This document contains a set of Questions and Responses related to Solicitation Number W912PM24Q0045 for Dredge "MERRITT" COMMERCIAL SHIPYARD. The solicitation is seeking a contractor to provide labor, materials, and services to accomplish repairs, maintenance, and modifications on the dredge vessel while it is dry-docked for up to 90 days. The Questions cover various aspects of the work, including option items, performance period, fuel consumption, electrical work, bilge cleaning, crane testing, fire suppression system service, and surface preparation requirements. The responses provide clarification and additional details requested by the bidders. The solicitation has a site visit scheduled for September 30, 2024, and quotes are due by October 22, 2024. The contract will be awarded to the lowest priced, technically acceptable offeror.
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder Questions
| BIDDER QUESTIONS & RESPONSES |
| Solicitation Number: W912PM24Q0045 |
| Dredge "MERRITT" COMMERCIAL SHIPYARD |
| # | Question | Response |
| 1 | Option Items 18 thru 27: Please clarify that the Option Items (18 thru 27) are Level of Effort Items that the government has set a limit on and the contractor has only to include these costs in their proposal. | Correct |
| 2 | Combined Synopsis - Solicitation: The Synopsis - Solicitation reads, "The Contractor shall provide labor, materials, and services to accomplish all the repairs, maintenance, and modification items listed in the Performance Work Statement (PWS), while dry-docked for up to ninety (90) days at the Contractor’s Shipyard." We highlight this section because the specifications require Arrival Tests and Inspections along with Departure Sea Trials which have to be completed not later than 5 days prior to the expiration of the performance period. In total, these tests will require at least 10 days. Is the overall contract length longer than the 90 days on dry dock? | The POP is for a total of 90 days from the yard acceptance until returning the vessel to COE control. The Contractor will have up to 30 days from the Contract award date to accept the vessel, and then a 90-day shipyard period of performance will begin (dockside and dry-dock). * The initial 30-days is to allow time for the vessel to de-mob and transit to the shipyard and/or to allow for any delays in the shipyards scheduling. See updated paragraph 5 of the PWS. |
| 3 | Departure Sea Trials: Paragraph 3.4.1 indicates that the contractor is reponsible for providing all "fuel, luricating oils, water, greases, anitfreeze and refrigerants as specified or required by the manufacturer of any item of machinery or equipment involved." Please provide the fuel consumption rate for the main engines and generators per hour for the tests and trials along with coolant capacities for each of the main and generator engines. | Fuel consumption rate for the main engines and generators per hour is approximately 25 gallons. Coolant capacities for main engines (47 quarts each) and generators (45.4 quarts each). See revised PWS paragraphs 3.4.1.1 and 3.4.1.2. |
| 4 | Departure Sea Trials: Paragraph 3.4.2 reads, " The contractor shall furnish and install new replacement light bulbs, lamps, and fuses found defective upon energizing and operating all electronic and electrical circuits, components, and systems." Since the contractor cannot determine the number of items to be replaced at the time of bidding, will the cost to replace these items be the subject of a Contract Change Order? | The arrival inspection should determine the qty and location of any burnt light bulbs, lamps, and fuses, etc. and then a CFR should be submitted. |
| 5 | Anodes / Zincs: Paragraph 7.2.1 indicates the zinc anode data and lists the size as 6" x 4" x 1-1/4". The pictures referenced in this item show zinc anodes that are ZHS-23, 12" x 6" x 1-1/4". Please verify the size of zinc anode to be installed onboard the vessel. | The size is 12" x 6" x 1-1/4". See update to paragrapg 7.2.1 of the PWS. |
| 6 | Fuel Tank Cleaning: Paragraph 8.6.1 directs the contractor to remove and store no more than 3,000 gallon of marine diesel fuel. Will the government allow the contractor to dispose of the fuel and provide new at the end of the contract period if it more cost effective? | Yes, as long as the fuel meets the filtration requirement |
| 7 | Electrical Maintenance: Paragraph 11.2.1 reads, "The contractor shall furnish the services of an authorized Electrical Contractor to inspect, clean, and tighten all electrical connections on the vessel." What type of "authorized Electrical Contractor" is the government looking for? Will the contractor electricians meet this requirement? | A qualified Contractor Electrician will satisfy this requirement. |
| 8 | Pump Out and Clean Bilges: Pump Out and Clean Bilges: PARA. NO: 12.2.2: Please verify that the government is asking for a surface preparation equal to SSPC SP-3 in the bilge areas prior to preservation. | YES, SSPC SP-3 is correct |
| 9 | Replace Wire Rope on Fwd Multipurpose Crane: Please provide the test weight amount or load test pull requirements for testing of the mutlipurpose crane after work is complete. | No actual load test is required. This was a mistake in the SOW. There should be an operational test to check the left and right, and up and down (full range to stops) operation of the crane with a load. See updated paragraph 13.4.5 of the PWS. |
| 10 | Fire Suppression System Service: Paragraph 16.7.3 reads, "Replace defective and missing indicator lamps/bulbs." The contractor cannot price this item at the time of bidding. Please verify that replacement of lamps and bulbs will be the subject of a Contract Change Order. | The arrival inspection should determine the quantiy and location of any burnt light bulbs, lamps, and fuses, etc. and then a CFR should be submitted. |
| 11 | Fire Suppression System Service: Paragraph 16.7.5 reads, " Remove and replace the alarm panel batteries." Please provide the type, quantity and part number of the batteries as none of the references provided has this information. | No need to replace batteries. Paragraph 16.7.5 of the PWS hs been deleted. |
| 12 | Mechanically Clean and Paint Rudder Locker: Paragraph 17.2.5 directs the contractor to "mechanically clean and paint the Rudder Locker." Please provide the standard of mechanical cleaning required (i.e. SSPC SP-3 or SSPC SP-11) and the preservation requirements (type of paint and mil thickness). | SSPC SP-3 PRIMER: 1 coat Devoe #302 3Mils Inorganic-Zinc, 2 coats Devoe #235 Epoxy, total 9 Mils PAINT: 1 coat International Paint, 5 Mils Intergard Epoxy Gray FPJ034/FPA327 1 coat Intergard Epoxy 5 Mils Red FPL274/FPA327 |
| 13 | Main Deck Bulwark Vertical Stiffeners: PARA. NO: 18.2.1: Item 18 is an OPTION item and the visual inspection would not be completed without the item being activated. The visual inspection should be a pre-priced inspection and the repair cost should be included as Level of Effort money with a not to exceed total as indicated. Without separating the inspection and repairs, the inspection will not be completed until the item is activated by the government. Please review and provide direction. | The inspection should be included in the Arrival Testing and Inspections. If there are areas found that need repair then a CFR should be submitted for the appropriate option CLIN. |
| 14 | Main Deck Bulwark Vertical Stiffeners: PARA. NO: 18.2.2: Paragraph reads, "vertical stiffener surfaces shall be blasted to near white metal, or water jetting to a near white blasted surface (SSPC-SP-12, WJ-2)". Item 5, paragraph 5.5.1 directs the contractor to complete surface preparation "from the centerline and up to main deck bulwark cap rail to include the inside of the bulwark and stiffeners" to SSPC-SP-10. Please identify the correct level of surface preparation required for the vertical stiffeners. | SSPC-SP-10 or SSPC-SP-12 is acceptable (should be consistant) |
| 15 | Head Service and Repairs: PARA. NO: 23.1.1: Item 23 is an OPTION item and the inspection and subsequent CFR would not be completed without the item being activated. The inspection should be a pre-priced inspection and the repair cost should be included as Level of Effort money with a not to exceed total as indicated. Without separating the inspection and repairs, the inspection will not be completed until the item is activated by the government. Please review and provide direction. | The inspection should be included in the Arrival Testing and Inspections. If there are areas found that need repair then a CFR should be submitted for the appropriate option CLIN. |
| 16 | Marine Electrial / Electronic Services and Supplies: PARA. NO: 24.1.1: Item 24 is an OPTION item and the inspection and subsequent CFR would not be completed without the item being activated. The inspection should be a pre-priced inspection and the repair cost should be included as Level of Effort money with a not to exceed total as indicated. Without separating the inspection and repairs, the inspection will not be completed until the item is activated by the government. Please review and provide direction. | The inspection should be included in the Arrival Testing and Inspections. If there are areas found that need repair then a CFR should be submitted for the appropriate option CLIN. |
| 17 | Inspect Shafts, Props, Cutlass Bearings and Rudders and Check Proper Alignments: PARA NO: 25.2.1: Item 25 is an OPTION item and the inspection and subsequent CFR would not be completed without the item being activated. The inspection should be a pre-priced inspection and the repair cost should be included as Level of Effort money with a not to exceed total as indicated. Without separating the inspection and repairs, the inspection will not be completed until the item is activated by the government. Please review and provide direction. | The inspection should be included in the Arrival Testing and Inspections. If there are areas found that need repair then a CFR should be submitted for the appropriate option CLIN. / All of this has recently been done. |
| 18 | Replace External Visor Located Above Pilothouse Windows: PARA. NO: 26.2.1: Item 26 is an OPTION item and the inspection and subsequent CFR would not be completed without the item being activated. The inspection should be a pre-priced inspection and the repair cost should be included as Level of Effort money with a not to exceed total as indicated. Without separating the inspection and repairs, the inspection will not be completed until the item is activated by the government. Please review and provide direction. | The inspection should be included in the Arrival Testing and Inspections. If there are areas found that need repair then a CFR should be submitted for the appropriate option CLIN. |
| 19 | Work Item 16: Will the Army Corps of Engineers please provide a copy of last year’s Firefighting certification along with a list of cylinders and extinguishers onboard? | Attached |
| 20 | We are looking to request further details on the vessel displacement/lightship/stability conditions. | Displacement = 342 long tons Tonnage, Gross = 162 long tons This vessel has never been USCG inspected and has never had a stability report done. |