This document is an addendum to Solicitation 405-24R0020771 for the Statewide Tower Replacement project issued by the Department of Public Safety Procurement and Contract Services in Texas. The addendum clarifies that the vendor is responsible for conducting land surveys to determine grade and develop a 1A letter. It also provides specifications for a required 20kVA Eaton 9PXM UPS, including installation, startup, and warranty services. The solicitation is for turn-key radio communication tower services to support various statewide site projects required to design, construct, maintain, improve, decommission, or expand the state's radio communications infrastructure. The affected jurisdictions include Kenedy County and La Casita CDP in Texas. No extension to the response due date will be granted at this time.
The addendum does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or other salient financial information. The solicitation is for statewide radio tower replacement services, but the specific project scope, quantities, and other contract details are not fully disclosed in the provided documents.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM OF SOLICITATION
1. SOLICITATION NO.
405-24R0020771
2. ADDENDUM NO.
3. EFFECTIVE DATE
09/17/2024
4. ISSUED BY
Department of Public Safety
Procurement and Contract Services
5805 North Lamar Blvd. Bldg. A 1st floor
Austin, Texas 78752
5. NAME AND ADDRESS OF OFFEROR
6. The above numbered solicitation is amended as set forth in Item 7. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this addendum prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 5 and 8, and returning 3 copies of the addendum; (b) By acknowledging receipt of this addendum on each copy of the offer submitted; or (c) By separate letter or e-mail which includes a reference to the solicitation and addendum numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by e-mail or letter, provided each e-mail or letter makes reference to the solicitation and this addendum, and is received prior to the opening hour and date specified.
7. DESCRIPTION OF ADDENDUM:
1.To answer submitted questions.
Except as provided herein, all terms and conditions of the solicitation, as heretofore changed, remain unchanged and in full force and effect.
8a. NAME AND TITLE OF SIGNER (Type or Print)
8b. OFFEROR
(Signature of Person Authorized to Sign) Date Signed
Solicitation 405-24R0020771 Statewide Tower Replacement Questions and Answers
1. In response to a question 14 about which party is responsible for applicable surveys, Addendum No 1 stated that the contractor needed to clarify which surveys were being referenced. To clarify: which party is responsible for conducting land surveys to determine grade and develop a 1A letter?
Answer: The vendor.
2. Question 28 of Addendum 1 asked about specifications for an Uninterruptible Power Supply (UPS), to which the answer was "The SOW states the model and size of the UPS." We can find no mention of a UPS in the SOW nor in the shelter specs supplied with Addendum 1. Can you please tell us if the contractor is required to procure & install a UPS and the requisite specifications for such?
Answer: The vendor is required to procure & install a UPS. The specifications for the UPS are included on the SOW for the Goat Creek Tower Sample Project Exhibit F.10 and provided below for your convenience.
UPS
One (1) 20kVA Eaton 9PXM UPS, 1 Ph+N input/output, featuring 6 minutes of run time at full load with wall mounted Maintenance Bypass switches.
System startup includes one site trip by an Eaton technician after the UPS has been installed by vendor. The site trip includes the following services for each UPS: non-powered inspection, UPS electrical and operational checkout, full parts and labor for any remedial work required on the UPS or battery cabinets, and customer operation training. Warranty also includes remedial onsite labor, parts, and travel for the full two-year warranty period. The customer schedules warranty startup at the customers designated time.
Installation wiring and conduit per manufacturer’s instruction and the latest edition of the National Electrical Code NFPA70.
Any adjustments or testing at the final destination will be the responsibility of the customer unless otherwise provided for in writing. Vendor will, if requested, arrange to have a factory-authorized representative inspect the UPS system prior to utility power connection if requested. Any additional charges associated with this inspection will be negotiated separately.
3. If a UPS is required, we request an extension to source this specialized and costly item.
Answer: Responses due date will not be extended at this time.