00_41_13lnm_sup02_unit-price-bid-schedule.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- ENMRWS Texico Lateral
- Solicitation number
- 25-0126-01
- Issued by
- Chaves County, New Mexico
About this file
The document is a Unit Price Bid Schedule for the Eastern New Mexico Rural Water System Project Texico Lateral, involving Clovis Airport, Curry County, and the City of Texico in New Mexico. The project encompasses 4.3 miles of water pipeline installation using three alternative pipe materials (PVC, Ductile Iron Pipe, and HDPE), with 27 distinct line items covering pre-mobilization, mobilization, demobilization, traffic control, environmental controls, work limit preparation, utility locates, pipe production and installation, cathodic protection, dewatering, foundation stabilization, vault construction, and restoration. The project includes installing 8-inch diameter pipes across three different segments, with varying quantities for each jurisdiction, and involves specialized infrastructure components such as a flow control valve vault, water quality monitoring and SCADA building, and trenchless pipeline crossings.
The bid schedule provides detailed pricing alternatives with unit prices for each jurisdiction, including an additional alternate for connection to EPCOR and Texico Water. The document includes specific line item quantities and estimated extended unit prices for each alternative, with a total bid calculation that incorporates New Mexico Gross Receipts Tax (NMGRT) for Clovis Airport (5.8750%), Curry County (5.8750%), and City of Texico (7.3125%). The project appears to be funded through a rural water system expansion initiative, with a comprehensive approach to infrastructure development that allows bidders to propose different pipe material alternatives while maintaining consistent installation methodologies across the specified project segments.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Price Bid Schedule
| This Excel file is provided for information and Bidder use only. Unit Price Bid Schedule provided in Bid Form shall govern if there is a discrepancy. It is the Bidder's responsibility to confirm any discrepancy. | |||||||||||||||||||||||||||||||||||
| Item No. | Description | Unit | Alternative 1 - PVC/DIP | Alternative 2 - DIP | Alternative 3 - HDPE/DIP | ||||||||||||||||||||||||||||||
| Clovis Airport | Curry County | City of Texico | Alternative 1 TOTAL | Extended Bid Unit Price | Clovis Airport | Curry County | City of Texico | Alternative 2 TOTAL | Extended Bid Unit Price | Clovis Airport | Curry County | City of Texico | Alternative 3 TOTAL | Extended Bid Unit Price | |||||||||||||||||||||
| STA T 45+08.75 to STA T 115+40 | STA T 115+40 to STA T 247+40 | STA T 247+40 to STA T 272+11.69 | STA T 45+08.75 to STA T 115+40 | STA T 115+40 to STA T 247+40 | STA T 247+40 to STA T 272+11.69 | STA T 45+08.75 to STA T 115+40 | STA T 115+40 to STA T 247+40 | STA T 247+40 to STA T 272+11.69 | |||||||||||||||||||||||||||
| Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | Bid Unit Price | Extended Bid Unit Price | Estimated Quantity | ||||||
| A | B | C | A+B+C | A | B | C | A+B+C | A | B | C | A+B+C | ||||||||||||||||||||||||
| 1 | Pre-Mobilization | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 2 | Mobilization | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 3 | Demobilization/Final Completion | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 4 | Traffic Control | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 5 | Temporary Environmental Controls | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 6 | Work Limit Preparation | LF | 6,996 | 13,194 | 2,297 | 22,487 | 6,996 | 13,194 | 2,297 | 22,487 | 6,996 | 13,194 | 2,297 | 22,487 | |||||||||||||||||||||
| 7 | Work Limit Fencing | LF | 5,112 | 15,840 | 4,500 | 25,452 | 5,112 | 15,840 | 4,500 | 25,452 | 5,112 | 15,840 | 4,500 | 25,452 | |||||||||||||||||||||
| 8 | Utility Locates/Investigation | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 9 | 8-Inch PVC Production | LF | 6,620 | 12,794 | 2,055 | 21,469 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||
| 10 | 8-Inch DIP Production | LF | 411 | 400 | 302 | 1,113 | 7,031 | 13,194 | 2,357 | 22,582 | 91 | 0 | 0 | 91 | |||||||||||||||||||||
| 11 | 8-Inch HDPE Production | LF | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 6,940 | 13,194 | 2,357 | 22,491 | |||||||||||||||||||||
| 12 | Pipe Installation | LF | 7,031 | 13,194 | 2,357 | 22,582 | 7,031 | 13,194 | 2,357 | 22,582 | 7,031 | 13,194 | 2,357 | 22,582 | |||||||||||||||||||||
| 13 | Cathodic Protection | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 0 | 1 | 1 | |||||||||||||||||||||
| 14 | Dewatering | LF | 1,406 | 2,639 | 471 | 4,516 | 1,406 | 2,639 | 471 | 4,516 | 1,406 | 2,639 | 471 | 4,516 | |||||||||||||||||||||
| 15 | Foundation Stabilization | CY | 310 | 581 | 104 | 995 | 310 | 581 | 104 | 995 | 310 | 581 | 104 | 995 | |||||||||||||||||||||
| 16 | CLSM (Type J) Bedding and Pipe Zone Material | LF | 135 | 1,623 | 209 | 1,967 | 135 | 1,623 | 209 | 1,967 | 135 | 1,623 | 209 | 1,967 | |||||||||||||||||||||
| 17 | Granular (Type F) Bedding and Pipe Zone Material | LF | 6,861 | 11,572 | 2,088 | 20,520 | 6,861 | 11,572 | 2,088 | 20,520 | 6,861 | 11,572 | 2,088 | 20,520 | |||||||||||||||||||||
| 18 | CARV Vault | EACH | 1 | 1 | 0 | 2 | 1 | 1 | 0 | 2 | 1 | 1 | 0 | 2 | |||||||||||||||||||||
| 19 | Backflow Prevention Assembly | EACH | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 1 | |||||||||||||||||||||
| 20 | Texico Flow Control Valve Vault | LS | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||||||||||||||||||||
| 21 | Texico Water Quality Monitoring and SCADA Building | LS | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||||||||||||||||||||
| 22 | Pipeline Trenchless Crossings | LF | 35 | 0 | 60 | 95 | 35 | 0 | 60 | 95 | 35 | 0 | 60 | 95 | |||||||||||||||||||||
| 23 | Fiber Optic Conduit | LF | 0 | 0 | 100 | 100 | 0 | 0 | 100 | 100 | 0 | 0 | 100 | 100 | |||||||||||||||||||||
| 24 | Restoration of Disturbed Areas | LF | 7,031 | 13,194 | 2,357 | 22,582 | 7,031 | 13,194 | 2,357 | 22,582 | 7,031 | 13,194 | 2,357 | 22,582 | |||||||||||||||||||||
| 25 | Hydrostatic Testing | LS | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||
| 26 | As-Built Pipeline Survey | LF | 7,031 | 13,194 | 2,357 | 22,582 | 7,031 | 13,194 | 2,357 | 22,582 | 7,031 | 13,194 | 2,357 | 22,582 | |||||||||||||||||||||
| 27 | Utility Relocation and Miscellaneous | ALLOW | 1 | $ 50,000 | $ 50,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 150,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 150,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 50,000 | $ 50,000 | 1 | $ 150,000 |
| Total Extended Unit Bid Prices (Sum of Items 1 - 27) | D | E | F | X=D+E+F | D | E | F | X=D+E+F | D | E | F | X=D+E+F | |||||||||||||||||||||||
| Clovis Airport - NMGRT | 5.8750% | G | G | G | |||||||||||||||||||||||||||||||
| Curry County - NMGRT | 5.8750% | H | H | H | |||||||||||||||||||||||||||||||
| City of Texico - NMGRT | 7.3125% | I | I | I | |||||||||||||||||||||||||||||||
| Total NMGRT = Clovis Airport + Curry County + City of Texico | Y=G+H+I | Y=G+H+I | Y=G+H+I | ||||||||||||||||||||||||||||||||
| Total Bid (including NMGRT) | D+G | E+H | F+I | Z=X+Y | D+G | E+H | F+I | Z=X+Y | D+G | E+H | F+I | Z=X+Y |
| Add Alt A | Connection to EPCOR and Texico Water | LS | |||
| Total Extended Unit Bid Prices Additiive Alternate | J | J | J | ||
| City of Texico - NMGRT | 7.3125% | K | K | K | |
| Total Additive Alternate (including NMGRT) | J+K | J+K | J+K |
Eastern New Mexico Rural Water System Project Texico Lateral - Unit Price Tabulation Schedule BID FORM 00 41 13 - Supplement 2