This amendment modifies an existing solicitation for construction services. The solicitation seeks offers to perform construction work at the North Entrance of Yellowstone National Park in Montana. The modification adds a standard FAR clause for warranty of construction, specifying that the selected offeror must warrant its work for a period of one year following final acceptance or government possession, whichever occurs first. It also requires the offeror to obtain and enforce any warranties from subcontractors, manufacturers, or suppliers for the benefit of the government during the contract period and warranty term.

View the file

Other files

File Type Posted
Bid Opening Summary_North Entrance.pdf PDF
Amendment A003.pdf PDF
QA_05-08-2020.pdf PDF
Amendment A002.pdf PDF
QA_05-06-2020.pdf PDF
QA_04-29-2020.pdf PDF
Asbestos Test results.pdf PDF
Eearthwork_JUG01.pdf PDF
Eearthwork_DRIVE05.pdf PDF
XS_101_YNE01.pdf PDF
Eearthwork_APP01a.pdf PDF
XS_102_RREAM02.pdf PDF
XS_101_DRIVE05.pdf PDF
Eearthwork_DRIVE05A.pdf PDF
Eearthwork_DRIVE05B.pdf PDF
YNP North Entrance Station Full Drawing Set Volume 2 Building.pdf PDF
Eearthwork_DRIVE06.pdf PDF
Eearthwork_GTC_N_01.pdf PDF
Eearthwork_DRIVE03.pdf PDF
Eearthwork_YNE01_South_Asphalt Section.pdf PDF
IFB_North Entrance.pdf PDF
XS_101_EMPARKEXT.pdf PDF
SWPPP MT NPS YELL 11(2)N. Entrance_Park St.pdf PDF
2017-10-26 Gardiner Entrance Geotech Report.pdf PDF
Eearthwork_GTC_S_01.pdf PDF
XS_101_DRIVE05A.pdf PDF
XS_101_APP01.pdf PDF
XS_101_DRIVE03.pdf PDF
XS_102_DRIVE06.pdf PDF
Eearthwork_TBP2.pdf PDF
Eearthwork_YNE01_Concrete Section.pdf PDF
North_Entrance_Plan_Set Volume 1 Civil.pdf PDF
XS_101_GTC_N_01.pdf PDF
Eearthwork_YNE01_North_Asphalt Section.pdf PDF
XS_101_EMPBYP01.pdf PDF
XS_101_DRIVE05B.pdf PDF
XS_101_GTC-S-01.pdf PDF
Eearthwork_YNE01_All Sections.pdf PDF
Eearthwork_EMPAR_SideWalk.pdf PDF
Eearthwork_EMPBYP01.pdf PDF
XS_101_JUG01.pdf PDF
Eearthwork_EMPAR.pdf PDF
Earthwork_RREAM022S_14.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 04/30/2020 N/A See Block 10

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056719B000024

9B. DATED (SEE ITEM 11)

04/10/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A D OTHER (Specify type of modification and authority)

N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT NPS YELL 11(2), North Entrance See page 2

Page C-125 & C-126. Adds FAR Clause 52.246-21, Warranty of Construction (MAR 1994)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

C-125

Revised by amendment A001

52.246-21 Warranty of Construction (MAR 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect.

In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

C-126

Revised by amendment A001

(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

(End of clause)