This document is a Progress Assessment Report (PAR) form requirement issued by the Texas Workforce Commission HUB Department in accordance with Texas Administrative Code, Title 34, Part 1, Chapter 20, Subchapter D, Rule 20.284 (H)(I). The PAR form is a mandatory submission requirement for all HUB Subcontracting Plan contracts under the Texas Workforce Commission. Contractors are required to submit the PAR form monthly throughout the contract's entire life, regardless of whether subcontracting activity occurred during the reporting period. The report must include information for both HUB and Non-HUB subcontractors when applicable.

The PAR form must be submitted no later than the 5th of each month and should include all invoices for the reporting period. Contractors must complete all specified fields, including company and contract identifiers in the header section, list every subcontractor with corresponding payment amounts for the reporting period (entering $0 if no subcontracting occurred), provide totals at the bottom of the report, and include the signature, date, and position or title of the authorized signatory. The completed PAR, supporting invoices, and any supplemental information must be submitted to TWCHUBINFO@twc.texas.gov. For self-performing contracts with no subcontracting activity, the subcontractor listing section should be left blank. Questions regarding PAR requirements should be directed to the Texas Workforce Commission HUB Office at the provided email address.

View the file

Other files

File Type Posted
ESBD_473696_1767975216845_3202600039 - Addendum 1.pdf PDF
ESBD_473696_1768234258501_3202600039_Pre-Bid Conference Presentation.pptx PPTX presentation
ESBD_473696_1768234221406_3202600039 Prebid Sign in Sheet.pdf PDF
ESBD_473696_1765225105302_3202600039 - Attachment 3 Evaluation Critera Matrix.pdf PDF
ESBD_473696_1765224410777_3202600039 Attachment 2 UGCs_12.3.2024 (1).docx DOCX document
ESBD_473696_1765225889544_3202600039 Attachment 6 Prevailing Wage.pdf PDF
ESBD_473696_1765226013583_3202600039 Attachment 8 Project Manual.pdf PDF
ESBD_473696_1765227267574_Form 7_3202600039_HUB Subcontracting Plan (HSP).pdf PDF
ESBD_473696_1765225847975_3202600039 Attachment 5 Supplementary General Conditions (2).docx DOCX document
ESBD_473696_1765227048778_3202600039 - Form 5 Title Page.docx DOCX document
ESBD_473696_1765226760122_3202600039 - FORM 3 PAST PROJECT PERFORMANCE SHEET.docx DOCX document
ESBD_473696_1765226272688_3202600039 Attachment 12 - Progress Assessment Report.xls XLS spreadsheet
ESBD_473696_1765225952873_3202600039 Attachment 7 Project Drawings.pdf PDF
ESBD_473696_1765227198469_Form 6 - Subtitute W-9 and direct deposit form.docx DOCX document
ESBD_473696_1765226857126_3202600039 FORM_4-Financial_Questionnaire.docx DOCX document
ESBD_473696_1765226453752_3202600039 Form 2 - Cost Proposal Form.docx DOCX document
ESBD_473696_1765224357824_Attachment 1 - T&C Architect & Engineer Version (07-31-25).docx DOCX document
ESBD_473696_1765224306933_3202600039_RFP_Solicitation_Final.docx DOCX document
ESBD_473696_1765226343910_32302600039 - Form 1 Execution of Response.docx DOCX document
ESBD_473696_1765226101264_3202600039 Attachment 10 - HSP Subcontracting Plan Giude.pdf PDF
ESBD_473696_1765225798764_3202600039 - Attachment 4 - Proposal Submission Checklist.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEXAS WOKFORCE COMMISSION _HUB DEPARTMENT

TEXAS WORKFORCE COMMISSION_HUB

HUB Subcontracting Plan PAR - Progress Assessment Report

In accordance with Texas Administrative Code, Title 34, Part 1, Chapter 20, Subchapter D, Rule §20.284 (H)(I), the Progress Assessment Report (PAR) form is a requirement of the HUB Subcontracting Plan (HSP). A PAR form must be submitted every month of the contract’s life. The submission of the PAR form is required whether there is any subcontracting to report or not and must be completed with both HUB and Non-HUB subcontractor information, when applicable.

Any questions regarding this requirement should be addressed with the Texas Workforce Commission HUB Office at TWCHUBINFO@twc.texas.gov

How to fill out the PAR This report is due no later than the 5th of each month:

In the submission email, include all invoices for the month reporting if applicable. SUBMIT TO TWCHUBINFO@twc.texas.gov

1. Fill out the top of the form with your company and contract identifiers.

FILL ALL FIELDS SPECIFIED BELOW:

mailto:HUBPARS@dps.texas.gov mailto:TWCHUBINFO@twc.texas.gov mailto:HUBPARS@dps.texas.gov

TEXAS WORKFORC COMMISSION _HUB

TEXAS WOKORC COMMISSION

TWCHUBINFO@twc.texas.gov

2. List every subcontractor, the amount paid for this reporting period, IF ZERO ENTER $0

FILL ALL FIELDS SPECIFIED BELOW:

(IF SELF PERFORMING, LEAVE THIS SECTION BLANK AND SKIP TO STEP 4)

https://mycpa.cpa.state.tx.us/tpasscmblsearch/tpasscmblsearch.do

3. Fill in totals at the bottom of the report.

4. Sign, date, and include the position or title of the signee:

5. Submit PAR, invoices, and any supplemental information to

TWCHUBINFO@twc.texas.gov mailto:DPSHUB@dps.texas.gov https://mycpa.cpa.state.tx.us/tpasscmblsearch/tpasscmblsearch.do mailto:HUBPARS@dps.texas.gov

HUB Subcontracting Plan
How to fill out the PAR
FILL ALL FIELDS SPECIFIED BELOW:
FILL ALL FIELDS SPECIFIED BELOW:

File details come from the government source that posted it. Updated .