This document is an Addendum to the contract documents for the Enlisted Barracks 5 (EB5) new construction project for the Oregon Military Department. The project consists of constructing a 2-story, approximately 21,505 square foot enlisted barracks building. The addendum modifies the original project manual and drawings, including changes to the table of contents, alternates, and various drawing sheets. Key changes include the deletion of synthetic grass surfacing, modification of attic access hatches, and the addition of attic draftstopping requirements.
The base bid for the project includes a sun and shade mix turf at the west lawn, while Alternate #2 involves adding artificial turf at that location. Alternate #1 adds a gravel-paved north barracks parking lot and site lighting, and Alternate #3 adds a 24-strand IT fiber pull from Building 57 to the EB5 facility. The project is targeted for LEED 4.0 Silver certification and includes sustainable design features such as rooftop solar hot water panels and low-water landscaping.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 01 - Page 1
Addendum 1- EB5
Project Name OMD EB5 Project # 2201032 Project Address
78798 Ordnance Rd Hermiston, OR 97838
Company SERA Architects, Inc.
Address 600 SW 10th Ave
Suite 500 Portland, OR 97205
Addendum # 01
Date of Issuance
14 July 2023
To: All Contract Document Holders
This Addendum forms a part of the Contract Documents and modifies the original Project Manual and Drawings, dated 07 07 2023 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification.
ATTACHMENTS
1. 01 10 00 – Table of Contents
2. 01 23 00 - Alternates
3. Drawing Sheet G002
4. Drawing Sheet G051
5. Drawing Sheet LP101
6. Drawing Sheet A103
7. Drawing Sheet A202
8. Drawing Sheet A801
ADDENDUM No. 01 - Page 2 of 4
PROJECT MANUAL
Division 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 - Table of Contents
1. Delete: Section 32 18 13 – Synthetic Grass Surfacing
Division 01 – GENERAL REQUIREMENTS
01 23 00 - Alternates
1. Delete: Paragraph 1.05.B
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 18 13 – Synthetic Grass Surfacing
1. Delete Section in its entirety.
DRAWINGS
G002
1. DELETE Add Alternate #2 from the Alternates list.
G051
1. CLARIFY draftstopping section added to code summary analysis
2. DELETE double astericks reference to the fire protection section highlighting the sprinklering of the attic
LP101
1. DELETE detail 2/LP101 Add Alternate # 2 for synthetic grass surfacing at west lawn
2. DELETE synthetic grass surfacing from Legend
A103
1. ADD attic draftstopping plan
A202
1. CHANGE 24” x 24” attic access hatch in 201 Sr. Leader’s Quarters to 24” x 30” attic access hatch
2. ADD 24” x 30” attic access hatch in 202 Sr. Leader’s Quarters
3. CHANGE 24” x 24” attic access hatch in 217 Men’s Restroom to 24” x 30” attic access hatch
A801
1. ADD attic draftstopping detail
END OF ADDENDUM ‘01’
PROJECT NO. 2001041 OMD: RAYMOND F REES TRAINING CENTER PAGE 1
14 JUL 2023 ENLISTED BARRACKS EB5 SECTION 00 01 10
TABLE OF CONTENTS
SERA Architects, Inc. ADD 01
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 SEALS PAGE
00 01 10 TABLE OF CONTENTS
00 31 00 AVAILABLE PROJECT INFORMATION
GEOTECHNICAL REPORT
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 20 00 PRICE AND PAYMENT PROCEDURES
ARCHITECTURAL BULLETIN (AB) FORM FORM
01 23 00 ALTERNATES
01 26 13 REQUEST FOR INTERPRETATION
RFI SAMPLE FORM FORM
01 30 00 ADMINISTRATIVE REQUIREMENTS
ELECTRONIC MEDIA RELEASE FORM FORM
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 35 15 LEED REQUIREMENTS SUMMARY
LEED SCORECARD
01 35 73 DELEGATED DESIGN PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 43 39 COORDINATED MOCK-UPS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 51 00 TEMPORARY UTILITIES
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 60 00 PRODUCT REQUIREMENTS
SUBSTITUTION REQUEST FORM (DURING BIDDING) FORM
SUBSTITUTION REQUEST FORM (AFTER BIDDING) FORM
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 81 00 FACILITY PERFORMANCE REQUIREMENTS
01 91 00 GENERAL COMMISSIONING REQUIREMENTS BE
DIVISION 02 - EXISTING CONDITIONS
NOT USED
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 35 11 CONCRETE FLOOR FINISHES
03 45 00 PRECAST ARCHITECTURAL CONCRETE
03 54 00 CAST UNDERLAYMENT
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 20 01 MASONRY VENEER
PROJECT NO. 2001041 OMD: RAYMOND F REES TRAINING CENTER PAGE 2
DIVISION 05 - METALS
05 05 13 SHOP APPLIED METAL COATING
05 50 00 METAL FABRICATIONS
05 51 00 METAL STAIRS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 17 33 WOOD I-JOISTS
06 17 36 METAL-WEB WOOD JOISTS
06 17 53 SHOP-FABRICATED WOOD TRUSSES
06 18 00 GLUE-LAMINATED CONSTRUCTION
06 20 00 FINISH CARPENTRY
06 41 00 ARCHITECTURAL WOOD CASEWORK
06 82 05 FIBERGLASS REINFORCED PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 00 THERMAL INSULATION
07 25 00 WEATHER BARRIERS
07 41 13 METAL ROOF PANELS
07 46 46 FIBER-CEMENT SIDING
07 62 00 SHEET METAL FLASHING AND TRIM
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 53 13 VINYL WINDOWS
08 71 00 DOOR HARDWARE
HARDWARE GROUPS
08 80 00 GLAZING
08 91 00 LOUVERS
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 21 16 GYPSUM BOARD ASSEMBLIES
09 30 00 TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 13 TILE CARPETING
09 90 00 PAINTING AND COATING
PROJECT NO. 2001041 OMD: RAYMOND F REES TRAINING CENTER PAGE 3
DIVISION 10 - SPECIALTIES
10 14 00 SIGNAGE
10 21 13.19 PLASTIC TOILET COMPARTMENTS
10 26 01 WALL AND CORNER GUARDS
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 00 FIRE EXTINGUISHERS AND CABINETS
DIVISION 11 - EQUIPMENT
11 52 70 TELEVISION MOUNTS
DIVISION 12 - FURNISHINGS
12 21 13 HORIZONTAL LOUVER BLINDS
12 93 23 LITER AND RECYCLING RECEPTORS
DIVISION 13 - SPECIAL CONSTRUCTION THROUGH DIVISION 21 – FIRE SUPPRESSION
NOT USED
VOLUME 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 SEALS PAGE
00 01 10 TABLE OF CONTENTS
DIVISION 22 - PLUMBING
22 00 00 COMMON WORK RESULTS FOR PLUMBING CTE
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT
CTE
22 05 93 TESTING, ADJUSTING, AND BALANCING FOR PLUMBING CTE
22 07 19 PLUMBING PIPING INSULATION CTE
22 08 00 COMMISSIONING OF PLUMBING CTE
22 11 16 DOMESTIC WATER PIPING CTE
22 11 19 DOMESTIC WATER PIPING SPECIALTIES CTE
22 11 23.21 INLINE, DOMESTIC-WATER PUMPS CTE
22 13 16 SANITARY WASTE AND VENT PIPING CTE
22 13 19 SANITARY WASTE PIPING SPECIALTIES CTE
22 33 30 SOLAR HOT WATER EQUIPMENT CTE
22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS CTE
22 40 00 PLUMBING FIXTURES CTE
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 00 COMMON RESULTS FOR HVAC CTE
23 05 23.11 GLOBE VALVES FOR HVAC PIPING CTE
23 05 23.12 BALL VALVES FOR HVAC PIPING CTE
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC CTE
23 07 00 HVAC INSULATION CTE
23 08 00 COMMISSIONING OF HVAC CTE
23 09 23 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC
23 11 26 FACILITY LIQUEFIED-PETROLEUM GAS PIPING CTE
23 21 13 HYDRONIC PIPING CTE
PROJECT NO. 2001041 OMD: RAYMOND F REES TRAINING CENTER PAGE 4
23 21 16 HYDRONIC PIPING SPECIALTIES CTE
23 21 23 HYDRONIC PUMPS CTE
23 31 13 METAL DUCTS CTE
23 33 00 AIR DUCT ACCESSORIES CTE
23 34 16 CENTRIFUGAL HVAC FANS CTE
23 37 00 AIR OUTLETS AND INLETS CTE
23 52 16 CONDENSING BOILERS CTE
23 65 13 ADIABATIC CLOSED-CIRCUIT COOLER CTE
23 72 23.19 ENERGY RECOVERY UNITS CTE
23 81 26 SPLIT-SYSTEM HEAT PUMPS CTE
23 81 46 WATER-SOURCE UNITARY HEAT PUMPS CTE
DIVISION 26 - ELECTRICAL
26 00 00 COMMON WORK RESULTS FOR ELECTRICAL CTE
26 05 09 EQUIPMENT WIRING CTE
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES CTE
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS CTE
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS CTE
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS CTE
26 05 44 SLEEVES & SLEEVE SEALS FOR ELECTRICAL RACEWAYS &
CABLING
CTE
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS CTE
26 09 23 LIGHTING CONTROL DEVICES CTE
26 09 25 DIGITAL LIGHTING CONTROLS CTE
26 24 13 SWITCHBOARDS CTE
26 24 16 PANELBOARDS CTE
26 27 13 ELECTRICITY METERING CTE
26 27 26 WIRING DEVICES CTE
26 28 13 FUSES CTE
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS CTE
26 33 23 CENTRAL BATTERY EQUIPMENT FOR EMERGENCY LIGHTING CTE
26 43 00 SURGE PROTECTIVE DEVICES CTE
26 51 00 LIGHTING CTE
DIVISION 27 - COMMUNICATIONS
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS CTE
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS CTE
27 05 44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS
PATHWAYS
CTE
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 12 10 FIRE ALARM AND MASS NOTIFICATION SYSTEMS CTE
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING HDG
31 20 00 EARTH MOVING HDG
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASHPHALT PAVING HDG
32 13 13 CONCRETE PAVING HDG
PROJECT NO. 2001041 OMD: RAYMOND F REES TRAINING CENTER PAGE 5
32 17 23 PAVEMENT MARKINGS HDG
32 18 13 SYNTHETIC GRASS SURFACING
32 31 13 CHAIN LINK FENCES AND GATES
32 84 23 UNDERGROUND SPRINKLERS
32 92 19 SEEDING
32 93 00 PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING HDG
33 31 00 SANITARY SEWERAGE HDG
33 41 00 STORM UTILITY DRAINAGE PIPING HDG
33 46 00 SUBDRAINAGE HDG
END OF TABLE OF CONTENTS
PROJECT NO. 2201032 OMD: CAMP UMATILLA PAGE 1
14 JUL 2023 ENLISTED BARRACKS EB5 SECTION 01 23 00
ALTERNATES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Schedule of Alternates
B. Procedures for Alternates.
1.02 DEFINITIONS
A. Alternate: An amount proposed by Bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
B. Deferred Alternate: An Alternate that may be accepted by Owner after execution of Agreement.
1. Deferred Time Limit: Unless stated otherwise in Bidding Requirements or Contracting Requirements or description of a specific Alternate, Alternates may be accepted up to 60 days after Bids are due.
1.03 PROCEDURE
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
1.04 ACCEPTANCE OF ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected or deferred at Owner's option. Accepted alternates will be identified in the Owner-Contractor Agreement or an amendment there to.
B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.
1.05 SCHEDULE OF ALTERNATES
A. Alternate No. 1 – North Barracks Parking Lot and Site Lighting:
1. Alternate: Add gravel-paved North Barracks Parking Lot plus add Site wide lighting: Dual-head pole lights and pedestrian light bollards. Refer to Sheet A051 for additional details.
2. Base Bid: No gravel-paved North Barracks Parking Lot. No Site lighting, with the exception of building-mounted lights.
B. Alternate No. 2 – Artificial turf at West Lawn (Army Combat Fitness Test Course)
1. Alternate: Add artificial turf at West Lawn. Refer to Section 32 18 13 and LP101 for additional details.
2. Base Bid: Sun and Shade mix turf at West Lawn.
C.B Alternate No. 3 - New 24-strand fiber pull from Bldg57 to EB5
1. Alternate: Add 24-strand IT fiber to the scope of the project to be pulled from Bldg 57 to EB5 per Electrical plan.
2. Base Bid: 2 inch conduit extension for future fiber with stubbed conduit for future DFAC per electrical. No new IT fiber.
B. Alternate No. 2 - Not Used Artificial turf at West Lawn (Army Combat Fitness Test Course)
C.
PROJECT NO. 2201032 OMD: CAMP UMATILLA PAGE 2
14 JUL 2023 ENLISTED BARRACKS EB5 SECTION 01 23 00
ALTERNATES
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
SE
RA
A rch ite cts , In c.
C op yr ig ht p ro te ct ed
Se e D es ig n Ag re em en t.
F or u se o n th is p ro je ct o nl y.
U na ut ho riz ed re pr od uc tio n of a ny p ar t o f t hi s m at er ia l i s pr oh ib ite d.
7/
/2
:4
2:
A M
PE
RM
IT
/ B
ID
S
ET
O M D E N
LI
ST
ED
B A R R A C K S
EB
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
O
R D
N
AN
C E
R D
H
ER
M
IS
TO
N
, O R
G002
ML
30 JUNE 2023
2201032
GENERAL
INFORMATION
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
G001 COVER SHEET
G002 GENERAL INFORMATION
G051 CODE COMPLIANCE SITE PLAN AND SUMMARY
G101 CODE COMPLIANCE PLANS
G801 DIMENSIONAL GUIDELINES
G901 SIGNAGE DETAILS
CIVIL
C0.00 COVER SHEET
C0.01 OVERALL SITE PLAN
C1.00 LAYOUT AND PAVING PLAN
C2.00 GRADING PLAN
C3.00 UTILITY PLAN
C4.00 CIVIL DETAILS
C4.01 CIVIL DETAILS
C5.00 FIRE ACCESS PLAN
C6.00 ESC COVER
C6.01 DEMO, CLEARNING, MASS GRADING, ESC PLAN
C6.02 FINAL ESC PLAN
C6.03 ESC DETAILS
LANDSCAPE
LP101 PLANTING PLAN
LP102 PLANTING DETAILS
LI101 IRRIGATION PLAN
LI102 IRRIGATION DETAILS
ARCHITECTURE
A001 SYMBOLS AND ANNOTATION
A002 ASSEMBLY INFORMATION
A051 SITE PLAN
A101 FLOOR PLAN - LEVEL 01
A102 FLOOR PLAN - LEVEL 02
A103 ATTIC DRAFTSTOPPING PLAN AND ROOF PLAN
A201 REFLECTED CEILING PLAN - LEVEL 01
A202 REFLECTED CEILING PLAN - LEVEL 02
A301 BUILDING ELEVATIONS
A401 BUILDING SECTIONS
A451 WALL SECTIONS
A501 VERTICAL CIRCULATION
A502 VERTICAL CIRCULATION DETAILS
A601 INTERIOR COMPOSITES - RESTROOMS
A602 INTERIOR COMPOSITES - LOUNGE AND VENDING
A603 INTERIOR COMPOSITES - BILLETS
A701 EXTERIOR DETAILS - RAINSCREEN
A702 EXTERIOR DETAILS - FENESTRATIONS
A703 EXTERIOR DETAILS - FENESTRATION
A704 EXTERIOR DETAILS - ROOF
A705 EXTERIOR DETAILS - ENTRY SCREEN
A801 INTERIOR DETAILS
A901 DOOR, LOUVER & WINDOW SCHEDULE
A921 ROOM FINISH SCHEDULE AND SCHEDULE OF FINISHES
STRUCTURAL
S001 DRAWING INDEX AND LIST OF ABBREVIATIONS
S002 GENERAL STRUCTURAL NOTES
S003 GENERAL STRUCTURAL NOTES
S004 SPECIAL INSPECTIONS AND TESTING
S005 SPECIAL INSPECTIONS AND TESTING
S101 FOUNDATION PLAN
S101S SLAB DIMENSION PLAN
S102 LEVEL 2 FRAMING PLAN
S103 ROOF FRAMING PLAN
S301 MASONRY WALL ELEVATIONS
S501 CONCRETE DETAILS
S502 MASONRY DETAILS
S503 MASONRY DETAILS
S701 WOOD DETAILS
MECHANICAL
M001 MECHANICAL - LEGEND
M002 MECHANICAL - SCHEDULES AND CALCULATIONS
M201 MECHANICAL - LEVEL 01 - HVAC
M202 MECHANICAL - LEVEL 02 - HVAC
M203 MECHANICAL - ROOF - HVAC
M301 MECHANICAL - LEVEL 01 - HVAC PIPING
M302 MECHANICAL - LEVEL 02 - HVAC PIPING
M401 MECHANICAL - WSHP PIPING SCHEMATIC
M402 CONTROLS SEQUENCE OF OPERATIONS
M501 MECHANICAL - DETAILS
M502 MECHANICAL - DETAILS
PLUMBING
P001 PLUMBING - LEGEND
P002 PLUMBING - SCHEDULES AND CALCULATIONS
P201 PLUMBING - LEVEL 01 - WASTE
P202 PLUMBING - LEVEL 02 - WASTE
P203 PLUMBING - ROOF - WASTE
P301 PLUMBING - LEVEL 01 - WATER
P302 PLUMBNG - LEVEL 02 - WATER
P401 PLUMBING - SOLAR HOT WATER DIAGRAM
P501 PLUMBING - ENLARGED VIEWS
P502 PLUMBING - ENLARGED VIEWS
P601 PLUMBING - DETAILS
ELECTRICAL
E001 ELECTRICAL - LEGEND
E002 ELECTRICAL - LUMINAIRE SCHEDULE
E101 ELECTRICAL - SITE PLAN
E201 ELECTRICAL - LEVEL 01 - LIGHTING
E202 ELECTRICAL - LEVEL 02 - LIGHTING
E301 ELECTRICAL - LEVEL 01 - POWER AND DATA
E302 ELECTRICAL - LEVEL 02 - POWER AND DATA
E401 ELECTRICAL - ONE-LINE DIAGRAM
E501 ELECTRICAL - SCHEDULES
E601 ELECTRICAL - DETAILS
VICINITY MAP
PROJECT
LOCATION
INTERSTATE 84 (I-84)
CE
DA
R
ST
RE
ET
D
AT
E
ST
RE
ET
ORDNANCE ROAD
E
LM
S
TR
EE
T
G ST.
A ST.
DISCLAIMER
THE WRITTEN AGREEMENT, DRAWINGS, SPECIFICATIONS AND ANY ADDENDA COMPRISE
THE CONTRACT FOR THIS PROJECT. THEY SHALL BE TREATED AS ONE ENTITY, EQUALLY,
WITHOUT PRIORITY. ITEMS, ELEMENTS, FIXTURES, SYSTEMS AND EQUIPMENT SHOWN
SHALL BE FURNISHED AND INSTALLED EVEN THOUGH TYPICALLY SHOWN ELSEWHERE.
THEREFORE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO READ AND COMPREHEND
ALL THESE DOCUMENTS IN ORDER TO COMPLETE THE WORK. IF A CONTRACTOR CHOOSES
TO NOT THOROUGHLY REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS, THEY DO SO
AT THEIR OWN RISK AND AGREE TO FURNISH & INSTALL ALL ITEMS NOTED ABOVE AT NO
ADDITIONAL COST OR DELAY TO THE OWNER. (THE ONLY EXCEPTION TO THIS IS THAT THE
SPECIFICATIONS SHALL TAKE PRECEDENCE OVER GENERAL NOTES ON THIS SHEET.)
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING WITH
THE WORK.
DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS. DO NOT SCALE DRAWINGS. NOTIFY
ARCHITECT OF DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS AND METHODS AND
SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF CONSTRUCTION UNTIL FINAL LATERAL
AND VERTICAL CARRYING SYSTEMS ARE COMPLETED.
DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF CONCRETE, FACE OF MASONRY,
GRID/COLUMN LINE, CENTER OF ELEMENT, COUNTERTOP EDGE, OR AS NOTED.
CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF
SUBCONTRACTORS WORK, COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS,
ACCURATE LOCATION OF STRUCTURAL MEMBERS, OPENINGS FOR MECHANICAL,
ELECTRICAL, AND MISCELLANEOUS EQUIPMENT. CONTRACTOR SHALL VERIFY
DIMENSIONS AND OPENING SIZES (CLEARANCES REQUIRED) FROM THE MANUFACTURERS
PRIOR TO CONSTRUCTION OF OR INSTALLATION OF EQUIPMENT, FURNISHINGS, AND
ACCESSORIES.
DETAILS NOTED AS "TYPICAL" OR "TYP" APPLY IN ALL CASES UNLESS SPECIFICALLY
REFERENCED. DETAILS THAT ARE SPECIFICALLY REFERENCED SHALL TAKE PRECEDENCE
OVER DETAILS NOTED AS "TYPICAL" OR "TYP". SPECIFIC NOTES AND DETAILS SHALL TAKE
PRECEDENCE OVER GENERAL NOTES AND DETAILS.
CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE
PROJECT IS IN PROGRESS UNTIL PROJECT COMPLETION.
LOCATE EXISTING UTILITIES WHETHER INDICATED OR NOT AND PROTECT FROM DAMAGE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS ASSOCIATED WITH REPAIR OR
REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN
CONJUNCTION WITH THE EXECUTION OF THE WORK.
PROVIDE ACCESS PANELS AS REQUIRED. LOCATION, FINISH, AND TYPE SHALL BE
APPROVED BY ARCHITECT PRIOR TO OBTAINING AND INSTALLING. ACCESS PANEL
LOCATIONS NOT APPROVED BY ARCHITECT WILL BE SUBJECT TO MODIFICATION AT NO
ADDITIONAL COST. PROVIDE RATED ACCESS PANELS WITH THE SAME RATING AS THE
ASSEMBLY IN WHICH THEY ARE INSTALLED. ACCESS PANELS IN SHAFT WALLS, RATED
FLOOR/CEILINGS OR RATED ROOF/CEILINGS SHALL BE SMOKE SEALED.
PROVIDE TEMPORARY PEDESTRIAN PROTECTION, AS REQUIRED BY ACCEPTED
STANDARDS OF THE AUTHORITY HAVING JURISDICTION.
PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE FIRESTOPPED PER
SPECIFICATION SECTION 07 84 00 - FIRESTOPPING AND THE ACCEPTED REQUIREMENTS
OF THE AUTHORITY HAVING JURISDICTION. RATED ASSEMBLIES SHALL BE CONSTRUCTED
TO PREVENT THE MOVEMENT OF HOT FLAME OR GASES PER LOCAL CODES.
THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED
ACCESS TO ANY WATER OR POWER FACILITIES (POWER POLES, PULL-BOXES,
TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.) OR TO THE
LOCATION OF HOOK-UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY
POWER LINES - WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE
TO COMPLY MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSES.
MECHANICAL EXHAUST OF BATHROOMS AND LAUNDRY FACILITIES IS REQUIRED. AIR
CHANGES AND DISTANCE OF DISCHARGE FROM OPERABLE OPENINGS SHALL BE
COMPLIANT WITH LOCAL CODES.
AN APPROVED GAS SHUT-OFF VALVE SHALL BE INSTALLED ON THE FUEL GAS LINE ON
THE DOWNSTREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE
EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING.
OBTAIN FINAL SIGN-OFF FROM PLUMBING INSPECTOR PRIOR TO ENCLOSING FIRE
SPRINKERS IN WALLS OR CEILINGS.
SEE STRUCTURAL DRAWINGS FOR SPECIAL INSPECTIONS ASSOCIATED WITH
STRUCTURAL WORK.
ANTI-GRAFFITI COATINGS ARE REQUIRED AT THE GROUND LEVEL WHERE CONCRETE OR
MASONRY FINISHES ARE USED. REFERENCE SPECIFICATION SECTION 07 19 00.
R. MOUNT ALL OVERHEAD MOUNTED ARCHITECTURAL AND UTILITIES WEIGHING 31-LBS OR
MORE (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS SUSPENDED CEILINGS AND PIPING
NETWORKS THAT COLLECTIVELY EXCEED THAT WEIGHT) USING EITHER RIGID OR
FLEXIBLE SYSTEMS. MOUNT ALL SYSTEMS TO RESIST FORCES OF 0.5 TIMES THE
EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE EQUIPMENT
WEIGHTS IN THE DOWNWARD DIRECTION. THESE REQUIREMENTS TO NOT PRECLUDE
THE NEED TO DESIGN ARCHITECTURAL FEATURE AND EQUIPMENT MOUNTINGS FOR
FORCES REQUIRED BY OTHER CRITERIA SUCH AS SEISMIC STANDARDS.
PROJECT DIRECTORY
OREGON MILITARY DEPARTMENT
1776 MILITIA WAY SE
SALEM, OR 97309
TEL: (503) 584-3504
ATTN: MELISSA WEBBER, PROJECT MANAGER
melissa.s.webber.nfg@mail.mil
SERA ARCHITECTS
600 SW 10TH AVENUE #500
PORTLAND, OR 97205
TEL: (503) 445-7372
FAX: (503) 445-7395
ATTN: CASSANDRA TYLER
cassandrat@seradesign.com
HUMBER DESIGN GROUP, INC.
117 SE TAYLOR ST, Suite 001
PORTLAND, OR 97214
TEL: (503) 946-6632
ATTN: ALLEN SCHMITZ, PROJECT ENGINEER
allen.schmitz@hdgpdx.com
SERA ARCHITECTS
600 SW 10TH AVENUE #500
PORTLAND, OR 97205
TEL: (503) 445-7372
FAX: (503) 445-7395
ATTN: DAN JENKINS, ASLA, LEED
danj@seradesign.com
KPFF CONSULTING ENGINEERS
111 SW 5TH, SUITE 2500
PORTLAND, OR 97204
TEL: (503) 227-3251
FAX: (503) 227-7980
ATTN: JOSH RICHARDS, PE, SE
josh.richards@kpff.com
KPFF CONSULTING ENGINEERS
45 FREMONT ST, 28th FLOOR
SAN FRANCISCO, CA 94105
TEL: (415) 268-1042
ATTN: SHARON GALLANT, SE
sharon.gallant@kpff.com
OWNER
DEVELOPER:
ARCHITECT OF
RECORD:
CIVIL ENGINEER:
LANDSCAPE
ARCHITECT:
STRUCTURAL
ENGINEER:
ATFP
CONSULTING
ENGINEER:
COLEBREIT ENGINEERING
2021 NW GRANT AVENUE
CORVALLIS, OR 97330
TEL: (541) 728-3293
ATTN: ADAM BOYD, PE
adamboyd@colebreit.com
COLEBREIT ENGINEERING
2021 NW GRANT AVENUE
CORVALLIS, OR 97330
TEL: (541) 728-3293
ATTN: ADAM BOYD, PE
adamboyd@colebreit.com
COLEBREIT ENGINEERING
2021 NW GRANT AVENUE
CORVALLIS, OR 97330
TEL: (541) 728-3293
ATTN: BRUCE JESSUP, PE
bruce.jessup@colebreit.com
PROFESSIONAL ROOF CONSULTANTS INC.
1108 SE GRAND AVENUE, Suite 300
PORTLAND, OR 97214
TEL: (503) 280-8759
ATTN: THOMAS BERTRAND
thomas.bertrand@professionalroofconsultants.com
DCW COST MANAGEMENT
815 1ST AVENUE, #176
SEATTLE, WA 98104
TEL: (206) 259-2990
ATTN: TRISH DREW
trish@dcwcost.com
BANTAM ENGINEERING
7032 NE SISKIYOU ST
PORTLAND, OR 97213
TEL: (503) 888-3864
ATTN: CHRISTINE McKINLEY, PE cmckinley@bantameng.com
ENERGY
MODELER:
MECHANICAL/
PLUMBING
ENGINEER:
ELECTRICAL
ENGINEER:
BUILDING
ENVELOPE
CONSULTANTS:
COST
ESTIMATORS:
COMMISSIONING
ENGINEER:
REFERENCE SECTION 01 35 73 - DELEGATED DESIGN PROCEDURES FOR ADDITIONAL INFORMATION SEE PROJECT DRAWINGS AND SPECIFICATIONS FOR BALANCE OF DELEGATED DESIGN COMPONENTS AND SYSTEMS
DELEGATED DESIGN AND DEFERRED SUBMITTALS
Section Section Name Delegated Design
Deferred Submittal
Items for AHJ Review
03 00 00 CAST-IN-PLACE CONCRETE YES NO N/A
05 50 00 METAL FABRICATIONS YES YES
05 51 00 METAL STAIRS YES YES
08 80 00 GLAZING YES YES
21 00 00 FIRE SUPPRESSION YES SEPARATE PERMIT BY DESIGN-
BUILD CONTRACTOR
28 00 00 ELECTRONIC SAFETY AND
SECURITY
YES
DESIGN-BUILD CONTRACTOR TO DESIGN "FULLY CODE COMPLIANT SYSTEM" CONCURRENTLY WITH ARCHITECT'S DOCUMENTS. SEISMIC RESTRAINT AND BRACING AND SECUREMENT OF ALL ASSOCIATED EQUIPMENT SHALL BE PROVIDED WHERE THE MOVEMENT AND OVERTURNING DUE TO SEISMIC DISPLACEMENT OF SUCH ITEMS COULD CREATE A LIFE SAFETY HAZARD EITHER BY DIRECT INJURY OR INDIRECTLY BY BLOCKING SAFE EGRESS FROM THE BUILDING.
SEPARATE FIRE PROTECTION REQUIREMENTS
GENERAL CONTRACTOR SHALL OBTAIN FIRE PROTECTION PERMITS FROM THE FIRE MARSHALL'S OFFICE FOR THE FOLLOWING ITEMS:
FIRE SPRINKLERS (PERMIT)
FIRE ALARM SYSTEMS (PERMIT)
UNDERGROUND FIRE LINES (PERMIT)
KNOX BOX
07 46 46 FIBER CEMENT SIDING YES
09 21 16 GYPSUM BOARD ASSEMBLIES YES YES SUSPENDED CEILINGS, SEISMIC BRACING
REQUIREMENTS AND JOISTED SOFFITS
09 51 00 ACOUSTICAL CEILINGS YES YES
03 45 00 PRECAST ARCHITECTURAL CONCRETE YES YES SUPPORT AND ATTACHMENT TO STRUCTURE
06 17 33 PREFABRICATED PLYWOOD I-JOISTS YES
06 17 53 SHOP FABRICATED WOOD TRUSSES YESYES
Separate Permit
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
YES
YES
SHOP DRAWINGS AND CALCULATIONS
SHOP DRAWINGS AND CALCULATIONS
NO N/A
SHOP DRAWINGS AND CALCULATIONS
07 41 13 YES YES ATTACHMENT TO STRUCTURE;
SOLAR HOT WATER PANELS
NO
SHOP DRAWINGS AND CALCULATIONS
SUSPENDED CEILINGS AND SEISMIC
BRACING REQUIREMENTS
NO
NO SEPARATE PERMIT BY DESIGN-
BUILD CONTRACTOR
METAL ROOF PANELS
01 10 00 SUMMARY NO YES FIRE EVACUATION PLANS
FIRE SAFETY PLANS
BUILDING INFORMATION CARD
SMOKE CONTROL COMMISSIONING REPORT
NO
ATTACHMENT TO STRUCTURE
07 62 00 SHEET METAL FLASHING AND TRIM YES NO NO N/A
07 84 00 FIRESTOPPING YES NO SEE FIRESTOPPING TABLE ON CODE
SUMMARY SHEET
NO
10 14 00 SIGNAGE YES NO CODE REQUIRED SIGNAGE
11 24 25 FALL PROTECTION EQUIPMENT YES YES OSHA COMPLIANCENO
32 84 23 IRRIGATION SYSTEM -
UNDERGROUND SPRINKLERS
YES NO NO DESIGN BUILD SHOP DRAWINGS
NO
NO
05 41 00 LIGHT GAUGE METAL STUD FRAMING YES YES NO SUPPORT OF SUSPENDED GYPSUM CEILINGS
ALTERNATES
EB5
1. NORTH GRAVEL PARKING LOT + SITE LIGHTING
2. NOT USED
3. 24-PAIR FIBER PULL FROM BLDG 57 TO EB5
ADD 1 14 JUL 2023
ADD 1
1X 1X1X
X XX
SB SBSB
2X 2X2X
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
D
AT
E
ST
R
EE
T
'F' STREET
'G' STREET
'E' STREET
FUTURE
FUTURE
FUTURE
DFAC
S-607
53M
53S
53N
GARAGE
S T O P
STOP
CE
DA
R
ST
RE
ET
LIMITIED DATA
POINTS TO
AROUND SITE -
BG (09/24/2020)
STOP
STOP
S T O P
STOP
S T O P
S T O P
S T O P
EB3
EB2
EB4
EB1
78 PARKING SPACES
LEGEND - CODE COMPLIANCE SYMBOLS
PROPERTY LINE
1/2 HOUR FIRE PARTITION
1 HOUR FIRE PARTITION
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE RESISTANCE RATED CONSTRUCTION
1 HOUR SMOKE BARRIER
2 HOUR FLOOR / CEILING ASSEMBLY
EXTERIOR EGRESS PATH TO ROW WITH TRAVEL WIDTH
REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR
EXITING - REFER TO ELECTRICAL DRAWINGS).
EGRESS PATH OF TRAVEL WITH TRAVEL WIDTH
REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR
EXITING - REFER TO ELECTRICAL DRAWINGS).
ACCESSIBLE ROUTE OF TRAVEL
COMMON PATH OF EGRESS TRAVEL
EXIT ACCESS DISTANCE
RATED SHAFT (WALL CONSTRUCTION TO MEET FIRE
BARRIER REQUIREMENTS)
44"
E.A. X'-XX" - (PER 1016.2)
C.P. X'-XX" - (PER 1014.3)
44"
# HR
OCCUPANT LOAD AT OPENING
CUMULATIVE OCCUPANT LOAD AT OPENING
BUILDING EXIT
BUILDING CODE APPEAL
AREA REQUIRING CARBON MONOXIDE DETECTION
AREA REQUIRING SMOKE DETECTION
SPRINKLER, SEE FIRE PROTECTION DRAWINGS
AREA NAME
MANUAL PULL STATION REQUIRED
LIGHTED EXIT SIGN - SHADING INDICATES LIGHTED FACE(S)
DIRECTION ARROW CORRESPONDS TO DIRECTION ARROW ON SIGN
LIGHTED EXIT SIGN - CEILING MOUNTED
LIGHTED EXIT SIGN - WALL MOUNTED
FIRE EXTINGUISHER (AND CABINET WHERE OCCURS)
AREA
FE
CO
EB5
2-STORY
EL
M
ST
RE
ET
ST
RE
ET
N
AM
E
TB
D
(F
IR
S
TR
EE
T)
'G' STREET
FUTURE
PARKING
FUTURE
PARKING
FUTURE
DFAC
(400)
NEW BLOCK CENTERED ON BUILDING 5049 (SIM BUILDING)
SHARED SERVICE ACCESS ROAD
TO EB5 MECH YARD & DFAC
FUTURE
OFFICER'S QUARTERS
FUTURE
OFFICER'S QUARTERS
FUTURE
OFFICER'S QUARTERS
241'-1 35/128"
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
SE
RA
A rch ite cts
, In c.
C op yr ig ht p ro te ct ed
Se e D es ig n Ag re em en t.
F or u se o n th is p ro je ct o nl y.
U na ut ho riz ed re pr od uc tio n of a ny p ar t o f t hi s m at er ia l i s pr oh ib ite d.
7/
/2
:4
6:
A M
PE
RM
IT
/ B
ID
S
ET
O M D E N
LI
ST
ED
B A R R A C K S
EB
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
O
R D
N
AN
C E
R D
H
ER
M
IS
TO
N
, O R
G051
ML
30 JUNE 2023
2201032
CODE
COMPLIANCE
SITE PLAN AND
SUMMARY
BUILDING NARRATIVE
THIS NEW BARRACKS FACILITY EB5 WILL PROVIDE HOUSING FOR 160 NATIONAL GUARD ENLISTED TRAINEES FOR THE TRANSIENT TRAINING PROGRAMS AT THE RAYMOND F. REES TRAINING CENTER. THE 2-STORY BUILDING WILL BE BUILT OF AUSTERE DURABLE FINISHES INCLUDING CMU WALLS WITH A BRICK VENEER FACADE, AND A STANDING SEAM METAL ROOF. THE (8) OPEN BAY BARRACKS WHICH MAKE UP THE WINGS OF THE BUILDING WILL HOUSE 20 BILLETS EACH, AND THE 2ND LEVEL WILL ALSO INCLUDE HOUSING FOR (4) SENIOR LEADER'S QUARTERS IN THE FORM OF TWO PRIVATE ROOMS. THE CENTRAL CORE OF THE BUILDING WILL HOUSE SHARED RESTROOM AND SHOWER FACILITIES, AND A LOUNGE WILL BE LOCATED AT THE SOUTH SIDE FACING THE FUTURE DINING FACILITY WHICH THE BARRACKS WILL SHARE A SERVICE ROAD WITH. THE PROJECT IS TARGETED FOR LEED 4.0 SILVER AND WILL IMPLEMENT ROOFTOP SOLAR HOT WATER PANELS FOR HOT WATER HEATING, AND WILL INCLUDE WATER SAVING INTERIOR AND EXTERIOR MEASURES INCLUDING LOW-WATER LANDSCAPE COMPOSED OF TREES, GRAVEL, DROUGHT TOLERANT GROUNDCOVER, AND DRY CREEK BIOSWALES FOR ONSITE STORMWATER.
APPLICABLE BUILDING REGULATIONS
2022 OREGON STRUCTURAL SPECIALTY CODE (OSSC) BASED ON THE 2021 INTERNATIONAL BUILDING
CODE WITH OREGON AMENDMENTS
2021 INTERNATIONAL FIRE CODE (IFC) WITH OREGON AMENDMENTS
2021 OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC) BASED ON ASHRAE STANDARD 90.1-2019
2021 OREGON ELECTRICAL SPECIALTY CODE (OESC) BASED ON 2020 NFPA 70 NATIONAL ELECTRICAL CODE
2022 OREGON MECHANICAL SPECIALTY CODE (OMSC) BASED ON 2021 INTERNATIONAL MECHANICAL CODE
AND INTERNATIONAL FUEL GAS CODE
2021 OREGON PLUMBING SPECIALTY CODE (OPSC) BASED ON 2021 UNIFORM PLUMBING CODE
UNIFIED FACILITIES CRITERIA, DEPARTMENT OF DEFENSE
1-200-01_2019 DoD BUILDING CODE
1-200-02_2020 HIGH PERFORMANCE BULIDING STANDARD
3-201-02_2021 LANDSCAPE ARCHITECTURE
3-210-10_2021 LOW IMPACT DEVELOPMENT
3-410-01_2020 HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
3-420-01_2019 PLUMBING
4-010-01_2022 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
4-010-06_2017 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
4-021-01_2010 MASS NOTIFICATION SYSTEMS
OPERATIONAL READINESS TRAINING COMPLEX ARMY DESIGN STANDARD, SEPT 2020
ALLOWABLE AREA
ALLOWABLE AREA PER STORY (TABLE 506.2)
*R-1 AND V-B = 7,000 SF PER STORY (MOST RESTRICTIVE)
A-3 AND V-B = 24,000 SF PER STORY
S-1 AND V-B = 36,000 SF PER STORY
MIXED OCCUPANCY, MULTI-STORY BLDGS (TABLE 506.2.4): Aa = [At + (NS X If)]
CHAPTER 5
FRONTAGE INCREASE FACTORS
NORTH EAST SOUTH WEST
30' 30' 30' 30'FRONTAGE (506.2)
AREA INCREASE: FRONTAGE (SECTION 506.3.3, EQUATION 5-5)
TOTAL FRONTAGE (F) = 230' + 93' + 230' + 93' = 646' (SEE SECTION 506.3)
PERIMETER (P) = 230' + 93' + 230' + 93' = 646'
OPEN SPACE WIDTH (W) = 30' (SEE SECTION 506.3.2)
FRONTAGE INCREASE FACTOR: I =
PROPOSED BUILDING AREAS (SF)
LEVEL 01
LEVEL 02
TOTAL
OCC R-1OCC A-3
1,953 SF
1,953 SF
8,885 SF
9,422 SF
18,307 SF
855 SF
609 SF
1,464 SF
BUILDING IS PROVIDED WITH NFPA 13R SPRINKLER SYSTEM (S13R) PER 903 3.1.2
If = F P - 0.25 W
30 = - 0.25 30
Aa =
ALLOWABLE AREA PER STORY
A = ALLOWABLE AREA PER STORY
A = TABULAR AREA PER STORY, R-1, V-B, S13R (TBL 506.2) =
I = AREA INCREASE FACTOR DUE TO FRONTAGE (SEE ABOVE) =
NS = NON-SPRINKLERED, R-1, V-B =
f t a
At + x I f f
= + xNS 12,250 SF
< 12,250 SF ALLOWABLE
ACC S-1 TOTAL
11,693 SF
10,031 SF
21,724 SF
508 PATH
SEPARATED
ACCESSORY
NOTE 1: LEVEL 1 OCC A-3 EXCEEDS 10% AREA OF LEVEL 1 AND IS SEPARATED BY A 2-HR FIRE BARRIER.
NOTE 2: LEVEL 2 SINCE S-1 IS LESS THAN 10% FLOOR AREA, IT IS ACCESSORY TO R-1, THEREFORE THE
STORY IS EVALUATED SOLELY AS GROUP R-1
NOTE 3: LEVEL 2 OCC R-1 GOVERNS
ACTUAL AREA OCC A-3
ALLOWABLE AREA OCC A-3
ACTUAL AREA OCC R-1
ALLOWABLE AREA OCC R-1+ ACTUAL AREA OCC S-1
ALLOWABLE AREA OCC S-1+
24,000
8,885 12,250+ 855
36,000+ =
0.081 + 0.725 + 0.02 = 0.826 < 1
OK
REFER TO CALC ABOVE
0.75
75%
0.75
0.75
7000 SF 7000 SF
7000 SF
7000 SF
BUILDING CONSTRUCTION
CONSTRUCTION TYPE: V-B OCCUPANCY: R-1 SPRINKLERS: S13R
CHAPTER 5, 6 & 7
BUILDING HEIGHT (PER TABLE 504.3) 60'-0" 34'-8"
ALLOWABLE PROPOSED
NUMBER OF STORIES (PER TABLE 504.4) 3 STORIES 2 STORIES
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (TABLE 601)
BUILDING ELEMENT VB
REQUIRED PROPOSED
STRUCTURAL FRAME
BEARING WALLS - EXTERIOR
INTERIOR
a. NOT LESS THAN THE FIRE RESISTANCE REQUIRED BY FIRE SEPARATION DISTANCE PER TABLE 602
b. NOT LESS THAN THE FIRE RESISTANCE REQUIRED BY SECTION 704.10
NONBEARING WALLS AND PARTITIONS - INTERIOR
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
VB
a,b b
BUILDING OCCUPANCY AND SEPARATIONS
APPLICABLE OCCUPANCY CLASSIFICATION GROUPS: A-3, R-1
ACCESSORY OCCUPANCIES: B, S-1 (508.2.4)
OCCUPANCY SEPARATION REQUIRED (508.4)
OCCUPANCY
CORRIDOR
UNIT TO UNIT
UNIT TO OTHER
OCCUPANCY SEPARATION (FIRE RATING)
1/2 HOUR FIRE PARTITION (1020.1)
1 HOUR FIRE PARTITION (420 & 708)
CHAPTER 3 & 5
OPENING PROTECTIVES TABLE 716.1(2)
R-1 TO A-3 2 HOUR FIRE BARRIER (508.4 & 707) 90 MIN
45 MIN
20 MIN
FIRE PROTECTION
FIRE EXTINGUISHERS: CLASS A/B/C/D
CHAPTER 9
AUTOMATIC SPINKLER SYSTEM
FIRE ALARM SYSTEM*
SMOKE DETECTION SYSTEM*
REQUIRED PROPOSED TYPE/CLASS
YES PER 420.4, 903.3.1.2 YES NFPA 13R
YES PER 907.2.8 YES NFPA 72
YES PER 907.2.10.1 YES NFPA 72
*PROVIDE FIRE PROTECTION PER IFC 907.
CARBON MONOXIDE ALARMS YESYES PER 915.1.2 GROUP R
CARBON MONOXIDE ALARMS: PROVIDE A CARBON MONOXIDE DETECTOR IN EACH SLEEPING ROOM, AS WELL AS THE LOUNGE COMMON AREA PER OSSC 915.1.2. A COMBINATION FIRE, SMOKE, CARBON
MONOXIDE ALARM IS PERMITTED IN A HARDWIRED DETECTION SYSTEM.
ENERGY CONSERVATION 2021 OEESC
REQUIRED PROPOSED
SYSTEM DESIGN FOR THIS PROJECT IS GOVERNED BY LEED REQUIREMENTS. REFERENCE SECTION 01 35 15
- LEED REQUIREMENTS FOR ADDITIONAL INFORMATION.
BUILDING COMPONENTS
BUILDING ENVELOPE REQUIREMENTS - CLIMATE ZONE 5B - ASHRAE 90.1 2022, 5.5 (TABLE 5.5-5)
R-30 ci
R-11.4 ci R-11.4 ci
R-30 ciROOFS - INSULATION ENTIRELY ABOVE DECK
ABOVE-GRADE WALL - MASS
SLAB-ON-GRADE FLOORS - UNHEATED R-15 FOR 24" R-15 FOR 24"
FENESTRATION (FIXED): U-VALUE 0.36
U = 0.370
0.26
U = 0.370OPAQUE DOORS - SWINGING
FLOORS - WOOD-FRAMED AND OTHER R-30 R-30
R-7.5 ci R-7.5 ciBELOW-GRADE WALL - MASS
FENESTRATION (OPERABLE): U-VALUE
FENESTRATION (FIXED): SHADING CO-EFFICIENT (SHGC)
FENESTRATION (OPERABLE): SHGC
0.38 0.22
0.45
0.33
0.27
0.22
GENERAL INFORMATION
PERMIT APPLICANT: SERA ARCHITECTS, INC. 503.445.7372
ON BEHALF OF OREGON MILITARY DEPARTMENT
LEGAL DESCRIPTION: UMATILLA ORDNANCE DEPOT (TAX EXEMPT)
A PARCEL OF LAND SITUATED IN TOWNSHIP 4 NORTH, RANGE 27 WEST,
SECTION 15, OF THE UMATILLA COUNTY DEPOT PLAN DISTRICT, HERMISTON
OREGON, CONTAINING 19,728 ACRES WITH 7,500 ACRES ZONED FOR MILITARY
USE
ZONING: UDM (UMATILLA ARMY DEPOT MILITARY ZONE)
SEISMIC ZONE: DESIGN CATEGORY C
PROJECT ADDRESS: 78798 ORDNANCE ROAD / HERMISTON, OR 97838
INTERIOR ENVIRONMENT
OCCUPIED ROOMS: NATURAL VENTILATION PROVIDED PER 1202.5.
TOILET & BATH ROOMS: MECHANICAL VENTILATION PROVIDED PER 1202.5.2.1
NATURAL LIGHT: NET GLAZED AREA IS GREATER THAN 8% OF FLOOR AREA OF ROOM SERVED PER 1204.2
CHAPTER 12
MEANS OF EGRESS
EGRESS WIDTH PER OCCUPANT SERVED (SECTION 1005.3):
STAIRWAYS: (0.3"/OCC) = REFER TO BUILDING EXITING TABLE ON THIS SHEET
OTHER EGRESS COMPONENTS: (0.2"/OCC) = REFER TO BUILDING EXITING TABLE ON THIS SHEET
44" MINIMUM STAIRWAY WIDTH REQUIRED PER 1009.4
CHAPTER 10
NUMBER OF EXITS (1006):
TWO EXITS REQUIRED PER TABLE 1006.2.1
ILLUMINATED EXIT SIGNS: REQUIRED PER 1011.1
EXIT ACCESS (1006):
COMMON PATH OF EGRESS TRAVEL PER 1006.2.1: R-1 OR A OCCUPANCY: 75'-0"
EXIT ACCESS TRAVEL DISTANCE (1017):
OCC A,R,S-1 = 250'-0" IN A BUILDING PROVIDED WITH A SPRINKLER MEETING 903.3.1.2
EXIT ACCESS ILLUMINATION REQUIREMENT:
EGRESS LIGHTING REQUIRED ALONG THE EGRESS PATH TO THE R.O.W. PER SECTION 1008.
PERFORMANCE REQUIREMENTS:
AVERAGE OF 1fc WITH A MINIMUM OF 0.1fc AT ANY POINT ON THE EGRESS PATH AT FLOOR LEVEL LIGHT LEVEL MAY DECLINE TO AVERAGE OF 0.6fc WITH A MINUMN OF 0.06fc AT ANY POINT ON THE EGRESS
PATH AT FLOOR LEVEL AFTER 90 MINUTES OF OPERATION ON EMERGENCY POWER.
MAXIMUM TO MINIMUM ILLUMINATION UNIFORMITY RATIO OF 40 TO 1 SHALL NOT BE EXCEEDED.
POWER PROVIDED BY BATTERY INVERTERS (EMERGENCY GENERATOR) (REFERECE ELECTRICAL
DOCUMENTS)
MINIMUM PLUMBING FIXTURE REQUIREMENTS
CHAPTER 29 AND PLUMBING CODE
USE
LAVATORIES DRINKING
FOUNTAINS
1 PER
FLOOR
SHOWERS
F
0.13
0.10
2.9
0.15
M
0.52
0.10
11.9
0.15
A-3
B
R-1
(DORM)
S-1
WATER CLOSET
F
0.38
0.16
2.9
0.15
M
4.16
0.16
11.9
0.15
LOAD
104/25
119/29
RATIO RATIO
OCCUPANCY
1 PER
1 PER
1 PER
1 PER
1 PER
1 PER
1 PER
1 PER
RATIO
1 PER
1 PER
1 PER
1 PER
SUBTOTAL
REQUIRED
PROVIDED
16.37
3.59
4 2
F
M
RATIO
1 PER
3.614.9
3.2812.67
13 4
3.614.9
14 W.C.'S +
14 URINALS*
= 23.33 WC'S
4 W.C.'S 21 3 321
NOTE: THE GENDER SPLIT IS BASED ON THE DESIGN CRITERIA OF ONE OPEN BAY DEDICATED TO FEMALES DUE TO THE UNEVEN DIVISION OF GENDER IN THE NATIONAL GUARD. NON-DORMITORY AREAS HAVE BEEN
GENDER SPLIT AT 80/20.
ROOFING REQUIREMENTS
BASIC WIND SPEED: 102 MPH
WIND EXPOSURE: C (PER 1609.4.3)
FIRE CLASSIFICATION: C (PER 1505.1)
METAL ROOF PANELS: 1507.4
ROOFTOP MOUNTED SOLAR PANELS 1505.9
CHAPTER 15
CLADDING REQUIREMENTS
BASIC WIND SPEED: 102 MPH
WIND EXPOSURE: C (PER 1609.4.3)
FIRE CLASSIFICATION: PER TABLE 602
ANCHORED MASONRY VENEER: 1404.6
CHAPTER 14 & 16
SHAFTS
SHAFT CONSTRUCTION: 1-HR REQUIRED PER 713.4
CHAPTER 7
SOUND TRANSMISSION CHAPTER 12
FLOOR/CEILING ASSEMBLIES SEPARATING SLEEPING
UNITS FROM EACH OTHER AND FROM ADJACENT
PUBLIC AREAS
IIC 50 (45 FIELD) IIC 50 MIN
REQUIRED PROPOSED
INTERIOR WALL ASSEMBLIES SEPARATING
SLEEPING UNITS FROM EACH OTHER AND FROM
ADJACENT PUBLIC AREAS.
NOTES:
REFERENCE ASSEMBLIES FOR SPECIFIC ASSEMBLY SOUND TRANSMISSION INFORMATION.
STC 50 (45 FIELD) STC 50 MIN
BUILDING ELEMENT
DISABLED ACCESS REQUIREMENTS
THIS BUILDING TYPE IS CONSIDERED AN ABLE-BODIED TRAINING FACILITY AND IS NOT REQUIRED TO BE
ACCESSIBLE PER ORTC 3.1.3 (B).
UFC, ORTC
GENERAL NOTES - CODE SUMMARY
A.
B.
C.
D.
E.
CODE SUMMARY KEYED NOTES APPLY TO G100 SERIES SHEETS. ALL KEYED NOTES MAY
NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS EXCEPT THOSE
NOTED.
ALL WORK SHOWN ON THIS SHEET IS INCLUDED IN THE CONTRACT FOR CONSTRUCTION,
WHETHER SHOWN ELSEWHERE OR NOT. CONTRACTOR SHALL MAKE ALLOWANCES FOR
CONNECTION, HOOK UP, ETC. AS REQUIRED SO THAT ITEMS, EQUIPMENT, ETC. ARE FIT
FOR INTENDED PURPOSE.
SEE ELECTRICAL AND MECHANICAL PLANS FOR ADDITIONAL SYMBOLS
PROVIDE LISTED FIRESTOP, CONTINUOUS AT PERIMETER GAPS OF ALL RATED
CONSTRUCTION AS REQUIRED TO MAINTAIN THE SPECIFIED RATING.
SQUARE FOOTAGE AREA CALCULATIONS ARE BASED ON THE BUILDING CODE
DEFINITIONS OF GROSS AND NET AREAS AS USED TO DETERMINE OCCUPANT LOADS
ONLY AND ARE NOT A REPRESENTATION OF LEASABLE AREA.
F. AT FIRE WALLS, BARRIERS, AND PARTITIONS ACCESSIBLE IN A CONCEALED FLOOR,
FLOOR/CEILING OR ATTIC SPACE - PROVIDE PERMANENT IDENTIFICATION WITH SIGNS OR
STENCILING, NOT LESS THAN 3" HIGH WITH A MINIMUM 3/8" STROKE IN CONTRASTING
COLOR TO SAY "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS." SIGNS SHALL
BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND AT INTERVALS NOT
EXCEEDING 30 FEET PER OSSC 703.7.
1" = 40'-0"
CODE COMPLIANCE SITE PLAN1
ADD 1 14 JUL 2023
DRAFTSTOPPING
DRAFTSTOPPING IN ATTICS ARE REQUIRED PER 718.4 & 708.4.2. ALIGN DRAFTSTOPPING WITH ALL R-1 SEPARATION FIRE PARTITIONS AT 2ND FLOOR, WHERE ATTIC IS NOT SPRINKLERED. REFER TO A103 FOR
ATTIC DRAFTSTOPPING PLAN WITH ADDITIONAL INFO.
CHAPTER 7ADD 1
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
D
AT
E
ST
R
EE
T
'F' STREET
'G' STREET
'E' STREET
FUTURE
FUTURE
FUTURE
DFAC
S-607
53M
53S
53N
GARAGE
S T O P
STOP
LIMITIED DATA
POINTS TO
AROUND SITE -
BG (09/24/2020)
STOP
STOP
S T O P
STOP
S T O P
S T O P
S T O P
EB3
EB2
EB4
EB1
78 PARKING SPACES
LEGEND - LANDSCAPE MATERIALS PLAN
FUTURE WORK, N.I.C. - REFER TO MASTERPLAN
AT/FP STANDOFF ZONE
CONCRETE SIDEWALK
GRAVEL WITH STEEL EDGING (1/4-10 CRUSHED BASALT)
SCOPE OF WORK/LEED BOUNDARY
PLANTING SCHEDULE
ARCTOSTAPHYLOS UVA-URSI
CRUSHED BASALT
KINNIKINNICK
SUN AND SHADE MIX
BLUEGRASS (45%)
RYEGRASS (45%)
RED FESCUE (10%)
1 GAL.
SEED
BOTANICAL NAME COMMON NAME SIZE
24" O.C.
SEEDING RATE
4-6 (PLS) lbs.
per 1000 sf
SPACINGSYMBOL DETAIL
3 & 4/LP102
GRAVEL 5/LP1021/4" MINUS ---
COBBLESTONE COBBLE PER CIVIL1"- 6", CLEAN
WITH NO FINES ---
POA PRATENSIS (45%)
LOLIUM PERENNE (45%)
FESTUCA RUBRA (10%)
ACHILLEA TOMENTOSA (25%)
FESTUCA IDAHOENSIS (75%)
WOOLLY YARROW
IDAHO FESCUE
1 GAL.
1 GAL.
12" O.C.
12" O.C.
GRAVEL LOT GRAVEL PER CIVILPER CIVIL ---
THORNLESS
HONEY LOCUST
GLEDITSIA TRIACONTHOS 1/LP10225-90' 30' O.C. MIN
SEE PLANS
ADD ALTERNATE SCOPE OF WORK
EB5
2-STORY
EL
M
ST
RE
ET
ST
RE
ET
N
AM
E
TB
D (F
IR
S
TR
EE
T)
'G' STREET
FUTURE
PARKING
FUTURE
PARKING
FUTURE
DFAC
(400)
C
EQ EQ
'-0 " T
YP
EQ
EQ
'-0 " T
YP
EQ
EQ
10'-0" 10'-0" ~94'-0" 10'-0"25'-0" 10'-0" ~94'-0" 10'-0" 10'-0"
EQ EQ
ADD ALTERNATE #1: NORTH BARRACKS
PARKING LOT + SITE LIGHTING
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
SE
RA
A rch ite cts , In c.
C op yr ig ht p ro te ct ed
Se e D es ig n Ag re em en t.
F or u se o n th is p ro je ct o nl y.
U na ut ho riz ed re pr od uc tio n of a ny p ar t o f t hi s m at er ia l i s pr oh ib ite d.
7/
/2
:4
2:
A M
PE
RM
IT
/ B
ID
S
ET
O M D E N
LI
ST
ED
B A R R A C K S
EB
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
O
R D
N
AN
C E
R D
H
ER
M
IS
TO
N
, O R
LP101
DJ
30 JUNE 2023
2201032
PLANTING PLAN
GENERAL NOTES - PLANTING
ALL EXISTING PLANTING SOIL SHALL BE AMENDED AS RECOMMENDED IN AN APPROVED
AGRICULTURAL SOILS REPORT.
UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE INSTALLED IN ALL PLANTING
AREAS FOR ESTABLISHMENT. (COMPLY WITH LEED 4.0 REQUIREMENTS - TO BE
REMOVED/CAPPED AND ABANDONED AFTER 2-YEAR PLANTING ESTABLISHMENT PERIOD.)
REFER TO PLANTING DETAILS ON SHEET LP102
PROPOSED PLANTING WITHIN THE CANTONMENT IS REQUIRED TO MEET AT/FP STANDARDS
WITHIN THE ATFP STANDOFF ZONE IN WHICH THE ENTIRE SITE IS CONTAINED WITHIN,
LANDSCAPE MUST NOT BE ALLOWED TO CONCEAL A 6" SPHERE, AND IS EXCLUDED FROM
ANY LOCAL JURISDICTION PLANTING STANDARDS WHICH CONTRADICT THIS REQUIREMENT.
ORGANIC MATTER IS NOT ALLOWED WITHIN 3'-0" OF THE EDGE OF BUILDING PER
HANTAVIRUS REQUIREMENTS. PROVIDE GRAVEL BAND ALONG BUILDING EDGE PER PLAN.
A.
B.
C.
D.
E.
F.
1" = 20'-0"
PLANTING PLAN1
ADD 1 14 JUL 2023
LEGEND - ROOF PLAN
ROOF CRICKET
VENT THROUGH ROOFVTR
ROOFING AS SCHEDULED; SEE ASSEMBLIES
RIDGE
VALLEY
SNOW GUARD
07 62 00 - PREFINISHED SHEET METAL DOWNSPOUTDS
DRAFT STOPPING
H
A301
A301 3
A301
A3012
G
F
E
D
C
6 4 2
B
A
3 18
3" / 12" 3" / 12"
3"
6"
6"
6" / 12"
6"
6"
6"
6"
6" / 12"
6"
6"
6"
4 3/4" / 12"4 3/4" / 12"
VTR
VTRVTR
VTRVTR
R1
6"
6" / 12"
RIDGE
VENT
R6
R7 TYP
A704 TYP
R6
7'- 5 3 /4"
15'-8"
ATTIC VENTILATION CALCULATIONS
ATTIC AREA
REQ'D VENTING (1/150)
EAVE SOFFIT VENTING
RIDGE ROOF VENTING
TOTAL PROVIDED
PER 2022 OSSC SECTION 1202.2.1 VENTILATED ATTICS AND RAFTER SPACES
NOTE:
PERFORATED SOFFIT VENTS ~5 SQIN FREE VENTING PER LINEAL FOOT
METAL ROOF RIDGE VENTS ~10 SQIN FREE VENTING PER LINEAL FOOT
1404 SQIN
9.36 SQIN
150 SQIN
10 SQIN
160 SQIN
DS
DS
DS
DS
DSDS
DS
DS
DS
DS
R8
R8 R8
R8
R8
VTR
R8
VTR
R8
VTR
R8
R9 TYP
A801
TYP
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
SE
RA
A rch ite cts , In c.
C op yr ig ht p ro te ct ed
Se e D es ig n Ag re em en t.
F or u se o n th is p ro je ct o nl y.
U na ut ho riz ed re pr od uc tio n of a ny p ar t o f t hi s m at er ia l i s pr oh ib ite d.
7/
/2
:4
2:
A M
PE
RM
IT
/ B
ID
S
ET
O M D E N
LI
ST
ED
B A R R A C K S
EB
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
O
R D
N
AN
C E
R D
H
ER
M
IS
TO
N
, O R
A103
ML
30 JUNE 2023
2201032
ATTIC
DRAFTSTOPPING
PLAN AND ROOF
PLAN
GENERAL NOTES - ROOF PLAN
A.
B.
C.
ROOF PLAN KEYED NOTES APPLY TO A100 SERIES SHEETS. ALL KEYED NOTES MAY NOT
OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS EXCEPT THOSE
NOTED.
SEE A002 FOR ASSEMBLIES.
GRIDS ARE FOR REFERENCE ONLY. CONTRACTOR TO SET CONTROL POINTS FOR
LAYOUT.
D. FALL PROTECTION TO BE PROVIDED AS DELEGATED DESIGN BY ROOFING
SUBCONTRACTOR. SEE G002 FOR FULL LIST OF DELEGATED DESIGN ITEMS.
E. AREAS WHERE GUTTER LENGTH IS GREATER THAN 50' PROVIDE THERMAL EXPANSION
1/8" = 1'-0"
ROOF PLAN1
KEYED NOTES - ROOF
R1 07 62 00 - 8" PREFINISHED SHEET METAL GUTTER
R6 FALL PROTECTION ANCHORS; B.O.D. GUARDIAN 00657 CB-18 (QTY 2) -
LOCATIONS TBD IN THE FIELD
R7 07 72 00 - SNOW GUARDS
R8 07 41 13 - COMBINE R/R VENT LINES AT SHARED PLUMBING WALLS TO SINGLE
VTR LOCATION WHERE POSSIBLE - REFER TO MECH/PLUMB DRAWINGS FOR
ADDITIONAL INFORMATION
R9 DRAFTSTOPPING TO ALIGN WITH FIRE PARTITION BELOW
ADD 1 14 JUL 2023
1/8" = 1'-0"
ATTIC DRAFTSTOPPING PLAN2
ADD 1
SUSPENDED ACOUSTIC
CEILING TILE 2' x 4', SCORED
09 21 16 - PAINTED GB CEILING
9' - 0" CEILING HEIGHT
09 21 16 - PAINTED GB CEILING JOISTED-DOWN FROM
STRUCTURE; SEE ASSEMBLIES FC3 & FC5;
SEE MECHANICAL FOR DUCT ROUTING
ACCESS PANEL (24"x24")
LEGEND - REFLECTED CEILING PLAN
RECESSED LIGHT FIXTURE; SEE ELECTRICAL
SURFACE-MOUNTED LIGHT FIXTURE; SEE ELECTRICAL
WALL-MOUNTED LIGHT FIXTURE; SEE ELECTRICAL
RECESSED LINEAR LIGHT FIXTURE; SEE ELECTRICAL
SUSPENDED LINEAR LIGHT FIXTURE; SEE ELECTRICAL
SUPPLY DIFFUSER, SEE MECHANICAL
RETURN DIFFUSER, SEE MECHANICAL
EXHAUST DIFFUSER, SEE MECHANICAL
ACCESS PANEL (24"x30")
SURFACE MOUNTED LIGHT FIXTURE; SEE ELECTRICAL
A401
A401
G
F
E
D
C
6 4 2
B
3 18
9'-9 1/2"
9'-9 1/2"
9'-9 1/2"
9'-9 1/2"
9'-9 1/2" 9'-9 1/2"
9'-9 1/2"
9'-9 1/2"
9'-9 1/2"9'-9 1/2"
9'-9 1/2"
9'-9 1/2"
9'-9 1/2"
9'-9 1/2"9'-9 1/2"
9'-9 1/2"
9'-9 1/2" 9'-9 1/2"
9'-9 1/2"
9'-9 1/2"
7'-11 3/8"7'-10 1/4"
EQEQEQEQEQEQEQEQEQEQEQEQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQEQEQEQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQEQEQEQEQEQEQEQEQEQEQEQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQEQ EQEQ
EQEQ
EQEQ
EQ
EQ
EQ
EQ
EQEQEQEQEQEQ
EQEQ3'-
6"
3'- 6"
EQEQEQEQ
EQEQ
1'- 6"
1'- 6"
EQEQ 3'-
6"
3'- 6"
EQEQ EQEQ
1'- 6"
1'- 6"
EQ
EQ
EQ
EQ
EQEQEQEQ
EQ
EQ
EQ
EQ
EQEQ
EQ
EQ
EQEQ
EQ
EQ
EQ
EQ
EQ
EQ EQEQEQEQ
C1C1 C1C1
C1C1
C1C1
C1C1
C1C1
EQEQEQEQEQEQ
EQ
EQ
EQ
EQ
EQ
EQ C2
C2
EQ
EQEQ
EQ
C2
C2
EQ EQ EQ
C3 TYP
6'-0 3/4" 6'-0 3/4" 6'-0 3/4" 6'-0 3/4" 6'-0 3/4"
30'-3 1/2"
C2C2
C2
C2
C2
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
SE
RA
A rch ite cts , In c.
C op yr ig ht p ro te ct ed
Se e D es ig n Ag re em en t.
F or u se o n th is p ro je ct o nl y.
U na ut ho riz ed re pr od uc tio n of a ny p ar t o f t hi s m at er ia l i s pr oh ib ite d.
7/
/2
:5
9:
P M
PE
RM
IT
/ B
ID
S
ET
O M D E N
LI
ST
ED
B A R R A C K S
EB
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
O
R D
N
AN
C E
R D
H
ER
M
IS
TO
N
, O R
A202
ML
30 JUNE 2023
2201032
REFLECTED
CEILING PLAN -
LEVEL 02
GENERAL NOTES - RCP
A.
B.
C.
D.
E.
REFLECTED CEILING PLAN KEYED NOTES APPLY TO A200 SERIES SHEETS. ALL KEYED
NOTES MAY NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS
EXCEPT THOSE NOTED.
GRIDS ARE FOR REFERENCE ONLY. CONTRACTOR TO SET CONTROL POINTS FOR LAYOUT.
ALL CEILING HEIGHTS ARE RELATIVE TO FINISHED FLOOR, UNO.
SEE ELECTRICAL LIGHTING DRAWINGS FOR FIXTURE TYPES AND LUMINAIRE SCHEDULE
CENTER LIGHT FIXTURES/J BOXES IN ROOM, UNO.
1/8" = 1'-0"
REFLECTED CEILING PLAN - LEVEL 021
KEYED NOTES - REFLECTED CEILING PLAN
C1 ALIGN
C2 24"x30" ACCESS PANEL, LOCATE WHERE 30" CLR. HEADROOM IN ATTIC IS
PROVIDED ABOVE
C3 06 20 00 - 1X4 PAINTED WOOD TRIM WHERE TOP PLATE IS EXPOSED (PUBLIC
SPACES ONLY)
ADD 1 14 JUL 2023
ADD 1
1.
NOTE:
CONTRACTOR TO COORDINATE
FIRE STOPPING ASSEMBLIES
WITH SECTION 07 84 00
FIRESTOPPING.
FIRE CAULK EACH SIDE
06 10 00 - BLOCKING AT
UNSUPPORTED SHEATHING
EDGES, TYP
PIPE OR CONDUIT PER PLUMBING
3/8" NEOPRENE WAFFLE PAD
(45 DUROMETER)
07 84 00 - FIRESTOPPING07 84 00 - FIRESTOPPING
ASSEMBLY
METAL WALL
ANGLE, TYP
T-GRID
SUSPENDED W/
WIRE HANGERS
ACT TILE TO WALL TILE TO TILE
CONC SLAB, SEE PLANS
WALL,
SEE PLANS
CEILING GRID MAY BE
ATTACHED TO (2) ADJ
WALLS - CEILING MUST
BE 1/2" MIN FREE OF
OTHER WALLS
8" MAX
(OR 1/4" OF THE
LENGTH OF THE
RUNNER, WHICH EVER
IS LESS, TYP)
HANGER WIRES SHALL BE
PROVIDED AT ALL MAIN
RUNNERS AND CROSS
RUNNERS, WITHIN 8" OF
CEILING PERIMETER
1 1 /2"
M
IN
IM
U
M
TI
G H
T
TU
R N
S
SEE RCP
09 51 00 ACOUSTIC CEILING
TILE WITH EDGE SUPPORT
SEE RCP
6" M
IN
09 21 16 CORNER BEAD
WOOD FRAMING TO DECK
ABOVE
09 51 00 - CEILING
SUSPENSION SYSTEM
09 21 16 GYP BOARD CEILING
OR STRUCTURE, SEE RCP
DOOR - WHERE OCCURS, SEE PLANS
09 65 00, TRANSITION TRANS-4
FLOOR FINISH SCHEDULED
1/4
12 48 13 WALK-OFF MAT
NOTE:
FLOOR TRANSITION WITH 0" - 1/2" HEIGHT
DIFFERENTIAL TO HAVE TRANSITION STRIP
WITH 1:2 SLOPE. BEYOND 1/2", TRANSITION
STRIP TO SLOPE 1:12
PREFERRED SUBSTRATE,
SEE ASSEMBLY
WALL SUBSTRATE AS SCHEDULED
09 65 00 - COVE CAP
09 65 00 - BONDED COVE
REINFORCEMENT
6"
09 65 00 - RESILIENT FLOORING
NOMINAL MO
08 11 13 - HOLLOW METAL
DOOR, SEE SCHEDULE
DOOR OPENING 08 11 13 - HOLLOW METAL FRAME
04 20 00 - BOND BEAM, PER STRUCTURAL
07 92 00 - INTERIOR JOINT SEALANT
ASSEMBLY
NO
MI
NA
L R O
DO
OR
O
PE
NI
NG
08 11 13 - HOLLOW METAL FRAME
08 11 13 - HOLLOW METAL
DOOR, SEE SCHEDULE
04 20 00 - MASONRY ANCHOR
07 92 00 - INTERIOR JOINT SEALANT
ASSEMBLY
ASSEMBLY
RECESSED OR SEMI-RECESSED
ACCESSORY
PLAN / SECTION
NOTE: MOUNT PER MFR
SPECIFICATION
04 20 01 - 4" OR 6" CMU (REDUCED
DEPTH AS REQ'D) BEHIND
RECESSED ACCESSORIES
>1 " D
IA
FOR PIPES >1" DIA.
FOR PIPES <1" DIA.
1" D
IA
NOTE:
1. PROVIDE REQUIRED "T" OR "F" RATING FOR PENETRATIONS IN RATED ASSEMBLIES
07 84 00 ACOUSTICAL JOINT
SEALANT, CONTINUOUS ON
ALL SIDES OF PIPE
07 84 00 ACOUSTICAL JOINT
SEALANT, CONTINUOUS ON ALL
SIDES OF PIPE
07 21 00 ACOUSTICAL INSULATION
ASSEMBLY
09 65 00 RESILIENT
FLOORING WITH
INTEGRAL 6" COVED BASE
BLOCKING IN WALL
AS NECESSARY TO
SECURE VANITYTO
B
OT
TO
M
OF
M
IR
RO
R
" M
AX
09 30 00, CERAMIC WALL
TILE, FULL HEIGHT
06 41 00 INTEGRAL
CASTING COUNTERTOP
(MODERN WHITE)
08 83 00, MIRROR
2'-
CTP-1
6"
6"
05 50 00 COUNTERTOP
SUPPORT BRACKET
2'-0"
22 40 00 - PIPE PROTECTION /
INSULATION
06 20 00 - 1X4 WOOD TRIM WHERE TOP
PLATE IS EXPOSED (AT PUBLIC SPACES
ONLY) PAINT TO MATCH WALL FINISH
04 20 00 - CONCRETE BLOCK
09 21 16 - 5/8" TYPE X GYPSUM BOARD (2) LAYERS
FINISH SEALANT
ASSEMBLY
04 20 00 - CONCRETE BLOCK
06 20 00 - 2X6 OAK CHAIR RAIL,
CLEAR STAIN FINISH -
CONTINUOUS ALONG EXT
WINDOW WALL PER INT. ELEV'S
T/CHAIR RAIL
3'-0" ABOVE LVL 2 FF
3/8"X5 TITEN HD FLATHEAD
COUNTERSUNK SCREWS, MIN 2-3/4"
EMBEDMENT @ 24" O.C. MAX,
(MAINTAIN END/EDGE DISTANCE AT
WINDOWS AND FROM CMU GROUT
JOINTS PER MFR) CONCEAL
FASTENERS WITH MATCHING
WOOD PLUG WITH CLEAR FINISH
FINISH SEALANT, TOP & BOTTOM
ASSEMBLY
NOTE:
FLOOR TRANSITION WITH 0" TO
1/2" HEIGHT DIFFERENTIAL TO
HAVE TRANSITION STRIP WITH
1:2 SLOPE. WHERE GREATER
THAN 1/2", TRANSITION STRIP TO
SLOPE 1:12
03 30 00 - CONCRETE SLAB
12 48 43 - WALK-OFF MAT
09 68 00 - CARPETING RESILIENT TRANSITION
LOUNGE WALL BEYOND TO ALIGN WITH
RESILIENT TRANSITION
ASSEMBLY
VARIES
ASSEMBLY
VARIES
09 21 16 - 1/2" GYPSUM BOARD
TOP CHORD OF ROOF TRUSS
BOTTOM CHORD OF ROOF TRUSS
FRAMING WHERE ROOF
TRUSS AND FIRE PARTITION
BELOW DON'T ALIGN
NOTE:
AT PENETRATIONS THROUGH DRAFTSTOPPING PROVIDE FIBER GLASS INSULATION
FOR OPENINGS NO GREATER THAN 1/2"
CONDITION PARALLEL TO TRUSS CONDITION PERPENDICULAR TO TRUSS
ATTIC
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
SE
RA
A rch ite cts , In c.
C op yr ig ht p ro te ct ed
Se e D es ig n Ag re em en t.
F or u se o n th is p ro je ct o nl y.
U na ut ho riz ed re pr od uc tio n of a ny p ar t o f t hi s m at er ia l i s pr oh ib ite d.
7/
/2
:4
2:
A M
PE
RM
IT
/ B
ID
S
ET
O M D E N
LI
ST
ED
B A R R A C K S
EB
O R
EG
O
N M
IL
IT
AR
Y
D
EP
AR
TM
EN
T
O
R D
N
AN
C E
R D
H
ER
M
IS
TO
N
, O R
A801
ML
30 JUNE 2023
2201032
INTERIOR
DETAILS
1 1/2" = 1'-0"
PIPE PENETRATION AT FLOOR2
6" = 1'-0"
TYP ACT ASSEMBLY9 3" = 1'-0"
ACT TO GWB - LEVEL CHANGE5
6" = 1'-0"
SECTION AT WALK OFF MAT
TO CONCRETE3 6" = 1'-0"
RESILIENT FLOOR TO COVE7
3" = 1'-0"
SECTION AT HOLLOW METAL
HEAD AT CMU4 3" = 1'-0"
HOLLOW METAL JAMB AT CMU8
1 1/2" = 1'-0"
RECESSED ACCESSORY1
3" = 1'-0"
PIPE PENETRATION AT WALL6 1 1/2" = 1'-0"
RESTROOM SINK TYPICAL10
3" = 1'-0"
TRIM AT TOP OF WALL11
3" = 1'-0"
CHAIR RAIL AT LVL 2 WINDOW WALLS12
6" = 1'-0"
CARPET TO CONCRETE13
ADD 1 14 JUL 2023
1 1/2" = 1'-0"
DRAFTSTOPPING14
| EB5 Addendum 1 |
| 2023_0714-EB5_Addendum 1 Narrative |
| 2023_0714-EB5_Addendum 1 Narrative PG 2 |
| 00 01 10 - Table of Contents ADD 01 |
| 01 23 00- Alternates ADD 01 |
| G002 - GENERAL INFORMATION |
| G051 - CODE COMPLIANCE SITE PLAN AND SUMMARY |
| LP101 - PLANTING PLAN |
| A103 - ATTIC DRAFTSTOPPING PLAN AND ROOF PLAN |
| A202 - REFLECTED CEILING PLAN - LEVEL 02 |
| A801 - INTERIOR DETAILS |
File details come from the government source that posted it. Updated .