Sheet1
PAVEMENT PRESERVATION PACKAGE 4- CONTRACT NO. 26-0364
| Package 4 | | | | | Engineer Estimate |
| Pay Item No. | Description | Quantity | Unit | UnitPrice | Amount |
| 006765A - Alderman Rd (Alt 19 - Regal Oaks Blvd) ROADWAY PROJECT A | | | | | |
| A101-0100 | MOBILIZATION | 1 | LS | $70,000.00 | $ 70,000.00 |
| A102-1000 | MAINTENANCE OF TRAFFIC | 1 | LS | $90,000.00 | $ 90,000.00 |
| A102-14 | TRAFFIC CONTROL OFFICER | 28 | HR | $80.00 | $ 2,240.00 |
| A102-99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 48.00 | DAY | $ 18.00 | $ 864.00 |
| A104-18 | INLET PROTECTION SYSTEMS | 20.00 | EA | $ 40.00 | $ 800.00 |
| A327-70-5 | MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH | 90,000.00 | SY | $ 3.20 | $ 288,000.00 |
| A334-2-0001 | SUPERPAVE ASPHALT CONCRETE, Leveling | 1100.00 | TN | $ 172.00 | $ 189,200.00 |
| A334-2-0125 | SUPERPAVE ASPHALT CONCRETE, Type SP 12.5,TRAFFIC LEVEL C | 9,900.00 | TN | $ 164.00 | $ 1,623,600.00 |
| A660-2101-1 | LOOP ASSEMBLY, F & I, TYPE A, 6' X 20' | 4.00 | AS | $ 1700.00 | $ 6,800.00 |
| A660-2101-2 | LOOP ASSEMBLY, F & I, TYPE A, 6' X 25' | 3.00 | AS | $ 1800.00 | $ 5,400.00 |
| A706-1-3 | RAISED PAVEMENT MARKER, TYPE B | 646.00 | EA | $ 8.00 | $ 5,168.00 |
| A710-11101-1 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID, 6" | 27,824.00 | LF | $ 1.50 | $ 41,736.00 |
| A710-11123 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" | 2,793.00 | LF | $ 2.54 | $ 7,094.22 |
| A710-11124 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR DEIAGONAL OR CHEVERON, 18" | 57.00 | LF | $ 3.00 | $ 171.00 |
| A710-11125 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 2,417.00 | LF | $ 3.50 | $ 8,459.50 |
| A710-11131 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, 10'-30' OR 3'-9' SKIP, 6" | 3.77 | GM | $ 750.00 | $ 2,827.50 |
| A710-11141-1 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION 6" | 4,512.00 | LF | $ 1.10 | $ 4,963.20 |
| A710-11160 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, MESSAGE OR SYMBOL | 34.00 | EA | $ 100.00 | $ 3,400.00 |
| A710-11170 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, ARROWS | 101.00 | EA | $ 50.00 | $ 5,050.00 |
| A710-11201-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID, 6" | 25,989.00 | LF | $ 1.50 | $ 38,983.50 |
| A710-11224-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID FOR DIAGONAL OR CHEVERON, 18" | 255.00 | LF | $ 3.00 | $ 765.00 |
| A710-11241-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, 2-4 DOTTED GUIDELINE / 6-10 DOTTED EXTENSION, 6" | 3386.00 | LF | $ 1.00 | $ 3,386.00 |
| ROADWAY PROJECT (A) SUBTOTAL | | | | $ 2,398,907.92 |
| 006765A - Alderman Rd (Alt 19 - Regal Oaks Blvd) UTILITY PROJECT A | | | | | |
| APW-331101-309-9001 | Adjust Valve Box to Finished Grade, in Pavement (Portable water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| ARW-333501-310-9001 | Adjust Valve Box to Finshed Grade, in pavement ( reclaimed water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| ASS-334-2095-460 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Utility owner | 10.00 | EA | $ 150.00 | $ 1,500.00 |
| ASS-334-3125-000 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Contractor. | 10.00 | EA | $ 200.00 | $ 2,000.00 |
| UTILITY PROJECT (A) SUBTOTAL | | | | $ 5,500.00 |
| 006765A - Alderman Rd (Alt 19 - Regal Oaks Blvd) UNSPECIFIED PROJECT A | | | | | |
| AUT-999-0001 | UNSPECIFIED WORK ( UTILITY) | 5,000.00 | EA | $ 1.00 | $ 5,000.00 |
| A999-0000 | UNSPECIFIED WORK ( ROADWAY) | 235,000.00 | EA | $ 1.00 | $ 235,000.00 |
| UNSPECIFIED PROJECT (A) SUBTOTAL | | | | $ 240,000.00 |
PROJECT (A) - SUBTOTAL $ 2,644,407.92
Pay Item No. Description Quantity Unit UnitPrice Amount
| 006835A - Local Group 137 (Highland Lakes P2 North) ROADWAY PROJECT B | | | | | |
| B101-0100 | MOBILIZATION | 1 | LS | $30,000.00 | $ 30,000.00 |
| B102-1000 | MAINTENANCE OF TRAFFIC | 1 | LS | $50,000.00 | $ 50,000.00 |
| B102-99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 28.00 | DAY | $ 18.00 | $ 504.00 |
| B102-14 | TRAFFIC CONTROL OFFICER | 28 | HR | $80.00 | $ 2,240.00 |
| B104-18 | INLET PROTECTION SYSTEMS | 25.00 | EA | $ 40.00 | $ 1,000.00 |
| B327-70-6 | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG. DEPTH | 39,699.00 | SY | $ 3.20 | $ 127,036.80 |
| B334-2-0001 | SUPERPAVE ASPHALT CONCRETE, Leveling | 400.00 | TN | $ 175.00 | $ 70,000.00 |
| B334-2-0095 | SUPERPAVE ASPHALT CONCRETE, Type SP | | | | |
| 9.5, Fine, Traffic Level C | 3,276.00 | TN | $ 168.00 | $ 550,368.00 | | |
| C706-1-3 | RAISED PAVEMENT MARKER, TYPE B | 156.00 | EA | $ 8.00 | $ 1,248.00 |
| B710-11125 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 228.00 | LF | $ 3.50 | $ 798.00 |
| B710-11201-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID, 6" | 2,920.00 | LF | $ 1.50 | $ 4,380.00 |
| B710-11224-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID FOR DIAGONAL OR CHEVERON, 18" | 97.00 | LF | $ 3.00 | $ 291.00 |
| | ROADWAY PROJECT (B) SUBTOTAL | | | | $ 837,865.80 |
| 006835A - Local Group 137 (Highland Lakes P2 North) UTILITY PROJECT B | | | | | |
| BPW-331101-309-9001 | Adjust Valve Box to Finished Grade, in Pavement (Portable water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| BRW-333501-310-9001 | Adjust Valve Box to Finshed Grade, in pavement ( reclaimed water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| B334-2095-460 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Utility owner | 10.00 | EA | $ 150.00 | $ 1,500.00 |
| B334-3125-000 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Contractor. | 10.00 | EA | $ 200.00 | $ 2,000.00 |
| UTILITY PROJECT (B) SUBTOTAL | | | | $ 5,500.00 |
| 006835A - Local Group 137 (Highland Lakes P2 North) UNSPECIFIED PROJECT B | | | | | |
| BUT-999-0001 | UNSPECIFIED WORK ( UTILITY) | 5,000.00 | EA | $ 1.00 | $ 5,000.00 |
| B999-0000 | UNSPECIFIED WORK ( ROADWAY) | 83,000.00 | EA | $ 1.00 | $ 83,000.00 |
| UNSPECIFIED PROJECT (B) SUBTOTAL | | | | $ 88,000.00 |
PROJECT (B) - SUBTOTAL $ 931,365.80
Pay Item No. Description Quantity Unit UnitPrice Amount
| 006769A - Local Group 214 ROADWAY PROJECT C | | | | | |
| C101-0100 | MOBILIZATION | 1 | LS | $60,000.00 | $ 60,000.00 |
| C102-1000 | MAINTENANCE OF TRAFFIC | 1 | LS | $80,000.00 | $ 80,000.00 |
| C102-99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 42.00 | DAY | $ 18.00 | $ 756.00 |
| C102-14 | TRAFFIC CONTROL OFFICER | 32 | HR | $80.00 | $ 2,560.00 |
| C104-18 | INLET PROTECTION SYSTEMS | 20.00 | EA | $ 40.00 | $ 800.00 |
| C327-70-6 | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG. DEPTH | 107,092.00 | SY | $ 3.20 | $ 342,694.40 |
| C334-2-0001 | SUPERPAVE ASPHALT CONCRETE, Leveling | 1000.00 | TN | $ 175.00 | $ 175,000.00 |
| C334-2-0095 | SUPERPAVE ASPHALT CONCRETE, Type SP | | | | |
| 9.5, Fine, Traffic Level C | 8,836.00 | TN | $ 168.00 | $ 1,484,448.00 | | |
| C706-1-3 | RAISED PAVEMENT MARKER, TYPE B | 76.00 | EA | $ 8.00 | $ 608.00 |
| C710-11123 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" | 187.00 | LF | $ 2.54 | $ 474.98 |
| C710-11125 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 1,043.00 | LF | $ 3.50 | $ 3,650.50 |
| C710-11170 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, ARROWS | 1.00 | EA | $ 50.00 | $ 50.00 |
| C710-11201-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID, 6" | 2,426.00 | LF | $ 1.50 | $ 3,639.00 |
| | ROADWAY PROJECT (C) SUBTOTAL | | | | $ 2,154,680.88 |
| 006769A - Local Group 214 UTILITY PROJECT C | | | | | |
| CPW-331101-309-9001 | Adjust Valve Box to Finished Grade, in Pavement (Portable water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| CRW-333501-310-9001 | Adjust Valve Box to Finshed Grade, in pavement ( reclaimed water) | 10.00 | LF | $ 100.00 | $ 1,000.00 |
| CSS-334-2095-460 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Utility owner | 10.00 | LF | $ 150.00 | $ 1,500.00 |
| CSS-334-3125-000 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Contractor. | 10.00 | LF | $ 200.00 | $ 2,000.00 |
| UTILITY PROJECT (C) SUBTOTAL | | | | $ 5,500.00 |
| 006769A - Local Group 214 UNSPECIFIED PROJECT C | | | | | |
| CUT-999-0001 | UNSPECIFIED WORK ( UTILITY) | 5,000.00 | EA | $ 1.00 | $ 5,000.00 |
| C999-0000 | UNSPECIFIED WORK ( ROADWAY) | 212,000.00 | EA | $ 1.00 | $ 212,000.00 |
| UNSPECIFIED PROJECT (C) SUBTOTAL | | | | $ 217,000.00 |
PROJECT (C) - SUBTOTAL $ 2,377,180.88
Pay Item No. Description Quantity Unit UnitPrice Amount
| 006827A - Local Group 231 (113th St N & Park Blvd N) ROADWAY PROJECT D | | | | | |
| D101-0100 | MOBILIZATION | 1 | LS | $15,000.00 | $ 15,000.00 |
| D102-1000 | MAINTENANCE OF TRAFFIC | 1 | LS | $25,000.00 | $ 25,000.00 |
| D102-14 | TRAFFIC CONTROL OFFICER | 28 | HR | $80.00 | $ 2,240.00 |
| D102-99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 28.00 | DAY | $ 18.00 | $ 504.00 |
| D104-18 | INLET PROTECTION SYSTEMS | 20.00 | EA | $ 40.00 | $ 800.00 |
| D327-70-6 | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG. DEPTH | 12,000.00 | SY | $ 3.20 | $ 38,400.00 |
| D334-2-0001 | SUPERPAVE ASPHALT CONCRETE, Leveling | 150.00 | TN | $ 175.00 | $ 26,250.00 |
| D334-2-0095 | SUPERPAVE ASPHALT CONCRETE, Type SP | | | | |
| 9.5, Fine, Traffic Level C | 1,000.00 | TN | $ 168.00 | $ 168,000.00 | | |
| D706-1-3 | RAISED PAVEMENT MARKER, TYPE B | 108.00 | EA | $ 8.00 | $ 864.00 |
| D710-11101-1 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID, 6" | 2,065.00 | LF | $ 1.50 | $ 3,097.50 |
| D710-11123 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" | 39.00 | LF | $ 2.54 | $ 99.06 |
| D710-11125 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 112.00 | LF | $ 3.50 | $ 392.00 |
| D710-11141-1 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION 6" | 63.00 | LF | $ 1.10 | $ 69.30 |
| D710-11201-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID, 6" | 2,140.00 | LF | $ 1.50 | $ 3,210.00 |
| | ROADWAY PROJECT (D) SUBTOTAL | | | | $ 283,925.86 |
| 006827A - Local Group 231 (113th St N & Park Blvd N) UTILITY PROJECT D | | | | | |
| DPW-331101-309-9001 | Adjust Valve Box to Finished Grade, in Pavement (Portable water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| DRW-333501-310-9001 | Adjust Valve Box to Finshed Grade, in pavement ( reclaimed water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| DSS-334-2095-460 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Utility owner | 10.00 | EA | $ 150.00 | $ 1,500.00 |
| DSS-334-3125-000 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Contractor. | 10.00 | EA | $ 200.00 | $ 2,000.00 |
| UTILITY PROJECT (D) SUBTOTAL | | | | $ 5,500.00 |
| 006827A - Local Group 231 (113th St N & Park Blvd N) UNSPECIFIED PROJECT D | | | | | |
| DUT-999-0001 | UNSPECIFIED WORK ( UTILITY) | 5,000.00 | EA | $ 1.00 | $ 5,000.00 |
| D999-0000 | UNSPECIFIED WORK ( ROADWAY) | 27,000.00 | EA | $ 1.00 | $ 27,000.00 |
| UNSPECIFIED PROJECT (D) SUBTOTAL | | | | $ 32,000.00 |
PROJECT (D) - SUBTOTAL $ 321,425.86
Pay Item No. Description Quantity Unit UnitPrice Amount
| 006828A - Local Group 237 (Belleair Rd & Northwood Dr) ROADWAY PROJECT E | | | | | |
| E101-0100 | MOBILIZATION | 1 | LS | $25,000.00 | $ 25,000.00 |
| E102-1000 | MAINTENANCE OF TRAFFIC | 1 | LS | $35,000.00 | $ 35,000.00 |
| E102-14 | TRAFFIC CONTROL OFFICER | 28 | HR | $80.00 | $ 2,240.00 |
| E102-99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 28.00 | DAY | $ 18.00 | $ 504.00 |
| E104-18 | INLET PROTECTION SYSTEMS | 20.00 | EA | $ 40.00 | $ 800.00 |
| E327-70-6 | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG. DEPTH | 19,437.00 | SY | $ 3.20 | $ 62,198.40 |
| E334-2-0001 | SUPERPAVE ASPHALT CONCRETE, Leveling | 200.00 | TN | $ 175.00 | $ 35,000.00 |
| E334-2-0095 | SUPERPAVE ASPHALT CONCRETE, Type SP | | | | |
| 9.5, Fine, Traffic Level C | 1,604.00 | TN | $ 168.00 | $ 269,472.00 | | |
| E706-1-3 | RAISED PAVEMENT MARKER, TYPE B | 70.00 | EA | $ 8.00 | $ 560.00 |
| E710-11125 | PAINTED PAVEMENT MARKING, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 63.00 | LF | $ 3.50 | $ 220.50 |
| E710-11201-1 | PAINTED PAVEMENT MARKING, STANDARD, YELLOW, SOLID, 6" | 1,200.00 | LF | $ 1.50 | $ 1,800.00 |
| | ROADWAY PROJECT (E) SUBTOTAL | | | | $ 432,794.90 |
| 006828A - Local Group 237 (Belleair Rd & Northwood Dr) UTILITY PROJECT E | | | | | |
| EPW-331101-309-9001 | Adjust Valve Box to Finished Grade, in Pavement (Portable water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| ERW-333501-310-9001 | Adjust Valve Box to Finshed Grade, in pavement ( reclaimed water) | 10.00 | EA | $ 100.00 | $ 1,000.00 |
| ESS-334-2095-460 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Utility owner | 10.00 | EA | $ 150.00 | $ 1,500.00 |
| ESS-334-3125-000 | Adjust Manhole Ring & Cover to Finished Grade in pavemet Riser provided by Contractor. | 10.00 | EA | $ 200.00 | $ 2,000.00 |
| UTILITY PROJECT (E) SUBTOTAL | | | | $ 5,500.00 |
| 006828A - Local Group 237 (Belleair Rd & Northwood Dr) UNSPECIFIED PROJECT E | | | | | |
| EUT-999-0001 | UNSPECIFIED WORK ( UTILITY) | 5,000.00 | EA | $ 1.00 | $ 5,000.00 |
| E999-0000 | UNSPECIFIED WORK ( ROADWAY) | 43,000.00 | EA | $ 1.00 | $ 43,000.00 |
| UNSPECIFIED PROJECT (E) SUBTOTAL | | | | $ 48,000.00 |
PROJECT (E) - SUBTOTAL $ 486,294.90
| TOTAL | | $ 6,520,675.36 |
| CEI | 231000 |
| Total | $ 6,751,675.36 |