This document is a Request for Qualifications (RFQ) issued by the California Department of General Services Real Estate Services Division Project Management and Development Branch for the Exposition Park Underground Parking Structure, Office of Exposition Park Management Headquarters, Community Center and Park (EPUHC) project in Los Angeles, California. The project consists of the design and construction of a new underground parking structure, surface parking areas, roadways, headquarters and community center building, infrastructure, and park. The RFQ requests qualifications from interested Design-build Entities to provide professional Architectural/Engineering and Construction services for the project. A mandatory RFQ Briefing Conference is scheduled for August 8, 2024, and Statements of Qualifications must be submitted by September 10, 2024. The Design-build contract award is currently scheduled for late Spring 2025.
The State is using the Design-build method of project delivery and has established an estimated stipulated sum of approximately $307,000,000 for the project. The project will be designed and constructed for LEED Gold certification at a minimum and Zero Net Energy (ZNE). The State has small business and disabled veterans business enterprise (DVBE) program goals and requirements for this project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNA HIGHWAY PATROL – VENTURAVENTURA REPLACEMENT FACILITY
REQUEST FOR QUALIFICATIONS
Exposition Park Underground Parking Structure, Management Headquarters, Community Center & Park (EPUHC)
REQUEST FOR QUALIFICATIONS
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Exposition Park Underground Parking Structure, Office of Exposition Park Management Headquarters, Community Center and Park (EPUHC)
Los Angeles, California
REQUEST FOR QUALIFICATIONS
PROJECT NO: 12509
PART B - EXPERIENCE
· Project Profiles (Design – Architect)
· Project Profiles (Construction – General Contractor)
August 5, 2024
PROJECT PROFILE INFORMATION SHEET
DESIGN - ARCHITECT
Submit profiles for no more than five (5) projects completed within the last fifteen (15) years or under current contract. Photos and other graphic materials may be included.
Project Manager (for Architect): ______________________________________________________________________
Principal in Charge:_________________________________________________________________________________________
Project Name & Description:_________________________________________________________________________
Location: _________________________________________________________________________________________
Owner: ____________________________ Representative: _____________________________ Telephone: __________
General Contractor: ____________________________________ Structural Engineer: ___________________________
Mechanical Engineer: ___________________________________ Electrical Engineer:____________________________
Construction Manager: __________________________________ Other Relevant Consultants:_____________________
Project Type: ______________________________________________ Gross Square Footage: ____________________
Scheduled Completion Date: ___________________________________ Actual Completion Date: __________________
Explain Difference, if any: ____________________________________________________________________________
Original Contract Amount: _________________________ Final Contract Amount: _______________________________
Explain Difference, if any: ____________________________________________________________________________
Describe Design Delivery Method:____________________________________________________________________
Sustainable Building Measure Incorporated (Provide additional sheets.):
1. Energy Efficiency Measures (describe).
2. Recycling, Resource Efficiency, Building Materials, Waste Reduction (describe).
3. Indoor Air Quality, Use of Low Emission/Toxicity Materials (describe).
4. Alternative Energy Sources (describe).
5. Other Sustainable Building Measures (describe).
Other Relevant Factors from the RFQ – Provide additional sheets up to three (3) total per project responding to requested information: Provide examples of projects completed and describe the design approach. Include information that addresses the architect’s ability to design a project demonstrating:
1. Design of Underground Parking Structure, Underground Structure, Community Center, Headquarters Building, Large Park Landscape Space or projects similar in nature and complexity.
2. A commitment to energy efficiency, sustainability, and environmental sensitivity, including projects completed that meet USGBC criteria for LEED certification.
3. Efficient operations which are flexible and functional for future needs.
4. Designs that achieve community goals, successfully relate to planned and existing development.
5. Sensitivity to the local context of social, cultural, environmental, and built influences of the surrounding community.
6. Awards/Recognition – Provide information regarding any national, regional, or local awards or recognitions received for exceptional design in architecture and/or sustainability.
ATTACH UP TO FOUR (4) ADDITIONAL PROJECTS AS REQUIRED
2. PROJECT PROFILE INFORMATION SHEET
CONSTRUCTION - GENERAL CONTRACTOR
Submit profiles for no more than five (5) projects completed within the last fifteen (15) years or under current contract. Photos and other graphic materials may be included.
Project Manager: _________________________________________________________________________________
Principal in Charge:________________________________________________________________________________________
Project Name & Description:__________________________________________________________________________
Location: _________________________________________________________________________________________
Owner: ____________________________ Representative: _____________________________ Telephone: __________
General Contractor: ____________________________________ Structural Engineer: ___________________________
Architect: __________________________________________ Electrical Engineer:______________________________
Construction Manager: __________________________________ Other Relevant Consultants:_____________________
Project Type: ______________________________________________ Gross Square Footage: ____________________
Scheduled Completion Date: ___________________________________ Actual Completion Date: __________________
Explain Difference, if any: ____________________________________________________________________________
Original Contract Amount: _________________________ Final Contract Amount: _______________________________
Explain Difference, if any: ____________________________________________________________________________
Describe Design Delivery Method:_______________________________________________________
Sustainable Building Measure Incorporated (Provide additional sheets):
1. Energy Efficiency Measures (describe).
2. Recycling, Resource Efficiency, Building Materials, Waste Reduction (describe).
3. Indoor Air Quality, Use of Low Emission/Toxicity Materials (describe).
4. Alternative Energy Sources (describe).
5. Other Sustainable Building Measures (describe).
Other Relevant Factors from the RFQ – Provide additional sheets up to three (3) total per project responding to requested information: Provide examples of projects completed and describe the design approach. Include information that addresses the architect’s ability to design a project demonstrating:
1. Construction of Underground Parking Structure, Underground Structure, Community Center, Headquarters Building, Large Landscape Space or projects similar in nature and complexity.
2. High Performance projects that had a commitment to energy efficiency, sustainability, and environmental sensitivity, including projects completed that meet USGBC criteria for LEED certification.
3. Efficient operations which are flexible and functional for future needs.
4. Projects that achieve community goals, successfully relate to planned and existing development.
5. Sensitivity to the local context of social, cultural, environmental, and built influences of the surrounding community.
6. Awards/Recognition – Provide information regarding any national, regional, or local awards or recognitions received for exceptional design in architecture and/or sustainability.
ATTACH UP TO FOUR (4) ADDITIONAL PROJECTS AS REQUIRED
| PART B - EXPERIENCE | EPUHC |
| Project No. 12509 | August 5, 2024 |
image1.png image2.jpeg
File details come from the government source that posted it. Updated .