About this file

This document is a Request for Quote (RFQ) for shipyard repair services for the DREDGE MERRITT in Wilmington, NC. The U.S. Army Corps of Engineers Engineering District Wilmington is issuing this small business set-aside solicitation under FAR Part 13 Simplified Acquisition Procedures. The contractor shall provide labor, materials, and services to accomplish all repairs, maintenance, and modifications listed in the Performance Work Statement while the vessel is dry-docked for up to 90 days. The associated NAICS code is 336611 with a size standard of 1,300 employees. Written questions are due by October 10, 2024, and quotes are due by October 22, 2024. Award will be made to the lowest priced, technically acceptable offer. A site visit is scheduled for September 30, 2024, and the government will not respond to questions during the visit. The solicitation includes a PWS and related enclosures.

View the file

Other versions and copies of DA Form 5587-R

File Revision Posted Attached to
Enclosure 43 - DA Form 5587-R_Report of Dry-docking Paint and Condition of Bottom.pdf Same revision and size as this file Revision not stated Brandy Station Shipyard Repair Services

Who attaches DA Form 5587-R

Other files

File Type Posted
Enclosure 66 - ME_Fire Inspection and Certificate_2024.pdf PDF
Enclosure 67 - DM-M900-92 - Bilge Piping.pdf PDF
A21 - AMD 0002 - (A) Combined Synopsis-Solicitation - DREDGE MERRITT - SHIPYARD REPAIR SERVICES - W912PM24Q0045_Conformed Copy - Final.pdf PDF
A21 - AMD 0002 - DREDGE MERRITT - SHIPYARD REPAIR SERVICES - W912PM24Q0045_Final.pdf PDF
A21 - AMD 0002 - (B) PWS_ME_COMMERCIAL_SHIPYARD_10-15.2024.pdf PDF
A22 - Site Visit Sign In Sheet.pdf PDF
A22 - W912PM24Q0045 Questions and Responses - Merritt Shipyard_Updated_10-07-2024.xlsx XLSX spreadsheet
A22 - AMD 0001 - ME_Fire Inspection and Certificate_2024.pdf PDF
A21 - AMD 0001 - DREDGE MERRITT - SHIPYARD REPAIR SERVICES - W912PM24Q0045_Final.pdf PDF
A22 - AMD 0001 - W912PM24Q0045 Questions and Responses - Merritt Shipyard_09-27-2024.xlsx XLSX spreadsheet
A21 - AMD 001 - (B) PWS_ME_COMMERCIAL_SHIPYARD_09-27.2024.pdf PDF
A21 - AMD 0001 - (A) Combined Synopsis-Solicitation - DREDGE MERRITT - SHIPYARD REPAIR SERVICES - W912PM24Q0045_Conformed Copy - Final.pdf PDF
Enclosure 51 - DM-H300-10 - Deck House Structure.pdf PDF
Enclosure 20 - DM-M300-40 - Wiring Diagram.pdf PDF
Enclosure 57 - DM-H200-28 - Tunnel Lines and Offsets.PDF PDF
Enclosure 55 - DM-H200-55 - Potable Water Piping Diagram.pdf PDF
Enclosure 63 - CE-1532-45 - Engine Room Arrangement.pdf PDF
Enclosure 39 - DM-H500-18 - Trunnion bearing.PDF PDF
Enclosure 29 - DM-H500-18F - Drag Arm Trunnion.pdf PDF
Enclosure 59 - DM-H200-17 - Hull Plate Measurement.pdf PDF
Enclosure 9 - DM-M900-101 Misc. Piping Mods Diagram.pdf PDF
Enclosure 35 - DM-H500-18C - Drag Arm Trunnion Stuffing Box.pdf PDF
Enclosure 28 - DM-H800-8 - Hydraulic Crane Sketch.pdf PDF
Enclosure 33 - DM-H500-18D - Trunnion Tube.pdf PDF
Enclosure 58 - DM-H200-26 - Outboard Profile.pdf PDF
Enclosure 16 - DM-M700-153 - Lengthened Shaft Arrangement.pdf PDF
Enclosure 49 - DM-H300-47 - Pilot House Windows.pdf PDF
Enclosure 19 - DM-M300-73 - Electrical.pdf PDF
Enclosure 61 - DM-H9-153 - Rudder Quadrant Modification.pdf PDF
Enclosure 6 - H1-1A Docking Plan-Default-000.pdf PDF
Enclosure 40 - DM-H500-18 - Drag Arm Trunnion.pdf PDF
Enclosure 42 - DM-H500_Trunnion_dwgs.pdf PDF
Enclosure 38 - DM-H500-18A - Drag Arm Trunnion Assembly.pdf PDF
Enclosure 30 - DM-H500-18E - Trunnion Bearing.pdf PDF
Enclosure 5 - Merritt Paint schedule 2005.pdf PDF
Enclosure 54 - DM-H200-160 - Transducer Housing 18 Inch Diameter.pdf PDF
Enclosure 31 - DM-H500-18E - REV (B) - trunnion bearing.PDF PDF
Enclosure 14 - DM-M800-50 - Fuel Oil System.pdf PDF
Enclosure 34 - DM-H500-18D - Dragarm Trunnion Tube.pdf PDF
Enclosure 15 - DM-M700-159 - Marine Propeller Shaft.pdf PDF
Enclosure 26 - DM-H900-9 - Rudder Assembly Details.pdf PDF
Enclosure 23 - DM-M100-70 - Engine Room Arrangement - REV 2.pdf PDF
Enclosure 1 - TB_43-0144_9OCT1990 PAINTING OF WATERCRAFT.pdf PDF
Enclosure 2 - Shipgrid June 2010.PDF PDF
Enclosure 53 - DM-H200-167 - Grid Cooler Framing.pdf PDF
A21 - (B) PWS_ME_COMMERCIAL_SHIPYARD.pdf PDF
Enclosure 4 - MERRITT-arrangement_2009 -12-21.pdf PDF
Enclosure 43 - DM-H300-87 - Staterooms Joiner Installations.pdf PDF
Enclosure 56 - DM-H200-45 - Engine Grid Cooler Chest..pdf PDF
Enclosure 10 - DM-M900-99 - Sanitary Supply System.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DA FORM 5587, AUG 2004

SEA CHESTS AND VALVES

TYPE RENEWED AT THE DOCKING

APD 9V1.000

TIME ELAPSED SINCE LAST PAINTING (Mos & Days)

NAME OF VESSEL/HULL NUMBER/DESIGN NUMBER

REPORT OF DRYDOCKING, PAINTING AND

CONDITION OF VESSEL BOTTOM

(FROM KEEL TO TOP OF BOOT TOP LINE)

For use of this form, see DA PAM 750-8; the proponent agency is DCS, G-4.

REPORTS CONTROL SYMBOL

CSGLD-1943

TO: FROM:

DATE

SECTION I - DRYDOCKING AND PAINTING DATA

SECTION II - CONDITION OF UNDERWATER FITTINGS

Where two or more shafts are fitted, report separately the condition of propellers, shafting, stern and strut bearings, zincs, rings, struts, etc.

Indicate starboard (S) or port (P) as applicable.

COMMAND:

STATION:

LOCATION:

LOCATION OF PRESENT DD OR HAUL OUT

LOCATION LAST DD OR HAUL OUT

CONTRACTOR'S NAME

DATE OF LAST DD DATE REFLOATED

STATE FULLY CONDITION OF THE UNDERWATER HULL PLATES

OUTBOARD SHAFTING AND SLEEVES SIZE OF SHAFT DATE TAIL SHAFT LAST DRAWN

RUDDER(S)

RUDDERS PINTLE BEARINGS AND GUDGEONS RENEWED AT THIS DOCKING

YES NO

PROPELLERS SIZE & PITCH

OUTBOARD STERN BEARING(S) AT DOCKING

PROPELLERS STRUTS

PRIOR TO FLOATING

HOW MUCH WEAR (Thousandths of an inch) DATE LAST CUTLASS RUBBER RENEWED

SEA STRAINERS RENEWED AT THE DOCKING

YES NO

YES NO

RENEWED AT THE DOCKING

YES NO

BILGE KEELS

STERN FRAME/SKEG/KORT NOZZLE

SIZE

SIZE

NUMBER

NUMBER TYPE

HULL ZINCS

ZINC BARS AT SEA

DATE OF PRESENT DD

COST OF PRESENT DDCOST OF CLEANING & PAINTING OF

DA FORM 5587-R EDITION OF NOV 86, IS OBSOLETE.

REVERSE OF DA FORM 5587, AUG 2004

SIGNATURE OF SURVEYOR

SECTION III - BOTTOM FOULING

PLANT ANIMAL

Heavy

Moderate

Slight

SECTION IV- PAINT RECORD

Heavy

Moderate

Slight

CONDITION AND TYPE OF FOULING

APD 9V1.000

WEATHER CONDITION (Temp/Humidity) SANDBLAST TO NEAR WHITE METAL

YES NO

TYPED NAME AND GRADE OF SURVEYOR TYPED NAME AND GRADE OF APPROVING OFFICIAL

SIGNATURE OF APPROVING OFFICIAL

REMARKS

IF FULLY REPAINTED

IF SPOT PAINT ONLY

TIME FACTORS

Time Between Each Coat (Hrs)

Length of Time to Complete Painting

Time Between Last Coat and Refloating

NO. OF COATS MANUFACTURER FORMULA GAL USED

NO. OF COATS MANUFACTURER FORMULA GAL USED

1-2 2-3 3-4 4-5 5-6 6-7 7-8

COATS

File details come from the government source that posted it. Updated .