Elite_Choice_Inspections_-_2651_Sapp_Ln_-_Report.pdf
PDF 1 MB Posted
- Attached to
- CDBG - 2651 Sapp Lane Foundation Rehabilitation
- Solicitation number
- 25/26-006
- Issued by
- Clay County, Miramar Beach CDP, Florida
About this file
This is a home inspection report prepared by Elite Choice Inspections for Clay County at 2651 Sapp Lane, Middleburg, Florida 32068, inspected on June 16, 2025, by Inspector Gregory King. The inspection identified numerous structural and safety defects requiring immediate attention across multiple building systems. Significant exterior defects include siding gaps and missing sections with damaged insulation that could allow moisture penetration, a degraded exterior door with rotted framing, and deck boards that are loose and rotted due to pest damage. The foundation and structural systems present the most critical concerns, with improper joist alterations and inadequate support posts in the crawl space that do not meet standard building practices, evidence of water intrusion causing wood rot and continuous moisture problems, a floor joist that has fallen loose compromising structural integrity, falling insulation throughout the crawl space, and exposed PBC drain pipes prone to damage. Interior defects noted include pest activity observed within the home. The inspection recommends sealing siding gaps, installing approved replacement siding, replacing the degraded door and frame, reattaching and replacing damaged deck boards, isolating water sources with further evaluation and repair of affected floor structures, and engaging qualified structural engineers and pest specialists to address the identified deficiencies.
The inspection report serves as the technical baseline for the related Clay County RFP for Housing Foundation and Substructure Rehabilitation Services at the same property. This report documents the scope and severity of structural deficiencies that contractors bidding on the CDBG-funded project must address, with the RFP requiring removal and replacement of deteriorated floor framing components and restoration of the substructure to code-compliant conditions. Contractors submitting proposals must account for all deficiencies identified in this inspection report in their lump-sum pricing, with no additional compensation available for site conditions already visible in the structural inspection documentation. The inspection findings directly inform the project scope, pricing requirements, and contractor qualifications necessary for successful completion of the foundation rehabilitation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elite Choice Inspections Scan or click QR code to view HTML report
Jun 16th, 2025
2651 Sapp Ln, Middleburg, FL 32068
Home Inspection Report
PREPARED FOR:
Clay County
INSPECTED BY:
Gregory King / Elite Choice Inspections
Gregory King
Elite Choice Inspections 2651 Sapp Ln Prepared for: Clay County
Table of Contents
ECI TEMPLATE-2024-10-25.XLS
Inspection Details
Dexnitions
Emterior
PlubFing
&oundation W Structure
Interior, Doors, Nindows
Summary
2 / 16
Inspection Details
INSPECTOR
Gregory King Elite Choice Inspections
20 Oorth Arange -venue,3 Arlando, 82z01
Phone 407603752
Ebail elitechoiceinspections@gmail.com
INSPECTOR
Gregory King Elite Choice Inspections
20 Oorth Arange -venue,3 Arlando, 82z01
Phone 407603752
Ebail elitechoiceinspections@gmail.com
CLIENT
Clay County
Phone
Ebail
ADDITIONAL INFO
Inspection date Jun 16th, 2025
3 / 16
ECI TEMPLATE-2024-10-25.XLS
Dexnitions
Minor Defect Minor/cobbon defect
Hazard Defect Ibbediate -ttention
Defect Prioriti.ed AFservation
OATE: -ll dexnitions listed aFove refer to the property or iteb listed as inspected on this report at the tibe of in3 spectionj
&lagged itebs will show up in subbary viewj
1. EHterior
1.1 SIDING, FLAS&ING U TRIM
COMMENTS:
Defect
Siding Gaps
Siding had a gap in noted areas which could allow for boisture penetration or pest Fehind wall structurej Rec3 obbend either adVust or xll to seal gapsj
4 / 16
Defect
Siding Missing
Ane or bore areas of the siding was bissing with dabaged insulation at the tibe of the inspection which could allow for boisture intrusion to supportive wallj Recobbend correction Fy installation of approved sidingj
1.2 EXTERIOR DOORS
COMMENTS:
Defect
Door Degraded
Door was noted as degraded and door frabe wood is rottedj Recobbend door and frabe replacedj
1.3 DECKS, BALCONIES, PORC&ES U STEPS
APPkRTENANCE: Deck with Steps
COMMENTS:
Defect
DecW - Loose Boards
Deck Foards were loose in noted locations which could Fecobe fully detached due to pest dabagej Recobbend fully reattach using fasteners such as deck screws after dabaged wood as Feen rebovedj
5 / 16
Defect
DecW - Rotted Boards
Ane or bore deck Foards are showing signs of rot and are dabagedj Recobbend correction Fy replacing fouled deckingj
2. Plumbing
2.1 DRAIN, VASTE, U qENT SYSTEMS
COMMENTS:
Defect
EHposed Drain Pipe
Emposed PBC discharge lines are bore prone to dabage frob norbal activityj Recobbend Furying line with soil ensuring you leave clean3out emposedj
3. Foundation U Structure
6 / 16
3.1 FLOOR STRkCTkRE
MATERIAL: Nood I3Joists
SkB-FLOOR: AS(, Plank
BASEMENT/CRAVLSPACE FLOOR: Dirt, Gravel
COMMENTS:
Defect
Improper Joist Alteration U Inadevuate Support Post
- )oor Voist in the crawl space appears to have Feen notches or bodixed, potentially cobprobising its structural integrityj -dditionally, vertical support posts have Feen installed Fut are resting on non3 perbanent or unap3 proved footingsq loose Flocks or deFris Aj This setup is not consistent with standard Fuilding practices and bay result in settlebent or )oor de)ectionj Recobbend further evaluation and correction Fy licensed contractor or structural engineerj
Defect
Ewidence of Vater Intrusion
There were signs of water intrusion in the underlying )oor structure likely causing wood rot and continual boisture in the crawlspacej Recobbend isolation of water source and further evaluation and repairj
7 / 16
Defect
Joists Need Repair
Ane )oor Voist was ibproperly installed and apparently has fallen loosej This can cobprobise the structural integrity of the hobej Recobbend that a Bualixed structural engineer evaluate and advise on how to correct the issuej
3.2 CRAVLSPACES
CRAVLSPACE ACCESS: Door &oundation
CRAVLSPACE INSPECTION: Inspection Fy direct entry
MEDIA:
8 / 16
COMMENTS:
Defect
Insulation Falling
Insulation was noted falling frob Voists in various locations in crawlspacej Recobbend Bualixed handyban reattach insulationj
4. Interior, Doors, Vindo9s
4.1 FLOORS
FLOORING: check 1
4.2 PEST
COMMENTS:
Defect
Pest obserwed
-ctions of pest has Feen oFserved in the hobej Recobbend Bualixed pest specialist to evaluatej
/ 16
10 / 16
DSummary
ECI TEMPLATE-2024-10-25.XLS
This subbary is not the entire reportj The cobplete report bay include additional inforbation of concern to the clientj It is recobbended that the client readthe cobplete reportj
Minor Defect Minor/cobbon defect
Hazard Defect Ibbediate -ttention
Defect Prioriti.ed AFservation
1. EHterior
1.1 SIDING, FLAS&ING U TRIM
COMMENTS:
Defect
Siding Gaps
Siding had a gap in noted areas which could allow for boisture penetration or pest Fehind wall structurej Rec3 obbend either adVust or xll to seal gapsj
Defect
11 / 16
Siding Missing
Ane or bore areas of the siding was bissing with dabaged insulation at the tibe of the inspection which could allow for boisture intrusion to supportive wallj Recobbend correction Fy installation of approved sidingj
1.2 EXTERIOR DOORS
COMMENTS:
Defect
Door Degraded
Door was noted as degraded and door frabe wood is rottedj Recobbend door and frabe replacedj
1.3 DECKS, BALCONIES, PORC&ES U STEPS
COMMENTS:
Defect
DecW - Loose Boards
Deck Foards were loose in noted locations which could Fecobe fully detached due to pest dabagej Recobbend fully reattach using fasteners such as deck screws after dabaged wood as Feen rebovedj
12 / 16
Defect
DecW - Rotted Boards
Ane or bore deck Foards are showing signs of rot and are dabagedj Recobbend correction Fy replacing fouled deckingj
2. Plumbing
2.1 DRAIN, VASTE, U qENT SYSTEMS
COMMENTS:
Defect
EHposed Drain Pipe
Emposed PBC discharge lines are bore prone to dabage frob norbal activityj Recobbend Furying line with soil ensuring you leave clean3out emposedj
3. Foundation U Structure
13 / 16
3.1 FLOOR STRkCTkRE
COMMENTS:
Defect
Improper Joist Alteration U Inadevuate Support Post
- )oor Voist in the crawl space appears to have Feen notches or bodixed, potentially cobprobising its structural integrityj -dditionally, vertical support posts have Feen installed Fut are resting on non3 perbanent or unap3 proved footingsq loose Flocks or deFris Aj This setup is not consistent with standard Fuilding practices and bay result in settlebent or )oor de)ectionj Recobbend further evaluation and correction Fy licensed contractor or structural engineerj
Defect
Ewidence of Vater Intrusion
There were signs of water intrusion in the underlying )oor structure likely causing wood rot and continual boisture in the crawlspacej Recobbend isolation of water source and further evaluation and repairj
14 / 16
Defect
Joists Need Repair
Ane )oor Voist was ibproperly installed and apparently has fallen loosej This can cobprobise the structural integrity of the hobej Recobbend that a Bualixed structural engineer evaluate and advise on how to correct the issuej
3.2 CRAVLSPACES
COMMENTS:
Defect
Insulation Falling
Insulation was noted falling frob Voists in various locations in crawlspacej Recobbend Bualixed handyban reattach insulationj
15 / 16
4. Interior, Doors, Vindo9s
4.2 PEST
COMMENTS:
Defect
Pest obserwed
-ctions of pest has Feen oFserved in the hobej Recobbend Bualixed pest specialist to evaluatej
16 / 16