ENMWUA Geotechnical Data Report Texico Apr23.pdf

PDF 6 MB Posted

Attached to
ENMRWS Texico Lateral
Solicitation number
25-0126-01
Issued by
Chaves County, New Mexico

About this file

The document is a Geotechnical Data Report prepared by GEOMAT Inc. for the Eastern New Mexico Water Utility Authority (ENMWUA) for the Texico Lateral Pipeline project. The report details the results of a geotechnical field exploration and laboratory testing conducted between September and October 2022, involving 22 soil borings (numbered TL-BH-1 through TL-BH-22) along the proposed pipeline alignment. The project involves a new water pipeline approximately 4.5 miles in length, starting at the intersection of New Mexico Highway 523 and Curry County Road D, running east to New Mexico Highway 108, and ending in the town of Texico, New Mexico.

The geotechnical investigation focused on collecting subsurface data to support pipeline design and construction, analyzing soil conditions, groundwater levels, and potential engineering challenges. Laboratory testing included sieve analysis, hydrometer tests, moisture content measurements, Atterberg limits, consolidation tests, and chemical analyses for chlorides, sulfates, and soil resistivity. The report found that groundwater was not encountered in any of the borings, and soil classifications were predominantly Sandy Lean Clay (CL) with varying amounts of sand. Chemical tests indicated the soils have negligible to mild potential for corrosion of concrete and are characterized as severely to moderately corrosive to ferrous metals, which may require special consideration during pipeline design and construction.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENMWUA GEOTECHNICAL DATA REPORT TEXICO APR2023.DOCX TL – 19

T E C H N I C A L M E M O R A N D U M T L – 1 9

ENMWUA Texico Lateral Pipeline – Geotechnical Data Report

PREPARED FOR: Eastern New Mexico Water Utility Authority (ENMWUA) PREPARED BY: GEOMAT Inc., a subconsultant to Jacobs DATE: April 2023

The purpose of this Technical Memorandum (TM) is to present the results of the geotechnical field exploration and subsequent laboratory testing performed by GEOMAT Inc. (GEOMAT) along the proposed Texico Lateral (TL) Pipeline alignment for the Eastern New Mexico Rural Water System (ENMRWS). The objective of this exploration was to collect additional geotechnical data to support development of the pipeline during final design and construction. This data report includes the results of 22 soil borings (numbered TL-BH-1 through TL-BH-22) drilled between September and October 2022.

GEOTECHNICAL DATA REPORT

EASTERN NEW MEXICO REGIONAL WATER SYSTEM

TEXICO LATERAL PIPELINE

TEXICO, NEW MEXICO

Submitted To:

Kevin Brusso, P.E.

Jacobs Engineering Group

3721 Rutledge Road NE, Suite B-1

Albuquerque, New Mexico 87109

Submitted By:

GEOMAT Inc.

4529 Arrowhead Ridge Drive SE, Suite 102

Rio Rancho, New Mexico 87124

March 2, 2023

GEOMAT Project 222-4120R

Geotechnical Data Report GEOMAT Project No. 222-4120R

ENMRWS Texico Lateral Pipeline

TABLE OF CONTENTS

Page No.

INTRODUCTION

PROPOSED CONSTRUCTION

SITE EXPLORATION

Field Exploration

Laboratory Testing

SITE CONDITIONS

SUBSURFACE CONDITIONS

Groundwater Conditions

Laboratory Test Results

Soil Unconfined Compressive Strength Test Results

Chemical Test Results

Corrosion of Concrete

Corrosion of Metals

GENERAL COMMENTS

Geotechnical Data Report GEOMAT Project No. 222-4120R

ENMRWS Texico Lateral Pipeline

LIST OF APPENDICES

APPENDIX A

Site Plans

Test Drilling Equipment and Procedures

Logs of Borings

Unified Soil Classification System

APPENDIX B

Laboratory Testing Procedures

Summary of Soil Tests

Consolidation Test Results

Hydrometer Results

Summary of Chemical Tests

Chemical Testing Reports

APPENDIX C

Site Photographs

APPENDIX D

Important Information About This Geotechnical Engineering Report (Taken From GBA)

GEOTECHNICAL DATA REPORT

EASTERN NEW MEXICO REGIONAL WATER SYSTEM

TEXICO LATERAL PIPELINE

TEXICO, NEW MEXICO

GEOMAT PROJECT NO. 222-4120R

INTRODUCTION

This report contains the results of our geotechnical exploration for the proposed Eastern New

Mexico Regional Water System (ENMRWS) Texico Lateral (TL) Pipeline project in Texico, New Mexico, as shown on the Site Plans in Appendix A of this report.

The purpose of these services is to provide geotechnical data and observations regarding:

• subsurface soil conditions

• groundwater conditions

• soil engineering properties

The data contained in this report is based upon the results of field and laboratory testing, as presented below.

PROPOSED CONSTRUCTION

We understand that the proposed ENMRWS Texico Lateral Pipeline project will consist of a new water pipeline that is expected to be approximately 4.5 miles in length. The pipeline is planned to begin at the intersection of New Mexico Highway 523 and Curry County Road D, running east to New Mexico Highway 108, and ending in the town of Texico, New Mexico.

SITE EXPLORATION

Our scope of services performed for this project included a subsurface exploration program, laboratory testing, and preparation of a geotechnical data report.

Field Exploration:

Subsurface conditions along the Texico Lateral Pipeline alignment were explored between

September 19th and October 19th, 2022 by drilling twenty-two (22) exploratory borings at the approximate locations shown on the Site Plans in Appendix A. The boring locations were

Geotechnical Data Report GEOMAT Project No. 222-4120R

ENMRWS Texico Lateral Pipeline Page 2 specified and marked in the field by Jacobs representatives. If necessary, some boring locations were adjusted to allow for drill rig access or utility line avoidance. The northings, eastings, and elevations for the boring locations were obtained from the final survey data provided to us by

Jacobs and are listed on the Boring Logs in Appendix A, having the units of US survey feet. All coordinates are on the New Mexico east state plane coordinate system, and all elevations are

NAVD88. At various locations across the alignment, some borings were terminated short of the planned depths due to auger refusal. The table below summarizes the planned boring depths and total depths reached.

Boring No. Planned Depth (ft) Total Depth (ft)

TL BH-1 25 26

TL BH-2 35 14 ½

TL BH-3 35 14 ¼

TL BH-4 25 26 ½

TL BH-5 25 26

TL BH-6 25 26 ½

TL BH-7 25 26

TL BH-8 25 26 ½

TL BH-9 25 26

TL BH-10 25 26 ½

TL BH-11 25 26

TL BH-12 25 26 ½

TL BH-13 25 26

TL BH-14 25 26 ½

TL BH-15 25 25 ¾

TL BH-16 35 35 ½

TL BH-17 35 35 ¼

TL BH-18 25 26 ½

TL BH-19 25 26

TL BH-20 25 26 ½

TL BH-21 35 36 ½

TL BH-22 35 36

The borings were advanced using a CME-55 truck-mounted drill rig with continuous-flight, 7 ¼-inch O.D. hollow-stem augers. The borings were continuously monitored by engineers from our office who examined and classified the subsurface materials encountered, obtained representative samples, observed groundwater conditions, and maintained a continuous log of each boring.

ENMRWS Texico Lateral Pipeline Page 3

Soil samples were obtained from the borings using a combination of standard 2-inch O.D. split spoon and 3-inch O.D. ring-lined barrel samplers. The samplers were driven using a 140-pound hammer falling 30 inches. The standard penetration resistance was determined by recording the number of hammer blows required to advance the sampler in six-inch increments.

Representative bulk samples of subsurface materials were also obtained.

Boring logs were prepared and are presented in Appendix A. Soils were classified in accordance with the Unified Soil Classification System described in Appendix A. Relative Drilling

Resistance (RDR) is noted on the boring logs on a scale of 1 to 5. The RDR criteria is presented in the following table.

Relative Drilling Resistance (RDR) Criteria

RDR Value Term Criteria Typical Conditions

1 Very Easy

No chatter, very little resistance, very fast and steady drill advance rate

Very soft to soft silts and clays; very loose to loose silts and sands; no gravel, cobbles, boulders or rubble

2 Easy

No chatter, some resistance, fast and steady drill advance rate

Firm to stiff silts and clays; loose to medium dense silts and sands; little or no gravel, no to very few cobbles, boulders, or pieces of rubble

3 Moderate

Some chatter, firm drill resistance with moderate advance rate

Stiff to very stiff silts and clays; dense silts and sands; medium dense sands and gravel;

occasional cobbles or rubble pieces (2-3 occurrences per 10 ft)

4 Hard

Frequent chatter and variable drill resistance, slow advance rate

Very stiff to hard silts and clays with some gravel and cobbles; very dense to extremely dense silts and sands with some gravel; dense to very dense sands and gravel; very weathered, soft bedrock; frequent cobbles and boulders or rubble pieces (3-4 per 10 ft)

5 Very Hard

Constant chatter, variable and very slow drill advance, nearly refusal

Hard to very hard silts and clays with some gravel; very dense to extremely dense gravelly sand or sandy gravel; very frequent cobbles and boulders (at least 5 per 10 feet);

weathered, very jointed bedrock

ENMRWS Texico Lateral Pipeline Page 4

Laboratory Testing:

Samples retrieved during the field exploration were transported to our laboratory for further evaluation. At that time, the field descriptions were confirmed or modified as necessary, and laboratory tests were performed to evaluate the engineering properties of the subsurface materials.

SITE CONDITIONS

Site photographs are presented in Appendix C. The photos provide a general indication of the surface conditions along the alignment.

SUBSURFACE CONDITIONS

Subsurface condition details are shown on the Boring Logs presented in Appendix A.

Groundwater Conditions:

Groundwater was not encountered in any of the borings to the depths explored. Groundwater elevations can fluctuate over time depending upon precipitation, irrigation, runoff, and infiltration of surface water. We do not have any information regarding the historical fluctuation of the groundwater level in this vicinity.

Laboratory Test Results:

Laboratory testing was performed on select samples throughout the pipe alignment. Laboratory testing included the following:

• Sieve Analysis (ASTM C136)

• Hydrometer (ASTM D7928)

• Oven-Dried Moisture Content (ASTM D2216)

• In-Situ Moisture/Density (ASTM D7263)

• Atterberg Limits (ASTM D4318)

• Compression/Expansion (ASTM D2435)

• Swell (ASTM D4546) with Modified Proctor – Method A (ASTM D1557)

• Soil Unconfined Compressive Strength

• Chemical Testing:

- Soluble Chlorides (EPA Method 300.0)

- Soluble Sulfates (ASTM C1580-20)

- Soil Resistivity (ASTM G187-18)

ENMRWS Texico Lateral Pipeline Page 5

- pH (ASTM G51-18)

- Carbonate Content (ASTM D4373-21)

Detailed results of the laboratory testing are presented in Appendix B.

Soil Unconfined Compressive Strength Test Results:

Unconfined compressive strength tests were conducted on select samples of soil. The tests were not performed in accordance with ASTM D2166 due to the samples’ dimensions not meeting the requirements for that standard. The summary of the unconfined compressive strength results is presented in the table below.

Lab No. Boring No.

Sample

Depth (ft)

Unconfined

Compressive

Strength (psf)

Cohesion

(psf)

(Estimated)

Axial

Strain (%)

10043 TL BH-1 7 ½ 13,211 6,605 1.1

10067 TL BH-12 10 4,377 2,189 0.1

10428 TL BH-18 5 - - -

10431 TL BH-19 7 ½ - - -

The samples from borings TL BH-18 and TL BH-19 were evaluated for suitability of unconfined compressive strength tests; however, the soils lacked enough cohesion to be able to adequately run the tests.

Chemical Test Results:

Select samples of soil were tested to evaluate the potential for the on-site soils to corrode buried metal and/or concrete. As requested, the samples were tested for pH, resistivity, soluble sulfates, and chlorides. Samples that were tested for soluble chlorides were submitted to an independent analytical laboratory. Summarized chemical testing results and complete reports of the soluble chloride results are included in Appendix B. Discussions of the soluble sulfates and resistivity results pertaining to corrode buried metal and/or concrete are below.

• Corrosion of Concrete:

The soluble sulfate contents of the samples tested are less than 0.02 percent (by weight), therefore, the soils tested may be characterized as having negligible to mild potential for corrosion (IBC Table 1904.3). According to the American Concrete Institute Building Code

318, when the sulfate content is less than 0.10 percent by weight, there are no restrictions on the type of cement to be used.

ENMRWS Texico Lateral Pipeline Page 6

• Corrosion of Metals:

Corrosion of buried ferrous metals can occur when electrical current flows from the metal into the soil. As the resistivity of the soil decreases, the flow of electrical current increases, increasing the potential for corrosion. A commonly accepted correlation between soil resistivity and corrosion of ferrous metals is shown in the following table.

Resistivity (ohm-cm) Corrosivity

0 to 1,000 Severely Corrosive

1,000 to 2,000 Corrosive

2,000 to 10,000 Moderately Corrosive

>10,000 Mildly Corrosive

The samples tested had resistivity values ranging between 500 and 3,000 ohm-cm. Based on these laboratory results and the table above, the on-site soils would be characterized as severely corrosive to moderately corrosive toward ferrous metals.

GENERAL COMMENTS

Our professional services were performed using that degree of care and skill ordinarily exercised, under similar circumstances, by reputable geotechnical engineers practicing in this or similar localities at the same time. No warranty, express or implied, is intended or made. We prepared the report as an aid in design of the proposed project. This report is not a bidding document.

Any contractor reviewing this report must draw his own conclusions regarding site conditions and specific construction equipment and techniques to be used on this project. This report is for the exclusive purpose of providing geotechnical data. The scope of services for this project does not include, either specifically or by implication, any environmental assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner is concerned about the potential for such contamination, other studies should be undertaken.

This report may be used only by the Client and only for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both on and off site), or other factors may change over time and additional work may be required with the passage of time. Any party, other than the Client, who wishes to use this report, shall notify GEOMAT in writing of such intended use. Based on the intended use of the report, GEOMAT may require that additional work be performed and that an updated report be issued. Non-compliance with any of these requirements, by the Client or anyone else, will release GEOMAT from any liability resulting from the use of this report by an unauthorized party.

Appendix A

Vicinity Map (approximate)

Approximate

Not to Scale

PROJECTSITE PLAN (Page 1 of 6)

GEOMAT Project No. 222-4120R

Dates of Exploration: 9/19 - 10/19/2022

ENMRWS Texico Lateral Pipeline Texico, New Mexico

N M

-108

NM-523

US Hwy-60/84 E/Wheeler Avenue

Proposed Texico Lateral Pipeline Alignment

Site Plan

Site Plan

Site Plan

Site Plan

Site Plan

Boring Locations (approximate)

Not to Scale

PROJECTSITE PLAN (Page 2 of 6)

ENMRWS Texico Lateral Pipeline Texico, New Mexico

TL BH-4NM-523

C urry C ounty R o ad C

GEOMAT Project No. 222-4120R

Dates of Exploration: 9/19 - 10/19/2022

TL BH-2

TL BH-3

TL BH-1 TL BH-5

C urry C ounty R o ad D

Not to Scale

PROJECTSITE PLAN (Page 3 of 6)

ENMRWS Texico Lateral Pipeline Texico, New Mexico

TL BH-8NM-523

GEOMAT Project No. 222-4120R

Dates of Exploration: 9/19 - 10/19/2022

TL BH-6 TL BH-9

C u rry C ounty R oad C

TL BH-7

Not to Scale

PROJECTSITE PLAN (Page 4 of 6)

ENMRWS Texico Lateral Pipeline Texico, New Mexico

TL BH-12NM-523

N M

-108

GEOMAT Project No. 222-4120R

Dates of Exploration: 9/19 - 10/19/2022

TL BH-10

TL BH-13

TL BH-11

TL BH-14

Not to Scale

PROJECTSITE PLAN (Page 5 of 6)

ENMRWS Texico Lateral Pipeline Texico, New Mexico

TL BH-17

N M

- 108

GEOMAT Project No. 222-4120R

Dates of Exploration: 9/19 - 10/19/2022

TL BH-15

TL BH-18

TL BH-16

Curry County Road 10

Not to Scale

PROJECTSITE PLAN (Page 6 of 6)

ENMRWS Texico Lateral Pipeline Texico, New Mexico

TL BH-20

Craig Avenue

N M

-108

GEOMAT Project No. 222-4120R

Dates of Exploration: 9/19 - 10/19/2022

TL BH-19

TL BH-21 TL BH-22

Hutson Avenue

63 22

Sandy Lean CLAY, light reddish-brown to tan, stiff to very stiff, slightly damp to moist, RDR 2

PP 4.5

PP 1.0

PP 3.0

RDR 3

PP 4.5

trace caliche RDR 3 to 4 carbonate cementation lenses caliche gravels

Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 26 feet

105.9

9-12

3-5-6

7-13

4-4-6

16-30

3-3-7

15-27

R

SS

R

SS

R

SS

R

CL

11.8

10.5

11.9

13.5

9.9

12.2

10.6

Hammer Weight: 140 lbs

Date Drilled: 9/19/2022

Elevation: 4202.2

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 916178.0

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246201.1

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-1

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

A T

2-

R

.G P

J G

E O

M A

T .G

D T

/9 /2

Clayey SAND, reddish-brown, fine- to coarse-grained, medium dense, slightly damp, RDR 2

Lean Clay with varying amounts of Sand, tan to reddish-brown, medium stiff to hard, slightly damp to moist, RDR 2 to 3

PP 4.5

RDR 3

PP 4.5

RDR 3 to 4 no sample recovery, caliche gravels in auger cuttings caliche gravels, slight grinding RDR 4 to 5, harder grinding Auger Refusal at approximately 14 ½ feet on caliche Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 14 ½ feet

9-8-12

10-13

4-3-5

6-9

50/½"

50/½"

SS

R

SS

R

SS

SS

SC

CL

10.7

11.9

12.8

12.5

Hammer Weight: 140 lbs

Date Drilled: 9/19/2022

Elevation: 4195.2

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 917110.0

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246210.3

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-2

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

57 19

Sandy Lean CLAY, reddish-brown to light reddish brown, stiff to hard, slightly damp, RDR 2 trace white carbonate cementation RDR 2 to 3

PP 4.5

poor sample recovery, caliche gravels grinding, RDR 4 to 5 Auger Refusal at approximately 14 ¼ feet on caliche Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 14 ¼ feet

95.2

111.8

13-15

9-8-6

11-13

7-9-8

10-16

50/3"

R

A

SS

R

SS

R

SS

CL

8.5

7.8

9.6

10.9

Hammer Weight: 140 lbs

Date Drilled: 9/19/2022

Elevation: 4195.1

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 917109.4

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246169.9

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-3

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Bulk, Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Sandy Lean CLAY, tan to reddish-brown, very stiff to hard, slighly damp to moist, RDR 2

PP 3.0

RDR 2 to 3

PP 3.5

trace carbonate cementation trace carbonate cementation

PP 4.5

RDR 3

Average Drilling Rate with Sampling = 0.6 ft/min Total Depth 26 ½ feet

100.7

8-9-11

21-24

8-16-9

16-19

7-10-12

17-38

13-16-19

SS

R

SS

R

SS

R

SS

CL

7.8

6.5

10.9

9.7

12.0

11.7

8.3

Hammer Weight: 140 lbs

Date Drilled: 9/20/2022

Elevation: 4188.5

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 918329.1

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246187.3

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-4

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Lean CLAY with varying amounts of Sand, light reddish-brown to tan, very stiff, slightly damp to moist, RDR 2 white carbonate cementation trace white/tan caliche gravels

PP 4.5

PP 4.5

Silty SAND, light reddish-brown, fine- to coarse-grained, medium dense, slightly damp to moist, RDR 2 trace clay

Sandy Lean CLAY, reddish-brown, very stiff, slightly damp to moist, RDR 2

PP 4.5

Average Drilling Rate with Sampling = 0.6 ft/min Total Depth 26 feet

11-17

6-7-6

13-22

11-11-10

11-22

9-9-12

11-23

R

SS

R

SS

R

SS

R

CL

SM

CL

8.0

7.9

7.9

12.8

13.7

Hammer Weight: 140 lbs

Date Drilled: 9/20/2022

Elevation: 4184.5

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 919627.5

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246200.4

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-5

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Sandy Lean CLAY, tan to reddish-brown, stiff to hard, slightly damp, RDR 2

RDR 2 to 3

PP 4.5

tan/white carbonate cementation

PP 3.75

tan/white carbonate cementation

RDR 3

PP 4.5

trace caliche gravels carbonate cementation Average Drilling Rate with Sampling = 0.5 ft/min Total Depth 26 ½ feet

94.8

5-8-12

13-26

7-8-12

8-14

12-11-17

20-44

14-19-18

SS

R

SS

R

SS

R

SS

CL

7.5

6.0

7.7

8.0

14.2

11.2

12.0

Hammer Weight: 140 lbs

Date Drilled: 9/20/2022

Elevation: 4179.2

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 920866.4

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246214.3

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-6

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 5' South

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

67 17

Sandy Lean CLAY, tan to reddish-brown, medium stiff to very stiff, dry to moist, RDR 2

PP 4.5

trace carbonate cementation

PP 3.75

RDR 2 to 3

PP 4.5

trace carbonate cementation

RDR 3

silty sand lens PP 4.5, trace carbonate cementation Average Drilling Rate with Sampling = 0.6 ft/min Total Depth 26 feet

9-12

5-5-7

16-27

8-7-8

18-37

4-3-4

24-27

R

A

SS

R

SS

R

SS

R

CL

8.5

7.9

10.3

10.3

10.6

10.3

Hammer Weight: 140 lbs

Date Drilled: 9/20/2022

Elevation: 4175.1

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 922126.3

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246237.1

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-7

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Bulk, Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

65 20

Sandy Lean CLAY, light reddish-brown to brown to tan, very stiff to hard, slightly damp, RDR 2

PP 4.0

carbonate cementation

RDR 2 to 3

PP 4.5

RDR 3, caliche gravels harder drilling

PP 4.5

sandy lens, tan carbonate cementation

RDR 2 to 3

PP 4.5

RDR 3, some weak caliche

Average Drilling Rate with Sampling = 0.6 ft/min Total Depth 26 ½ feet

8-9-12

13-22

10-13-16

22-31

11-10-12

50/4"

14-23-29

SS

R

SS

R

SS

R

SS

CL

7.7

7.4

9.2

7.4

11.6

11.7

5.9

Hammer Weight: 140 lbs

Date Drilled: 9/20/2022

Elevation: 4173.9

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 923401.0

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246232.8

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-8

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 21' South

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

77 18

Lean CLAY with varying amounts of SAND, white to light brown, very stiff to hard, dry to slightly damp, RDR 2 caliche gravels

RDR 2 to 3

RDR 2

sandy lens

RDR 2 to 3, slight grinding Silty SAND, light reddish-brown, fine- to medium-grained, medium dense to dense, slightly damp, RDR 2 to 3 trace white carbonate cementation white carbonate cementation trace white carbonate cementation Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 26 feet

22-31

13-14-13

22-39

17-31-38

13-20

30-26-19

26-30

R

SS

R

SS

R

SS

R

CL

SM

5.4

7.3

7.7

8.2

Hammer Weight: 140 lbs

Date Drilled: 9/20/2022

Elevation: 4170.9

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 924609.8

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246241.5

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-9

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 21' South

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Lean CLAY with varying amounts of Sand, light brown to reddish-brown, very stiff to hard, slightly damp, RDR 2 light brown carbonate cementation white carbonate cementation, PP 4.5

PP 3.5

grinding, caliche lens (approx. 12 to 13 ½ feet), RDR 4 to 5

Silty SAND, reddish-brown, fine- to coarse-grained, medium dense to very dense, slightly damp, RDR 2 to 3

PP 4.5

slight grinding, RDR 4 white caliche gravels

Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 26 ½ feet

7-7-10

6-9

11-11-13

19-50/5"

19-40- 50/4"

12-13-20

13-33

19-16-35

SS

R

SS

R

SS

SS

R

SS

CL

SM

6.9

7.6

8.5

9.5

6.6

Hammer Weight: 140 lbs

Date Drilled: 9/21/2022

Elevation: 4170.7

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 925772.8

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246251.5

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-10

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 22' South

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Lean Clay with varying amounts of SAND, brown to reddish-brown, stiff to hard, slightly damp to moist, RDR 2

PP 4.5

caliche gravels

PP 3.5

white/tan carbonate cementation

PP 4.5

RDR 2 to 3 trace caliche gravels

RDR 3

PP 4.5

Average Drilling Rate with Sampling = 0.7 ft/min Total Depth 26 feet

9-10

7-6-8

12-12

8-9-10

17-31

7-6-7

15-33

R

SS

R

SS

R

SS

R

CL

7.7

6.2

9.0

10.2

13.9

12.4

9.8

Hammer Weight: 140 lbs

Date Drilled: 9/21/2022

Elevation: 4172.8

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 926812.2

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246286.6

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-11

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

65 14

Sandy Lean CLAY, light brown to reddish-brown, soft to hard, slightly damp to moist, RDR 2 trace organic material

PP 4.25

trace tan carbonate cementation

PP 4.25

trace tan carbonate cementation

RDR 2 to 3

PP 4.5

with white mineral veins, trace caliche gravel, RDR 3 to 4 lens of increased moisture

Average Drilling Rate with Sampling = 0.6 ft/min Total Depth 26 ½ feet

104.5

3-3-3

5-6

2-3-4

3-3

7-9-21

17-37

6-8-38

SS

R

SS

R

SS

R

SS

CL

12.6

15.0

14.6

12.8

17.9

17.5

10.2

Hammer Weight: 140 lbs

Date Drilled: 9/21/2022

Elevation: 4171.4

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927948.4

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1246276.2

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-12

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Sandy Lean CLAY, tan to reddish-brown, medium stiff to very stiff, slightly damp to moist, RDR 2

PP 4.5

trace white carbonate cementation

PP 4.5

RDR 2 to 3

PP 3.75

trace white carbonate cementation, RDR 3

RDR 3 to 4

PP 4.5

Average Drilling Rate with Sampling = 0.7 ft/min Total Depth 26 feet

5-5

9-7-5

7-8

6-7-9

11-22

7-7-9

10-9

R

A

SS

R

SS

R

SS

R

CL

16.4

15.0

10.5

11.5

12.3

16.3

13.9

Hammer Weight: 140 lbs

Date Drilled: 9/21/2022

Elevation: 4168.8

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927959.4

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1245010.4

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-13

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Bulk, Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Sandy Lean CLAY, tan to reddish-brown, medium stiff to hard, slightly dense to moist, RDR 2

PP 4.5

PP 3.0

silty lens

RDR 2 to 3

Average Drilling Rate with Sampling = 0.8 ft/min Total Depth 26 ½ feet

3-3-3

6-10

4-34

5-6

2-2-4

4-4

5-5-6

SS

R

SS

R

SS

R

SS

CL

11.1

15.6

14.4

13.1

14.0

17.6

14.6

Hammer Weight: 140 lbs

Date Drilled: 9/21/2022

Elevation: 4161.0

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927977.1

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1243754.9

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-14

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Sandy Lean Clay, tan to reddish-brown, stiff to hard, slightly damp to moist, RDR 2 to 3

PP 4.5

with carbonate cementation

RDR 3

PP 4.5

RDR 2 to 3 trace caliche gravel

PP 4.5

RDR 3

RDR 3

trace caliche gravel

PP 4.5

Average Drilling Rate with Sampling = 0.8 ft/min Total Depth 25 ¾ feet

7-8

10-11-10

8-11

5-4-7

13-20

6-6-9

44-50/3"

R

SS

R

SS

R

SS

R

CL

14.8

6.7

8.4

12.6

14.6

14.0

8.8

Hammer Weight: 140 lbs

Date Drilled: 9/22/2022

Elevation: 4149.1

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927986.8

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1242507.8

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-15

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

72 22

Lean CLAY with Sand, tan to reddish-brown, medium stiff to hard, slightly damp to moist, RDR 2

PP 4.0

PP 4.5

RDR 2 to 3

RDR 3 to 4

PP 3.5

with tan carbonate cementation

PP 4.5

Silty SAND, reddish-brown, fine- to medium-grained, medium dense to dense, slightly damp to moist, RDR 3 to 4

103.2

8-10-13

8-5

4-4-2

8-16

5-5-8

7-12

50/4"

18-12

17-19-20

19-20

SS

A

R

SS

R

SS

R

SS

R

SS

R

CL

SM

7.7

9.0

14.7

15.7

17.5

15.6

10.3

12.3

11.3

12.6

Hammer Weight: 140 lbs

Date Drilled: 9/22/2022

Elevation: 4139.8

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927999.3

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1241086.0

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-16

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 13 ½' North

M oi st ur e C on te nt

Sampling Method: Bulk, Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

RDR 4, moderate cementation

Average Drilling Rate with Sampling = 0.7 ft/min Total Depth 35 ½ feet

11-15-20

50/5¾"

SS

R

SM

Hammer Weight: 140 lbs

Date Drilled: 9/22/2022

Elevation: 4139.8

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927999.3

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1241086.0

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-16

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 13 ½' North

M oi st ur e C on te nt

Sampling Method: Bulk, Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Lean CLAY with Sand, brown, stiff to hard, slightly damp to damp, RDR 2 to 3

PP 4.0

caliche lenses

PP 4.0

caliche lenses

Clayey SAND, brown, fine- to medium-grained, medium dense to very dense, slightly damp to damp, RDR 2

PP 4.0

with carbonate cementation

RDR 2 to 3

101.8

7-14

7-9-11

18-31

9-12-28

14-27

11-16-20

20-40

5-10-13

17-30

19-29-35

R

SS

R

SS

R

SS

R

SS

R

SS

CL

SC

7.9

10.2

13.7

11.9

7.5

9.2

7.1

Hammer Weight: 140 lbs

Date Drilled: 9/27/2022

Elevation: 4140.0

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927999.9

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1240947.2

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: PG

Boring TL BH-17

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 74' South

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, SM

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9 with carbonate cementation, PP 4.0

RDR 3 to 4

Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 35 ¼ feet

50/4½"

50/4"

R

SS

SC

Hammer Weight: 140 lbs

Date Drilled: 9/27/2022

Elevation: 4140.0

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 927999.9

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1240947.2

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: PG

Boring TL BH-17

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 74' South

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, SM

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

NP

NP

Lean CLAY with Sand, pale brown, slightly damp, with caliche gravel, RDR 1 to 2

Silty SAND, pale brown to reddish-brown, fine- to medium-grained, medium dense to very dense, slightly to damp to moist, RDR 1 to 2 pale brown carbonate cementation

PP 4.5

RDR 2 to 3 pale brown carbonate cementation

PP 4.5

RDR 2

white mineral veins

PP 4.5

pale orange carbonate cementation

RDR 2 to 3 RDR 3 to 4

Average Drilling Rate with Sampling = 0.8 ft/min Total Depth 26 ½ feet

95.1

4-5-7

13-31

50/5½"

24-50/5"

13-19-22

18-32

27-33-27

SS

R

SS

R

SS

R

SS

CL

SM

12.9

15.4

8.4

10.8

13.3

Hammer Weight: 140 lbs

Date Drilled: 10/19/2022

Elevation: 4144.4

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928017.0

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1239929.0

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: PG

Boring TL BH-18

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 4 ½' East

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: FE, DH

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Silty SAND, brown, fine- to medium-grained, moist, RDR 1 to 2

Sandy Lean CLAY, light brown to reddish-brown, medium stiff to hard, slightly damp, RDR 2

PP 4.5

with carbonate cementation RDR 1 to 2

PP 4.5

PP 4.5

with carbonate cementation

RDR 2 to 3

Silty SAND, brown to reddish-brown, fine- to medium-grained, medium dense, slightly damp, RDR 2 to 3 with caliche gravel

PP 4.5

Average Drilling Rate with Sampling = 0.8 ft/min Total Depth 26 feet

102.7

4-6

6-5-5

5-14

4-8-9

27-50

4-8-9

25-36

R

SS

R

SS

R

SS

R

SM

SM

19.5

17.9

15.1

14.8

11.6

Hammer Weight: 140 lbs

Date Drilled: 10/19/2022

Elevation: 4144.1

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928030.3

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1238706.8

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: PG

Boring TL BH-19

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: None

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: FE, DH

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Clayey SAND, brown to reddish-brown, fine- to medium-grained, loose to medium dense, slightly damp, RDR 2

Sandy Lean CLAY, light reddish-brown to reddish-brown, medium stiff to very stiff, damp to moist, RDR 2

PP 4.5

caliche gravel

PP 4.5

RDR 2 to 3

RDR 3 to 4

PP 4.5

Silty SAND, reddish-brown to light reddish-brown, fine- to medium-grained, loose, slightly damp, RDR 1

Average Drilling Rate with Sampling = 0.7 ft/min Total Depth 26 ½ feet

5-5-5

6-12

5-4-4

8-11

6-9-10

10-11

5-4-4

SS

R

SS

R

SS

R

SS

SC

CL

SM

18.1

13.3

13.7

13.7

Hammer Weight: 140 lbs

Date Drilled: 9/22/2022

Elevation: 4146.7

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928030.1

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1237448.7

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-20

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 9' West

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Sandy Lean CLAY, brown, stiff to hard, slightly damp, trace organics, RDR 2

PP 4.5

Clayey SAND, reddish-brown, fine- to medium-grained, medium dense, slightly damp, RDR 2 to 3

PP 4.5

Sandy Lean CLAY, reddish-brown, medium stiff to very stiff, slightly damp to moist, RDR 3

PP 4.5

trace white/tan carbonate cementation

PP 4.5

PP 4.5

PP 4.5

PP 4.5

with caliche gravel RDR 3 to 4

8-12

16-19-21

17-30

7-10-11

8-16

9-9-9

12-22

6-10-9

5-6

5-5-6

R

SS

R

SS

R

SS

R

SS

R

SS

CL

SC

CL

7.3

9.1

7.9

13.0

14.4

9.3

9.7

13.8

17.2

14.7

Hammer Weight: 140 lbs

Date Drilled: 9/22/2022

Elevation: 4141.6

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928048.0

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1236223.4

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-21

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 13' West

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

PP 4.5

tan carbonate cementation

RDR 4

Average Drilling Rate with Sampling = 0.7 ft/min Total Depth 36 ½ feet

7-11

10-12-13

R

SS

CL

13.8

9.3

Hammer Weight: 140 lbs

Date Drilled: 9/22/2022

Elevation: 4141.6

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928048.0

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1236223.4

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-21

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 13' West

M oi st ur e C on te nt

Sampling Method: Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

Asphalt Concrete Pavement (approx. 1" thick) Sandy Lean CLAY, reddish-brown, stiff to hard, slightly damp to moist, RDR 2 trace organic material

PP 4.5

tan carbonate cementation

PP 4.5

trace caliche gravel

RDR 2 to 3

PP 4.5

RDR 3

PP 4.5

silty lens

PP 4.5

white mineral veins and caliche gravel slight intermittent grinding

108.4

4-4-5

8-14

10-9-9

13-24

11-14-15

14-22

8-9-10

10-16

8-11-10

15-19

SS

A

R

SS

R

SS

R

SS

R

SS

R

ACP

CL

8.6

7.0

10.3

9.2

12.2

10.5

10.3

14.5

8.9

12.0

Hammer Weight: 140 lbs

Date Drilled: 9/23/2022

Elevation: 4142.7

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928096.1

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1236223.1

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-22

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks: Offset approx. 6' North

M oi st ur e C on te nt

Sampling Method: Bulk, Ring and Split spoon samples

S oi l S ym bo l

Drilling Crew: JD, LD

G E

O M

R

.G P

J G

E O

M A

T .G

D T

/9

RDR 3 to 4 carbonate cementation and caliche gravel, PP 4.5 Average Drilling Rate with Sampling = 0.4 ft/min Total Depth 36 feet

8-8-8

21-50

SS

R

CL

9.2

10.0

Hammer Weight: 140 lbs

Date Drilled: 9/23/2022

Elevation: 4142.7

Laboratory Results

Rig Type: CME-55

P la st ic ity In de x

Boring Location: See Site Plan of

4529 Arrowhead Ridge Drive, SE, Suite 102 Rio Rancho, New Mexico 87124 Tel: (505) 300-5816

Boring Location: See Site Plan

Project Number: 222-4120R

Page

D ry

D en si ty

(p cf

Easting: 928096.1

S am pl e

T yp e

D ep th ft)

P as si ng #2

S ie ve

Hammer Fall: 30 inches

B lo w s pe r

6"

Northing: 1236223.1

S ym bo l

Client: Jacobs Engineering Group

Soil Description

Groundwater Depth: Not Encountered

Logged By: TW

Boring TL BH-22

Drilling Method: 7.25" O.D. Hollow Stem Auger

Project Name: ENMRWS Texico Lateral Pipeline

M at er ia l T yp e

Site Location: Texico, New Mexico

A = Auger Cuttings R = Ring-Lined Barrel Sampler SS = Split Spoon RDR = Relative Drilling Resistance PP = Pocket Penetrometer (tsf)

Remarks:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .