ESBD_363502_1722625772753_HHS0014827 Response to Question - 2.pdf

PDF 70 KB Posted

Attached to
Project 20-104-ABL-B Generator Replacement at Abilene SSLC
Solicitation number
HHS0014827
Issued by
Taylor County, Abilene City, Texas

About this file

This document is a response to questions regarding a state and local contract opportunity for the Project 20-104-ABL-B Generator Replacement at the Abilene State Supported Living Center in Texas. The project scope includes furnishing labor, materials, and equipment for generator replacement, in accordance with the plans and specifications. The project is estimated to cost approximately $4,680,000. The solicitation schedule includes an optional pre-proposal webinar, two mandatory site visits, a deadline for submitting questions, a deadline for courtesy HUB subcontracting plan (HSP) review, a proposal submission deadline, an HSP submission deadline, and a public proposal opening. The anticipated notice of award is scheduled for August 19, with the contract start date in September 2024.

The document also provides information on the jurisdictions involved, which include Taylor County and the City of Abilene. It notes that the contractor should refer to the contract specifications for guidance on the required safety disconnects to be installed. No additional details are provided regarding pricing terms, set-asides, incumbents, funding requirements, or other salient information.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PCS 134 HHS Responses to Questions

Effective Date 06/26/2015 Version 1.00 Page 1 of 1 Revision Date 09/13/2023

Solicitation Title: Project 20-104-ABL-B Generator Replacement at Abilene SSLC

Solicitation Number: HHS0014827

# Reference Question Response

1.

Contract Specification section 26 05 00, Paragraph 1.19, C, 6

Addendum 3 Item #3 adding the EDP-A's and transformers; the drawings EAD.01 through EAD.03. The new power into the added J-box leaves the conductors between the J-box and transformer unfused. And, the conductors from the J-box to the chiller ATS unfused. I believe two more fused disconnects are required. Please advise. This would be at all three locations, six disconnects total

Concur. The additional Safety Disconnects should be installed.

Contractor should refer to Contract Specification section 26 05 00, paragraph 1.19, C, 6: “Furnish and install fusible or non-fusible disconnecting switches or NEC approved disconnecting means for motors and equipment that are not otherwise provide with same.” The disconnects should be installed at the split where the J-box wireway is indicated.