Enclosure 1 NFPA 409 Hangar Testing Chapter 11_2026.pdf
NFPA Standard 2026 PDF 146 KB Posted
- Solicitation number
- 70ZL3227Q20190001
- Issued by
- Not on record
About this file
This document is Enclosure 1 to NFPA 409-26, Aircraft Hangars, 2016 Edition, Chapter 11, which establishes inspection, testing, and maintenance requirements for fire protection systems in aircraft hangars. The document provides a comprehensive regulatory framework requiring that all fire protection system inspections, testing, and maintenance be performed in accordance with applicable NFPA standards (NFPA 11, NFPA 25, NFPA 70, NFPA 72, or NFPA 80) as supplemented by Table 11.1.1. A critical provision permits waiver of the required 5-year discharge test for piping if an internal inspection per NFPA 25 confirms the pipe is in good condition and free of obstructions, mechanical damage, leakage, and corrosion. Records of all inspections, tests, and results must be maintained.
Table 11.1.1 specifies inspection and testing frequencies and methodologies for 40 system components, ranging from sprinkler heads and piping to detectors, control panels, and ventilation systems. Inspection types are coded as V (visual inspection), D (operational test with actual discharge), O (operational test with flow, no discharge), and F (functional test, no flow). Components require inspection on weekly, monthly, quarterly, semi-annual, annual, or 5-year cycles. For example, fire pumps require weekly functional tests (churn test); sprinkler alarm valves require monthly visual inspections and quarterly operational flow tests; and piping requires annual visual inspection and 5-year operational discharge testing. Optical detectors require weekly visual inspection plus quarterly and semi-annual functional tests with set point verification. This standardized inspection schedule ensures systematic maintenance and operational readiness of aircraft hangar fire protection systems.
View the file
Other versions and copies of NFPA 409
| File | Revision | Posted | Attached to |
|---|---|---|---|
| Enclosure 1 NFPA 409 Hangar Testing Chapter 11_2025.docx | 2025 | Annual Fire Protection System Inspection | |
| Enclosure 1 NFPA 409 Hangar Testing Chapter 11.docx | Revision not stated | Fire Suppression Systems Inspections for Port Angeles, WA | |
| Enclosure 1 NFPA 409 Hangar Testing Chapter 11.docx | Revision not stated | Fire Systems Service/inspections |
Who attaches NFPA 409
| Agency | Files |
|---|---|
| Department of Homeland Security US Coast Guard | 3 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure 1
NFPA 409-26 AIRCRAFT HANGARS
2016 Edition Chapter 11 Inspection, Testing, and Maintenance
11.1 Fire Protection Systems.
11.1.1 Inspection, testing, and maintenance of fire protection systems in aircraft hangars shall be performed in accordance with NFPA 11, NFPA 25, NFPA 70, NFPA 72, or NFPA 80 as applicable and as supplemented by Table 11.1.1.
11.1.2 The 5-year discharge test for piping required in Table 11.1.1 shall not be required if an internal inspection in accordance with NFPA 25 indicates that the pipe is in good condition and free of obstructions, mechanical damage, leakage, and corrosion.
11.1.3 Records of inspections, tests, and test results shall be maintained.
Table 11.1.1 Inspection and Testing of Hangar Fire Protection Systems
Type and Frequency of Inspections and Tests
System Components Weekly Monthly Quarterly Semi- Annually Every5 Annually Years
Sprinkler heads — — — — V — Piping — — — — V D Pipe hangers — — — — V — Sprinkler alarm valve — V O1 — — — Deluge valve — V — — O D Pre-action system — V — — D — Dry pipe systems — V — — D — Shutoff valves — V — — F — Fire pumps F2 — — — D — Water reservoirs — V — — — — Hose stations — V — — — D Strainer filter baskets — — — — V — Foam concentrate — — — — F — Concentrate storage tanks — V — — — — Concentrate pumps F2 — — — O D Concentrate control valve (automatic) — V — — O D Concentrate shutoff valve — V — — F — Foam proportioning device — V — — — D Water-powered monitor nozzle — V — — D — Electric-powered monitor nozzle — V — — F D Water-powered high-expansion-foam (HEF) Generator — V — — D D Electric-powered high-expansion-foam (HEF) Generator — V — — F D Pneumatic detector — — — F O3 — Electric detector — — — F O3 — Optical detector V — — F O3 — Control panels — V — F O — Alarm transmission (local and remote) — F — — — — Tamper switch (supervisory switch valve) — — F — — — Flow indication switch — — — — O — Low air pressure supervisory switch — — — F O — Supervisory alarms — — — F — — Manual actuation stations — — — F — — Hangar floor drain system and separators — V — — — D Fire doors — V — — F — Gas detectors — V — F — — Ventilation system in pits, tunnels, and ducts — — — F — — Grounding equipment — — — — — F
V: Visual inspection. D: Operational test with actual discharge. O: Operational test with flow, no discharge. F:
Functional test, no flow.
1For the purposes of this test, the inspector’s flow valve is acceptable.
2Churn test.
3At this time it is necessary to check that the set points are the same as the original.
Table 11.1.1 Inspection and Testing of Hangar Fire Protection Systems
Type and Frequency of Inspections and Tests
System Components Every 5 Years
Piping D: Operational test with actual discharge.
Deluge valve D: Operational test with actual discharge.
Hose stations D: Operational test with actual discharge.
Concentrate pumps D: Operational test with actual discharge.
Concentrate control valve (automatic) D: Operational test with actual discharge.
Foam proportioning device D: Operational test with actual discharge.
Electric-powered monitor nozzle D: Operational test with actual discharge.
Water-powered high-expansion-foam (HEF) Generator D: Operational test with actual discharge.
Electric-powered high-expansion-foam (HEF) Generator D: Operational test with actual discharge.
Hangar floor drain system and separators D: Operational test with actual discharge.
Grounding equipment F: Functional test, no flow.
V: Visual inspection. D: Operational test with actual discharge. O: Operational test with flow, no discharge. F:
Functional test, no flow.
1For the purposes of this test, the inspector’s flow valve is acceptable.
2Churn test.
3At this time it is necessary to check that the set points are the same as the original.