ESBD_381402_1730237861750_SOL_EXH_F.9_24R0022034_Statement of Work Additional Requirements.pdf

PDF 3 MB Posted

Attached to
AUTOCLAVE AND NITROGEN GENERATOR PROJECT
Solicitation number
405-24R0022034
Issued by
Travis County, Austin City, Texas

About this file

This document is an Invitation for Bids (IFB) issued by the Texas Department of Public Safety (DPS) for the Autoclave and Nitrogen Generator Project in Austin, Texas. The scope of work requires the removal and replacement of the currently installed autoclave, boiler, and nitrogen generator equipment at the DPS facility. The project involves the provision and installation of two new autoclaves and one new nitrogen generator system with all necessary accessories. A mandatory pre-bid site visit will be held on November 5, 6, and 14, 2024, and bids must be submitted electronically by 5:00 PM Central Time on December 3, 2024. DPS anticipates awarding the contract by December 3, 2024, with a contract term of one year and potential for optional renewal periods.

The IFB does not include any set-aside designations or restrictions on the types of organizations that can respond. It does not specify any incumbent vendors or current contractors, and the existing infrastructure or technology that requires integration is not detailed. The total estimated value of the contract is also not provided. However, the contract does include requirements for historically underutilized business (HUB) subcontracting and compliance with applicable state regulations, as outlined in the HUB Subcontracting Plan and other supporting documents.

View the file

Other files

File Type Posted
ESBD_381402_1732285102168_SOL_ADD_2_405-24R0022034.pdf PDF
ESBD_381402_1730237861750_SOL_EXH_F.8_24R0022034_Statement of Work.pdf PDF
ESBD_381402_1730237676215_SOL_EXH_F.2_24R0022034_Information and Certifications Form.pdf PDF
ESBD_381402_1730237690698_SOL_EXH_F.3_24R0022034_HUB Subcontracting Plan.pdf PDF
ESBD_381402_1730237768490_SOL_EXH_F.6_24R0022034_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_381402_1730237823184_SOL_EXH_F.7_24R0022034_Vendor Exceptions Form.pdf PDF
ESBD_381402_1730237648195_SOL_EXH_F.1_24R0022034_ DPS Standard Terms and Conditions.pdf PDF
ESBD_381402_1730237502820_SOL_PST_405-24R0022034.pdf PDF
ESBD_381402_1730237748840_SOL_EXH_F.5_24R0022034_Direct Deposit Authorization.pdf PDF
ESBD_381402_1730237714667_SOL_EXH_F.4_24R0022034_Application for Texas Identification Number.pdf PDF
ESBD_381402_1730923605740_SOL_ADD_1_405-24R0022034.pdf PDF
ESBD_381402_1730237648195_SOL_EXH_F.1_24R0022034_ DPS Standard Terms and Conditions.pdf PDF
ESBD_381402_1730237748840_SOL_EXH_F.5_24R0022034_Direct Deposit Authorization.pdf PDF
ESBD_381402_1730237714667_SOL_EXH_F.4_24R0022034_Application for Texas Identification Number.pdf PDF
ESBD_381402_1730237502820_SOL_PST_405-24R0022034.pdf PDF
ESBD_381402_1730923605740_SOL_ADD_1_405-24R0022034.pdf PDF
ESBD_381402_1730237823184_SOL_EXH_F.7_24R0022034_Vendor Exceptions Form.pdf PDF
ESBD_381402_1730237861750_SOL_EXH_F.9_24R0022034_Statement of Work Additional Requirements.pdf PDF
ESBD_381402_1730237676215_SOL_EXH_F.2_24R0022034_Information and Certifications Form.pdf PDF
ESBD_381402_1730237861750_SOL_EXH_F.8_24R0022034_Statement of Work.pdf PDF
ESBD_381402_1730237690698_SOL_EXH_F.3_24R0022034_HUB Subcontracting Plan.pdf PDF
ESBD_381402_1730237768490_SOL_EXH_F.6_24R0022034_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_381402_1730237748840_SOL_EXH_F.5_24R0022034_Direct Deposit Authorization.pdf PDF
ESBD_381402_1730237676215_SOL_EXH_F.2_24R0022034_Information and Certifications Form.pdf PDF
ESBD_381402_1730237714667_SOL_EXH_F.4_24R0022034_Application for Texas Identification Number.pdf PDF
ESBD_381402_1730237768490_SOL_EXH_F.6_24R0022034_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_381402_1730237648195_SOL_EXH_F.1_24R0022034_ DPS Standard Terms and Conditions.pdf PDF
ESBD_381402_1730237502820_SOL_PST_405-24R0022034.pdf PDF
ESBD_381402_1730237690698_SOL_EXH_F.3_24R0022034_HUB Subcontracting Plan.pdf PDF
ESBD_381402_1730237823184_SOL_EXH_F.7_24R0022034_Vendor Exceptions Form.pdf PDF
ESBD_381402_1730237861750_SOL_EXH_F.9_24R0022034_Statement of Work Additional Requirements.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# DATE DESCRIPTION

KEY PLAN

CLIENT

PROJECT NO.

Parkhill.com

/6

/2

:4

:2

P

M

42652.24

05/06/2024

100% Construction Documents05/06/2024

5800 Guadalupe Street Austin, Texas 78752

Department of Public Safety

G-001

Cover Sheet & Index

D e p a rt m e n t o f

P u b li c S a fe ty

B u il d in g

U A

U T

O C

L A

V E

A N

D N

IT

R

O G

E N

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

Department of Public Safety - Building U

Department of Public Safety

5800 Guadalupe Street Austin, Texas 78752

SHEET INDEX

GENERAL

G-001 Cover Sheet & Index

G-002 Accessibility Standards

ARCHITECTURAL

A-101 Second Floor Plan - Autoclave

MECHANICAL

ME001 Mechanical & Electrical Abbreviations & Legends

ME110 Overall Mechanical and Electrical Plans

ME111 Mechanical and Electrical Plan

Autoclave and Nitrogen Generator Replacement

# DATE DESCRIPTION

KEY PLAN

CLIENT

PROJECT NO.

Parkhill.com

/6

/2

:4

:2

P

M

42652.24

05/06/2024

100% Construction Documents05/06/2024

5800 Guadalupe Street Austin, Texas 78752

Department of Public Safety

G-002

Accessibility Standards

D e p a rt m e n t o f

P u b li c S a fe ty

B u il d in g

U A

U T

O C

L A

V E

A N

D N

IT

R

O G

E N

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

CL CL CL CL CL CL

CL

CL

CL

CL

CL

URINAL

SCREEN

URINAL

SCREEN

WITH

PILASTERS

SIDE

ELEV

CHILDREN'S MOUNTING

HEIGHTS & REACH RANGES

REACH RANGES

RAMPS AND STAIRS

WATER CLOSETS

READING AND STUDY AREAS, AND

FIXED OR BUILT-IN SEATING AND TABLES,

WORK STATIONS

• ACCESSIBILITY GUIDELINE SHEETS ARE BASED ON

THE 2012 TEXAS ACCESSIBILITY STANDARDS (TAS).

• ACCESSIBILITY GUIDELINE SHEETS ARE FOR

INFORMATIONAL PURPOSES ONLY. AND INTENDED

TO SERVE AS A GUIDE FOR CONSTRUCTION

PROFESSIONALS AND OWNERS.

• SOME OF THE INFORMATION AND PICTOGRAPHS

SHOWN MAY NOT BE APPLICABLE TO THIS

PROJECT.

• REFER TO PLUMBING SHEETS FOR PLUMBING

FIXTURE MOUNTING HEIGHTS.

• GRAPHICS SHOWN ARE FOR ADULTS.

ROOM

60" MIN

M

IN

M

IN

M

IN

MIN

MIN

MIN

60 MIN

48 MIN

M

IN 4

M

IN

30 MIN

M

IN

48 MIN

36 MIN

X

60 MIN

X

M

IN

6 MAX

17-25

8 MIN

M

IN

11 MIN

M

IN

4 MAX

X

X

X

M A

X

M

A X

M

IN

MAX

M

A X

M

A X

2O-25

MAX

10 MAX

M

A X

M

IN

M

A X

10 MAX

M

A X

M

A X

>10-24

MAX

M

A X

MAX 48 MIN

MAX

M

IN

M

IN

M

IN

M

IN

Y

M

IN

X

42 MIN

X

42 MIN

X<48

M

A X

M

IN

M

IN

M

IN

12 MIN

M

IN

C

O N

T R

O L

E N

D W

A L

12 MAX 24 MAX24 MIN

M

IN

12 MAX 15 MAX

12 MAX 15 MAX12 MAX 24 MAX24 MIN 36

M

IN

48 MIN 60 MIN

M

IN

M

IN

36 MIN

60 MIN60 MIN

M

IN

M

IN

M

A X

6 MAX6 MAX

M

A X

6 MAX 6 MAX

M

A X

M

A X

6 MAX

15 MAX

CNTRL

AREA

MAX

CONTROL

AREA

M

A X

C O

N T

R O

L A

R E

A

-1

-1

-1

-1

-1

M

IN

33 MIN 33 MIN

M

IN

33 MIN 33 MIN

M

IN

M

IN

M

IN

M

IN

60 MIN60 MIN

4 MAX

M

IN

M

IN

6 MIN

M

IN

M

IN

35-37

ANY AMOUNT

X

X

36 MIN

15 MIN

M

A X

M

A X

M

IN

-9

M

A X

2 FROM

DOOR FRAME

M

A X

17 MIN

M

A X

-3

M

A X

M

A X

M

IN

18 MIN

M

IN

X

Y

M

IN

X

Y

Y

M

IN

22 MIN

Y

M

IN

24 MIN 24 MIN

48 MIN

M

IN

32 MIN

CLEAR

M

A X

M

IN

M

IN

18 MIN

X

M

IN

12 MIN

X

M

IN

MAX

CONTROL

AREA

17-19 16-18 16-18 16-18 16-18

60 MIN

16-18

M

IN

MIN

24 MIN

15 MIN

T O

S H

O U

LD

E

R

T O

S H

O U

L D

E R

-3

M

IN

M

IN

M

IN

M

IN

M

IN

M

IN

M

IN

M

A X

M A

X

M

IN

M

IN

M A

X

M

IN

M

A X

M

IN

CL36 MAX

MAX

54 MIN

42 MIN

-3

T O

P O

F G

R

IP

P

IN

G S

U R

F A

C E

7-9

M

A X

M

IN

M

IN

MIN

IF X>24

X

36 MIN

24 MIN

M

IN

M

A X

M

A X

M

IN

M

A X

-3

T O

P O

F G

R

IP

P

IN

G S

U R

F A

C E

M

IN

C

O N

T R

O L A

R E

A

-3

T O

P O

F G

R

IP

P

IN

G S

U R

F A

C E

M

A X

C O

N T

R O

L A

R E

A

M

IN

C

O N

T R

O L A

R E

A

-3

T O

P O

F G

R

IP

P

IN

G S

U R

F A

C E

M

A X

C O

N T

R O

L A

R E

A

M

IN

C

O N

T R

O L A

R E

A

-3

T O

P O

F G

R

IP

P

IN

G S

U R

F A

C E

M

A X

C O

N T

R O

L A

R E

A

M

IN

C

O N

T R

O L A

R E

A

-3

T O

P O

F G

R

IP

P

IN

G S

U R

F A

C E

M

IN

C

O N

T R

O L

E N

D W

A L

-1

/2 C

L R

MIN

MIN

IF X>24

X

IF X ≤ 24

X

MIN

MIN

MIN

MIN

X

MIN

IF X>24

M

IN

M

IN

H

O L D

MIN

MIN

IF X>24

X

M

A X

/4

/2

FORWARD PARALLEL ELEVATION

TOE CLEARANCE

PLAN

CENTERED

ELEVATION

KNEE CLEARANCE

ALCOVE

FORWARD

ALCOVE

PARALLEL

180 DEG

TURN AROUND

NARROW

PASSAGE

SINGLE

WHEELCHAIR

T-SHAPE

TURN AROUND

CIRCLE

TURN AROUND

BEVELED TRANSITION

VERTICAL TRANSITION

PROTRUDING

OBJECT

UNDER STAIRS

FORWARD REACH RANGES SIDE REACH RANGES

BACK WALLBACK WALL

LENGTH

REMOVABLE SEAT CONTROLS LOCATION FIXED SEAT

REMOVABLE SEAT FIXED SEAT

C O

N T

R O

L W

A L L

BACK

S E

A T

W A

L L

S E

A T

TRANSFER SHOWER ROLL-IN SHOWER ROLL-IN SHOWER

W/ SEAT ROLL-IN SHOWER

W/ SEAT

ALTERNATE

BACK

WALL

CONTROL WALL

WITHOUT SEAT

CONTROL WALL

WITH SEAT

CONTROL WALL

BENCH SEATINGTHEATER SEATING

BENCH SEATINGTHEATER SEATING

LINE OF SIGHT

LINE OF SIGHT

SPORTS ARENA

THEATER/PLAYHOUSE

AUDITORIUM/CONCERT HALL

LECTURE HALLS

MEETING ROOMS

OF TUB

H E

A D

E N

D W

A L L

LENGTH

OF TUB

W A

L L /P

O S

T M

T D

C A

N T

IL

E

V E

R E

D U

N

IT

FORWARD APPROACH

ACCESSIBLE UNIT

PROTRUDING

OBJECT

NOTE:

WIDE SIDE

LEVER ON

250 LBS AND BE CONTINUOUS

GRAB BARS MUST SUPPORT

DOWN TO 27" AFF MIN

APRON THAT EXTENDS

HIGH UNIT SHOULD HAVE

CL

BRACKET MOUNTED

FIRE EXTINGUISHER* CHALKBOARD MOUNTING

* MARKERBOARD MOUNTING

FIRE ALARM

AUDIBLE &

ACCESSIBLE

COAT HOOKS

VISUAL SIGNAL

OUTLET

* TACKBOARD MOUNTING

CABINET

FIRE EXTINGUISHER

TOWELS

MISC MOUNTING (DIMENSIONS SHOWN ARE TO THE HIGHEST OPERABLE PART)

TELEPHONE

THERMOSTAT

TOWELS

SWITCH

OUTLET

CUPS

SOAP

T O

P O

F E

X T

IN

G

U

IS

H E

R

IN

S

ID

E O

F C

A B

IN

E

T

T O

P O

F T

R A

Y

FIN CLG

IF CEILING IS BELOW 90"

MOUNT TOP OF SIGNAL DEVICE

6" BELOW FINISHED CEILING

NOTE:

EQUIPMENT PERMITTED

IN OUTLINED AREA

WASHING MACHINE

TOP LOAD

CONVEYOR

GROCERY

SLIDE

TRAYACCESSIBLE

COAT HOOKS

AMBULATORY ACCESSIBLE TOE CLEARANCE SIDE APPROACH WALL HUNG WATER CLOSET FLOOR MTD WATER CLOSET

CL

H E

A D

E N

D

(REQUIRED) (REQUIRED)

W A

L L

CL

PUSH SIDE

NOTE:

PULL SIDE

FRONT APPROACHES SWINGING DOORS

HAS BOTH A CLOSER AND A LATCH

X = 12" MIN (305mm) IF DOOR

PUSH SIDE

PUSH SIDE

NOTE:

A CLOSER

PULL SIDE

A CLOSER

Y = 54" MIN (1370mm) IF DOOR HAS

NOTE:

PULL SIDE

NOTE: X = 36" MIN IF Y = 60";

X = 42" MIN IF Y = 54"

HINGE SIDE APPROACHES SWINGING DOORS

LATCH SIDE APPROACHES SWINGING DOORS

Y = 48" MIN (1220mm) IF DOOR

HAS BOTH A CLOSER AND A LATCH

Y = 48" MIN IF DOOR HASNOTE:

VESTIBULE DOORS

TWO HINGED DOORS IN SERIES

NOTE:

THE CLEARANCES FOR FRONT APPROACHES

ALL DOORS IN ALCOVES SHALL COMPLY WITH

VESTIBULE DOORS

RECESSED DOOR

DOOR HARDWARE DOOR LITE

CLOSER & LATCH PROVIDED

WALL

CL

14-17 20-25

LOW

HIGH

TOP OF HANDRAIL GRIPPING SURFACE

GRAB BARS

DISPENSER HEIGHT

28 MAX

18-20

KNEE CLEARANCE

HEIGHT OF TABLES OR COUNTERS

24 MIN

26-30 MAX

AGES: 3 AND 4 AGES: 5 THROUGH 8

17-19 25-27

AGES: 9 THROUGH 12

WATER CLOSET CENTERLINE 12-1512 15-18

CLEARANCE AT WATER CLOSET

LAVATORY, URINAL

OR TOILET ACCESSORIES

NOT IN A STALL

CL

IF Y=60 MIN, X=36 MIN

LINE OF SIGHT OVER HEADS

FRONT LOAD

APPROACH ALLOWED

PARALLEL

AGES: 5 & YOUNGER AGES: 6-12

LETTERS & BRAILLE

GRAPHIC SYMBOLS

6x8 PICTOGRAM

MEN

6x8 PICTOGRAM

GRAPHIC SYMBOLS

LETTERS & BRAILLE

WOMEN

& BRAILLE

ROOM NUMBER

8x6 ROOM NAME

SUPERVISOR

MAINTENANCE

& BRAILLE

10x3 ROOM NAME

ADMINISTRATION

6x6 DIRECTIONAL

GRAPHIC SYMBOL

ONLY ONLY

GRAPHIC SYMBOL

6x6 DIRECTIONAL

& BRAILLE

6x6 CHANGEABLE

MESSAGE W/ PERMANENT

ROOM NAME, NUMBER,

ITHJOHN S

OFFICE

REFER TO SIGNAGE PACKAGE OR DETAILS FOR ACTUAL SIGNAGE SPECIFIED

6x8 PICTOGRAM

GRAPHIC SYMBOLS

LETTERS & BRAILLE

STAIR 1

6x8 PICTOGRAM

GRAPHIC SYMBOLS

LETTERS & BRAILLE

STAIR 1

DISPENSERS

IF A WALL HUNG OR FLOOR

MOUNTED FLUSH VALVE

WATER CLOSET IS SPECIFIED,

ENSURE ALL DIMENSIONS

SHOWN ARE MET.

CL

REFER TO KNEE AND

TOE CLEARANCE GRAPHICS

NOT ASSOCIATED

WITH A WATER CLOSET

ONLY TOILET

ASSOCIATED WITH

WATER CLOSETS ARE

ALLOWED WITHIN

FLOOR AREA

ACCESSORIES

28 MAX 28 MAX

NOTE: REFER TO "CHANGES IN LEVEL" DETAILS FOR SHOWER THRESHOLDS

THRESHOLD

SEAT

SEAT

THRESHOLD THRESHOLD

/4

VERTICAL/BEVELED

/4

TRANSITION

M

A X

L

IT

E

O P

E N

IN

G

SURFACE OF MIRROR

TOP OF REFLECTIVE

BOTTOM OF

MIRROR

SURFACE OF

REFLECTIVE

WITH SEAT

CNTRL

AREA

T O

P O

F H

O O

K

CLEAR FLOOR AREA/ACCESSIBLE ROUTE

PROTRUDING OBJECT PROTECTION/REACH RANGES SHOWERS

ASSEMBLY SEATING

TYPICAL WATER CLOSETS

EWC/DRINKING FOUNTAINS

STANDARD ACCESSIBLE MOUNTING HEIGHTS TYPICAL TOILET STALLS

TUBS

TYPICAL DOOR CLEARANCES

GENERAL NOTES

EXAMPLE SIGNAGE - SEE STANDARD ACCESSIBLE MOUNTING HEIGHT

CHANGES IN LEVEL

REFLECTIVE SURFACE

LAVATORIESURINALS

CORRIDOR

CORR.4

STAIR

U-2.2

BIOHAZARD

U-202.01

CORRIDOR

CORR.4

STAIR

U-2.2

BIOHAZARD

U-202.01

# DATE DESCRIPTION

KEY PLAN

CLIENT

PROJECT NO.

Parkhill.com

/6

/2

:4

:2

P

M

42652.24

05/06/2024

100% Construction Documents05/06/2024

5800 Guadalupe Street Austin, Texas 78752

Department of Public Safety

A-101

Second Floor Plan - Autoclave

D e p a rt m e n t o f

P u b li c S a fe ty

B u il d in g

U A

U T

O C

L A

V E

A N

D N

IT

R

O G

E N

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

1/4" = 1'-0"A4 FLOOR PLAN - AUTOCLAVE DOOR DEMOILITION

1/4" = 1'-0"A6 FLOOR PLAN - AUTOCLAVE DOOR

AS INDICATED BY: #

KEY NOTES

1. REMOVE WALL, GYPSUM BOARD AND STUDS AS NECESSARY TO

REMOVE EQUIPMENT. CONTRACTOR TO VARIFY CONDITIONS BEFORE

BEGINNING DEMOLITION OF WALL.

2. REPLACE PREVIOUSLY DEMOLISHED WALL WITH NEW STUDS, GYPSUM

BOARD, WALL BASE, ETC. TO MATCH SURROUNDINGS. CONTRACTOR

TO COORDINATE FINISHES WITH OWNER.

GENERAL NOTES

1 CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO

BEGINNING WORK

2 NOTIFY ARCHITECT/OWNER OF ANY DISCREPANCIES PRIOR TO

BEGINNING WORK

3. CONTRACTOR TO VERIFY WITH OWNER ANY FINISH COLORS

NECESSARY TO MATCH SURROUNDING FINISHES

4. CONTRACTOR TO VERIFY ALL HARDWARE/ACCESS CONTROL/KEYING

REQUIREMENTS WITH OWNER

5. CONTRACTOR TO COORDINATE WITH MECHANICAL, ELECTRICAL AND

PLUMBING WORK AS NEEDED

6. THE CONTRACTOR IS REQUIRED TO SAFEGUARD ALL EXISTING

CONSTRUCTION AND EQUIPMENT FROM POTENTIAL HARM CAUSED BY

DUST, DEBRIS, OR DAMAGE RESULTING FROM CONSTRUCTION AND

DEMOLITION ACTIVITIES.

7. THE CONTRACTOR IS EXPECTED TO UPHOLD STRINGENT STANDARDS

OF CLEANLINESS THROUGHOUT THE WORKSPACE. IT IS IMPERATIVE

THAT ALL AREAS AND EQUIPMENT BE THOROUGHLY CLEANED

AND ORGANIZED AT THE CONCLUSION OF EACH WORKDAY.

PLUMBING SYMBOL LEGEND

BUTTERFLY VALVE

BALL VALVE

PRESSURE REDUCING VALVE

CONNECT TO EXISTING

POINT OF DISCONNECT

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SEWER

VENT

CONDENSATE DRAIN

INDICATES DEMOLITION

FLUID FLOW DIRECTION

PIPE TURNED UP

PIPE TURNED DOWN

PIPING LEGEND

EXISTING PIPING IS INDICATED SAME AS ABOVE,

EXCEPT IN A LIGHTER PEN WEIGHT.

P.O.D

MECHANICAL/PLUMBING ABBREVIATIONSSYMBOL LEGEND

AUTOMATIC AIR VENT

MANUAL AIR VENT

P/T PLUG

VENTURI FLOW METER

AUTOMATIC FLOW CONTROL

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

GLOBE VALVE

GATE VALVE

ANGLE GATE VALVE

PRESSURE REDUCING VALVE

AUTOMATIC VALVE, 2-WAY

AUTOMATIC VALVE, 3-WAY

FLANGE

UNION

STRAINER

GAS METER

AUTOMATIC AIR VENT

ELECTRIC MOTOR

CENTRIFUGAL FAN

THERMOMETER

EXPANSION VALVE

FLOW SWITCH

PRESSURE SWITCH

PUMP

MV

M

FS

PS

AV

BTUH BRITISH THERMAL UNIT PER HOUR

CFM CUBIC FEET PER MINUTE

DEG DEGREE

°F DEGREES FAHRENHEIT

DIA DIAMETER

ID DIAMETER, INSIDE

OD DIAMETER, OUTSIDE

DDC DIRECT DIGITAL CONTROLS

DB DRY BULB TEMPERATURE

EAT ENTERING AIR TEMPERATURE

EWT ENTERING WATER TEMPERATURE

FT FEET

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HP HORSEPOWER

IN INCHES

inHG INCHES OF MERCURY inH2O INCHES OF WATER kW KILOWATT

LAT LEAVING AIR TEMPERATURES

MAT MIXED AIR TEMPERATURE

NC NORMALLY CLOSED

NO NORMALLY OPEN

PH PHASE

LBS POUNDS

LBS/HR POUNDS PER HOUR

PSI POUNDS PER SQUARE INCH

PRV PRESSURE REDUCED VALVE

RPZ REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

SEER SEASONAL ENERGY EFFICIENCY RATIO

SQ.FT. SQUARE FEET

SP STATIC PRESSURE

k THERMAL CONDUCTIVITY

R THERMAL RESISTANCE

U U-FACTOR, HEAT TRANSFER COEFFICIENT

VFD VARIABLE FREQUENCY DRIVE

VEL VELOCITY

V VOLTS

WB WET BULB TEMPERATURE

HEATING VENTILATING AND AIR

CONDITIONING SPECIFICATIONS

I. GENERAL

A. NOTE:

1. CONFORM WITH THE APPLICABLE PROVISIONS OF THE GENERAL CONDITIONS,

THE SPECIAL CONDITIONS AND THE GENERAL REQUIREMENTS.

B. SUBMITTALS

1. SUBMIT MANUFACTURER'S DATA AND SHOP DRAWING ON ALL MATERIALS.

C. SCOPE:

1. THIS SECTION OF THE SPECIFICATIONS PERTAINS TO ALL LABOR, MATERIALS,

EQUIPMENT AND SERVICE NECESSARY FOR AND INCIDENTAL TO THE HEATING,

VENTILATING AND AIR CONDITIONING SYSTEM AS SHOWN ON THE DRAWINGS

AND/OR AS SPECIFIED HEREIN.

2. ALL APPURTENANCES AND AUXILIARY EQUIPMENT NECESSARY TO THE

FUNCTION OF ANY SPECIFIED ITEM OF EQUIPMENT SHALL BE FURNISHED WITH

THE ITEM OF EQUIPMENT, WHETHER SPECIFICALLY MENTIONED OR NOT. EACH

ITEM OF EQUIPMENT SHALL PERFORM THE FUNCTION FOR WHICH IT IS

INTENDED, AND ALL WORK NECESSARY TO PROVIDE A COMPLETE FUNCTIONAL

SYSTEM SHALL BE PROVIDED.

3. THIS SPECIFICATION REQUIRES THAT ALL ITEMS OF EQUIPMENT BE COMPLETELY

INSTALLED, FINALLY CONNECTED, TESTED AND PLACED IN SERVICE.

4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL

REQUIREMENTS OF THE EQUIPMENT AND THE CONTRACT AND CERTIFY WITH

THE SUBMITTAL OF THE SHOP DRAWINGS THAT ALL REQUIREMENTS HAVE BEEN

MET, INCLUDING:

a. SPACE REQUIREMENTS

b. ELECTRICAL REQUIREMENTS (VOLTAGE, PHASE, WIRES - NO. AND SIZE)

c. CAPACITIES

d. CLEARANCE FOR MAINTENANCE

e. QUALITY

f. QUANTITY

II. PRODUCTS

A. AUTOCLAVE

1. Model 3AV, CHAMBER SINGLE DOOR STERILIZER BY CONSOLIDATED STERILIZER

SYSTEMS.

2. CONSTRUCTION:

a. CHAMBER SHALL BE CONSTRUCTED FROM 316L STAINLESS STEEL.

b. JACKET SHALL BE CONSTRUCTED FROM STEEL.

c. DOOR SHALL BE VERTICALLY SLIDING AND CONSTRUCTED FROM 316L

STAINLESS STEEL.

3. STANDARD FEATURES:

a. ECOCALENDAR, AUTO IDLE SHUT-OFF

b. ASME U-1 CODE STAMPING

c. UL, CUL LISTED

d. END-OF CYCLE VACUUM DRYING

e. FULLY OPENING FRONT SERVICE PANEL

f. CSS STARTER KIT

4. ADDITIONAL OPTIONS:

a. X1 CONTROLS: TOP MOUNT 7" COLOR TOUCHSCREEN

b. STERINET DATAPORT - USB

c. PASSWORK PROTECTION AND LOCKABLE CYCLE PARAMETERS

d. THERMAL PRINTER

e. 110 VOLT CONTROLS

f. 316L STAINLESS STEEL CHAMBER WITH CARBON STEEL JACKET

g. STANDARD FINISH PASSIVATED CHAMBER

h. PROGEN MODEL INTEGRAL ELECTRICALLY HEATED STEAM GENERATOR -

25 KW

i. GENERATOR: 480 VOLTS, 3 PHASE

j. AUTMATIC GENERATOR BLOWDOWN WITH MOTORIZED BALL VALVE

k. GRAVITY AIR REMOVAL WITH ECONOMY POST-VACUUM DRYING SYSTEM

l. BRASS, BRONZE AND COPPER PIPING

m. EZ-GLIDE VERTICAL SLIDING DOOR WITH NON-STICK GASKET

n. CABINET MOUNTING WITH STAINLESS STEEL FRONT AND SIDE PANELS

o. WATERECO WATER CONSERVATION AND MONITORING SYSTEM

p. AUTOMATIC JACKET BLOWNDOWN FOR LIQUIDS CYCLE

q. WHISPER-QUIET ON-BOARD AIR COMPRESSOR

r. EMERGENCY STOP BUTTON

s. 2 SHELVES - 1 STATIONARY BOTTOM SHELF AND 1 STATIONARY UPPER

SHELF

5. INSTALLATION:

a. MANUFACTURER REP SHALL INCLUDE UNCRATING, SETTING IN PLACE, LEVELING, FINAL ASSEMBLY, FINAL UTILITY CONNECTIONS(5' MAX), START

UP AND END USER TRAINING.

B. NITROGEN GENERATOR SYSTEM

1. PERFORMANCE REQUIREMENTS

a. SYSTEM OPERATING PRESSURE: 130-160 PSI.

b. RESERVIOR PRESSURE: 300 PSI MAX.

c. PURITY: MIN 99%.

d. GENERATION: MIN 1,200 L/MIN.

2. MANUFACTURER

A. ATLAS COPCO

B. BAUER COMPRESSORS

C. SUBSTUTIONS ALLOWED

3. PRODUCTS

a. DESCRIPTION: PACKAGED OIL INJECTED SCREW COMPRESSOR AND

PACKAGED NITROGEN GENERATOR WITH AIR BUFFER TANK AND

NITROGEN PRODUCT TANK.

b. OIL INJECTOR SCREW COMPRESSOR BASIS OF DESIGN: GA30VSD-175.

c. NITROGEN GENERATOR BASIS OF DESIGN: NGP+160-360.

d. ACCESSORIES:

1. PROVIDE ALL MANUFACTURERS RECCOMENDED ACCESSORIES

FOR SYSTEM TO FUNCTION INCLUDING BUT NOT LIMITED TO:

MICROPROCESSOR CONTROLS, PRE-FILTER, AIR DRYER, CARBON

AND PARTICULATE FILTER AFTER DRYER, COMPRESSED AIR

BUFFER TANK AND NITROGEN PRODUCT TANK, SAFETY VALVE,

POWER CORD AND POWER DRAIN FOR BUFFER AND PRODUCT

TANK, POST FILTER AFTER NITROGEN GENERATOR AND PROVIDE

OWNER COMISSIONING AND TRAINING AFTER SETUP.

PLUMBING SPECIFICATIONS

I. GENERAL

A. NOTE:

1. CONFORM WITH APPLICABLE PROVISIONS OF THE GENERAL CONDITIONS,

SPECIAL CONDITIONS, GENERAL REQUIREMENTS, AND SUPPLEMENTAL

CONDITIONS.

B. SUBMITTALS:

1. SUBMIT MANUFACTURER'S DATA ON ALL MATERIALS.

C. SCOPE:

1. THIS SECTION OF THE SPECIFICATIONS REQUIRES THE FURNISHING AND

INSTALLATION OF ALL EQUIPMENT, LABOR, MATERIALS, TRANSPORTATION,

TOOLS AND APPLIANCES AND IN PERFORMING ALL OPERATIONS IN CONNECTION

WITH THE INSTALLATION OF THE PLUMBING SYSTEMS.

II. PRODUCTS

A. MATERIALS:

1. DOMESTIC COLD WATER PIPING: COPPER TUBING, ASTM B 88, TYPE L , HARD

DRAWN. FITTINGS CONFORMING TO ASME B 16.18, CAST COPPER ALLOY OR

ASME B 16.22, WROUGHT COPPER AND BRONZE. JOINTS: SOLDER, LEAD FREE,

ASTM B32, 95-5 TIN-ANTIMONY, OR TIN AND SILVER, WITH MELTING RANGE 430 TO

535 DEGREES F OR BRAZE, AWS A5.8 BCUP ALLOY WITH MELTING RANGE 1,190

TO 1,480 DEGREES F.

2. SANITARY SOIL, WASTE AND DRAIN LINES: PVC-DWV PLASTIC PIPE AND

FITTINGS CONFORMING TO ASTM D-2665-68, ASSEMBLED WITH SOLVENT

CEMENT CONFORMING TO ASTM D-2564-67.

B. HANGERS AND SUPPORTS:

1. SUPPORT ALL PIPES AS REQUIRED BY THE PLUMBING CODE AND AS REQUIRED

TO PREVENT SAGGING. PIPES SHALL BE SUPPORTED ON 8' INTERVALS AS A

MINIMUM. HANGERS SHALL BE CLEVIS TYPE WITH ADJUSTERS.

C. FABRICATION OF PIPE JOINTS:

1. THREADED PIPES: REAM AND DEBURR PIPE AFTER IT IS CUT AND BEFORE IT IS

THREADED. STAND EACH PIPE ON ONE END AND HAMMER TO REMOVE ALL

FOREIGN MATERIAL. FULL CUT THREADS, BUT NOT MORE THAN 3 PIPE THREADS

SHALL REMAIN EXPOSED WHEN JOINT IS COMPLETED. MAKE UP JOINTS WITH

GRAPHITE AND OIL OR AN APPROVED GRAPHITE COMPOUND APPLIED TO MALE

THREADS ONLY. CAULKING OF THREADED JOINTS TO STOP OR PREVENT LEAKS

IS PROHIBITED.

2. COPPER TUBING: CUT TUBING SQUARE, REAM AND DEBURR. CLEAN INSIDES OF

FITTINGS AND OUTSIDES OF TUBING WITH SAND CLOTH BEFORE ASSEMBLY.

EXERCISE CARE TO PREVENT ANNEALING OF FITTINGS AND HARD DRAWN

TUBING. MAKE ALL JOINTS WITH HIGH TEMPERATURE SOLID STRING OR WIRE

SOLDER, 95% TIN, 5% ANTIMONY, USING NON-CORROSIVE PASTE FLUX OF THE

PROPER TYPE FOR ALL COPPER TUBING. LOW TEMPERATURE SOLDER SUCH AS

50/50 OR 40/60 WILL NOT BE PERMITTED.

D. REPAIR OF LEAKS:

1. ALL LEAKS IN PIPING SYSTEMS SHALL BE CORRECTED AS FOLLOWS:

a. REPAIR LEAKS IN SOLDER JOINTS BY REMAKING THE JOINT; NO

SOLDERING OR BRAZING OVER EXISTING JOINTS WILL BE PERMITTED.

b. REPAIR LEAKS IN SCREWED JOINTS BY TIGHTENING THE JOINT; REMAKE

THE JOINT IF THE TIGHTENING FAILS TO STOP THE LEAK.

c. REPAIR LEAKS IN PVC PIPE BY REMAKING THE JOINT.

2. WHEN ANY DEFECT IS REPAIRED, RETEST THAT SECTION OF THE SYSTEM.

E. INSULATION:

1. ANY INSULATION WHICH IS NOT APPLIED IN A WORKMANLIKE MANNER WILL BE

REJECTED AND REPLACED. ALL COVERINGS SHALL BE SMOOTH, FLUSH,

DRESSED TO LINE AND TIGHT. MASTIC SHALL BE NEATLY APPLIED AND TOOLED.

ARCHITECT RESERVES THE RIGHT TO REJECT ANY INSULATION WHOSE

APPEARANCE IS DEEMED UNACCEPTABLE.

2. APPLY INSULATION AND PIPE COVERING AFTER ALL WORK HAS BEEN TESTED,

FOUND TO BE TIGHT AND ACCEPTED AS SUCH BY THE ARCHITECT.

THOROUGHLY CLEAN AND DRY ALL SURFACE TO BE COVERED.

3. FACTORY-APPLIED VAPOR-BARRIER JACKETS SHALL BE ONE OF THE

FOLLOWING:

a. AN ALL SERVICE JACKET (ASJ) LAMINATED OF FLAME RESISTANT WHITE

KRAFT PAPER, GLASS SCRIM REINFORCEMENT, AND KRAFT PAPER.

b. FOIL REINFORCED KRAFT (FRK) JACKET LAMINATED OF FLAME

RESISTANT 0.001" ALUMINUM FOIL, GLASS SCRIM REINFORCEMENT AND

KRAFT PAPER.

4. INSULATE VALVES AND FITTINGS WITH TWO FIBERGLASS INSERTS AND

PREFORMED MANVILLE "ZESTON" COVERS WITH TAPED SEAMS.

5. THE FOLLOWING DESCRIBES MATERIALS, THICKNESSES AND FINISHES FOR

INSULATION AND COVERINGS.

6. DOMESTIC COLD WATER LINES: INSULATE WITH 1" THICK OWENS-CORNING

FIBERGLAS ASJ/SSL-II MOLDED SECTIONAL GLASS FIBER PIPE COVERING WITH

AN ALL SERVICE JACKET (ASJ). INSULATE CONCEALED VALVES AND FITTINGS

WITH PREFORMED "ZESTON" PVC COVERS OVER FIBERGLASS INSULATION.

INSULATE EXPOSED VALVES AND FITTINGS WITH HAMFAB INSULATION FITTINGS.

F. TESTING:

1. TEST ALL PIPES BEFORE THEY ARE CONCEALED IN FURRINGS OR CHASES,

INSULATED, PAINTED, OR OTHERWISE COVERED UP OR RENDERED

INACCESSIBLE. ACCOMPLISH TESTING BY SECTIONS OF LINES OR SYSTEMS, AS

REQUIRED BY CONDITIONS DURING CONSTRUCTION. CLEAN ALL PIPING AND

EQUIPMENT BEFORE TESTING.

2. DOMESTIC WATER LINES INTERIOR: HYDROSTATICALLY TEST FOR 6 HOURS AT

150 PSIG. THERE SHALL BE NO LEAKS WHATSOEVER.

3. OTHER TESTS: PERFORM ALL TESTS REQUIRED TO DEMONSTRATE THAT EACH

SYSTEM IS OPERATING PROPERLY.

END OF SECTION

1. GENERAL NOTES ON THIS SHEET ARE APPLICABLE TO EACH DRAWING OF THIS SET OF

CONSTRUCTION DOCUMENTS. NOTES SPECIFIC TO INDIVIDUAL DRAWINGS WILL BE SHOWN

ON THE RESPECTIVE MECHANICAL DRAWING.

2. THE CONTRACTOR SHALL PROVIDE A COMPLETE SYSTEM TO INCLUDE ALL LABOR,

MATERIALS, TOOLS AND EQUIPMENT FOR A COMPLETE AND FUNCTIONAL SYSTEM

INCLUDING ALL NECESSARY APPURTENANCES CUSTOMARILY INCLUDED IF NOT

SPECIFICALLY CALLED OUT.

3. ENTIRE INSTALLATION, INCLUDING MATERIALS, EQUIPMENT AND WORKMANSHIP SHALL

CONFORM WITH ALL APPLICABLE LAWS, CODES AND REGULATIONS.

4. THIS PROJECT SHALL CONFORM TO APPLICABLE ASHRAE, NFPA AND SMACNA STANDARDS

AND OTHER REGULATORY BODIES HAVING JURISDICTION OVER THE CLASS OF WORK.

5. MATERIAL AND EQUIPMENT SHALL HAVE STAMPS OR SEALS OF AHRI, ASME, UL OR ASTM.

6. THE CONTRACTOR SHALL MAKE TESTS FOR ACCEPTANCE AND APPROVAL AS REQUIRED BY

CODE AND THE REQUIREMENTS OF APPLICABLE REGULATORY AGENCIES. REQUIRED TESTS

SHALL BE PERFORMED IN THE PRESENCE OF THE ENGINEER OF RECORD AND/OR OWNER

UNLESS OTHERWISE WAIVED IN WRITING.

7. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, DOCUMENTS AND

SERVICES RELATED TO INSTALLATION OF THE WORK.

8. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE OTHER TRADES IN ORDER TO

RESOLVE ANY CONFLICTS THAT MIGHT ARISE DUE TO THE LOCATION OF EQUIPMENT OR

THE USE OF SPACE.

9. EQUIPMENT OF DIFFERENT ELECTRICAL CHARACTERISTICS MAY BE FURNISHED PROVIDED

SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND CONNECTING ELECTRICAL

SERVICE, CIRCUIT BREAKERS AND CONDUIT ARE APPROPRIATELY MODIFIED AT NO COST TO

THE OWNER.

10. DO NOT INSTALL EQUIPMENT, PIPING OR DUCTWORK OVER ANY ELECTRICAL EQUIPMENT

OR ELECTRICAL SERVICE SPACE.

11. LAYOUT OF PIPING AND DUCTWORK IS DIAGRAMMATIC.

12. INSTALL MECHANICAL EQUIPMENT TO FACILITATE SERVICING, MAINTENANCE AND REPAIR

OR REPLACEMENT OF ELECTRICAL COMPONENTS. AS MUCH AS PRACTICAL, CONNECT

EQUIPMENT FOR EASE OF DISCONNECTING, WITH A MINIMUM OF INTERFERENCE WITH

OTHER INSTALLATIONS, PIPING SHALL NOT INTERFERE WITH FILTER PULL.

13. MECHANICAL CONTRACTORS SHALL PROVIDE AUTOMATIC CONTROL DEVICES SUCH AS

STARTERS, VARIABLE FREQUENCY DRIVES (VFD), TEMPERATURE SENSORS, RELAYS,

PRESSURE SWITCHES THAT ARE ASSOCIATED WITH MECHANICAL EQUIPMENT AND

ASSOCIATED CONTROL WIRING FROM CONTROL POWER LOCATION TO THE CONTROL

DEVICE/ ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT AND WIRING FROM POWER

SOURCE TO DISCONNECT SWITCH, FROM DISCONNECT SWITCH TO STARTER OR VFD, AND

FROM STARTER OR VFD TO THE EQUIPMENT.

14. LOCATE SENSORS 48" ABOVE FINISHED FLOOR.

15. BEFORE INSTALLATION, EQUIPMENT AND DEVICES INCLUDING, BUT NOT LIMITED TO, ANY

DEVICE WITH ELECTRICAL CONNECTIONS, DUCTWORK, INSULATION, PIPING, VALVES, AIR

DEVICES, ETC., SHALL NOT BE STORED DIRECTLY ON GRADE OR ON A SLAB OR FLOOR.

BEFORE AND AFTER INSTALLATION, SUCH EQUIPMENT AND DEVICES SHALL BE PROTECTED

FROM ENTRY OF DIRT, TRASH, WATER (EXCEPT AS REQ'D), VERMIN, ETC.

16. CONTRACTOR SHALL NOT CUT, DRILL, OR ALTER ANY ELEMENT OF A WALL, FLOOR, CEILING, ROOF, SLAB, ETC., WITHOUT FIRST RECEIVING INSTRUCTIONS FROM ARCHITECT. ALL CUTS

SHALL BE MADE WITH A CUTTING TOOL.

17. PATCHING OR SEALING OF CUTS, PENETRATIONS, ETC., SHALL BE DONE BY CONTRACTOR

PER INSTRUCTIONS FROM AND TO FINAL APPROVAL OF ARCHITECT. COORDINATE WITH

GENERAL CONTRACTOR.

18. NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED.

GENERAL NOTES

ELECTRICAL SPECIFICATIONS

CODE COMPLIANCE/WORKMANSHIP

1. CONTRACTOR SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES

AND ACCEPTED GOOD PRACTICE.

2. ALL WORK SHALL BE PERFORMED BY LICENSED AND QUALIFIED PERSONNEL.

EXISTING CONDITIONS

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO

SUBMITTING BID. BY SUBMITTING BID, CONTRACTOR STATES THAT HE HAS

EXAMINED ALL EXISTING CONDITIONS. IF CONTRACTOR ENCOUNTERS EXISTING

CONDITIONS WHICH NEED CLARIFICATION, CONTACT ENGINEER FOR

RESOLUTION OR CLARIFICATION.

PERMITS AND FEES

1. CONTRACTOR SHALL OBTAIN ALL PERMITS AND PAY ALL FEES AND CHARGES

REQUIRED (INCLUDING UTILITY COMPANY CHARGES).

GUARANTEE AND WARRANTIES

1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL HAVE ONE (1) YEAR

WRITTEN GUARANTEE FOR ALL MATERIALS AND WORKMANSHIP.

MATERIALS

1. ALL MATERIALS SHALL BE NEW AND SPECIFICATION GRADE.

OWNERS MANUAL

1. AT COMPLETION OF PROJECT, CONTRACTOR SHALL DELIVER TO OWNER ALL

DOCUMENTS (INCLUDING BUILDING PERMITS, OPERATION AND MAINTENANCE

MANUALS, WARRANTY ETC.).

CONDUIT

1. ALL INTERIOR CONDUIT SHALL BE EMT. ALL EXTERIOR AND ABOVE GRADE

CONDUIT SHALL BE RIGID GALVANIZED STEEL. MINIMUM SIZE OF CONDUIT SHALL

BE 3/4". ALL CONDUIT SHALL BE ROUTED PERPENDICULAR TO BUILDING LINES

WHERE EXPOSED TO VIEW.

WIRE

1. ALL WIRE SHALL BE THHN/THWN COPPER UNLESS OTHERWISE INDICATED ON

THE DRAWINGS. MINIMUM SIZE OF WIRE SHALL BE #12. FOR 20A CIRCUITS

LONGER THAN 100', MINIMUM WIRE SIZE SHALL BE #10 AWG.

DISCONNECT SWITCHES

1. ALL DISCONNECT SWITCHES SHALL BE HEAVY DUTY WITH NEMA CONFIGURATION

AS INDICATED ON DRAWINGS OR AS REQUIRED BY N.E.C. PROVIDE FUSES IN

SWITCHES AS INDICATED ON THE DRAWINGS.

RECEPTACLES

1. ALL RECEPTACLES SHALL BE SPECIFICATION GRADE (HUBBELL 5352 OR

APPROVED EQUAL). COLOR OF ALL RECEPTACLES AND COVERPLATES SHALL BE

WHITE. MOUNTING HEIGHT OF RECEPTACLES SHALL COMPLY WITH A.D.A.

REQUIREMENTS UNLESS SPECIFIC OR SPECIAL MOUNTING HEIGHT IS SHOWN ON

DRAWINGS OR REQUIRED BY EQUIPMENT.

SUBMITTALS AND SUBSTITUTIONS

1. CONTRACTOR SHALL FURNISH SUBMITTAL DATA TO ENGINEER FOR APPROVAL

ON ALL FIXTURES AND EQUIPMENT PRIOR TO ORDERING ANY ITEMS.

CONTRACTOR MAY OFFER SUBSTITUTIONS ON ITEMS FOR APPROVAL BY

ENGINEER. SUBSTITUTIONS MUST BE EQUAL IN ALL RESPECTS TO ITEMS

SCHEDULED OR SPECIFIED.

# DATE DESCRIPTION

KEY PLAN

CLIENT

PROJECT NO.

Parkhill.com

/6

/2

:4

:2

P

M

42652.24

05/06/2024

100% Construction Documents05/06/2024

5800 Guadalupe Street Austin, Texas 78752

Department of Public Safety

ME001

Mechanical & Electrical Abbreviations & Legends

D e p a rt m e n t o f

P u b li c S a fe ty

B u il d in g

U A

U T

O C

L A

V E

A N

D N

IT

R

O G

E N

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

R

05/06/2024

05/06/2024

J

J

J

J

J

A. REFER TO GENERAL NOTES ON M-001.

/ME111A4

/ME111C4

# DATE DESCRIPTION

KEY PLAN

CLIENT

PROJECT NO.

Parkhill.com

/6

/2

:4

:2

P

M

42652.24

05/06/2024

100% Construction Documents05/06/2024

5800 Guadalupe Street Austin, Texas 78752

Department of Public Safety

ME110

Overall Mechanical and Electrical Plans

D e p a rt m e n t o f

P u b li c S a fe ty

B u il d in g

U A

U T

O C

L A

V E

A N

D N

IT

R

O G

E N

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

GENERAL NOTES

3/32" = 1'-0"A2 OVERALL MECHANICAL PLAN- 1ST FLOOR

3/32" = 1'-0"D2 OVERALL MECHANICAL PLAN- 2ND FLOOR

NORTH

NORTH

05/06/2024

J

J

J

J

A. REFER TO GENERAL NOTES ON M-001.

CORRIDOR

CORR.4

STAIR

U-2.2

ACS-1

BIOHAZARD

U-202.01

1 1/2"

ACS-2

1/2"

1"

1 1/2"

1/2"

1 1/2"

CORRIDOR

CORR.4

STAIR

U-2.2

BIOHAZARD

U-202.01

P.O.D

LOADING

DOCK

U-103.01

CYLINDER

STORAGE

U-103.02

CORRIDOR

CORR.1.5

VEHICLE

SEARCH BAY

U-103.04

CYLINDER

STORAGE

U-103.02

CORRIDOR

CORR.1.5

LOADING

DOCK

U-103.01

VEHICLE

SEARCH BAY

U-103.04

# DATE DESCRIPTION

KEY PLAN

CLIENT

PROJECT NO.

Parkhill.com

/6

/2

:4

:2

P

M

42652.24

05/06/2024

100% Construction Documents05/06/2024

5800 Guadalupe Street Austin, Texas 78752

Department of Public Safety

ME111

Mechanical and Electrical Plan

D e p a rt m e n t o f

P u b li c S a fe ty

B u il d in g

U A

U T

O C

L A

V E

A N

D N

IT

R

O G

E N

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

AS INDICATED BY: #

KEY NOTES

GENERAL NOTES

1 REMOVE ALL EXISTING PIPING SERVING EXISTING BOILER AND AUTOCLAVE

MACHINE. REMOVE UP TO DESCALAR DEVICE. PREPARE PIPING FOR

CONNECTION TO NEW PIPING.

2 REMOVE EXISTING NITROGEN GENERATOR SYSTEM.

3 REMOVE EXISTING BOILER AND AUTOCLAVE SYSTEM.

4 ROUTE AUTOCLAVE SYSTEM DRAIN PIPING TO FLOOR SINK. TERMINATE WITH A

90 DEGREE FITTING OVER FLOOR SINK .

5 PROVIDE NEW AUTOCLAVE MACHINE. INSTALL PER MANUFACTURERS

REQUIREMENTS. SEE SPECS ON SHEET M-001 FOR MORE INFORMATION.

6 PROVIDE OXYGEN DEFICIENCY MONITOR. INTERLOCK TO NITROGEN

GENERATOR CONTROL SYSTEM. PROVIDE CONTROL TO SHUTDOWN NITROGEN

GENERATOR WHEN OXYGEN LEVEL IN THE SPACE FALLS BELOW 19.5%.

EXAMPLE: AMI MODEL 221R.

7 PROVIDE NEW NITROGEN GENERATOR SYSTEM. INSTALL PER

MANUFACTURERS REQUIREMENTS. MODIFY AND EXTEND PIPING AS REQURIED

TO CONNECT TO NEW UNIT. BASIS OF DESIGN IS ATLAS COPCO MODEL

GA30VSDP. REFER TO SPECIFICATIONS FOR PERFORMANCE REQUIREMENTS.

8 JUNCTION BOX FOR SENSOR. 120V/1P, 20A IN 3/4" CONDUIT. EXTEND AND

CONNECT (2) #12 AWG + #12 GND TO 120/208V PANEL SERVING THIS AREA.

COORDINATE WITH MECHANICAL FOR EXACT LOCATION ON SENSOR AND

HEIGHT.

9 PROVIDE A NEW CIRCUIT WITH (3) #4 AWG + #8 GND IN 1 1/4" CONDUIT TO

EXISTING PANEL CURRENTLY SERVING PREVIOUS NITROGEN GENERATOR.

PROVIDE A NEW 70A/3P CIRCUIT BREAKER IN EXISTING PANEL. NEW CIRCUIT

BREAKER SHALL MATCH EXISTING TYPE AND AIC RATING. PROVIDE A NEW

100A/3P DISCONNECT, WITH 70 AMP FUSES LOCATED ADJACENT TO

EQUIPMENT.

10 REQUIREMENTS FOR CONTROL SYSTEM. 120V, 10A NON GFCI RECEPTACLE

OUTLET. EXTEND 3/4" CONDUIT AND CONNECT TO 120/208V PANEL SERVING

THIS AREA. COORDINATE WITH MECHANICAL FOR EXACT LOCATION AND

HEIGHT.

11 EXTEND AND RECONNECT TO EXISTING 480V PANEL CIRCUIT FOR THE

AUTOCLAVE. COORDINATE ALL REQUIREMENTS WITH UNIT MANUAL AND

MECHANICAL FOR EXACT LOCATION.

12 PROVIDE POWER FOR CONTROLS. EXTEND (2) #12 AWG + # 12 GND IN 3/4"

CONDUIT AND CONNECT TO EXISTING 120/208V PANEL SERVING THIS

AREA.PROVIDE A NEW 20A/1P BREAKER OR UTILIZE SPARE IF AVAILABLE.

MATCH EXITING AIC RATING.

1/4" = 1'-0"C4 MECHANICAL FLOOR PLAN- AUTOCLAVE

1/4" = 1'-0"C1 DEMOLITION MECHANICAL FLOOR PLAN - AUTOCLAVE

1/4" = 1'-0"A1 DEMOLITION MECHANICAL FLOOR PLAN- NITROGEN GENERATOR

1/4" = 1'-0"A4 MECHANICAL FLOOR PLAN- NITROGEN GENERATOR

NORTHNORTH

NORTH NORTH

05/06/2024

Sheets
G-001 - Cover Sheet & Index
G-002 - Accessibility Standards
A-101 - Second Floor Plan - Autoclave
ME001 - Mechanical & Electrical Abbreviations & Legends
ME110 - Overall Mechanical and Electrical Plans
ME111 - Mechanical and Electrical Plan

File details come from the government source that posted it. Updated .