ESBD_492722_1774032802373_Attachment D – Full-sized printable Architectural Plan .pdf
PDF 7 MB Posted
- Solicitation number
- 644-26-02012026
- Issued by
- Kleberg County, Texas
About this file
This is a full-sized architectural plan document for the TJJD Giddings HVAC Replacement project located at Giddings State School in Giddings, Texas (Project No. 25-0040-00). The scope of work includes replacing direct expansion (DX) split HVAC systems across five buildings: Dorm 1 (2 systems), Dorm 5 (2 systems), Dorm 7 (2 systems), Dorm 9/10 (5 systems), and the Gymnasium (1 system), totaling 12 DX split system replacements. The project is designed in accordance with applicable codes including the 2021 International Building Code, 2023 National Electrical Code with Texas amendments, NFPA Life Safety Code 101-2021, and other relevant standards. The architectural plans were issued for permit and pricing on November 13, 2025, with a revision dated December 9, 2025. The engineering consultant is Johnston LLC, located in Houston, Texas.
The project documents include comprehensive mechanical and electrical plans with detailed specifications for equipment installation, ductwork modifications, condensate drainage systems, and control integration. New equipment specified includes Carrier air-cooled condensing units, Carrier air handling units with cooling coils, Allstyle Coil Company DX coils, Carrier natural gas furnaces, and Greenheck intake louvers. The mechanical systems include vibration isolation provisions, condensate overflow protection with shut-off switches, smoke detectors in ductwork for units exceeding 2000 CFM, and motorized outside air dampers with interlock controls. Electrical work encompasses new branch circuits, disconnect switches, and reconnection of existing electrical infrastructure to accommodate the new HVAC equipment. The project specifies that all existing refrigerant lines shall be removed and new lines installed per manufacturer specifications, with all system components balanced to specified airflow rates and subjected to testing, adjusting, and balancing per AABC or NEBB standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT & CODE SUMMARY
1. OWNER:
GIDDINGS STATE SCHOOL
2261 JAMES TURMAN RD
GIDDINGS, TX 78942
2. PROJECT SUMMARY
DORM 1: DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 2 DX SPLIT SYSTEMS.
DORM 5: DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 2 DX SPLIT SYSTEMS.
DORM 7: DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 2 DX SPLIT SYSTEMS.
DORM 9 / 10:DORMITORY BUILDING. SCOPE OF WORK INCLUDES REPLACING 5 DX SPLIT
SYSTEMS.
GYMNASIUM: INDOOR EXERCISE AND GYMNASIUM BUILDING. SCOPE OF WORK INCLUDES
REPLACING 1 DX SPLIT SYSTEM.
3. APPLICABLE CODES & ORDINANCES
NFPA LIFE SAFETY CODE 101-2021 (TAC 28.1.34.C.1-34.303)
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL FIRE CODE WITH STATE OF TEXAS AMENDMENTS
2018 INTERNATIONAL MECHANICAL CODE OR UNIFORM MECHANICAL CODE WITH STATE OF
TEXAS AMENDMENTS
2023 NATIONAL ELECTRICAL CODE WITH STATE OF TEXAS AMENDMENTS
2018 INTERNATIONAL PLUMBING CODE AND 2018 UNIFORM PLUMBING CODE WITH STATE OF
TEXAS AMENDMENTS
2018 INTERNATIONAL FUEL GAS CODE WITH STATE OF TEXAS AMENDMENTS
2018 ENERGY CONSERVATION CODE OR ANSI/ASHRAE/IED STANDARD 90.1-2016, WITH STATE OF
TEXAS AMENDMENTS
PROJECT NO. :
DATE ISSUED:
CONSULTANTS:
MEP:
Johnston, LLC 2603 Augusta Dr., Suite 1500 Houston, TX 77057
PERMIT AND
PRICING
11/13/2025
TJJD Giddings HVAC Replacement
TJJD Giddings HVAC Replacement
25-0040-00
GIDDINGS STATE SCHOOL
2261 JAMES TURMAN RD
GIDDINGS, TX 78942
SHEET INDEX1
DISCIPLINE Sheet Name 2
I S
S U
E F
O R
P E
R M
IT
A
N D
P R
IC
IN
G
R
E V
IS
IO
N
Designer
G0.00 COVER SHEET
A1.01 ARCHITECTURAL PLAN - DORM 7
M0.00 MECHANICAL LEGEND INDEX AND NOTES
M0.01 MECHANICAL SCHEDULES
M1.00 MECHANICAL SITE PLAN
MD2.01 MECHANICAL DEMOLITION PLAN - DORM 1
MD2.02 MECHANICAL DEMOLITION PLAN - DORM 5
MD2.03 MECHANICAL DEMOLITION PLAN - DORM 7
MD2.04 MECHANICAL DEMOLITION PLAN - DORM 9/10
MD2.05 MECHANICAL DEMOLITION PLAN - GYM
M2.01 MECHANICAL PLAN - DORM 1
M2.02 MECHANICAL PLAN - DORM 5
M2.03 MECHANICAL PLAN - DORM 7
M2.04 MECHANICAL PLAN - DORM 9/10
M2.05 MECHANICAL PLAN - GYM
M3.01 MECHANICAL SECTIONS
M4.01 MECHANICAL DETAILS
M5.01 MECHANICAL CONTROLS
E0.00 ELECTRICAL LEGEND INDEX AND NOTES
E0.01 ELECTRICAL SPECIFICATIONS
ED1.01 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1 -
TYPICAL DORM 1, 5 & 7
ED1.02 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1 -
DORM 9 / 10
ED1.03 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1 - GYM
E3.01 ELECTRICAL POWER PLAN - LEVEL 1 - TYPICAL DORM 1,
5 & 7
E3.02 ELECTRICAL POWER PLAN - LEVEL 1 - DORM 9 / 10
E3.03 ELECTRICAL POWER PLAN - LEVEL 1 - GYM
Attachment D – Full-sized printable Architectural Plan
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
WARD
BED
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
BE
D
WA
RD
BE
D
WA
RD
BE
D
BE
DR
OO
M
MECH
T V
CO
UC
H
CHAIR
CO
UC
H
C H A
IR
C O U C H
C O U C H
DE
SK
C O U C H
T V
CH
AIR
C O U C H
C O U C H
C O U C H
COUCH
C H A
IR
COUCH
DESK
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRY
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
ND
RY STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
SNACK
AREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SN
AC
K
AR
EA
BED
WARDWARD
WARD
BED
BED
BED
BED
WARD
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
MECH
EXIT
STAIRS
40' - 0"
A1
A2
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/9 /2
:2
:3
A
M
ARCHITECTURAL
PLAN - DORM 7
A1.01
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1 Revision 1 2025/12/09
NTS3
FENCE DETAIL
1/16" = 1'-0"1
ARCHITECTURAL PLAN - LEVEL 1 - DORM 7
1/2" = 1'-0"2
ENLARGED ARCHITECTURAL PLAN - LEVEL 1 - DORM 7
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
ARCHITECTURAL KEY NOTES
A1 PROVIDE NEW FENCE AND GATE AROUND ALL EQUIPMENT OUTSIDE DORM 7. FENCE TO BE 8
FEET TALL WITH 3 WIRES OF BARBWIRE ON ANGLED TOP. GATE TO BE MINIMUM 54 INCH WIDTH.
REFER TO 3/A1.01 FOR FENCE DETAIL.
A2 REFER TO MD2.03 AND M2.03 FOR MECHANICAL INFORMATION.
INTERIM REVIEW
Architect:
License No.:
Date:
JOHNSTON LLC,
TBPE FIRM REGISTRATION NO. F-421
Not for regulatory approval, permitting or construction
State of Texas
David Austin Butler
25257
11/13/2025
DN
UP
SYMBOL DESCRIPTION
MECHANICAL SYMBOL LEGEND
18/14 SA
18∅ SA
18x14 RA
24/18
SUPPLY CEILING DIFFUSER
RETURN CEILING GRILLE / REGISTER
FLEXIBLE DUCT
EXHAUST CEILING GRILLE / REGISTER
90° ELBOW W/ TURNING VANES
45° MITERED ELBOW W/ TURNING
90° LONG RADIUS ELBOW
45° LONG RADIUS ELBOW
CONCENTRIC TRANSITION
ECCENTRIC TRANSITION
RECTANGULAR BRANCH TAP
CONICAL BRANCH TAP
DUCT CAP
DUCT PENETRATION THROUGH WALL
SUPPLY / MAKEUP DUCT (UP / DOWN)
RETURN DUCT (UP / DOWN)
ROUND DUCT SIZE (DIAMETER) AND
SYSTEM
RECTANGULAR DUCT SIZE
SLOT OR LINEAR DIFFUSER
DIFFUSER FLOW ARROWS
(IF NO ARROWS ARE SHOWN,
DIFFUSER IS 4-WAY THROW)
SIDEWALL REGISTER TAP
DUCT MOUNTED HUMIDIFIER
RETURN AIR SLOT DEVICE
DUCT WITH INTERNAL LINER
FLEXIBLE DUCT CONNECTION
INCLINED DROP IN DUCT
INCLINED RISE IN DUCT
IN-LINE 90 DEGREE DROP (RISE)
FLAT OVAL DUCT SIZE
LOUVER W/ SCREEN (IN WALL)
SIDEWALL RETURN GRILLE / REGISTER
SIDEWALL SUPPLY GRILLE / REGISTER
TRANSFER BOOT (WIDTH x HEIGHT)
RECTANGULAR TO ROUND TRANSITION
SUPPLY / MAKEUP ROUND DUCT
(UP / DOWN)
EXHAUST DUCT (UP / DOWN)
IN DUCT (HIDDEN LINE INDICATES
(TYP. FOR ALL UNLESS OTHERWISE
VANES (TYP. FOR ALL UNLESS
HIDDEN ELBOW)
(SMACNA 45)
(W/ VOLUME DAMPER)
(WIDTH x HEIGHT) AND SYSTEM
(WIDTH x HEIGHT) AND SYSTEM
OTHERWISE NOTED)
NOTED)
SYMBOLSYMBOL
VFD
CP
NEW EQUIPMENT
(SIZE, SHAPE WILL VARY)
(SIZE, SHAPE WILL VARY)
EQUIPMENT TO REMAIN
EXISTING DUCT TO BE REMOVED
EXISTING DUCT TO REMAIN
VARIABLE FREQUENCY DRIVE
CONTROLLER OR CONTROL PANEL
NEW DUCT
MECHANICAL EQUIPMENTDUCTWORK PIPING
NOTE: NOT ALL SYMBOLS TABULATED ABOVE ARE NECESSARILY USED ON THE DRAWINGS.
TEMPERATURE SENSOR/THERMOSTAT
HUMIDITY SENSOR/HUMIDISTAT
SMOKE DETECTOR
AIR FLOW MONITORING STATION
CONTROL INSTRUMENTS
KEYED NOTE
REVISION
EQUIPMENT TAGAHU-1
AIR DEVICE TAG - DEVICE TYPE /
AIRFLOW (CFM)
POINT OF CONNECTION
AIR FLOW INDICATOR
(NEW TO EXISTING)
POINT OF DISCONNECTION
TYPICAL LEADERS
MISCELLANEOUS
SHEET SYMBOLS
RETURN ROUND DUCT (UP / DOWN)
EXHAUST ROUND DUCT (UP / DOWN)
MANUAL DAMPER
MOTORIZED DAMPER
M
FIRE DAMPER
FD
SMOKE DAMPER
SD
COMBINATION FIRE/SMOKE DAMPER
FSD
(SIZE, SHAPE WILL VARY)
EQUIPMENT TO BE REMOVED
VIEW NUMBER
SHEET NUMBER
M1.01
VIEW NUMBER
SHEET NUMBER
M1.01
A
1/8" = 1'-0"
TITLE
VIEW TITLE
VIEW SCALE
VIEW TITLE
VIEW NUMBER
SECTION REFERENCE
SHEET REFERENCE
H
SD
A
DP
SD
CO2
DIFFERENTIAL PRESSURE SENSOR
STATIC PRESSURE SENSOR
CO2 SENSOR
SINGLE LINE PIPE REDUCER
PIPING SERVICE HIDDEN OR
UNDERGROUND
SINGLE LINE TEE OUTLET UP OR COMING
TOWARD YOU IN SECTION
SINGLE LINE TEE OUTLET DOWN OR
TURNING AWAY FROM YOU IN SECTION
SINGLE LINE PIPE UP OR COMING
TOWARD YOU IN SECTION
SINGLE LINE PIPE DOWN OR TURNING
AWAY FROM YOU IN SECTION
PIPING PITCH (IN/FT)
1/8" / 1'-0"
PIPING FLOW DIRECTION)
SINGLE LINE PIPE CAP
DOUBLE LINE BLIND FLANGE
SINGLE LINE FLEXIBLE CONNECTION
DOUBLE LINE FLEXIBLE CONNECTION
DESCRIPTION DESCRIPTION
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
6" NAME
NEW SINGLE LINE PIPING WITH SIZE
AND SERVICE INDICATED (SEE PIPING
SYSTEM ABBREVIATIONS)
6" NAME NEW DOUBLE LINE PIPING WITH SIZE
AND SERVICE INDICATED (SEE PIPING
SYSTEM ABBREVIATIONS)
6" NAME
6" NAME
6" NAME
6" NAME
SINGLE LINE BLIND FLANGE
DOUBLE LINE PIPE CAP
PIPE PENETRATION THROUGH WALL
CEILING ACCESS DOOR/PANEL
M6.01
1 VIEW NUMBER
SHEET NUMBER
ELEVATION REFERENCE
T
H
DUCT TEE
SINGLE LINE PIPE TEE
SINGLE LINE PIPE ELBOW
SINGLE LINE PIPE CROSS
DOUBLE LINE PIPE ELBOW
FLANGED AND THREADED/WELDED
DOUBLE LINE PIPE TEE
FLANGED AND THREADED/WELDED
DOUBLE LINE PIPE CROSS
FLANGED AND THREADED/WELDED
DOUBLE LINE CONCENTRIC REDUCER
FLANGED AND THREADED/WELDED
DOUBLE LINE ECCENTRIC REDUCER
FLANGED AND THREADED/WELDED
DOUBLE LINE PIPE UP OR COMING
TOWARD YOU IN SECTION
DOUBLE LINE PIPE DOWN OR TURNING
AWAY FROM YOU IN SECTION
DOUBLE LINE TEE OUTLET UP OR
COMING TOWARD YOU IN SECTION
DOUBLE LINE TEE OUTLET DOWN OR
TURNING AWAY FROM YOU IN SECTION
SINGLE LINE SHUT-OFF VALVE
DOUBLE LINE SHUT-OFF VALVE
FLANGED AND THREADED/WELDED
M10
M
SINGLE LINE CHECK VALVE
DOUBLE LINE CHECK VALVE
FLANGED AND THREADED/WELDED
SINGLE LINE STRAINER
DOUBLE LINE STRAINER
FLANGED AND THREADED/WELDED
SINGLE LINE CONTROL VALVE
DOUBLE LINE CONTROL VALVE
FLANGED AND THREADED/WELDED
SINGLE LINE FLOWMETER
DOUBLE LINE FLOWMETER
FLANGED AND THREADED/WELDED
MECHANICAL GENERAL NOTES
1. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND EQUIPMENT AS WELL AS PERFORM ALL THE
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS
INDICATED ON THE DRAWINGS, AND AS SPECIFIED AND REQUIRED BY CODE.
2. THE DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY
SCOPE AND GENERAL AGREEMENT ONLY.
3. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS'
CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS
REQUIRED FOR FINAL EQUIPMENT CONNECTIONS. FIELD VERIFY AND COORDINATE ALL DUCT
AND PIPING DIMENSIONS BEFORE FABRICATION.
4. WHEN ALL TRADE WORK (HVAC, PLUMBING, AND FIRE PROTECTION) IS SUBCONTRACTED, IT
SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE HIS
SUBCONTRACTORS AND THEIR ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE
PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE WORK OR WHICH
CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THE CONTRACT, IT
SHALL BE BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR, WHOSE DECISION
SHALL BE FINAL.
5. SIZE AND LOCATION OF EQUIPMENT SHOWN ON PLANS ARE APPROXIMATE. REFER TO
MANUFACTURER'S LITERATURE FOR EXACT DIMENSIONS AND FIELD COORDINATE EXACT
LOCATION.
6. ALL EQUIPMENT AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURERS' RECOMMENDATIONS, CONTRACT DOCUMENTS AND APPLICABLE
CODES/REGULATIONS.
7. VIBRATION ISOLATION FOR ALL EQUIPMENT SHALL BE PROVIDED TO PREVENT TRANSMISSION
OF VIBRATION TO BUILDING STRUCTURE AS SPECIFIED.
8. PROVIDE VIBRATION ISOLATION FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50'-0"
OF ISOLATED EQUIPMENT (EXCEPT AT BASE BELOW SUPPORTS AND ANCHOR POINTS)
THROUGHOUT THE EQUIPMENT ROOMS.
9. CONTRACTORS SHALL MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS, CONDUITS AND SUSPENDED EQUIPMENT IN MECHANICAL ROOMS.
10. ALL TESTS SHALL BE COMPLETED BEFORE ANY EQUIPMENT, DUCT OR PIPING INSULATION IS
APPLIED.
11. CONTRACTOR SHALL LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES
IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM OR
DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER.
12. ANY TESTING, ADJUSTING AND BALANCING AGENCY CONSIDERED FOR THE PROJECT SHALL BE
A MEMBER OF THE ASSOCIATED BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN
ACCORDANCE WITH THEIR STANDARDS AND THE PROJECT SPECIFICATIONS.
13. WHERE TWO OR MORE ITEMS OF THE SAME TYPE ARE REQUIRED, THE PRODUCTS OF ONE
MANUFACTURER SHALL BE USED.
14. ALL CONTROL WIRING AND CONDUITS SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE
AND THE DIVISION 26 SERIES OF THE CONTRACT SPECIFICATIONS.
15. CONTRACTOR SHALL COORDINATE OPENINGS THROUGH STRUCTURAL ELEMENTS WITH
STRUCTURAL ENGINEER PRIOR TO EXECUTION. MODIFY LOCATION OF DUCTWORK AND PIPING
AS REQUIRED TO ACCOMMODATE LOCATION OF OPENINGS.
16. UNLESS OTHERWISE INDICATED ON ARCHITECTURAL OR MECHANICAL DRAWINGS,
CONTRACTOR SHALL PROVIDE A MINIMUM 12X12 INCHES ACCESS PANEL OR DOOR THROUGH
WALLS AND CEILINGS FOR ANY EQUIPMENT, WHICH REQUIRES ACCESS SUCH AS DAMPERS,
VALVES, SMOKE DETECTORS, ETC. SEE SPECIFICATINS FOR ADDITIONAL REQUIREMENTS.
17. ALL DUCTWORK, PIPING AND EQUIPMENT SHALL BE SUPPORTED FROM THE SURROUNDING
STRUCTURAL ELEMENTS AND COORDINATED THROUGH THE GENERAL CONTRACTOR. ANY
ATTACHMENT TO STEEL BAR JOISTS, TRUSSES OR JOIST GIRDERS SHALL BE AT PANEL POINTS.
CONTRACTOR SHALL PROVIDE BEAM CLAMPS MEETING MSS STANDARDS. ANY WELDING TO
STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE
PERMITTED.
18. ALL LOCATIONS AND SIZES OF ALL FLOOR, WALL AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES.
19. COOLING COIL CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET WITH A "P" TRAP AND PIPED TO THE NEAREST DRAIN.
COORDINATE WITH PLUMBING.
20. CONTRACTOR SHALL ERECT AND MAINTAIN THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD
A SECURE BARRIER TO ENSURE THE SEPARATION OF THE CONSTRUCTION AREA AND
CONSTRUCTION WORKERS FROM STUDENTS ENSURING STUDENTS WILL NOT BE ABLE TO
ENTER THE CONSTRUCTION AREA. THE CONSTRUCTION BARRIER SHALL CONSIST OF A 6’-0”
TALL (MIN.) CHAIN-LINK (9 GA. X 2” MESH) METAL FENCE PANELS CLAMPED TOGETHER AND
MOUNTED TO METAL BASE PLATES AT EACH PANEL CONNECTION. CONTRACTOR SHALL
PROVIDE ACCESS SWING GATES FOR EQUIPMENT AND PERSONNEL EQUIPPED WITH PADLOCK
HASPS. SIZE AND LOCATION OF GATES TO BE DETERMINED AT THE PRE-CONSTRUCTION
MEETING. PADLOCKS TO BE SUPPLIED BY TJJD. THE FENCE IS TO BE RELOCATED AS WORK
ACTIVITIES MOVE FROM ONE BUILDING TO THE OTHER.
MECHANICAL PIPING NOTES
1. ALL OVERHEAD PIPING INSTALLATIONS SHALL BE HELD TIGHT TO STRUCTURE OR SLAB WITH
THE REQUIRED SPACE PROVIDED FOR INSULATION INSTALLATION.
2. CONTRACTOR SHALL INSTALL ALL PIPING SYSTEMS SO THAT ANY VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER APPURTENANCES ARE ACCESSIBLE.
3. CONTRACTOR SHALL INSTALL ALL VALVES SO THAT SAID VALVE OR VALVES CAN REMAIN IN
SERVICE WHEN ITS ASSOCIATED EQUIPMENT OR PIPING IS REMOVED. ALL VALVES SHALL BE
ADJUSTED FOR EASY AND SMOOTH OPERATION.
4. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE SUPPLIED AND INSTALLED
FULL SIZE OF PIPE BEFORE ANY REDUCTION IN SIZE TO MAKE CONNECTIONS TO EQUIPMENT
AND CONTROLS.
5. FLANGED CONNECTIONS OR UNIONS SHALL BE SUPPLIED AND INSTALLED AT THE CONNECTION TO EACH PIECE OF EQUIPMENT, IN ANY BYPASS LINE, AND IN LONG PIPING RUNS 75 FEET OR
MORE, TO ALLOW SYSTEM DISASSEMBLY FOR ANY FUTURE ALTERATIONS AND/OR REPAIRS.
6. ALL PIPING SHALL BE COORDINATED WITH ALL TRADES. ANY OFFSET REQUIRED AROUND
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
CONTRACT.
HVAC / SHEET METAL NOTES
1. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL
ARRANGEMENT ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING THEIR
WORKING KNOWLEDGE OF THEIR SPECIFIC DISCIPLINES TO AUGMENT THE SCOPE DOCUMENT.
2. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED
AND AS REQUIRED BY CODE.
3. CERTAIN ITEMS SUCH AS RISERS AND DROPS IN DUCTWORK, ACCESS DOORS AND VOLUME
DAMPERS ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A
SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE
REQUIREMENTS FOR THESE ITEMS.
4. ALL DUCTWORK DIMENSIONS AS SHOWN ON THE DRAWINGS ARE INTERNAL. CLEAR
DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING
THICKNESS.
5. PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH TURNING
VANES.
6. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH EXISTING CONDITIONS AND
MAKE MINOR DUCT MODIFICATIONS TO SUIT.
7. UNLESS OTHERWISE SHOWN, LOCATE ALL NEW ROOM THERMOSTATS 4'-0" (CENTERLINE)
ABOVE FINISHED FLOOR. NOTIFY THE ARCHITECT OF ANY ROOMS WHERE THE ABOVE
LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.
8. LOCATE ALL MECHANICAL EQUIPMENT (VARIABLE VOLUME, CONSTANT VOLUME AND FAN
POWERED BOXES, FAN COIL UNITS, UNIT VENTILATORS AND COILS) FOR UNOBSTRUCTED
ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
9. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, RELIEF, AND
EXHAUST) CONNECTED TO AIR HANDLING UNITS, FAN AND OTHER EQUIPMENT WHICH REQUIRE
VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF
CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
10. RUNS OF LOW PRESSURE FLEXIBLE DUCT SHALL NOT EXCEED 6'-0" IN LENGTH. RUNS OF
MEDIUM PRESSURE FLEXIBLE DUCT SHALL NOT EXCEED 3'-0" IN LENGTH.
11. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED
AT NO ADDITIONAL COST TO THE OWNER.
12. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS,
FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, COILS, AND OTHER ITEMS LOCATED IN
THE DUCTWORK, WHICH REQUIRE SERVICE AND/ OR INSPECTION.
13. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND MAINTENANCE
OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.
14. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER
GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO BOTH THE
EQUIPMENT AND THE DUCT.
15. SMOKE DETECTORS SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND WIRED BY
THE ELECTRICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOUNTING THE SMOKE DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN
ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS.
MECHANICAL ABBREVIATIONS
DEFINITIONABBR. DEFINITIONABBR.
AC AIR CURTAIN
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
ADS AIR DIRT SEPARATOR
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR HANDLING UNIT
AP ACCESS PANEL
AS AIR SEPARATOR
B BOILER
BAS BUILDING AUTOMATION SYSTEM
BCU BLOWER COIL UNIT
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BIW BACKWARD INCLINED WHEEL (FAN)
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STEEL
BSC BIOLOGICAL SAFETY CABINET
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CA COMBUSTION AIR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CF COOLER FILTER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CM CARBON MONOXIDE
CO2 CARBON DIOXIDE
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CV CONTROL VALVE
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
(TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
(D) DEMO
DB DRY-BULB TEMPERATURE
DB DECIBELS
DEF DRYER EXHAUST FAN
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DIA DIAMETER
DP DEW POINT TEMPERATURE
DV DRYER VENT
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
(E) EXISTING
EA EXHAUST AIR
EAH EXHAUST AIR HOOD
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FCU FAN COIL UNIT
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN-POWERED TERMINAL UNIT
FS FLOW SWITCH
FSD COMBINATION FIRE-SMOKE DAMPER
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FV FACE VELOCITY
G GAS
GAL GALLONS
GH GRAVITY HOOD
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
H HUMIDIFIER
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVLS HIGH-VOLUME LOW-SPEED FAN
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
PIPING SYSTEM ABBREVIATIONS
BBD BOILER BLOW DOWN
BFW BOILER FEED WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CLPS CLEAN LOW PRESSURE STEAM
CMPS CLEAN MEDIUM PRESSURE STEAM
CTWR COOLING TOWER WATER RETURN
CTWS COOLING TOWER WATER SUPPLY
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DRAIN LINE
GR GLYCOL RETURN
GS GLYCOL SUPPLY
H/C R DUAL TEMPERATURE RETURN
H/C S DUAL TEMPERATURE SUPPLY
HPC HIGH PRESSURE STEAM CONDENSATE
HPS HIGH PRESSURE STEAM
HPWR HEAT PUMP WATER RETURN
HPWS HEAT PUMP WATER SUPPLY
HWR HOT WATER RETURN (HEATING)
HWS HOT WATER SUPPLY (HEATING)
LPC LOW PRESSURE STEAM CONDENSATE
LPS LOW PRESSURE STEAM
MPC MEDIUM PRESSURE STEAM
CONDENSATE
MPS MEDIUM PRESSURE STEAM
NPW NON-POTABLE WATER
PC PUMPED CONDENSATE
RD REFRIGERANT DISCHARGE (HOT GAS)
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RLR REFRIGERANT LIQUID OVERFEED
RETURN
RS REFRIGERANT SUCTION
S(PSI) STEAM WITH PRESSURE INDICATED
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IEER INTEGRATED ENERGY EFFICIENCY RATIO
IN INCHES
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LPR LOW PRESSURE RETURN
(STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M FLOW METER
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH 1,000 BTUH (BRITISH THERMAL UNITS
PER HOUR)
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MZ MULTI-ZONE
N.C. NORMALLY OPEN
N.O. NORMALLY CLOSED
N/A NOT APPLICABLE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH-ABSOLUTE
PSIG POUNDS PER SQUARE INCH- GAGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
RA RETURN AIR
RAF RELIEF AIR FAN
REA RELIEF AIR
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SMOKE DAMPER
SEER SEASONAL ENERGY EFFICIENCY RATIO
SEN SENSIBLE HEAT
SF SUPPLY FAN
SHC STEAM HEATING COIL
SP STATIC PRESSURE
SPRV STEAM PRESSURE REDUCING VALVE
SQ FT SQUARE FOOT (FEET)
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TOD TOP OF DUCT
TOS TOP OF STEEL
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UC UNDERCUT
UN UNIT HEATER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
W WATTS
WB WET-BULB (TEMPERATURE)
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WG WATER GAGE
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:4
A
M
MECHANICAL
LEGEND INDEX AND
NOTES
M0.00
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
SHEET NUMBER SHEET NAME
MECHANICAL SHEET INDEX
M0.00 MECHANICAL LEGEND INDEX AND NOTES
M0.01 MECHANICAL SCHEDULES
M1.00 MECHANICAL SITE PLAN
MD2.01 MECHANICAL DEMOLITION PLAN - DORM 1
MD2.02 MECHANICAL DEMOLITION PLAN - DORM 5
MD2.03 MECHANICAL DEMOLITION PLAN - DORM 7
MD2.04 MECHANICAL DEMOLITION PLAN - DORM 9/10
MD2.05 MECHANICAL DEMOLITION PLAN - GYM
M2.01 MECHANICAL PLAN - DORM 1
M2.02 MECHANICAL PLAN - DORM 5
M2.03 MECHANICAL PLAN - DORM 7
M2.04 MECHANICAL PLAN - DORM 9/10
M2.05 MECHANICAL PLAN - GYM
M3.01 MECHANICAL SECTIONS
M4.01 MECHANICAL DETAILS
M5.01 MECHANICAL CONTROLS
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL
SCHEDULES
M0.01
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
DX SPLIT OUTDOOR UNIT SCHEDULE
MARK SERVICE MBH
AMBIENT
TEMPERATURE (°F)
# OF
COMPRESSORS
KW PER
COMPRESSOR # OF FANS HP PER FAN VOLTS/PHASE/HZ MCA
MOP
(AMPS) EER / IEER
BASIS OF DESIGN
NOTESMANUFACTURER MODEL
ACCU-1E DXC-1E 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-1W DXC-1W 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-5E DXC-5E 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-5W DXC-5W 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-7E DXC-7E 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-7W DXC-7W 134 115 2 5.25 2 1/4 240/3/60 44 60 11/15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-D1 AHU-D1 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-D2 AHU-D2 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-D3 AHU-D3 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-D4 AHU-D4 134 115 2 5.25 2 1/4 240/3/60 44 60 11 / 15.5 CARRIER 38AXZ014A0M5-0A2C0 1,2,3,4,5
ACCU-D5 DXC-D5 36 115 1 2.96 1 1/3 240/1/60 20.9 35 12.5 / 16.3 CARRIER 26TPA836W003 1,2,3,4,5
ACCU-G2 AHU-G2 240 115 2 21.4 4 1/4 240/3/60 79 100 10.6/13.6 CARRIER 38AXZN25A0M5-0A2A0 1,2,3,4,5
DX SPLIT INDOOR UNIT SCHEDULE
MARK SERVICE
FAN DATA COOLING COIL
MCA MOP
BASIS OF DESIGN
NOTESTOTAL CFM
OUTSIDE
AIR CFM
MOTOR
(HP)
EXT. SP
(in. WG)
TOTAL SP (IN.
W.G.)
MIN. FAN
EFFICIENCY (%) VOLTS/PHASE/HZ
TOTAL COOLING
CAPACITY (MBH)
SENSIBLE COOLING
CAPACITY (MBH) # OF ROWS
EAT (°F DB/ °F
WB)
LAT (°F DB/
°F WB) MANUFACATURER MODEL
AHU-D1 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6
AHU-D2 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6
AHU-D3 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6
AHU-D4 DORM 9/10 4,310 435 5 1.5 3.1 89.5 240/3/60 127 104 6 74/65 55/54 17.9 30 CARRIER 39LA08AA-KX-AGM2A9 1,2,3,4,5,6
AHU-G2 GYMNASIUM 8,000 1,660 7.5 1.67 2.5 89.5 240/3/60 252 195 4 77/66 55/54 31 50 CARRIER 40RLAA25T3A5-UA0A0 1,2,3,4,5,6
NOTES:
1. PROVIDE UNIT WIT CRANK CASE HEATER, SITE GLASS, HIGH & LOW LIMIT SWITCHES, TIME GUARD RELAY, LIQUID LINE FILTER DRYER AND CONVENIENT OUTLET.
2. PROVIDE UNIT WITH SINGLE POINT ELECTRICAL CONNECTION WITH DISCONNECT SWITCH.
3. INSTALL UNITS ON CONCRETE PAD. CONCRETE PADS ARE EXISTING.
4. PROVIDE FACTORY APPLIED EPOXY COATING (OR ANTI-CORROSION COATING) TO CODENSER COIL.
5. PROVIDE WITH HAIL GUARD.
NOTES:
1. PROVIDE UNIT WITH FLOOR MOUNTED STEEL PLATFORM.
2. PROVIDE UNIT WITH SINGLE POINT ELECTRICAL CONNECTION WITH DISCONNECT SWITCH.
3. PROVIDE FLOAT SWITCH AT THE PRIMARY DRAIN PAN. FLOAT SWITCH SHALL TURN OFF UNIT WHEN PRIMARY DRAIN IS BLOCKED.
4. PROVIDE UNIT WITH ECM MOTOR.
5. PROVIDE WITH 2" THICK MERV 8 FILTERS. FILTERS SHALL HAVE MERV STAMP RATING.
6. EXTERNAL STATIC PRESSURE INCLUDE DUCTWORK, AIR DEVICES AND DIRTY FILTERS ONLY AND DOES NOT INCLUDE COIL AND CASING LOSES.
DX COIL SCHEDULE
MARK TOTAL CFM
OUTSIDE AIR
CFM
COOLING COIL
REFRIGERANT FURNACE Manufacturer Model NOTES
TOTAL COOLING
CAPACITY (MBH)
SENSIBLE COOLING
CAPACITY (MBH)
EAT (°F DB/ °F
WB)
LAT (°F DB/
°F WB)
DXC-1E 4,490 450 134 122 76/65 55/54 R-454B GF-1E-A & GF-1E-B ALLSTYLE COIL COMPANY ABM 120 1
DXC-1W 4,490 450 134 122 76/65 55/54 R-454B GF-1W-A & GF-1W-B ALLSTYLE COIL COMPANY ABM 120 1
DXC-5E 4,490 450 134 122 76/65 55/54 R-454B GF-5E-A & GF-5E-B ALLSTYLE COIL COMPANY ABM 120 1
DXC-5W 4,490 450 134 122 76/65 55/54 R-454B GF-5W-A & GF-5W-B ALLSTYLE COIL COMPANY ABM 120 1
DXC-7E 4,490 450 134 122 76/65 55/54 R-454B GF-7E-A & GF-7E-B ALLSTYLE COIL COMPANY ABM 120 1
DXC-7W 4,490 450 134 122 76/65 55/54 R-454B GF-7W-A & GF-7W-B ALLSTYLE COIL COMPANY ABM 120 1
DXC-D5 1,200 140 34.6 26.6 75/65 55/54 R-454B GF-D5 CARRIER CAAMP3617AMA 1,2
NOTES:
1. PROVIDE WITH CONDENSATE OVERFLOW SHUT-OFF SWITCH (ALL-ACCESS AA2-FS OR EQUIVALENT) AT SECONDARY DRAIN CONNECTION. SWITCH SHALL SHUT OFF ASSOCIATED CONDENSING UNIT, FURNACE AND
BLOWER WHEN CONDENSATE IS DETECTED IN SECONDARY DRAIN.
2. DX COIL SHALL HAVE CONDENSATE DRAIN CONNECTIONS FOR HORIZONTAL COIL CONFIGURATION.
NOTES:
1. PROVIDE CONSENSATE NEUTRALIZER KIT: CARRIER P908-0001 OR EQUAL.
2. INSTALL UNIT, FLUE VENT AND COMBUSTION AIR PIPING PER MANUFACTURER INSTRUCTIONS.
3. PROVIDE CONTROL RELAYS.
4. PROVIDE TRANSFORMER IF NEEDED.
5. PROVIDE UNIT WITH EXTERNAL FILTER RACK AND MERV 8 FILTERS.
6. PROVIDE TWINNING KIT PER MANUFACTURER'S INSTRUCTIONS.
NATURAL GAS FURNACE SCHEDULE
MARK SERVICE
FAN DATA NATURAL GAS FURNACE
MCA MOP
BASIS OF DESIGN
NOTESTOTAL CFM
EXT. SP
(in. WG)
TOTAL SP (IN.
W.G.) VOLTS/PHASE/HZ
HEATING INPUT
MBH
HEATING EAT/LAT
(°F DB)
EFFICIENCY
(%) FLUE SIZE MANUFACATURER MODEL
GF-1E-A DORM 1 2,245 0.5 0.8 115/1/60 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-1E-B DORM 1 2,245 0.5 0.8 FROM GF-1E-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-1W-A DORM 1 2,245 0.5 0.8 115/1/60 120 50 / 100 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-1W-B DORM 1 2,245 0.5 0.8 FROM GF-1W-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-5E-A DORM 5 2,245 0.5 0.8 115/1/60 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-5E-B DORM 5 2,245 0.5 0.8 FROM GF-5E-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-5W-A DORM 5 2,245 0.5 0.8 115/1/60 120 50 / 100 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-5W-B DORM 5 2,245 0.5 0.8 FROM GF-5W-A 120 50 / 90 96 3 NA NA CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-7E-A DORM 7 2,245 0.5 0.8 115/1/60 120 50 / 100 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-7E-B DORM 7 2,245 0.5 0.8 FROM GF-7E-A 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-7W-A DORM 7 2,245 0.5 0.8 115/1/60 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-7W-B DORM 7 2,245 0.5 0.8 FROM GF-7W-A 120 50 / 90 96 3 12.6 20 CARRIER 59SP6B120V24---22 1,2,3,4,5,6
GF-D5 DORM 9/10 1,200 0.5 0.8 115/1/60 66 50 / 90 80 4 10.5 15 CARRIER 58SP0B070V17--16 1,2,3,4,5
LOUVER SCHEDULE
MARK SERVICE TYPE MIN. FREE AREA DIMENSIONS SHAPE HEIGHT MANUFACTURER MODEL NOTES
L-1E DORM 1 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5
L-1W DORM 1 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5
L-5E DORM 5 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5
L-5W DORM 5 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5
L-7E DORM 7 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5
L-7W DORM 7 INTAKE 40% 12"X20" RECTANGULAR 7'-2" GREENHECK ESD-635 1,2,3,4,5
NOTES:
1. LOUVER SHALL BE DRAINABLE.
2. INCLUDE ALUMINUM BIRD SCREEN.
3. LOUVER SHALL BE AMCA CERTIFIED AND UL LISTED.
4. COORDINATE EXACT HEIGHT WITH EXISTING CONDITIONS.
5. VERIFY EXISTING CONDITIONS BEFORE FURNISHING FINAL SIZE OF LOUVER.
DORM 1
DORM 5
DORM 7
DORM 9/10
GYMNASIUM
M16
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL SITE
PLAN
M1.00
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1" = 80'-0"1
MECHANICAL SITE PLAN
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M16 PROVIDE NEW FENCE AND GATE AROUND ALL EQUIPMENT OUTSIDE DORM 7. FENCE TO BE 8 FEET TALL WITH 3 WIRES OF BARBWIRE ON ANGLED TOP. GATE TO BE 80 INCHES HEIGHT, WITH
MINIMUM 54 INCH WIDTH. FENCE AND BARBWIRE TO EXTEND OVER TOP OF GATE.
T
S D
S D
S D
S D
T T
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRYCORRIDOR
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
NDR
Y STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
CO
RRI
DOR
SNACKAREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SNA
CK
ARE
A
T V
CO
UC
H
C H A
IR
C O U C H
C O U C H
C O U C H
DE
SKCHAIR
CO
UC
H
C O U C H
C O U C H
COUCH
C H A
IR T
V
CH
AIR COUCH
DESK
C O U C H
MECH
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
M13M13
ACCU-1W ACCU-1E
GF-1E
DXC-1E
GF-1W
DXC-1W
M1
M3
M5
M1
M3
M5
M2
M3
M4
M11
M2
M3
M4
M11
M26 M26
M9 M9
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL
DEMOLITION PLAN -
DORM 1
MD2.01
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - LEVEL 1 - DORM 1
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED
ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT
EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.
M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO
EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR
PLENUM EXISTING TO REMAIN.
M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED
ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.
M4 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO DUAL GAS
FURNACE, HORIZONTAL COOLING COIL, AND RETURN AND SUPPLY TRANSITIONS. RETURN AIR
PLENUM BOX AND UNIT SUPPORT EXISTING TO REMAIN. INTAKE AND COMBUSTION DUCT
CONNECTIONS TO BE DISCONNECTED AND PENETRATIONS ARE TO REMAIN. DISPOSE OF DEMO
MATERIALS AS DIRECTED BY OWNER.
M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.
M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR
AIR HANDLER.
M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND
CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.
M13 VERIFY TEMPERATURE INPUT LOCATION AND CONFIRM WITH EOR.
M26 DEMOLISH EXISTING PATCHED WALL SPACE FOR NEW LOUVER INSTALLATION.
D
S D
S D
S D
T
T
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
BED
BED
WARD
WARD
BED BED
BED
BED
WARD
WARD
BED BED
WARD
BED
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
BE
D
WA
RD
BE
D
WA
RD
BE
D
BE
DR
OO
M
MECH
T V
CO
UC
H
CHAIR
CO
UC
H
C H A
IR
C O U C H
C O U C H
DE
SK
C O U C H
T V
CH
AIR
C O U C H
C O U C H
C O U C H
COUCH
C H A
IR
COUCH
DESK
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRY
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
NDR
Y STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
SNACK
AREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SNA
CK
ARE
A
BED
WARDWARD
WARD
BED
BED
BED
BED
WARD
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
M13
ACCU-5W ACCU-5E
GF-5E
DXC-5E
M13
M1 M1
M5 M5
M2
M11
M2
M11
M3M3
M4 M4
M3 M3
GF-5W
DXC-5W
M26 M26
M9
M9
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL
DEMOLITION PLAN -
DORM 5
MD2.02
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/8" = 1'-0"2
MECHANICAL DEMOLITION PLAN - DORM 5
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED
ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT
EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.
M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO
EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR
PLENUM EXISTING TO REMAIN.
M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED
ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.
M4 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO DUAL GAS
FURNACE, HORIZONTAL COOLING COIL, AND RETURN AND SUPPLY TRANSITIONS. RETURN AIR
PLENUM BOX AND UNIT SUPPORT EXISTING TO REMAIN. INTAKE AND COMBUSTION DUCT
CONNECTIONS TO BE DISCONNECTED AND PENETRATIONS ARE TO REMAIN. DISPOSE OF DEMO
MATERIALS AS DIRECTED BY OWNER.
M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.
M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR
AIR HANDLER.
M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND
CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.
S D
S D
S D
T
T
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED BED
WARD
BED
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
BE
D
WA
RD
BE
D
WA
RD
BE
D
BE
DR
OO
M
MECH
T V
CO
UC
H
CHAIR
CO
UC
H
C H A
IR
C O U C H
C O U C H
DE
SK
C O U C H
T V
CH
AIR
C O U C H
C O U C H
C O U C H
COUCH
C H A
IR
COUCH
DESK
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRY
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
NDR
Y STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
SNACK
AREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SNA
CK
ARE
A
BED
WARDWARD
WARD
BED
BED
BED
BED
WARD
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
M13
M13
ACCU-7E ACCU-7W
GF-7W
DXC-7W
GF-7E
DXC-7E
M1
M3
M5
M1
M3
M5
M2
M3
M4
M11
M2
M3
M4
M11
M26 M26
M9
M9
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL
DEMOLITION PLAN -
DORM 7
MD2.03
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - LEVEL 1 - DORM 7
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED
ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT
EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.
M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO
EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR
PLENUM EXISTING TO REMAIN.
M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED
ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.
M4 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO DUAL GAS
FURNACE, HORIZONTAL COOLING COIL, AND RETURN AND SUPPLY TRANSITIONS. RETURN AIR
PLENUM BOX AND UNIT SUPPORT EXISTING TO REMAIN. INTAKE AND COMBUSTION DUCT
CONNECTIONS TO BE DISCONNECTED AND PENETRATIONS ARE TO REMAIN. DISPOSE OF DEMO
MATERIALS AS DIRECTED BY OWNER.
M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.
M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR
AIR HANDLER.
M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND
CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.
F
M F
D
M
F D
F D
S D
S D
FD
FD
FD FD
T
T T
SD
SD
SD
SD
F D
M F
D
M
F D
F D
S D
FD
FD
S D
SD
SD
SD
SD
T T
M3
M1
M3 M3
M3 M3
M5 M5
M5
M5 M5
M1
M1
M1
M1
(D)
ACCU-D5
(D)
ACCU-D1
(D)
ACCU-D2
(D)
ACCU-D3
(D)
ACCU-D4
MD2.04
MD2.04
AHU-D1
AHU-D2
(E)DF-D2
(D)
GF-D5
DXC-D5
M2
M2
M3
M3
M22
M3 M11
M11
M11
M5
M5
(E)DF-D1
M9
M13
M9
M13
M23
RS
(E)SSF-D2
(E)SSF-D1
M14
(E)4"ø EA
(E)4"ø OA
M14
AHU-D4
AHU-D3
M2
M2
M3
M3
M5
M5
M11
M11
(E)DF-D3
(E)DF-D4
M9
M13
(E)SF-D3
(E)SSF-D4
(E)SSF-D3
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL
DEMOLITION PLAN -
DORM 9/10
MD2.04
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED
ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT
EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.
M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO
EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR
PLENUM EXISTING TO REMAIN.
M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED
ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.
M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.
M9 DEMOLISH EXISTING PROGRAMMABLE TEMPERATURE SENSOR AND ASSOCIATED WIRING FOR
AIR HANDLER.
M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND
CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.
M13 VERIFY TEMPERATURE INPUT LOCATION AND CONFIRM WITH EOR.
M14 DEMOLISH FLUE EXHAUST AND OA INTAKE DUCTS AS SHOWN.
M22 DISCONNECT GAS LINES AND ELECTRICAL AND CONTROLS WIRING TO DEMO GAS FURNACE,
CONDENSATE LINE, INTAKE AND COMBUSTION DUCTS AS SHOWN, AND RETURN AND SUPPLY
TRANSITIONS. RETURN AIR PLENUM BOX EXISTING TO REMAIN. DISPOSE OF DEMO MATERIALS
AS DIRECTED BY OWNER.
M23 DEMOLISH EXISTING COOLING COIL AND DISPOSE OF AS DIRECTED BY OWNER. DEMO EXISTING
SUPPLY AND RETURN AIR DUCT TRANSITIONS. DUCTWORK IS EXISTING TO REMAIN.
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - LEVEL 1 - DORM 9/10
1/4" = 1'-0"2
MECHANICAL DEMOLITION PLAN - SOUTH ATTIC - DORM 9/10
1/4" = 1'-0"3
MECHANICAL DEMOLITION PLAN - NORTH ATTIC - DORM 9/10
STORAGE
STORAGE
STAGE
POOL EQUIPMENT
LOCKERS
SHOWERS
OFFICE
STORAGE
LOCKERS
SHOWERS
STORAGE
STORAGE
STOR
CORR
LOCKERS
OFFICE
SHOWER
TLT
VESTIBULE
VESTIBULE
T
STORAGE
M3
M1
ACCU-G2
MD2.05
M5
M2
M3
M5
AHU-G2
M11
M13
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL
DEMOLITION PLAN -
GYM
MD2.05
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - GYM
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M1 EXISTING AIR COOLED CONDENSING UNIT TO BE REMOVED WITH ALL ASSOCIATED
ACCESSORIES. DISPOSE OF AS DIRECTED BY OWNER. CONTRACTOR SHALL DISCONNECT
EXISTING REFRIGERANT LINES, ELECTRICAL AND CONTROLS WIRING.
M2 DEMOLISH EXISTING AIR HANDLING UNIT AND DISPOSED OF AS DIRECTED BY OWNER. DEMO
EXISTING SUPPLY AIR DUCT TRANSITION AND RETURN AIR DUCT TRANSITION. RETURN AIR
PLENUM EXISTING TO REMAIN.
M3 DEMOLISH ALL EXISTING REFRIGERANT LINES, CONDENSATE LINES AND ASSOCIATED
ACCESSORIES BETWEEN THE AIR HANDLING UNIT AND CONDENSING UNIT.
M5 EXISTING CONCRETE HOUSEKEEPING PADS TO REMAIN.
M11 DISCONNECT EXISTING RETURN AIR PLENUM ,SMOKE DETECTORS, AND ALL ELECTRICAL AND
CONTROLS WIRING. PLACE IN CLEAN ENVIRONMENT DURING NEW UNIT INSTALLATION.
M13 VERIFY TEMPERATURE INPUT LOCATION AND CONFIRM WITH EOR.
1/2" = 1'-0"2
ENLARGED MECHANICAL DEMOLITION PLAN - GYM
TT
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BE
DR
OO
M
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRYCORRIDOR
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
NDR
Y STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
CO
RRI
DO
R
SNACKAREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SNA
CK
ARE
A
T V
CO
UC
H
C H A
IR
C O U C H
C O U C H
C O U C H
DE
SKCHAIR
CO
UC
H
C O U C H
C O U C H
COUCH
C H A
IR
T V
CH
AIR COUCH
DESK
C O U C H
MECH
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
M
T
S D
S D
S D
S D
M
EXIT
STAIRS
MECH
M
M2.01
M20M20
ACCU-1EACCU-1W
M6 M6
M7
M7
M7 M7
M8
M8
GF-1W-A GF-1E-BGF-1E-A
DXC-1E
GF-1W-B
DXC-1W
M10
M10
M12
M12
M19
M19
1" D
1" D
3" O
A
3" OA 3" OA
3" O
A
3" CA
3" CA
3" CA
3" CA
L-1W L-1E
RL RS RL RS
M20
M20
M27
M27
M18
M28
/1
O
A M18
M28
/1
O
A
M21
M21
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL PLAN
- DORM 1
M2.01
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/16" = 1'-0"1
MECHANICAL PLAN - LEVEL 1 - DORM 1
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M6 INSTALL NEW UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD.
M7 PROVIDE NEW REFRIGERANT LINES BETWEEN THE NEW AHU AND THE CONDENSING UNIT. SIZE
NEW REFRIGERANT LINES PER MANUFACTURER'S RECOMMENDATIONS. ROUTE REFRIGERANT
LINES TO MATCH EXISTING. CONTRACTOR SHALL NOT REUSE ANY PORTION OF THE EXISTING
REFRIGERANT LINES.
M8 PROVIDE NEW AIR HANDLING UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD AND MODIFY
PAD AS REQUIRED. PROVIDE CLEARANCES AROUND UNIT AS REQUIRED BY MANUFACTURER.
RECONNECT RETURN AIR PLENUM BOX AND SMOKE DETECTOR AND PROVIDE NEW
TRANSITIONS TO EXISTING SUPPLY AIR, OUTSIDE AIR DUCT, AND RETURN PLENUM AS
REQUIRED. BALANCE NEW UNIT TO CFM SHOWN ON SCHEDULE.
M10 INSTALL NEW CONDENSATE DRAIN LINE TO THE EXISTING FLOOR DRAIN. ROUTE NEW
EQUIPMENT CONDENSATE DRAIN LINE TO THE SAME FLOOR DRAIN LOCATION USED BY THE
DEMOED EQUIPMENT.
M12 PROVIDE NEW INSULATION FOR ANY AREAS DAMAGED DURING DEMO AS WELL AS FOR ANY
NEW DUCTWORK.
M18 PROVIDE NEW LOUVER, SECURITY BARS AND MOTORIZED DAMPER. REFER TO INTAKE LOUVER
DETAIL (REFER TO DETAIL 08 ON M4.01) FOR MORE INFORMATION. INTERLOCK DAMPER
ACTUATOR WITH BLOWER FAN OPERATION PER THE SEQUENCE OF OPERATIONS. BALANCE
DAMPER TO 450 CFM.
M19 CONTRACTOR SHALL PROVIDE NEW COMBUSTION AIR PIPING FOR FURNACE AND TERMINATE
PIPING PRIOR TO EXISTING ROOF PENETRATION.
M20 PROVIDE TAMPER PROOF TEMPERATURE SENSOR IN SAME LOCATION AS EXISTING.
CONTRACTOR SHALL PROVIDE NEW CONTROLS WIRING TO NEW PROGRAMMABLE THERMOSTAT
IN MECHANICAL ROOM AS REQUIRED TO INTEGRATE NEW AIR HANDLING UNIT.
M21 PROVIDE NEUTRALIZATION KIT PRIOR TO CONDENSATE DRIP INTO FLOOR DRAIN. INSTALL
ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
M27 PROVIDE NEW LOUVER IN EXISTING WALL OPENING. PATCH WALL AIR TIGHT.
M28 PROVIDE TRANSITION DOWN TO CONNECT INTO EXISTING RETURN AIR DUCT.
ENLARGED MECHANICAL PLAN - LEVEL 1 - DORM 1
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
WARD
BED
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
BE
D
WA
RD
BE
D
WA
RD
BE
D
BE
DR
OO
M
MECH
T V
CO
UC
H
CHAIR
CO
UC
H
C H A
IR
C O U C H
C O U C H
DE
SK
C O U C H
T V
CH
AIR
C O U C H
C O U C H
C O U C H
COUCH
C H A
IR
COUCH
DESK
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRY
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
ND
RY STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
SNACK
AREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SNA
CK
ARE
A
BED
WARDWARD
WARD
BED
BED
BED
BED
WARD
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
M M
S D
S D
S D
S D
MECH
EXIT
STAIRS
M
M
M2.02
M20 M20
M3.01
M3.01
ACCU-5EACCU-5W
M6 M6
M7M7
M7M7
M8 M8
GF-5W-A GF-5E-BGF-5E-A
DXC-5E
GF-5W-B
DXC-5W
M10 M10
RL RS RL RS
M12M12
L-5E L-5W
M19
M19
1" D
1" D
3" O
A
3" OA 3" OA
3" O
A
3" CA
3" CA
3" CA
3" CA
M20M20
M27
M27
/1
O
A M18
M28
/1
O
A M18
M28
M21 M21
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/1 /2
:5
:5
A
M
MECHANICAL PLAN
- DORM 5
M2.02
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/16" = 1'-0"2
MECHANICAL PLAN - DORM 5
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M6 INSTALL NEW UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD.
M7 PROVIDE NEW REFRIGERANT LINES BETWEEN THE NEW AHU AND THE CONDENSING UNIT. SIZE
NEW REFRIGERANT LINES PER MANUFACTURER'S RECOMMENDATIONS. ROUTE REFRIGERANT
LINES TO MATCH EXISTING. CONTRACTOR SHALL NOT REUSE ANY PORTION OF THE EXISTING
REFRIGERANT LINES.
M8 PROVIDE NEW AIR HANDLING UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD AND MODIFY
PAD AS REQUIRED. PROVIDE CLEARANCES AROUND UNIT AS REQUIRED BY MANUFACTURER.
RECONNECT RETURN AIR PLENUM BOX AND SMOKE DETECTOR AND PROVIDE NEW
TRANSITIONS TO EXISTING SUPPLY AIR, OUTSIDE AIR DUCT, AND RETURN PLENUM AS
REQUIRED. BALANCE NEW UNIT TO CFM SHOWN ON SCHEDULE.
M10 INSTALL NEW CONDENSATE DRAIN LINE TO THE EXISTING FLOOR DRAIN. ROUTE NEW
EQUIPMENT CONDENSATE DRAIN LINE TO THE SAME FLOOR DRAIN LOCATION USED BY THE
DEMOED EQUIPMENT.
M12 PROVIDE NEW INSULATION FOR ANY AREAS DAMAGED DURING DEMO AS WELL AS FOR ANY
NEW DUCTWORK.
M18 PROVIDE NEW LOUVER, SECURITY BARS AND MOTORIZED DAMPER. REFER TO INTAKE LOUVER
DETAIL (REFER TO DETAIL 08 ON M4.01) FOR MORE INFORMATION. INTERLOCK DAMPER
ACTUATOR WITH BLOWER FAN OPERATION PER THE SEQUENCE OF OPERATIONS. BALANCE
DAMPER TO 450 CFM.
M19 CONTRACTOR SHALL PROVIDE NEW COMBUSTION AIR PIPING FOR FURNACE AND TERMINATE
PIPING PRIOR TO EXISTING ROOF PENETRATION.
M20 PROVIDE TAMPER PROOF TEMPERATURE SENSOR IN SAME LOCATION AS EXISTING.
CONTRACTOR SHALL PROVIDE NEW CONTROLS WIRING TO NEW PROGRAMMABLE THERMOSTAT
IN MECHANICAL ROOM AS REQUIRED TO INTEGRATE NEW AIR HANDLING UNIT.
M21 PROVIDE NEUTRALIZATION KIT PRIOR TO CONDENSATE DRIP INTO FLOOR DRAIN. INSTALL
ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
M27 PROVIDE NEW LOUVER IN EXISTING WALL OPENING. PATCH WALL AIR TIGHT.
M28 PROVIDE TRANSITION DOWN TO CONNECT INTO EXISTING RETURN AIR DUCT.
1/2" = 1'-0"1
ENLARGED MECHANICAL PLAN - DORM 5
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
BED
BED
WARD
WARD
BED
BED
BED
BED
WARD
WARD
BED
BED
WARD
BED
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
WA
RD
BE
D
BE
D
BE
D
WA
RD
BE
D
WA
RD
BE
D
BE
DR
OO
M
MECH
T V
CO
UC
H
CHAIR
CO
UC
H
C H A
IR
C O U C H
C O U C H
DE
SK
C O U C H
T V
CH
AIR
C O U C H
C O U C H
C O U C H
COUCH
C H A
IR
COUCH
DESK
OFFICE
RECREATION
STORAGE
TLT
STO
LAUNDRY
EXIT
EXIT
ENTRY
REC
REA
TIO
N
EXI
T
OFF
ICE
STO
RAG
E
TLT
LAU
ND
RY STO
EXI
T
EXI
T
LAV.
LAV.
SHOWERS SHOWERS
TOILETS TOILETS
ENTRY
EXIT
STAIRS
SNACK
AREA
OFFICE
OFFICE
OFF
ICE
OFF
ICE
SN
AC
K
AR
EA
BED
WARDWARD
WARD
BED
BED
BED
BED
WARD
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
M M
S D
S D
S D
S D
MECH
EXIT
STAIRS
M
M
M2.03
M20
M20
ACCU-7W
ACCU-7E
M6 M6
M7
M7
M7 M7
M8
M8
GF-7E-A
GF-7W-BGF-7W-A
DXC-7W
GF-7E-B
DXC-7E
M10
M10
M12
M12 M19
M19
1" D
3" O A
3" OA 3" OA
3" O A
3" CA
3" CA
3" CA
3" CA
RL RS RL RS
1" D
L-7W L-7E
M20
M20
M27
M27
/1
O
A M18
M28
/1
O
A M18
M28
M21
M21
M161
REVISION/ISSUE NO. YYYY MM DD
PROJECT NO.
PROJECT TITLE:
PROJECT SUBMISSION:
PROFESSIONAL SEAL:
SHEET TITLE:
Original drawing is 42 x 30 Do not scale contents of this drawing
SHEET:
CONSULTANT
PLAN KEY:
DATE:
DRAWN BY
CLIENT
/9 /2
:1
:2
P
M
MECHANICAL PLAN
- DORM 7
M2.03
25-0040-00
TJJD Giddings
HVAC
Replacement
PERMIT AND PRICING
11/13/2025
JLLC
1/16" = 1'-0"1
MECHANICAL PLAN - LEVEL 1 - DORM 7
1 Revision 1 2025/12/09
(KEY NOTES SHOWN FOR THIS SPECIFIC SHEET ONLY)
MECHANICAL KEY NOTES
M6 INSTALL NEW UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD.
M7 PROVIDE NEW REFRIGERANT LINES BETWEEN THE NEW AHU AND THE CONDENSING UNIT. SIZE
NEW REFRIGERANT LINES PER MANUFACTURER'S RECOMMENDATIONS. ROUTE REFRIGERANT
LINES TO MATCH EXISTING. CONTRACTOR SHALL NOT REUSE ANY PORTION OF THE EXISTING
REFRIGERANT LINES.
M8 PROVIDE NEW AIR HANDLING UNIT ON EXISTING CONCRETE HOUSEKEEPING PAD AND…