The document is an earthwork log for the MT NPS Yell 11(2) North Entrance project. It provides calculations for excavation and fill volumes for roadway, existing pavement, topsoil, and pavement layer materials from station 46+00 to 66+75. Soil types, multiplication factors, and color codes are defined for existing ground, proposed finish grade, and undercut/backfill lines. Station-by-station end area calculations list excavation and fill quantities by material. The Federal Highway Administration Western Federal Lands Highway Division is the agency for this project located on National Park Service land along the North Entrance Road at Yellowstone National Park.

View the file

Other files

File Type Posted
Bid Opening Summary_North Entrance.pdf PDF
Amendment A003.pdf PDF
QA_05-08-2020.pdf PDF
Amendment A002.pdf PDF
QA_05-06-2020.pdf PDF
QA_04-29-2020.pdf PDF
Amendment A001.pdf PDF
Asbestos Test results.pdf PDF
Eearthwork_JUG01.pdf PDF
Eearthwork_DRIVE05.pdf PDF
XS_101_YNE01.pdf PDF
Eearthwork_APP01a.pdf PDF
XS_102_RREAM02.pdf PDF
XS_101_DRIVE05.pdf PDF
Eearthwork_DRIVE05A.pdf PDF
Eearthwork_DRIVE05B.pdf PDF
YNP North Entrance Station Full Drawing Set Volume 2 Building.pdf PDF
Eearthwork_DRIVE06.pdf PDF
Eearthwork_GTC_N_01.pdf PDF
Eearthwork_DRIVE03.pdf PDF
Eearthwork_YNE01_South_Asphalt Section.pdf PDF
IFB_North Entrance.pdf PDF
XS_101_EMPARKEXT.pdf PDF
SWPPP MT NPS YELL 11(2)N. Entrance_Park St.pdf PDF
2017-10-26 Gardiner Entrance Geotech Report.pdf PDF
Eearthwork_GTC_S_01.pdf PDF
XS_101_DRIVE05A.pdf PDF
XS_101_APP01.pdf PDF
XS_101_DRIVE03.pdf PDF
XS_102_DRIVE06.pdf PDF
Eearthwork_TBP2.pdf PDF
Eearthwork_YNE01_Concrete Section.pdf PDF
North_Entrance_Plan_Set Volume 1 Civil.pdf PDF
XS_101_GTC_N_01.pdf PDF
Eearthwork_YNE01_North_Asphalt Section.pdf PDF
XS_101_EMPBYP01.pdf PDF
XS_101_DRIVE05B.pdf PDF
XS_101_GTC-S-01.pdf PDF
Eearthwork_EMPAR_SideWalk.pdf PDF
Eearthwork_EMPBYP01.pdf PDF
XS_101_JUG01.pdf PDF
Eearthwork_EMPAR.pdf PDF
Earthwork_RREAM022S_14.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EARTHWORK LOG

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

MT NPS YELL 11(2)

NORTH ENTRANCE

North Entrance Road

(YNE01)

Station 46+00.00 to 66+75

File: c:\pw‐work\d0437239\Eearthwork_YNE01a.log 10/21/2019, 5:27:07 PM

Input File:

pw:\Montana\YELL_North_Entrance\MT_NPS_YELL_11(2)\Development\CADD\Design\V8_EARTHWORK _YNE01.inp Output File: Eearthwork_YNE01a.log 1 1 1 1 2 2 1 3 3 Earthwork 1 4 4 1 5 5 /* For use with the .x30 criteria files and TYPICAL SECTIONS */ 1 6 6 /* BELOW (tolerance setting)... use 0.001 for Metric projects and .03 for English projects */ 1 7 7 1 8 8 tolerance = 0.03 1 9 9 1 10 10 xs dgn = yell1102_xs_YNEPH.dgn 1 11 11 1 12 12 Existing Ground Line 1 13 13 soil type = RdwyExc 1 14 14 roadway exc mult factor = 1.00 1 15 15 subsoil exc mult factor = 1.00 1 16 16 fill mult factor = 1.00 1 17 17 type = line, line_string 1 18 18 lvname = x_e_ground_xs 1 19 19 co = 8 1 20 20 1 21 21 /* For use with subex type 1 */ 1 22 22 Existing Suitable Material 1 23 23 soil type = RdwyExc 1 24 24 roadway exc mult factor = 1.00 1 25 25 subsoil exc mult factor = 1.00 1 26 26 fill mult factor = 1.00 1 27 27 type = line, line_string 1 28 28 lvname = x_p_subex_exc1 1 29 29 co = 30 1 30 30 1 31 31 /* For use with sidewalks */ 1 32 32 Existing Suitable Material 1 33 33 soil type = SidewalkExc 1 34 34 roadway exc mult factor = 1.00 1 35 35 subsoil exc mult factor = 1.00 1 36 36 fill mult factor = 1.00 1 37 37 type = line, line_string 1 38 38 lvname = x_p_sidewalk_exc 1 39 39 co = 31 1 40 40 1 41 41 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 42 42 Existing Suitable Material 1 43 43 soil type = MseWallExc 1 44 44 roadway exc mult factor = 1.00 1 45 45 subsoil exc mult factor = 1.00 1 46 46 fill mult factor = 1.00 1 47 47 type = line, line_string

Page: 1

1 48 48 lvname = x_p_mse_wall_exc 1 49 49 co = 32 1 50 50 1 51 51 /* For use with subex types 1 and 2 */ 1 52 52 Existing Unsuitable Material 1 53 53 soil type = Subexcavation 1 54 54 roadway exc mult factor = 1.00 1 55 55 subsoil exc mult factor = 1.00 1 56 56 fill mult factor = 1.00 1 57 57 type = line, line_string 1 58 58 lvname = x_p_subex_exc2 1 59 59 co = 20 1 60 60 1 61 61 /* For use with all Concrete Retaining Walls */ 1 62 62 Existing Unsuitable Material 1 63 63 soil type = ConcWallStrucExc 1 64 64 roadway exc mult factor = 1.00 1 65 65 subsoil exc mult factor = 1.00 1 66 66 fill mult factor = 1.00 1 67 67 type = line, line_string 1 68 68 lvname = x_p_conc_wall_str_exc 1 69 69 co = 21 1 70 70 1 71 71 /* For use with REHAB typicals */ 1 72 72 Existing Unsuitable Material 1 73 73 soil type = ColdRecycle 1 74 74 roadway exc mult factor = 1.00 1 75 75 subsoil exc mult factor = 1.00 1 76 76 fill mult factor = 1.00 1 77 77 type = line, line_string 1 78 78 lvname = x_p_milling_exc 1 79 79 co = 22 1 80 80 1 81 81 /* For use with Existing Features typicals */ 1 82 82 Existing Unsuitable Material 1 83 83 soil type = ExistPavement 1 84 84 roadway exc mult factor = 1.00 1 85 85 subsoil exc mult factor = 1.00 1 86 86 fill mult factor = 1.00 1 87 87 type = line, line_string 1 88 88 lvname = x_e_pave_surface 1 89 89 co = 1 1 90 90 1 91 91 /* For use with Existing Features typicals (.x30 criteria)*/ 1 92 92 Existing Unsuitable Material 1 93 93 soil type = ExistPavementLayer2 1 94 94 roadway exc mult factor = 1.00 1 95 95 subsoil exc mult factor = 1.00 1 96 96 fill mult factor = 1.00 1 97 97 type = line, line_string 1 98 98 lvname = x_e_pave_surface2 1 99 99 co = 2

Page: 2

1 100 100 1 101 101 /* For use with Existing Features typicals (.x30 criteria)*/ 1 102 102 Existing Unsuitable Material 1 103 103 soil type = ExistGravel 1 104 104 roadway exc mult factor = 1.00 1 105 105 subsoil exc mult factor = 1.00 1 106 106 fill mult factor = 1.00 1 107 107 type = line, line_string 1 108 108 lvname = x_e_gravel_surface 1 109 109 co = 3 1 110 110 1 111 111 Existing Unsuitable Material 1 112 112 soil type = Topsoil 1 113 113 roadway exc mult factor = 0.000001 1 114 114 subsoil exc mult factor = 0.000001 1 115 115 fill mult factor = 0.000001 1 116 116 type = line, line_string 1 117 117 lvname = x_e_topsoil_layer 1 118 118 co = 23 1 119 119 1 120 120 /* For use with soil nail wall (.x30 criteria)*/ 1 121 121 Existing Unsuitable Material 1 122 122 soil type = SnWallStrExc 1 123 123 roadway exc mult factor = 1.00 1 124 124 subsoil exc mult factor = 1.00 1 125 125 fill mult factor = 1.00 1 126 126 type = line, line_string 1 127 127 lvname = x_p_sn_wall_str_exc 1 128 128 co = 57 1 129 129 1 130 130 /* For use with rockery wall (.x30 criteria)*/ 1 131 131 Existing Unsuitable Material 1 132 132 soil type = RockeryWallStrExc 1 133 133 roadway exc mult factor = 1.00 1 134 134 subsoil exc mult factor = 1.00 1 135 135 fill mult factor = 1.00 1 136 136 type = line, line_string 1 137 137 lvname = x_p_rk_wall_str_exc 1 138 138 co = 88 1 139 139 1 140 140 /* For use with guardwall (.x30 criteria)*/ 1 141 141 Existing Unsuitable Material 1 142 142 soil type = GuardwallStrucExc 1 143 143 roadway exc mult factor = 1.00 1 144 144 subsoil exc mult factor = 1.00 1 145 145 fill mult factor = 1.00 1 146 146 type = line, line_string 1 147 147 lvname = x_p_gd_wall_str_exc 1 148 148 co = 90 1 149 149 1 150 150 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 151 151 Existing Suitable Material

Page: 3

1 152 152 soil type = GfmseWallExc 1 153 153 roadway exc mult factor = 1.00 1 154 154 subsoil exc mult factor = 1.00 1 155 155 fill mult factor = 1.00 1 156 156 type = line, line_string 1 157 157 lvname = x_p_gfmse_wall_excav 1 158 158 co = 208 1 159 159 1 160 160 1 161 161 1 162 162 1 163 163 /* color 15 is used for the concrete footing for Prop_Cut_Wall1 and */ 1 164 164 /* color 15,0 are used for the stem for Prop_Cut_Wall1 */ 1 165 165 /* color 0 are used for the "face" of the wall for 3D models */ 1 166 166 /* color 0 is used for the Curb Surface Symbology */ 1 167 167 1 168 168 Proposed Finish Grade 1 169 169 soil type = RdwyExc 1 170 170 roadway exc mult factor = 1.00 1 171 171 subsoil exc mult factor = 1.00 1 172 172 fill mult factor = 1.00 1 173 173 type = line, line_string 1 174 174 lvname = x_p_cutslope 1 175 175 lvname = x_p_ditchslope 1 176 176 lvname = x_p_fillslope 1 177 177 lvname = x_p_foreslope 1 178 178 lvname = x_p_pave_layer_top 1 179 179 lvname = x_p_pave_layer_top_curb3_c 1 180 180 lvname = x_p_pave_layer_top_curb3_e 1 181 181 lvname = x_p_conc_wall_below 1 182 182 lvname = x_p_conc_wall_above 1 183 183 lvname = x_p_conc_wall_gutter 1 184 184 lvname = x_p_conc_wall_front 1 185 185 lvname = x_p_curb_top 1 186 186 lvname = x_p_curb_bottom 1 187 187 lvname = x_p_curb3_top 1 188 188 lvname = x_p_curb3_back_c 1 189 189 lvname = x_p_curb3_back_e 1 190 190 lvname = x_p_curb3_face 1 191 191 lvname = x_p_curb3_under_c 1 192 192 lvname = x_p_curb3_under_e 1 193 193 lvname = x_p_parkway_top 1 194 194 lvname = x_p_sidewalk_layer_top 1 195 195 lvname = x_p_sn_wall_face 1 196 196 lvname = x_p_sn_wall_top 1 197 197 lvname = x_p_rk_wall_face 1 198 198 lvname = x_p_rk_wall_top 1 199 199 lvname = x_p_gd_wall_above 1 200 200 lvname = x_p_gd_wall_below 1 201 201 lvname = x_p_conc_median_top 1 202 202 lvname = x_p_conc_median_bottom 1 203 203 lvname = x_p_mse_wall_front

Page: 4

1 204 204 lvname = x_p_mse_wall_veneer 1 205 205 lvname = x_p_wall_top 1 206 206 lvname = x_p_wall_seeding 1 207 207 lvname = x_p_gfmse_wall_pfg 1 208 208 lvname = x_p_rk_wall_tier 1 209 209 /* lvname = x_p_gfmse_wall_embedment_slope */ 1 210 210 1 211 211 1 212 212 /* co = 0,1,15,29,40,42,43,44,49,51,52,54,82,128,178,229,233,234,235,236,247 */ 1 213 213 1 214 214 Proposed Undercut 1 215 215 soil type = Topsoil 1 216 216 roadway exc mult factor = 0.000001 1 217 217 subsoil exc mult factor = 0.000001 1 218 218 fill mult factor = 0.000001 1 219 219 type = line, line_string 1 220 220 lvname=x_p_topsoil_backfill 1 221 221 co = 20 1 222 222 1 223 223 Proposed Undercut 1 224 224 soil type = Layer1 1 225 225 roadway exc mult factor = 0.000001 1 226 226 subsoil exc mult factor = 0.000001 1 227 227 fill mult factor = 0.000001 1 228 228 type = line, line_string 1 229 229 lvname = x_p_pave_layer_1 1 230 230 co = 22 1 231 231 1 232 232 Proposed Undercut 1 233 233 soil type = Layer2 1 234 234 roadway exc mult factor = 0.000001 1 235 235 subsoil exc mult factor = 0.000001 1 236 236 fill mult factor = 0.000001 1 237 237 type = line, line_string 1 238 238 lvname = x_p_pave_layer_2 1 239 239 co = 23 1 240 240 1 241 241 Proposed Undercut 1 242 242 soil type = Layer3 1 243 243 roadway exc mult factor = 0.000001 1 244 244 subsoil exc mult factor = 0.000001 1 245 245 fill mult factor = 0.000001 1 246 246 type = line, line_string 1 247 247 lvname = x_p_pave_layer_3 1 248 248 co = 24 1 249 249 1 250 250 Proposed Undercut 1 251 251 soil type = Layer4 1 252 252 roadway exc mult factor = 0.000001 1 253 253 subsoil exc mult factor = 0.000001 1 254 254 fill mult factor = 0.000001

Page: 5

1 255 255 type = line, line_string 1 256 256 lvname = x_p_pave_layer_4 1 257 257 co = 25 1 258 258 1 259 259 Proposed Undercut 1 260 260 soil type = Layer5 1 261 261 roadway exc mult factor = 0.000001 1 262 262 subsoil exc mult factor = 0.000001 1 263 263 fill mult factor = 0.000001 1 264 264 type = line, line_string 1 265 265 lvname = x_p_pave_layer_5 1 266 266 co = 26 1 267 267 1 268 268 /* For use with x20 sidewalks */ 1 269 269 Proposed Undercut 1 270 270 soil type = SidewalkLayer1 1 271 271 roadway exc mult factor = 0.000001 1 272 272 subsoil exc mult factor = 0.000001 1 273 273 fill mult factor = 0.000001 1 274 274 type = line, line_string 1 275 275 lvname = x_p_sidewalk_layer_1 1 276 276 co = 35 1 277 277 1 278 278 /* For use with x20 sidewalks */ 1 279 279 Proposed Undercut 1 280 280 soil type = SidewalkLayer2 1 281 281 roadway exc mult factor = 0.000001 1 282 282 subsoil exc mult factor = 0.000001 1 283 283 fill mult factor = 0.000001 1 284 284 type = line, line_string 1 285 285 lvname = x_p_sidewalk_layer_2 1 286 286 co = 36 1 287 287 1 288 288 /* For use with x20 sidewalks */ 1 289 289 Proposed Undercut 1 290 290 soil type = SidewalkLayer3 1 291 291 roadway exc mult factor = 0.000001 1 292 292 subsoil exc mult factor = 0.000001 1 293 293 fill mult factor = 0.000001 1 294 294 type = line, line_string 1 295 295 lvname = x_p_sidewalk_layer_3 1 296 296 co = 37 1 297 297 1 298 298 /* For use with x20 sidewalks */ 1 299 299 Proposed Undercut 1 300 300 soil type = SidewalkLayer4 1 301 301 roadway exc mult factor = 0.000001 1 302 302 subsoil exc mult factor = 0.000001 1 303 303 fill mult factor = 0.000001 1 304 304 type = line, line_string 1 305 305 lvname = x_p_sidewalk_layer_4 1 306 306 co = 38

Page: 6

1 307 307 1 308 308 /* For use with x20 subex criteria */ 1 309 309 Proposed Undercut 1 310 310 soil type = SubExBackfill 1 311 311 roadway exc mult factor = 0.000001 1 312 312 subsoil exc mult factor = 0.000001 1 313 313 fill mult factor = 0.00001 1 314 314 type = line, line_string 1 315 315 lvname = x_p_subex_backfill1 1 316 316 co = 40 1 317 317 1 318 318 /* For use with subex type 2 */ 1 319 319 Proposed Undercut 1 320 320 soil type = RdwyExc 1 321 321 roadway exc mult factor = 0.000001 1 322 322 subsoil exc mult factor = 0.000001 1 323 323 fill mult factor = 0.00001 1 324 324 type = line, line_string 1 325 325 lvname = x_p_subex_backfill2 1 326 326 co = 41 1 327 327 1 328 328 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 329 329 Proposed Undercut 1 330 330 soil type = SelectWallBackfill 1 331 331 roadway exc mult factor = 0.000001 1 332 332 subsoil exc mult factor = 0.000001 1 333 333 fill mult factor = 0.00001 1 334 334 type = line, line_string 1 335 335 lvname = x_p_mse_wall_backfill1 1 336 336 co = 51 1 337 337 1 338 338 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 339 339 Proposed Undercut 1 340 340 soil type = SelectWallBackfill 1 341 341 roadway exc mult factor = 0.000001 1 342 342 subsoil exc mult factor = 0.000001 1 343 343 fill mult factor = 0.00001 1 344 344 type = line, line_string 1 345 345 lvname = x_p_mse_wall_backfill2 1 346 346 co = 52 1 347 347 1 348 348 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 349 349 Proposed Undercut 1 350 350 soil type = GranularBackfill 1 351 351 roadway exc mult factor = 0.000001 1 352 352 subsoil exc mult factor = 0.000001 1 353 353 fill mult factor = 0.00001 1 354 354 type = line, line_string 1 355 355 lvname = x_p_mse_wall_backfill3 1 356 356 co = 53 1 357 357 1 358 358 /* For use with Prop_MSE_Wall1 (mse fill wall) */

Page: 7

1 359 359 Proposed Undercut 1 360 360 soil type = LevelingPad 1 361 361 roadway exc mult factor = 0.000001 1 362 362 subsoil exc mult factor = 0.000001 1 363 363 fill mult factor = 0.00001 1 364 364 type = line, line_string 1 365 365 lvname = x_p_mse_wall_backfill4 1 366 366 co = 56 1 367 367 1 368 368 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 369 369 Proposed Undercut 1 370 370 soil type = RdwyExc 1 371 371 roadway exc mult factor = 0.000001 1 372 372 subsoil exc mult factor = 0.000001 1 373 373 fill mult factor = 0.00001 1 374 374 type = line, line_string 1 375 375 lvname = x_p_mse_wall_backfill5 1 376 376 co = 57 1 377 377 1 378 378 /* For use with all Concrete Retaining Walls */ 1 379 379 Proposed Undercut 1 380 380 soil type = Pervious 1 381 381 roadway exc mult factor = 0.000001 1 382 382 subsoil exc mult factor = 0.000001 1 383 383 fill mult factor = 0.00001 1 384 384 type = line, line_string 1 385 385 lvname = x_p_conc_wall_backfill 1 386 386 co = 54 1 387 387 1 388 388 /* For use with all Concrete Retaining Walls */ 1 389 389 Proposed Undercut 1 390 390 soil type = FoundationFill 1 391 391 roadway exc mult factor = 0.000001 1 392 392 subsoil exc mult factor = 0.000001 1 393 393 fill mult factor = 0.00001 1 394 394 type = line, line_string 1 395 395 lvname = x_p_conc_wall_foundation 1 396 396 co = 58 1 397 397 1 398 398 /* For use with CFL Parapet Wall */ 1 399 399 Proposed Undercut 1 400 400 soil type = SelectWallBackfill 1 401 401 roadway exc mult factor = 0.000001 1 402 402 subsoil exc mult factor = 0.000001 1 403 403 fill mult factor = 0.00001 1 404 404 type = line, line_string 1 405 405 lvname = x_p_conc_wall_backfill2 1 406 406 co = 52 1 407 407 1 408 408 /* For use with all Parapet Walls */ 1 409 409 Proposed Undercut 1 410 410 soil type = Pervious /* CFL ‐ Use ‐ WallBackfill */

Page: 8

1 411 411 roadway exc mult factor = 0.000001 1 412 412 subsoil exc mult factor = 0.000001 1 413 413 fill mult factor = 0.00001 1 414 414 type = line, line_string 1 415 415 lvname = x_p_conc_wall_backfill 1 416 416 co = 56 1 417 417 1 418 418 /* For use with REHAB typicals */ 1 419 419 Proposed Undercut 1 420 420 soil type = ColdRecycle 1 421 421 roadway exc mult factor = 0.00001 1 422 422 subsoil exc mult factor = 0.00001 1 423 423 fill mult factor = 0.00001 1 424 424 type = line, line_string 1 425 425 lvname = x_p_milling_backfill 1 426 426 co = 57 1 427 427 1 428 428 /* For use with REHAB typicals */ 1 429 429 Proposed Undercut 1 430 430 soil type = PavedShoulder 1 431 431 roadway exc mult factor = 0.00001 1 432 432 subsoil exc mult factor = 0.00001 1 433 433 fill mult factor = 0.00001 1 434 434 type = line, line_string 1 435 435 lvname = x_p_pave_shd_backfill 1 436 436 co = 58 1 437 437 1 438 438 /* For use with REHAB typicals */ 1 439 439 Proposed Undercut 1 440 440 soil type = PreLevel 1 441 441 roadway exc mult factor = 0.00001 1 442 442 subsoil exc mult factor = 0.00001 1 443 443 fill mult factor = 0.00001 1 444 444 type = line, line_string 1 445 445 lvname = x_p_rehab_prelevel 1 446 446 co = 59 1 447 447 1 448 448 /* For use with CFL Type 3 curb special aggregate shoulder backfill (.x30 criteria)*/ 1 449 449 Proposed Undercut 1 450 450 soil type = ShoulderBackfill 1 451 451 roadway exc mult factor = 0.00001 1 452 452 subsoil exc mult factor = 0.00001 1 453 453 fill mult factor = 0.00001 1 454 454 type = line, line_string 1 455 455 lvname = x_p_shoulder_backfill 1 456 456 co = 72 1 457 457 1 458 458 /* For use with CFL paved ditches (.x30 criteria)*/ 1 459 459 Proposed Undercut 1 460 460 soil type = PavedDitchBackfill 1 461 461 roadway exc mult factor = 0.00001

Page: 9

1 462 462 subsoil exc mult factor = 0.00001 1 463 463 fill mult factor = 0.00001 1 464 464 type = line, line_string 1 465 465 lvname = x_p_pave_ditch_layer_1 1 466 466 co = 27 1 467 467 1 468 468 /* For use with soil nail wall (.x30 criteria)*/ 1 469 469 Proposed Undercut 1 470 470 soil type = BackfillMaterial 1 471 471 roadway exc mult factor = 0.000001 1 472 472 subsoil exc mult factor = 0.000001 1 473 473 fill mult factor = 0.00001 1 474 474 type = line, line_string 1 475 475 lvname = x_p_sn_wall_backfill 1 476 476 co = 55,175 1 477 477 1 478 478 /* For use with soil nail wall (.x30 criteria)*/ 1 479 479 Proposed Undercut 1 480 480 soil type = Concrete 1 481 481 roadway exc mult factor = 0.000001 1 482 482 subsoil exc mult factor = 0.000001 1 483 483 fill mult factor = 0.00001 1 484 484 type = line, line_string 1 485 485 lvname = x_p_sn_wall_back 1 486 486 co = 53 1 487 487 1 488 488 /* For use with soil nail wall (.x30 criteria)*/ 1 489 489 Proposed Undercut 1 490 490 soil type = BackfillMaterial 1 491 491 roadway exc mult factor = 0.000001 1 492 492 subsoil exc mult factor = 0.000001 1 493 493 fill mult factor = 0.00001 1 494 494 type = line, line_string 1 495 495 lvname = x_p_sn_wall_curb_backfill 1 496 496 co = 16,175 1 497 497 1 498 498 /* For use with soil nail wall (.x30 criteria)*/ 1 499 499 Proposed Undercut 1 500 500 soil type = SNFoundationFill 1 501 501 roadway exc mult factor = 0.000001 1 502 502 subsoil exc mult factor = 0.000001 1 503 503 fill mult factor = 0.00001 1 504 504 type = line, line_string 1 505 505 lvname = x_p_sn_foundation_backfill 1 506 506 co = 58 1 507 507 1 508 508 /* For use with rockery wall (.x30 criteria)*/ 1 509 509 Proposed Undercut 1 510 510 soil type = WallBackfill 1 511 511 roadway exc mult factor = 0.000001 1 512 512 subsoil exc mult factor = 0.000001 1 513 513 fill mult factor = 0.00001

Page: 10

1 514 514 type = line, line_string 1 515 515 lvname = x_p_rk_wall_backfill 1 516 516 co = 55,175 1 517 517 1 518 518 /* For use with rockery wall (.x30 criteria)*/ 1 519 519 Proposed Undercut 1 520 520 soil type = Rock 1 521 521 roadway exc mult factor = 0.000001 1 522 522 subsoil exc mult factor = 0.000001 1 523 523 fill mult factor = 0.00001 1 524 524 type = line, line_string 1 525 525 lvname = x_p_rk_wall_back 1 526 526 co = 45 1 527 527 1 528 528 /* For use with rockery wall (.x30 criteria)*/ 1 529 529 Proposed Undercut 1 530 530 soil type = FoundationFill 1 531 531 roadway exc mult factor = 0.000001 1 532 532 subsoil exc mult factor = 0.000001 1 533 533 fill mult factor = 0.00001 1 534 534 type = line, line_string 1 535 535 lvname = x_p_rk_foundation_backfill 1 536 536 co = 58 1 537 537 1 538 538 /* For use with Rockery Wall, (.x30 criteria)) */ 1 539 539 Proposed Undercut 1 540 540 soil type = GranularRockBd 1 541 541 roadway exc mult factor = 0.000001 1 542 542 subsoil exc mult factor = 0.000001 1 543 543 fill mult factor = 0.00001 1 544 544 Do not include in mass ordinate 1 545 545 type = line, line_string 1 546 546 lvname = x_p_rk_wall_backfill2 1 547 547 co = 52 1 548 548 1 549 549 /* For use with guardwall (.x30 criteria)*/ 1 550 550 Proposed Undercut 1 551 551 soil type = StructuralBackfill 1 552 552 roadway exc mult factor = 0.000001 1 553 553 subsoil exc mult factor = 0.000001 1 554 554 fill mult factor = 0.00001 1 555 555 type = line, line_string 1 556 556 lvname = x_p_gd_wall_backfill1 1 557 557 co = 50 1 558 558 1 559 559 /* For use with guardwall (.x30 criteria)*/ 1 560 560 Proposed Undercut 1 561 561 soil type = BackfillMaterial 1 562 562 roadway exc mult factor = 0.000001 1 563 563 subsoil exc mult factor = 0.000001 1 564 564 fill mult factor = 0.00001 1 565 565 type = line, line_string

Page: 11

1 566 566 lvname = x_p_gd_wall_backfill2 1 567 567 co = 55 1 568 568 1 569 569 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 570 570 Proposed Undercut 1 571 571 soil type = GabionRock 1 572 572 roadway exc mult factor = 0.000001 1 573 573 subsoil exc mult factor = 0.000001 1 574 574 fill mult factor = 0.00001 1 575 575 type = line, line_string 1 576 576 lvname = x_p_gfmse_wall_gabion 1 577 577 co = 78 1 578 578 1 579 579 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 580 580 Proposed Undercut 1 581 581 soil type = SelectWallBackfill 1 582 582 roadway exc mult factor = 0.000001 1 583 583 subsoil exc mult factor = 0.000001 1 584 584 fill mult factor = 0.00001 1 585 585 type = line, line_string 1 586 586 lvname = x_p_gfmse_wall_backfill1 1 587 587 co = 6 1 588 588 1 589 589 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 590 590 Proposed Undercut 1 591 591 soil type = GranularBackfill 1 592 592 roadway exc mult factor = 0.000001 1 593 593 subsoil exc mult factor = 0.000001 1 594 594 fill mult factor = 0.00001 1 595 595 type = line, line_string 1 596 596 lvname = x_p_gfmse_wall_backfill2 1 597 597 co = 36 1 598 598 1 599 599 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 600 600 Proposed Undercut 1 601 601 soil type = GranularBackfill 1 602 602 roadway exc mult factor = 0.000001 1 603 603 subsoil exc mult factor = 0.000001 1 604 604 fill mult factor = 0.00001 1 605 605 type = line, line_string 1 606 606 lvname = x_p_gfmse_wall_embedment_slope 1 607 607 lvname = x_p_gfmse_wall_backfill3 1 608 608 co = 16,100 1 609 609 1 610 610 /* For use with Prop_SMSE_Wall (mse wall facing, (.x30 criteria)) */ 1 611 611 Proposed Undercut 1 612 612 soil type = WallFacing 1 613 613 roadway exc mult factor = 0.000001 1 614 614 subsoil exc mult factor = 0.000001 1 615 615 fill mult factor = 0.00001 1 616 616 Do not include in mass ordinate 1 617 617 type = line, line_string

Page: 12

1 618 618 lvname = x_p_mse_wall_facing 1 619 619 1 620 620 /* For use with all walls with Foundation Fill adhoc, (.x30 criteria)) 1 621 621 Proposed Undercut 1 622 622 soil type = FoundationFill 1 623 623 roadway exc mult factor = 0.000001 1 624 624 subsoil exc mult factor = 0.000001 1 625 625 fill mult factor = 0.00001 1 626 626 Do not include in mass ordinate 1 627 627 type = line, line_string 1 628 628 lvname = x_p_mse_wall_foundation 1 629 629 co = 58 1 630 630 1 631 631 Excavation Limits 1 632 632 type = line 1 633 633 lvname = x_p_exc_limit 1 634 634 co = 0 1 635 635 1 636 636 /* 1 637 637 Skip Areas 1 638 638 from 10+050.00 R 1 to 10+100.00 R 1 1 639 639 from 10+200.00 R 1 to 10+300.00 R 1 1 640 640 from 10+500.00 R 1 to 10+600.00 R 1 1 641 641 */ 1 642 642 1 643 643 Write Earthwork Shapes 1 644 644 plot param 1 645 645 lvname = x_ew_shapes 1 646 646 co = 0 1 647 647 wt = 0 1 648 648 lc = 0 1 649 649 Stratify Shape Color 1 650 650 1 651 651 Combine common exc + subgrade exc 1 652 652 1 653 653 Add Accumulated Unadjusted Volume Column 1 654 654 1 655 655 End Area Decimal Places = 2 1 656 656 1 657 657 1 658 658 1 659 659 /************ The following code creates a column based ASCII file for importing **************/ 1 660 660 /************ into an Excel spreadsheet initially created by S. Pratt 3/24/2006 **************/ 1 661 661 /************ The name of this file is ^WFL_earthwork.xls^ and can be found on **************/

Page: 13

1 662 662 /************ under the WFL server X:\V8i_Resource\X_30\Standards\Bin 1 663 663 /************ Instructions for using the spreadsheet can be found on it's 1st tab **************/ 1 664 664 /************ The syntax and spreadsheet is used for creating SUBTOTALS of various *************/ 1 665 665 /************ volumes for placement at the bottom of Plan/Profile sheets. **************/ 1 666 666 /************ The code below is WFL specific. FOR .X30 CRITERIA USAGE!

1 667 667 /************ The file that gets created is named ^earthwork.txt^ 1 668 668 1 669 669 1 670 670 1 671 671 write column base ascii file = yell1102_YNE01_earthwork.txt 1 672 672 1 673 673 column 2 formula = abs( ["RdwyExc", Common Exc, Unadjusted Volumes] 1 674 674 ["RdwyExc", Subgrade Exc, Unadjusted Volumes] ) 1 675 675 column 2 number of decimal place = 2 1 676 676 column 2 total length = 10 1 677 677 1 678 678 column 3 formula = abs( ["RdwyExc", Fill, Unadjusted Volumes] ) 1 679 679 column 3 number of decimal place = 2 1 680 680 column 3 total length = 10 1 681 681 1 682 682 column 4 formula = abs( ["Subexcavation", Common Exc, Unadjusted Volumes] + 1 683 683 ["Subexcavation", Subgrade Exc, Unadjusted Volumes] + 1 684 684 ["Subexcavation", Subsoil Exc, Unadjusted Volumes] ) 1 685 685 column 4 number of decimal place = 2 1 686 686 column 4 total length = 10 1 687 687 1 688 688 column 5 formula = abs( ["SubExBackfill", Fill, Unadjusted Volumes] 1 689 689 column 5 number of decimal place = 2 1 690 690 column 5 total length = 10 1 691 691 1 692 692 column 6 formula = abs( ["Topsoil", Common Exc, Unadjusted Volumes] 1 693 693 ["Topsoil", Subgrade Exc, Unadjusted Volumes] + 1 694 694 ["Topsoil", Subsoil Exc, Unadjusted Volumes] ) 1 695 695 column 6 number of decimal place = 2 1 696 696 column 6 total length = 10 1 697 697 1 698 698 Process Earthwork for Baseline = YNE01 1 699 699 job number = 112

Page: 14

1 700 700 1 701 701 beg sta = 46+00.00 R 1 1 702 702 end sta = 66+75.00 R 1 1 703 703

0 0 704 END_OF_FILE

COMPUTING EARTHWORKS FOR BASELINE = YNE01

COMPUTING EARTHWORKS FOR JOB = 112

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 15

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

46+00.00 RDWYEXC

Excavation 70.01 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.14 0 0 1.00 0 0

EXISTPAVEMENT

Excavation 15.88 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for EXISTPAVEMENT = 0

TOPSOIL

Excavation 9.83 0 0 0.00 0 Subsoil Exc 0.14 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 0 0 0.00 0 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.84 0 0 0.00 0 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.20 0 0 0.00 0 0

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 0 0 0.00 0 0

46+25.00 RDWYEXC

Excavation 97.56 78 78 1.00 78 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 0

EXISTPAVEMENT

Excavation 0.00 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 0 Mass ordinate for EXISTPAVEMENT = 7

TOPSOIL

Excavation 0.00 4 0 0.00 4 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 78 0

Page: 16

Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 78 9

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 78 10

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 78 10

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 78 35

46+50.00 RDWYEXC

Excavation 76.35 81 81 1.00 159 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.19 0 0 1.00 159 0

EXISTPAVEMENT

Excavation 6.82 3 3 1.00 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 159 0 Mass ordinate for EXISTPAVEMENT = 10

TOPSOIL

Excavation 15.84 8 0 0.00 12 Subsoil Exc 0.19 0 0 0.00 0 Fill 0.00 0 0 0.00 159 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 159 18

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.40 10 0 0.00 159 20

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.42 10 0 0.00 159 20

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 41.27 37 0 0.00 159 72

46+75.00 RDWYEXC

Excavation 75.64 70 70 1.00 229 Subsoil Exc 0.00 0 0 1.00 0

Page: 17

Fill 0.12 0 0 1.00 229 0

EXISTPAVEMENT

Excavation 5.36 6 6 1.00 16 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 229 0 Mass ordinate for EXISTPAVEMENT = 16

TOPSOIL

Excavation 16.75 15 0 0.00 27 Subsoil Exc 0.12 0 0 0.00 0 Fill 0.00 0 0 0.00 229 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 229 27

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 229 30

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 229 30

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 40.39 38 0 0.00 229 110

47+00.00 RDWYEXC

Excavation 60.45 63 63 1.00 292 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.27 0 0 1.00 292 0

EXISTPAVEMENT

Excavation 14.96 9 9 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 292 0 Mass ordinate for EXISTPAVEMENT = 25

TOPSOIL

Excavation 8.23 11 0 0.00 38 Subsoil Exc 0.27 0 0 0.00 0 Fill 0.00 0 0 0.00 292 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 292 36

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 292 40

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 18

Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 292 40

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 39.40 37 0 0.00 292 147

47+25.00 RDWYEXC

Excavation 59.39 55 55 1.00 347 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.34 0 0 1.00 347 0

EXISTPAVEMENT

Excavation 11.85 12 12 1.00 37 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 347 0 Mass ordinate for EXISTPAVEMENT = 37

TOPSOIL

Excavation 10.41 9 0 0.00 47 Subsoil Exc 0.34 0 0 0.00 0 Fill 0.00 0 0 0.00 347 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.97 9 0 0.00 347 45

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.55 10 0 0.00 347 50

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.28 10 0 0.00 347 50

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.00 36 0 0.00 347 183

47+50.00 RDWYEXC

Excavation 53.56 52 52 1.00 399 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.35 0 0 1.00 399 0

EXISTPAVEMENT

Excavation 10.98 11 11 1.00 48 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 399 0 Mass ordinate for EXISTPAVEMENT = 48

TOPSOIL

Excavation 10.41 10 0 0.00 57 Subsoil Exc 0.35 0 0 0.00 0 Fill 0.00 0 0 0.00 399 0 Mass ordinate for TOPSOIL = 0

Page: 19

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 399 54

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 399 60

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 399 60

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 399 218

47+57.99 RDWYEXC

Excavation 53.46 15 15 1.00 414 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.35 0 0 1.00 414 0

EXISTPAVEMENT

Excavation 10.98 3 3 1.00 51 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 414 0 Mass ordinate for EXISTPAVEMENT = 51

TOPSOIL

Excavation 10.30 4 0 0.00 61 Subsoil Exc 0.35 0 0 0.00 0 Fill 0.00 0 0 0.00 414 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.92 3 0 0.00 414 57

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 3 0 0.00 414 63

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 3 0 0.00 414 63

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 11 0 0.00 414 229

47+75.00 RDWYEXC

Excavation 53.08 33 33 1.00 447 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.46 0 0 1.00 447 0

Page: 20

EXISTPAVEMENT

Excavation 10.99 7 7 1.00 58 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 447 0 Mass ordinate for EXISTPAVEMENT = 58

TOPSOIL

Excavation 10.06 6 0 0.00 67 Subsoil Exc 0.46 0 0 0.00 0 Fill 0.00 0 0 0.00 447 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.92 6 0 0.00 447 63

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 7 0 0.00 447 70

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 7 0 0.00 447 70

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 24 0 0.00 447 253

48+00.00 RDWYEXC

Excavation 51.42 48 48 1.00 495 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.43 0 0 1.00 495 0

EXISTPAVEMENT

Excavation 11.00 10 10 1.00 68 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 495 0 Mass ordinate for EXISTPAVEMENT = 68

TOPSOIL

Excavation 9.96 9 0 0.00 76 Subsoil Exc 0.43 0 0 0.00 0 Fill 0.00 0 0 0.00 495 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 495 72

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 495 80

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 21

Fill 10.99 10 0 0.00 495 80

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.29 35 0 0.00 495 288

48+25.00 RDWYEXC

Excavation 51.81 48 48 1.00 543 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.31 0 0 1.00 543 0

EXISTPAVEMENT

Excavation 10.93 10 10 1.00 78 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 543 0 Mass ordinate for EXISTPAVEMENT = 78

TOPSOIL

Excavation 12.46 10 0 0.00 86 Subsoil Exc 0.31 0 0 0.00 0 Fill 0.00 0 0 0.00 543 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 543 81

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 543 90

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.03 10 0 0.00 543 90

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.25 35 0 0.00 543 323

48+50.00 RDWYEXC

Excavation 48.94 47 47 1.00 590 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.84 1 1 1.00 589 1

EXISTPAVEMENT

Excavation 10.85 10 10 1.00 88 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 589 0 Mass ordinate for EXISTPAVEMENT = 88

TOPSOIL

Excavation 12.52 11 0 0.00 97 Subsoil Exc 0.78 1 0 0.00 1 Fill 0.00 0 0 0.00 589 0 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 22

Subsoil Exc 0.00 0 0 0.00 0 Fill 10.14 9 0 0.00 589 90

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 589 100

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.07 10 0 0.00 589 100

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.21 35 0 0.00 589 358

48+75.00 RDWYEXC

Excavation 46.70 45 45 1.00 635 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.38 1 1 1.00 633 2

EXISTPAVEMENT

Excavation 10.77 10 10 1.00 98 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 633 0 Mass ordinate for EXISTPAVEMENT = 98

TOPSOIL

Excavation 10.25 10 0 0.00 107 Subsoil Exc 0.38 1 0 0.00 2 Fill 0.00 0 0 0.00 633 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.97 9 0 0.00 633 99

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.61 10 0 0.00 633 110

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.13 10 0 0.00 633 110

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.14 35 0 0.00 633 393

49+00.00 RDWYEXC

Excavation 48.61 44 44 1.00 679 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.37 0 0 1.00 677 2

EXISTPAVEMENT

Page: 23

Excavation 10.74 10 10 1.00 108 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 677 0 Mass ordinate for EXISTPAVEMENT = 108

TOPSOIL

Excavation 10.02 10 0 0.00 117 Subsoil Exc 0.37 0 0 0.00 2 Fill 0.00 0 0 0.00 677 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.88 9 0 0.00 677 108

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 677 120

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 677 120

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 677 428

49+25.00 RDWYEXC

Excavation 47.70 45 45 1.00 724 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.55 0 0 1.00 722 2

EXISTPAVEMENT

Excavation 10.73 10 10 1.00 118 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 722 0 Mass ordinate for EXISTPAVEMENT = 118

TOPSOIL

Excavation 9.76 10 0 0.00 127 Subsoil Exc 0.55 0 0 0.00 2 Fill 0.00 0 0 0.00 722 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 722 117

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 722 130

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.26 10 0 0.00 722 130

Page: 24

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.02 35 0 0.00 722 463

49+50.00 RDWYEXC

Excavation 47.78 44 44 1.00 768 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.41 0 0 1.00 766 2

EXISTPAVEMENT

Excavation 10.73 10 10 1.00 128 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 766 0 Mass ordinate for EXISTPAVEMENT = 128

TOPSOIL

Excavation 12.27 11 0 0.00 138 Subsoil Exc 0.41 0 0 0.00 2 Fill 0.00 0 0 0.00 766 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 9 0 0.00 766 126

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.55 10 0 0.00 766 140

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 766 140

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 766 498

49+75.00 RDWYEXC

Excavation 46.53 44 44 1.00 812 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.36 0 0 1.00 810 2

EXISTPAVEMENT

Excavation 10.74 10 10 1.00 138 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 810 0 Mass ordinate for EXISTPAVEMENT = 138

TOPSOIL

Excavation 11.86 12 0 0.00 150 Subsoil Exc 0.36 0 0 0.00 2 Fill 0.00 0 0 0.00 810 0 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 25

Fill 9.78 9 0 0.00 810 135

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.57 10 0 0.00 810 150

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.25 10 0 0.00 810 150

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 810 533

50+00.00 RDWYEXC

Excavation 45.47 42 42 1.00 854 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.30 0 0 1.00 852 2

EXISTPAVEMENT

Excavation 10.74 10 10 1.00 148 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 852 0 Mass ordinate for EXISTPAVEMENT = 148

TOPSOIL

Excavation 11.87 11 0 0.00 161 Subsoil Exc 0.30 0 0 0.00 2 Fill 0.00 0 0 0.00 852 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.89 9 0 0.00 852 144

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 852 160

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 852 160

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 852 568

50+25.00 RDWYEXC

Excavation 45.80 43 43 1.00 897 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.18 0 0 1.00 895 2

EXISTPAVEMENT

Excavation 10.74 10 10 1.00 158

Page: 26

Fill 0.00 0 0 1.00 895 0 Mass ordinate for EXISTPAVEMENT = 158

TOPSOIL

Excavation 11.65 10 0 0.00 171 Subsoil Exc 0.18 0 0 0.00 2 Fill 0.00 0 0 0.00 895 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 895 153

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 895 170

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 895 170

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 895 603

50+50.00 RDWYEXC

Excavation 46.16 42 42 1.00 939 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.14 0 0 1.00 937 2

EXISTPAVEMENT

Excavation 10.74 10 10 1.00 168 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 937 0 Mass ordinate for EXISTPAVEMENT = 168

TOPSOIL

Excavation 11.91 11 0 0.00 182 Subsoil Exc 0.14 0 0 0.00 2 Fill 0.00 0 0 0.00 937 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.01 9 0 0.00 937 162

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.50 10 0 0.00 937 180

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 937 180

LAYER4

Page: 27

Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 937 638

50+75.00 RDWYEXC

Excavation 44.29 42 42 1.00 981 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.23 0 0 1.00 979 2

EXISTPAVEMENT

Excavation 10.74 10 10 1.00 178 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 979 0 Mass ordinate for EXISTPAVEMENT = 178

TOPSOIL

Excavation 12.18 11 0 0.00 193 Subsoil Exc 0.23 0 0 0.00 2 Fill 0.00 0 0 0.00 979 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.89 9 0 0.00 979 171

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.48 10 0 0.00 979 190

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.33 10 0 0.00 979 190

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.08 35 0 0.00 979 673

51+00.00 RDWYEXC

Excavation 38.67 39 39 1.00 1020 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.97 1 1 1.00 1017 3

EXISTPAVEMENT

Excavation 10.71 10 10 1.00 188 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1017 0 Mass ordinate for EXISTPAVEMENT = 188

TOPSOIL

Excavation 9.34 9 0 0.00 202 Subsoil Exc 2.97 1 0 0.00 3 Fill 0.00 0 0 0.00 1017 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 28

Fill 9.53 9 0 0.00 1017 180

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.93 10 0 0.00 1017 200

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.32 10 0 0.00 1017 200

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.01 35 0 0.00 1017 708

51+25.00 RDWYEXC

Excavation 34.97 34 34 1.00 1054 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.99 2 2 1.00 1049 5

EXISTPAVEMENT

Excavation 10.66 10 10 1.00 198 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1049 0 Mass ordinate for EXISTPAVEMENT = 198

TOPSOIL

Excavation 8.57 9 0 0.00 211 Subsoil Exc 0.99 2 0 0.00 5 Fill 0.00 0 0 0.00 1049 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 1049 189

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 1049 210

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 1049 210

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 1049 743

51+50.00 RDWYEXC

Excavation 29.74 30 30 1.00 1084 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.20 1 1 1.00 1078 6

EXISTPAVEMENT

Excavation 10.57 10 10 1.00 208

Page: 29

Fill 0.00 0 0 1.00 1078 0 Mass ordinate for EXISTPAVEMENT = 208

TOPSOIL

Excavation 8.20 8 0 0.00 219 Subsoil Exc 1.13 1 0 0.00 6 Fill 0.00 0 0 0.00 1078 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 1078 198

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 1078 220

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.03 10 0 0.00 1078 220

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.25 35 0 0.00 1078 778

51+75.00 RDWYEXC

Excavation 24.62 25 25 1.00 1109 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.42 2 2 1.00 1101 8

EXISTPAVEMENT

Excavation 10.50 10 10 1.00 218 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1101 0 Mass ordinate for EXISTPAVEMENT = 218

TOPSOIL

Excavation 7.75 7 0 0.00 226 Subsoil Exc 1.97 1 0 0.00 7 Fill 0.00 0 0 0.00 1101 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 1101 207

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 1101 230

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.07 10 0 0.00 1101 230

LAYER4

Page: 30

Fill 38.21 35 0 0.00 1101 813

52+00.00 RDWYEXC

Excavation 17.65 20 20 1.00 1129 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.11 3 3 1.00 1118 11

EXISTPAVEMENT

Excavation 10.54 10 10 1.00 228 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1118 0 Mass ordinate for EXISTPAVEMENT = 228

TOPSOIL

Excavation 7.21 7 0 0.00 233 Subsoil Exc 2.89 2 0 0.00 9 Fill 0.00 0 0 0.00 1118 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 9 0 0.00 1118 216

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 10 0 0.00 1118 240

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.24 10 0 0.00 1118 240

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.04 35 0 0.00 1118 848

52+02.03 RDWYEXC

Excavation 17.15 1 1 1.00 1130 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.27 0 0 1.00 1119 11

EXISTPAVEMENT

Excavation 10.54 1 1 1.00 229 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1119 0 Mass ordinate for EXISTPAVEMENT = 229

TOPSOIL

Excavation 7.16 0 0 0.00 233 Subsoil Exc 2.98 0 0 0.00 9 Fill 0.00 0 0 0.00 1119 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.93 1 0 0.00 1119 217

Page: 31

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.58 1 0 0.00 1119 241

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.12 1 0 0.00 1119 241

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.15 3 0 0.00 1119 851

52+25.00 RDWYEXC

Excavation 12.25 12 12 1.00 1142 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.66 4 4 1.00 1127 15

EXISTPAVEMENT

Excavation 10.58 9 9 1.00 238 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1127 0 Mass ordinate for EXISTPAVEMENT = 238

TOPSOIL

Excavation 6.28 6 0 0.00 239 Subsoil Exc 3.15 3 0 0.00 12 Fill 0.00 0 0 0.00 1127 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.95 8 0 0.00 1127 225

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.60 9 0 0.00 1127 250

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.25 10 0 0.00 1127 251

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.06 32 0 0.00 1127 883

52+50.00 RDWYEXC

Excavation 8.01 9 9 1.00 1151 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.72 6 6 1.00 1130 21

EXISTPAVEMENT

Excavation 10.56 10 10 1.00 248 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1130 0

Page: 32

Mass ordinate for EXISTPAVEMENT = 248

TOPSOIL

Excavation 3.68 5 0 0.00 244 Subsoil Exc 5.36 4 0 0.00 16 Fill 0.00 0 0 0.00 1130 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.65 10 0 0.00 1130 235

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.30 10 0 0.00 1130 260

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.96 11 0 0.00 1130 262

LAYER4

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 40.22 36 0 0.00 1130 919

52+75.00 RDWYEXC

Excavation 4.86 6 6 1.00 1157 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.58 12 12 1.00 1124 33

EXISTPAVEMENT

Excavation 10.49 10 10 1.00 258 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1124 0 Mass ordinate for EXISTPAVEMENT = 258

TOPSOIL

Excavation 2.13 3 0 0.00 247 Subsoil Exc 10.02 7 0 0.00 23 Fill 0.00 0 0 0.00 1124 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.27 11 0 0.00 1124 246

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.93 11 0 0.00 1124 271

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.58 12 0 0.00 1124 274

LAYER4

Excavation 0.00 0 0 0.00 0

Page: 33

File: c:\pw‐work\d0437239\Eearthwork_YNE01a.log 10/21/2

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .