ESBD_373836_1726607877244_SOLADD_2_405-24R0020771.pdf

PDF 110 KB Posted

Attached to
Statewide Tower Replacement
Solicitation number
405-24R0020771
Issued by
Kenedy County, La Casita CDP, Texas

About this file

This document is an addendum to Solicitation 405-24R0020771 for a Statewide Tower Replacement project issued by the Department of Public Safety Procurement and Contract Services in Texas. The addendum answers questions related to the solicitation, including clarification that the vendor is responsible for conducting land surveys and procuring and installing a 20kVA Eaton 9PXM UPS system with specific requirements. The project involves turn-key radio communication tower services to design, construct, maintain, improve, decommission, or expand the state's radio communications infrastructure across multiple jurisdictions, including Kenedy County and La Casita CDP.

The solicitation does not currently provide an extension for the responses due date to accommodate the UPS procurement. The pricing terms, set asides, incumbent information, funding requirements, and other salient details are not explicitly stated in the addendum, but may be included in the original solicitation document.

View the file

Other files

File Type Posted
ESBD_373836_1724352452890_SOLICIEXH_F.4_24R0020771_Application for Texas Identification Number.pdf PDF
ESBD_373836_1724352490939_SOLICIEXH_F.5_24R0020771_Direct Deposit Authorization.pdf PDF
ESBD_373836_1724352661179_SOLICIEXH_F.11_24R0020771_Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_373836_1724352347808_SOLICIEXH_F.1_24R0020771_ DPS Standard Terms and Conditions.pdf PDF
ESBD_373836_1724352631546_SOLICIEXH_F.10_24R0020771_Goat Creek Tower Sample Project.pdf PDF
ESBD_373836_1724352428466_SOLICIEXH_F.3_24R0020771_HUB Subcontracting Plan.pdf PDF
ESBD_373836_1724352514445_SOLICIEXH_F.6_24R0020771_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_373836_1726525724026_SOLADD_1_405-24R0020771.pdf PDF
ESBD_373836_1724352269594_SOLICI_405-24R0020771_913-16.pdf PDF
ESBD_373836_1724352605818_SOLICIEXH_F.9_24R0020771_GEO Kerrville Radio Tower.pdf PDF
ESBD_373836_1724352533096_SOLICIEXH_F.7_24R0020771_Vendor Exceptions Form.pdf PDF
ESBD_373836_1724352395275_SOLICIEXH_F.2_24R0020771_Information and Certifications Form.pdf PDF
ESBD_373836_1724352571366_SOLICIEXH_F.8_24R0020771_Statement of Work.pdf PDF
ESBD_373836_1724352428466_SOLICIEXH_F.3_24R0020771_HUB Subcontracting Plan.pdf PDF
ESBD_373836_1724352571366_SOLICIEXH_F.8_24R0020771_Statement of Work.pdf PDF
ESBD_373836_1724352533096_SOLICIEXH_F.7_24R0020771_Vendor Exceptions Form.pdf PDF
ESBD_373836_1726607877244_SOLADD_2_405-24R0020771.pdf PDF
ESBD_373836_1724352490939_SOLICIEXH_F.5_24R0020771_Direct Deposit Authorization.pdf PDF
ESBD_373836_1724352395275_SOLICIEXH_F.2_24R0020771_Information and Certifications Form.pdf PDF
ESBD_373836_1724352631546_SOLICIEXH_F.10_24R0020771_Goat Creek Tower Sample Project.pdf PDF
ESBD_373836_1724352514445_SOLICIEXH_F.6_24R0020771_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_373836_1724352452890_SOLICIEXH_F.4_24R0020771_Application for Texas Identification Number.pdf PDF
ESBD_373836_1724352661179_SOLICIEXH_F.11_24R0020771_Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_373836_1724352605818_SOLICIEXH_F.9_24R0020771_GEO Kerrville Radio Tower.pdf PDF
ESBD_373836_1724352347808_SOLICIEXH_F.1_24R0020771_ DPS Standard Terms and Conditions.pdf PDF
ESBD_373836_1726525724026_SOLADD_1_405-24R0020771.pdf PDF
ESBD_373836_1724352269594_SOLICI_405-24R0020771_913-16.pdf PDF
ESBD_373836_1724352347808_SOLICIEXH_F.1_24R0020771_ DPS Standard Terms and Conditions.pdf PDF
ESBD_373836_1724352661179_SOLICIEXH_F.11_24R0020771_Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_373836_1724352514445_SOLICIEXH_F.6_24R0020771_Request for Taxpayer Identification Number and Certification.pdf PDF
ESBD_373836_1724352269594_SOLICI_405-24R0020771_913-16.pdf PDF
ESBD_373836_1724352395275_SOLICIEXH_F.2_24R0020771_Information and Certifications Form.pdf PDF
ESBD_373836_1724352605818_SOLICIEXH_F.9_24R0020771_GEO Kerrville Radio Tower.pdf PDF
ESBD_373836_1724352533096_SOLICIEXH_F.7_24R0020771_Vendor Exceptions Form.pdf PDF
ESBD_373836_1724352490939_SOLICIEXH_F.5_24R0020771_Direct Deposit Authorization.pdf PDF
ESBD_373836_1724352428466_SOLICIEXH_F.3_24R0020771_HUB Subcontracting Plan.pdf PDF
ESBD_373836_1724352571366_SOLICIEXH_F.8_24R0020771_Statement of Work.pdf PDF
ESBD_373836_1724352452890_SOLICIEXH_F.4_24R0020771_Application for Texas Identification Number.pdf PDF
ESBD_373836_1724352631546_SOLICIEXH_F.10_24R0020771_Goat Creek Tower Sample Project.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM OF SOLICITATION

1. SOLICITATION NO.

405-24R0020771

2. ADDENDUM NO.

3. EFFECTIVE DATE

09/17/2024

4. ISSUED BY

Department of Public Safety

Procurement and Contract Services

5805 North Lamar Blvd. Bldg. A 1st floor

Austin, Texas 78752

5. NAME AND ADDRESS OF OFFEROR

6. The above numbered solicitation is amended as set forth in Item 7. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this addendum prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 5 and 8, and returning 3 copies of the addendum; (b) By acknowledging receipt of this addendum on each copy of the offer submitted; or (c) By separate letter or e-mail which includes a reference to the solicitation and addendum numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by e-mail or letter, provided each e-mail or letter makes reference to the solicitation and this addendum, and is received prior to the opening hour and date specified.

7. DESCRIPTION OF ADDENDUM:

1.To answer submitted questions.

Except as provided herein, all terms and conditions of the solicitation, as heretofore changed, remain unchanged and in full force and effect.

8a. NAME AND TITLE OF SIGNER (Type or Print)

8b. OFFEROR

(Signature of Person Authorized to Sign) Date Signed

Solicitation 405-24R0020771 Statewide Tower Replacement Questions and Answers

1. In response to a question 14 about which party is responsible for applicable surveys, Addendum No 1 stated that the contractor needed to clarify which surveys were being referenced. To clarify: which party is responsible for conducting land surveys to determine grade and develop a 1A letter?

Answer: The vendor.

2. Question 28 of Addendum 1 asked about specifications for an Uninterruptible Power Supply (UPS), to which the answer was "The SOW states the model and size of the UPS." We can find no mention of a UPS in the SOW nor in the shelter specs supplied with Addendum 1. Can you please tell us if the contractor is required to procure & install a UPS and the requisite specifications for such?

Answer: The vendor is required to procure & install a UPS. The specifications for the UPS are included on the SOW for the Goat Creek Tower Sample Project Exhibit F.10 and provided below for your convenience.

UPS

One (1) 20kVA Eaton 9PXM UPS, 1 Ph+N input/output, featuring 6 minutes of run time at full load with wall mounted Maintenance Bypass switches.

System startup includes one site trip by an Eaton technician after the UPS has been installed by vendor. The site trip includes the following services for each UPS: non-powered inspection, UPS electrical and operational checkout, full parts and labor for any remedial work required on the UPS or battery cabinets, and customer operation training. Warranty also includes remedial onsite labor, parts, and travel for the full two-year warranty period. The customer schedules warranty startup at the customers designated time.

Installation wiring and conduit per manufacturer’s instruction and the latest edition of the National Electrical Code NFPA70.

Any adjustments or testing at the final destination will be the responsibility of the customer unless otherwise provided for in writing. Vendor will, if requested, arrange to have a factory-authorized representative inspect the UPS system prior to utility power connection if requested. Any additional charges associated with this inspection will be negotiated separately.

3. If a UPS is required, we request an extension to source this specialized and costly item.

Answer: Responses due date will not be extended at this time.

SOLADD_2_405-24R0020771
Solicitation 405-24R0020771 Questions 2

File details come from the government source that posted it. Updated .