ESBD_389166_1736377372242_IW207002 Drawings 5-8.pdf

PDF 4 MB Posted

Attached to
HVAC and Accessories
Solicitation number
IW207002
Issued by
Texas

About this file

This is a set of electrical drawings and specifications from the Texas Department of Criminal Justice Engineering Services for HVAC installation work at the Bartlett State Jail inmate housing facility. The drawings include electrical site plans, building electrical plans, panel schedules, and riser diagrams detailing the replacement of existing wiring and electrical components. The plans show specific requirements for replacing existing wire from various panels (including Panel MOP-EM to Panel J-HE1) with 4-2/0 and 1-#4 GRD wiring in existing PVC conduits, along with new disconnects at each ACCU location.

The technical specifications include detailed panel schedules showing circuit assignments, generator readings per unit maintenance (C-74A), and the installation of external safety switches for all condensers. The plans indicate that branch circuits must be run from new sub-panels to new condensers, with a total generator load requirement of 450A where 380A load equals 450A total GEN load. The drawings provide comprehensive electrical modifications necessary to support the HVAC system upgrades, including specific conduit sizes, wire specifications, and safety requirements typical for correctional facility installations.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .