Enclosure 1 NFPA 409 Hangar Testing Chapter 11.docx

DOCX document 18 KB Posted

Attached to
Fire Suppression Systems Inspections for Port Angeles, WA
Solicitation number
USCG-SPS-0001
Issued by

About this file

This document is the Inspection, Testing, and Maintenance chapter from the NFPA 409 standard for Aircraft Hangars. It outlines the inspection and testing requirements for various fire protection system components in aircraft hangars, including sprinklers, valves, foam proportioning devices, detectors, and more. The required frequency of inspections and tests ranges from weekly visual checks to 5-year operational discharge tests. Records of all inspections and tests must be maintained.

The related federal contract opportunity is for fire suppression system inspections and maintenance services for the U.S. Coast Guard Air Station in Port Angeles, Washington. This is a small business set-aside solicitation seeking a contractor to provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary to inspect, test, and maintain the fire protection systems in accordance with NFPA standards. The government will award a firm-fixed-price contract to the lowest priced technically acceptable offeror.

View the file

Other files

File Type Posted
15-5545 Wage Determination.txt TXT text file
SOW_Scope of Work Fire System Inspection_2024.docx DOCX document
Enclosure 2 Fire System Details.docx DOCX document
Service-Clauses1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NFPA 409-26 AIRCRAFT HANGARS

2016 Edition Chapter 11 Inspection, Testing, and Maintenance

11.1 Fire Protection Systems.

11.1.1 Inspection, testing, and maintenance of fire protection systems in aircraft hangars shall be performed in accordance with NFPA 11, NFPA 25, NFPA 70, NFPA 72, or NFPA 80 as applicable and as supplemented by Table 11.1.1.

11.1.2 The 5-year discharge test for piping required in Table

11.1.1 shall not be required if an internal inspection in accordance with NFPA 25 indicates that the pipe is in good condition and free of obstructions, mechanical damage, leakage, and corrosion.

11.1.3 Records of inspections, tests, and test results shall be maintained.

Table 11.1.1 Inspection and Testing of Hangar Fire Protection Systems

Type and Frequency of Inspections and Tests

System ComponentsWeekly Monthly Quarterly Semi- Annually Every5
AnnuallyYears
Sprinkler heads————V—
Piping————VD
Pipe hangers————V —
Sprinkler alarm valve—VO1———
Deluge valve—V——OD
Pre-action system—V——D—
Dry pipe systems—V——D—
Shutoff valves—V——F—
Fire pumpsF2———D—
Water reservoirs—V————
Hose stations—V———D
Strainer filter baskets————V—
Foam concentrate————F—
Concentrate storage tanks—V————
Concentrate pumpsF2———OD
Concentrate control valve (automatic) —V——OD
Concentrate shutoff valve—V——F—
Foam proportioning device—V———D
Water-powered monitor nozzle—V——D—
Electric-powered monitor nozzle—V——FD

Water-powered high-expansion-foam (HEF) Generator — V — — D D Electric-powered high-expansion-foam (HEF)

Generator—V——FD
Pneumatic detector———FO3—
Electric detector———FO3—
Optical detectorV——FO3—
Control panels—V—FO—
Alarm transmission (local and remote) —F————
Tamper switch (supervisory switch valve) ——F———
Flow indication switch————O—
Low air pressure supervisory switch ———FO—
Supervisory alarms———F——
Manual actuation stations———F——
Hangar floor drain system and separators —V———D
Fire doors—V——F—
Gas detectors—V—F——
Ventilation system in pits, tunnels, and ducts ———F——
Grounding equipment—————F

V: Visual inspection. D: Operational test with actual discharge. O: Operational test with flow, no discharge. F: Functional test, no flow.

1For the purposes of this test, the inspector’s flow valve is acceptable.

2Churn test.

3At this time it is necessary to check that the set points are the same as the original.

Table 11.1.1 Inspection and Testing of Hangar Fire Protection Systems

Type and Frequency of Inspections and Tests

System Components Every 5 Years

PipingD: Operational test with actual discharge.
Deluge valveD: Operational test with actual discharge.
Hose stationsD: Operational test with actual discharge.
Concentrate pumpsD: Operational test with actual discharge.
Concentrate control valve (automatic)D: Operational test with actual discharge.
Foam proportioning deviceD: Operational test with actual discharge.
Electric-powered monitor nozzleD: Operational test with actual discharge.

Water-powered high-expansion-foam (HEF) Generator D: Operational test with actual discharge.

Electric-powered high-expansion-foam (HEF)

GeneratorD: Operational test with actual discharge.
Hangar floor drain system and separatorsD: Operational test with actual discharge.
Grounding equipmentF: Functional test, no flow.

V: Visual inspection. D: Operational test with actual discharge. O: Operational test with flow, no discharge. F: Functional test, no flow.

1For the purposes of this test, the inspector’s flow valve is acceptable.

2Churn test.

3At this time it is necessary to check that the set points are the same as the original.

Enclosure 1

File details come from the government source that posted it. Updated .