About this file

This document is an Addendum to a Request for Qualifications (RFQ) issued by the California Department of General Services Real Estate Services Division for the Exposition Park Underground Parking Structure, Office of Exposition Park Management Headquarters, Community Center and Park (EPUHC) project in Los Angeles, California. The project involves the design and construction of a new underground parking structure, surface parking areas, roadways, headquarters and community center building, infrastructure, and park. The RFQ has a mandatory briefing conference scheduled for August 8, 2024, and Statements of Qualifications are due by September 10, 2024. The Design-Build contract award is currently scheduled for late spring 2025.

The project is estimated to cost approximately $307 million, and the State is seeking Design-Build entities that can provide professional architectural/engineering and construction services. The Design-Build team must include an architect, general contractor, structural engineer, landscape architect, and other discipline-specific consultants. The project is required to achieve a minimum LEED Gold certification and Zero Net Energy (ZNE) standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

Page 1 of 1 12509

STATE OF CALIFORNIA

DEPARTMENT OF GENERAL SERVICES

REAL ESTATE SERVICES DIVISION

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Date: August 28, 2024

ADDENDUM No. 2 TO THE REQUEST FOR QUALIFICATIONS

SOQ Package Due Date – September 10, 2024

EXPOSITION PARK

UNDERGROUND PARKING STRUCTURE, OFFICE OF EXPOSITION PARK MANAGEMENT

HEADQUARTERS, COMMUNITY CENTER AND PARK

DEPARTMENT OF GENERAL SERVICES

LOS ANGELES, CALIFORNIA

PROJECT NO. 12509

REVISE THE CONTRACT DOCUMENTS AS FOLLOWS:

1) Change Part A – QUESTIONNAIRE: Section 6 Termination/Failure to Complete; Violations;

Claims, Arbitration and Litigation: add item 6.8 below:

6.8 Provide a declaration that the Design-Build Entity will comply with all other provisions of law applicable to the Project, including, but not limited to, the requirements of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.

2) Change Part D – SELECTION: SCORING SUMMARY (PARTS A, B, AND C): Part B Experience, Section 2: replace “AOR’s Project Manager” with “AOR’s Lead Designer.”

AOR’s Project Manager Lead Designer

3) Change Part A – QUESTIONNAIRE forms: Section 6 Termination/Failure to Complete;

Violations; Claims, Arbitration and Litigation: add form for item 8 declaration that DBE will comply with all other provisions of law.

See attached added form.

END OF ADDENDA 02

Exposition Park Underground Parking Structure, Management Headquarters, Community Center & Park (EPUHC)

REQUEST FOR QUALIFICATIONS

PART A - QUESTIONNAIRE EPUHC

Project No.12509 August 5, 2024

6. TERMINATION/FAILURE TO COMPLETE; VIOLATIONS; CLAIMS,

ARBITRATION AND LITIGATION (continued)

8. Provide a declaration that the Design-Build Entity will comply with all other provisions of law applicable to the Project, including, but not limited to, the requirements of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code. [Addendum No. 02]

Declaration:

I, ___________________________________________________________, authorized agent of the Design-Build Entity, ____________________________________ (Design-Build Entity), hereby certifies that the Design-Build Entity will comply with all other provisions of law applicable to the

Project, including, but not limited to, the requirements of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.

Printed: Dated:

Signed: Dated: