ESBD_462957_1762443720402_CC4_APPROVED_ISO_Texas A&M Texarkana - CHARTWELLS.pdf

PDF 831 KB Posted

Attached to
TAMUT - Anita & Truman Arnold University Center Servery Remodel
Solicitation number
TAMUT-RFP-1423_112025
Issued by
Blanco County, Waco City, Texas

About this file

This is an equipment specification and layout document prepared by CounterCraft for Texas A&M University-Texarkana's (TAMUT) Anita & Truman Arnold University Center Servery Remodel project, in partnership with Chartwells food service operations. The document contains detailed equipment preference specifications and isometric layout drawings for the food service installation, including front and rear equipment configurations for Items 1-2-3. The preliminary drawings were completed on August 28, 2025, with subsequent submittal and revision cycles occurring through October 1, 2025. The specifications are based on manufacturer and model requirements outlined in the contract documents, and CounterCraft requires timely notification of any changes to maintain accurate equipment planning and installation coordination.

The layout drawings and equipment specifications serve as critical technical documentation for the construction phase of the servery remodel. These isometric renderings provide contractors with precise equipment placement, dimensions, and configurations necessary for proper installation of food service equipment including serving lines, kitchen stations, coolers, and other modular casework components. The document emphasizes that all equipment layouts and material equipment plans (MEPs) are contingent upon the specifications defined in the contract documents, and any modifications to those specifications must be communicated to CounterCraft promptly to prevent installation errors or delays. This technical specification supports the broader project timeline, which includes a completion deadline before January 9, 2026, with associated daily penalties for delays.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Co un te rC ra ft

S

TE

AR

N

S H

O U

ST

O

N ,T

EX

AS

(7

7-

AN

O

TH

ER

Q U

AL

IT

Y

PR

O D

U C

T

FR

O M

PROJECT NO.

DATE

SCALE:

DRAWN BY

PROJECT MANAGER

SHEET NO.

OF

P R O

JE

C T

EQUIPMENT BY OTHERSEQUIPMENT BY OTHERS

COUNTERCRAFT LAYOUTS, MEPS, AND LOAD CENTERS ARE BASED ON SPECIFIED MANUFACTURERS AND MODELS AS OUTLINED IN THE SPECIFICATIONSCOUNTERCRAFT LAYOUTS, MEPS, AND LOAD CENTERS ARE BASED ON SPECIFIED MANUFACTURERS AND MODELS AS OUTLINED IN THE SPECIFICATIONS IN THE CONTRACT DOCUMENTS. COUNTERCRAFT MUST BE NOTIFIED OF ANY CHANGES TO THE CONTRACT DOCUMENTS IN A TIMELY MANNER.IN THE CONTRACT DOCUMENTS. COUNTERCRAFT MUST BE NOTIFIED OF ANY CHANGES TO THE CONTRACT DOCUMENTS IN A TIMELY MANNER.

D

EA

LE

R sheets

4-12892

AM

RF

CC4

Te xa s A&

M T ex ar ka n a C

H

AR

TW

EL

LS

EQ

U

IP

M

EN

T

PR

EF

RE

N

CE

I N C

8/28/25

R

EV

IS

IO

N S

N U

M

BE

R D

ES

C

R

IP

TI

O

N D

AT

E

BY

PR

EL

IM

IN

AR

Y D

W G

8/

/2

AM

SU

BM

IT

TA

L D

W G

9/

/2

AM

R

EV

IS

E

R

ES

U

BM

IT

9/

/2

AM

AA

N

C O

R R

EC

TI

O N

S

/1 /2

AM

5 6 7 8

SCALE:CC4

ITEM No 1-2-3 FRONT ISO1

SCALE:CC4

ITEM No 1-2-3 REAR ISO2

File details come from the government source that posted it. Updated .