TEMPERATURE INPUT LOCATION AND CONFIRM WITH EOR.

M26 DEMOLISH EXISTING PATCHED WALL SPACE FOR NEW LOUVER INSTALLATION.

D

S D

S D

S D

T

T

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

BED

BED

WARD

WARD

BED BED

BED

BED

WARD

WARD

BED BED

WARD

BED

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

BE

D

WA

RD

BE

D

WA

RD

BE

D

BE

DR

OO

M

MECH

T V

CO

UC

H

CHAIR

CO

UC

H

C H A

IR

C O U C H

C O U C H

DE

SK

C O U C H

T V

CH

AIR

C O U C H

C O U C H

C O U C H

COUCH

C H A

IR

COUCH

DESK

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRY

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

NDR

Y STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

SNACK

AREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SNA

CK

ARE

A

BED

WARDWARD

WARD

BED

BED

BED

BED

WARD

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

M13

ACCU-5W ACCU-5E

GF-5E

DXC-5E

M13

M1 M1

M5 M5

M2

M11

M2

M11

M3M3

M4 M4

M3 M3

GF-5W

DXC-5W

M26 M26

M9

M9

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL

DEMOLITION PLAN -

DORM 5

MD2.02

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/8" = 1'-0"2

MECHANICAL DEMOLITION PLAN - DORM 5

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED

ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT

EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.

M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO

EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR

PLENUM EXISTING TO REMAIN.

M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED

ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.

M4 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO DUAL GAS

FURNACE, HORIZONTAL COOLING COIL, AND RETURN AND SUPPLY TRANSITIONS. RETURN AIR

PLENUM BOX AND UNIT SUPPORT EXISTING TO REMAIN. INTAKE AND COMBUSTION DUCT

CONNECTIONS TO BE DISCONNECTED AND PENETRATIONS ARE TO REMAIN. DISPOSE OF DEMO

MATERIALS AS DIRECTED BY OWNER.

M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.

M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR

AIR HANDLER.

M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND

CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.

S D

S D

S D

T

T

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED BED

WARD

BED

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

BE

D

WA

RD

BE

D

WA

RD

BE

D

BE

DR

OO

M

MECH

T V

CO

UC

H

CHAIR

CO

UC

H

C H A

IR

C O U C H

C O U C H

DE

SK

C O U C H

T V

CH

AIR

C O U C H

C O U C H

C O U C H

COUCH

C H A

IR

COUCH

DESK

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRY

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

NDR

Y STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

SNACK

AREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SNA

CK

ARE

A

BED

WARDWARD

WARD

BED

BED

BED

BED

WARD

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

M13

M13

ACCU-7E ACCU-7W

GF-7W

DXC-7W

GF-7E

DXC-7E

M1

M3

M5

M1

M3

M5

M2

M3

M4

M11

M2

M3

M4

M11

M26 M26

M9

M9

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL

DEMOLITION PLAN -

DORM 7

MD2.03

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN - LEVEL 1 - DORM 7

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED

ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT

EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.

M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO

EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR

PLENUM EXISTING TO REMAIN.

M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED

ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.

M4 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO DUAL GAS

FURNACE, HORIZONTAL COOLING COIL, AND RETURN AND SUPPLY TRANSITIONS. RETURN AIR

PLENUM BOX AND UNIT SUPPORT EXISTING TO REMAIN. INTAKE AND COMBUSTION DUCT

CONNECTIONS TO BE DISCONNECTED AND PENETRATIONS ARE TO REMAIN. DISPOSE OF DEMO

MATERIALS AS DIRECTED BY OWNER.

M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.

M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR

AIR HANDLER.

M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND

CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.

F

M F

D

M

F D

F D

S D

S D

FD

FD

FD FD

T

T T

SD

SD

SD

SD

F D

M F

D

M

F D

F D

S D

FD

FD

S D

SD

SD

SD

SD

T T

M3

M1

M3 M3

M3 M3

M5 M5

M5

M5 M5

M1

M1

M1

M1

(D)

ACCU-D5

(D)

ACCU-D1

(D)

ACCU-D2

(D)

ACCU-D3

(D)

ACCU-D4

MD2.04

MD2.04

AHU-D1

AHU-D2

(E)DF-D2

(D)

GF-D5

DXC-D5

M2

M2

M3

M3

M22

M3 M11

M11

M11

M5

M5

(E)DF-D1

M9

M13

M9

M13

M23

RS

(E)SSF-D2

(E)SSF-D1

M14

(E)4"ø EA

(E)4"ø OA

M14

AHU-D4

AHU-D3

M2

M2

M3

M3

M5

M5

M11

M11

(E)DF-D3

(E)DF-D4

M9

M13

(E)SF-D3

(E)SSF-D4

(E)SSF-D3

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL

DEMOLITION PLAN -

DORM 9/10

MD2.04

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED

ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT

EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.

M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO

EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR

PLENUM EXISTING TO REMAIN.

M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED

ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.

M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.

M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR

AIR HANDLER.

M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND

CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.

M13 VERIFY TEMPERATURE INPUT LOCATION AND CONFIRM WITH EOR.

M14 DEMOLISH FLUE EXHAUST AND OA INTAKE DUCTS AS SHOWN.

M22 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO GAS FURNACE,

CONDENSATE LINE, INTAKE AND COMBUSTION DUCTS AS SHOWN, AND RETURN AND SUPPLY

TRANSITIONS. RETURN AIR PLENUM BOX EXISTING TO REMAIN. DISPOSE OF DEMO MATERIALS

AS DIRECTED BY OWNER.

M23 DEMOLISH EXISTING COOLING COIL AND DISPOSE OF AS DIRECTED BY OWNER. DEMO EXISTING

SUPPLY AND RETURN AIR DUCT TRANSITIONS. DUCTWORK IS EXISTING TO REMAIN.

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN - LEVEL 1 - DORM 9/10

1/4" = 1'-0"2

MECHANICAL DEMOLITION PLAN - SOUTH ATTIC - DORM 9/10

1/4" = 1'-0"3

MECHANICAL DEMOLITION PLAN - NORTH ATTIC - DORM 9/10

STORAGE

STORAGE

STAGE

POOL EQUIPMENT

LOCKERS

SHOWERS

OFFICE

STORAGE

LOCKERS

SHOWERS

STORAGE

STORAGE

STOR

CORR

LOCKERS

OFFICE

SHOWER

TLT

VESTIBULE

VESTIBULE

T

STORAGE

M3

M1

ACCU-G2

MD2.05

M5

M2

M3

M5

AHU-G2

M11

M13

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL

DEMOLITION PLAN -

GYM

MD2.05

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN - GYM

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED

ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT

EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.

M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO

EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR

PLENUM EXISTING TO REMAIN.

M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED

ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.

M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.

M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND

CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.

M13 VERIFY TEMPERATURE INPUT LOCATION AND CONFIRM WITH EOR.

1/2" = 1'-0"2

ENLARGED MECHANICAL DEMOLITION PLAN - GYM

TT

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BE

DR

OO

M

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRYCORRIDOR

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

NDR

Y STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

CO

RRI

DO

R

SNACKAREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SNA

CK

ARE

A

T V

CO

UC

H

C H A

IR

C O U C H

C O U C H

C O U C H

DE

SKCHAIR

CO

UC

H

C O U C H

C O U C H

COUCH

C H A

IR

T V

CH

AIR COUCH

DESK

C O U C H

MECH

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

M

T

S D

S D

S D

S D

M

EXIT

STAIRS

MECH

M

M2.01

M20M20

ACCU-1EACCU-1W

M6 M6

M7

M7

M7 M7

M8

M8

GF-1W-A GF-1E-BGF-1E-A

DXC-1E

GF-1W-B

DXC-1W

M10

M10

M12

M12

M19

M19

1" D

1" D

3" O

A

3" OA 3" OA

3" O

A

3" CA

3" CA

3" CA

3" CA

L-1W L-1E

RL RS RL RS

M20

M20

M27

M27

M18

M28

/1

O

A M18

M28

/1

O

A

M21

M21

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL PLAN

- DORM 1

M2.01

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/16" = 1'-0"1

MECHANICAL PLAN - LEVEL 1 - DORM 1

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M6 INSTALL NEW UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD.

M7 PROVIDE NEW REFRIGERANT LINES BETWEEN THE NEW AHU AND THE CONDENSING UNIT. SIZE

NEW REFRIGERANT LINES PER MANUFACTURER'S RECOMMENDATIONS. ROUTE REFRIGERANT

LINES TO MATCH EXISTING. CONTRACTOR SHALL NOT REUSE ANY PORTION OF THE EXISTING

REFRIGERANT LINES.

M8 PROVIDE NEW AIR HANDLING UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD AND MODIFY

PAD AS REQUIRED. PROVIDE CLEARANCES AROUND UNIT AS REQUIRED BY MANUFACTURER.

RECONNECT RETURN AIR PLENUM BOX AND SMOKE DETECTOR AND PROVIDE NEW

TRANSITIONS TO EXISTING SUPPLY AIR, OUTSIDE AIR DUCT, AND RETURN PLENUM AS

REQUIRED. BALANCE NEW UNIT TO CFM SHOWN ON SCHEDULE.

M10 INSTALL NEW CONDENSATE DRAIN LINE TO THE EXISTING FLOOR DRAIN. ROUTE NEW

EQUIPMENT CONDENSATE DRAIN LINE TO THE SAME FLOOR DRAIN LOCATION USED BY THE

DEMOED EQUIPMENT.

M12 PROVIDE NEW INSULATION FOR ANY AREAS DAMAGED DURING DEMO AS WELL AS FOR ANY

NEW DUCTWORK.

M18 PROVIDE NEW LOUVER, SECURITY BARS AND MOTORIZED DAMPER. REFER TO INTAKE LOUVER

DETAIL (REFER TO DETAIL 08 ON M4.01) FOR MORE INFORMATION. INTERLOCK DAMPER

ACTUATOR WITH BLOWER FAN OPERATION PER THE SEQUENCE OF OPERATIONS. BALANCE

DAMPER TO 450 CFM.

M19 CONTRACTOR SHALL PROVIDE NEW COMBUSTION AIR PIPING FOR FURNACE AND TERMINATE

PIPING PRIOR TO EXISTING ROOF PENETRATION.

M20 PROVIDE TAMPER PROOF TEMPERATURE SENSOR IN SAME LOCATION AS EXISTING.

CONTRACTOR SHALL PROVIDE NEW CONTROLS WIRING TO NEW PROGRAMMABLE THERMOSTAT

IN MECHANICAL ROOM AS REQUIRED TO INTEGRATE NEW AIR HANDLING UNIT.

M21 PROVIDE NEUTRALIZATION KIT PRIOR TO CONDENSATE DRIP INTO FLOOR DRAIN. INSTALL

ACCORDING TO MANUFACTURER'S INSTRUCTIONS.

M27 PROVIDE NEW LOUVER IN EXISTING WALL OPENING. PATCH WALL AIR TIGHT.

M28 PROVIDE TRANSITION DOWN TO CONNECT INTO EXISTING RETURN AIR DUCT.

ENLARGED MECHANICAL PLAN - LEVEL 1 - DORM 1

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

WARD

BED

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

BE

D

WA

RD

BE

D

WA

RD

BE

D

BE

DR

OO

M

MECH

T V

CO

UC

H

CHAIR

CO

UC

H

C H A

IR

C O U C H

C O U C H

DE

SK

C O U C H

T V

CH

AIR

C O U C H

C O U C H

C O U C H

COUCH

C H A

IR

COUCH

DESK

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRY

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

ND

RY STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

SNACK

AREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SNA

CK

ARE

A

BED

WARDWARD

WARD

BED

BED

BED

BED

WARD

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

M M

S D

S D

S D

S D

MECH

EXIT

STAIRS

M

M

M2.02

M20 M20

M3.01

M3.01

ACCU-5EACCU-5W

M6 M6

M7M7

M7M7

M8 M8

GF-5W-A GF-5E-BGF-5E-A

DXC-5E

GF-5W-B

DXC-5W

M10 M10

RL RS RL RS

M12M12

L-5E L-5W

M19

M19

1" D

1" D

3" O

A

3" OA 3" OA

3" O

A

3" CA

3" CA

3" CA

3" CA

M20M20

M27

M27

/1

O

A M18

M28

/1

O

A M18

M28

M21 M21

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/1 /2

:5

:5

A

M

MECHANICAL PLAN

- DORM 5

M2.02

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/16" = 1'-0"2

MECHANICAL PLAN - DORM 5

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M6 INSTALL NEW UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD.

M7 PROVIDE NEW REFRIGERANT LINES BETWEEN THE NEW AHU AND THE CONDENSING UNIT. SIZE

NEW REFRIGERANT LINES PER MANUFACTURER'S RECOMMENDATIONS. ROUTE REFRIGERANT

LINES TO MATCH EXISTING. CONTRACTOR SHALL NOT REUSE ANY PORTION OF THE EXISTING

REFRIGERANT LINES.

M8 PROVIDE NEW AIR HANDLING UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD AND MODIFY

PAD AS REQUIRED. PROVIDE CLEARANCES AROUND UNIT AS REQUIRED BY MANUFACTURER.

RECONNECT RETURN AIR PLENUM BOX AND SMOKE DETECTOR AND PROVIDE NEW

TRANSITIONS TO EXISTING SUPPLY AIR, OUTSIDE AIR DUCT, AND RETURN PLENUM AS

REQUIRED. BALANCE NEW UNIT TO CFM SHOWN ON SCHEDULE.

M10 INSTALL NEW CONDENSATE DRAIN LINE TO THE EXISTING FLOOR DRAIN. ROUTE NEW

EQUIPMENT CONDENSATE DRAIN LINE TO THE SAME FLOOR DRAIN LOCATION USED BY THE

DEMOED EQUIPMENT.

M12 PROVIDE NEW INSULATION FOR ANY AREAS DAMAGED DURING DEMO AS WELL AS FOR ANY

NEW DUCTWORK.

M18 PROVIDE NEW LOUVER, SECURITY BARS AND MOTORIZED DAMPER. REFER TO INTAKE LOUVER

DETAIL (REFER TO DETAIL 08 ON M4.01) FOR MORE INFORMATION. INTERLOCK DAMPER

ACTUATOR WITH BLOWER FAN OPERATION PER THE SEQUENCE OF OPERATIONS. BALANCE

DAMPER TO 450 CFM.

M19 CONTRACTOR SHALL PROVIDE NEW COMBUSTION AIR PIPING FOR FURNACE AND TERMINATE

PIPING PRIOR TO EXISTING ROOF PENETRATION.

M20 PROVIDE TAMPER PROOF TEMPERATURE SENSOR IN SAME LOCATION AS EXISTING.

CONTRACTOR SHALL PROVIDE NEW CONTROLS WIRING TO NEW PROGRAMMABLE THERMOSTAT

IN MECHANICAL ROOM AS REQUIRED TO INTEGRATE NEW AIR HANDLING UNIT.

M21 PROVIDE NEUTRALIZATION KIT PRIOR TO CONDENSATE DRIP INTO FLOOR DRAIN. INSTALL

ACCORDING TO MANUFACTURER'S INSTRUCTIONS.

M27 PROVIDE NEW LOUVER IN EXISTING WALL OPENING. PATCH WALL AIR TIGHT.

M28 PROVIDE TRANSITION DOWN TO CONNECT INTO EXISTING RETURN AIR DUCT.

1/2" = 1'-0"1

ENLARGED MECHANICAL PLAN - DORM 5

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

BED

BED

WARD

WARD

BED

BED

BED

BED

WARD

WARD

BED

BED

WARD

BED

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

WA

RD

BE

D

BE

D

BE

D

WA

RD

BE

D

WA

RD

BE

D

BE

DR

OO

M

MECH

T V

CO

UC

H

CHAIR

CO

UC

H

C H A

IR

C O U C H

C O U C H

DE

SK

C O U C H

T V

CH

AIR

C O U C H

C O U C H

C O U C H

COUCH

C H A

IR

COUCH

DESK

OFFICE

RECREATION

STORAGE

TLT

STO

LAUNDRY

EXIT

EXIT

ENTRY

REC

REA

TIO

N

EXI

T

OFF

ICE

STO

RAG

E

TLT

LAU

ND

RY STO

EXI

T

EXI

T

LAV.

LAV.

SHOWERS SHOWERS

TOILETS TOILETS

ENTRY

EXIT

STAIRS

SNACK

AREA

OFFICE

OFFICE

OFF

ICE

OFF

ICE

SN

AC

K

AR

EA

BED

WARDWARD

WARD

BED

BED

BED

BED

WARD

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

TABLE

M M

S D

S D

S D

S D

MECH

EXIT

STAIRS

M

M

M2.03

M20

M20

ACCU-7W

ACCU-7E

M6 M6

M7

M7

M7 M7

M8

M8

GF-7E-A

GF-7W-BGF-7W-A

DXC-7W

GF-7E-B

DXC-7E

M10

M10

M12

M12 M19

M19

1" D

3" O A

3" OA 3" OA

3" O A

3" CA

3" CA

3" CA

3" CA

RL RS RL RS

1" D

L-7W L-7E

M20

M20

M27

M27

/1

O

A M18

M28

/1

O

A M18

M28

M21

M21

M161

REVISION/ISSUE NO. YYYY MM DD

PROJECT NO.

PROJECT TITLE:

PROJECT SUBMISSION:

PROFESSIONAL SEAL:

SHEET TITLE:

Original drawing is 42 x 30 Do not scale contents of this drawing

SHEET:

CONSULTANT

PLAN KEY:

DATE:

DRAWN BY

CLIENT

/9 /2

:1

:2

P

M

MECHANICAL PLAN

- DORM 7

M2.03

25-0040-00

TJJD Giddings

HVAC

Replacement

PERMIT AND PRICING

11/13/2025

JLLC

1/16" = 1'-0"1

MECHANICAL PLAN - LEVEL 1 - DORM 7

1 Revision 1 2025/12/09

(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)

MECHANICAL KEY NOTES

M6 INSTALL NEW UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD.

M7 PROVIDE NEW REFRIGERANT LINES BETWEEN THE NEW AHU AND THE CONDENSING UNIT. SIZE

NEW REFRIGERANT LINES PER MANUFACTURER'S RECOMMENDATIONS. ROUTE REFRIGERANT

LINES TO MATCH EXISTING. CONTRACTOR SHALL NOT REUSE ANY PORTION OF THE EXISTING

REFRIGERANT LINES.

M8 PROVIDE NEW AIR HANDLING UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .