ELECTRICAL COMBINED.pdf

PDF 53 MB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a solicitation document for the installation of a REACT VII facility at Building 9001 (Post V19) issued by the Department of the Air Force Materiel Command Air Force Sustainment Center under solicitation number FA813726R0026. The project is designated WWYK250063 and is restricted to SBA Certified Women Owned Small Businesses (WOSB) only.

Interested WOSB contractors must submit a confirmation of interest (RSVP) via email to SSgt Isaac Demmers at isaac.demmers@us.af.mil within five calendar days of the posting date. An initial mandatory site visit is scheduled for Monday, July 20, 2026, at 9:00 a.m. CST, with the meeting location at the Northwest Parking lot of Building 9001 (coordinates: 35°23'43.9"N 97°23'56.8"W). Attendance at the initial site visit is mandatory for contractor eligibility to submit proposals. Contractors must indicate in their RSVP whether personnel require base access and, if so, provide an Entry Access List (EAL) to facilitate security clearance. A detailed site visit meet-up location map is available in the project attachments for reference.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 4_ODS.pdf PDF
WWYK250063-04March2026 1.docx DOCX document
250063_ATT 3_RMDF.pdf PDF
23 00 00.pdf PDF
23 07 00.pdf PDF
23 31 13.00 40.pdf PDF
23 08 00.pdf PDF
03 01 00.pdf PDF
23 64 26.pdf PDF
10 14 00.20.pdf PDF
23 05 48.00 40.pdf PDF
07 84 00.pdf PDF
23 03 00.pdf PDF
01 50 00.pdf PDF
00 80 00.pdf PDF
01 42 00.pdf PDF
UMRL.pdf PDF
PILE SCHEDULE.xlsx XLSX spreadsheet
HELICAL PILES NOTES.docx DOCX document
z400i.pdf_safe.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .