This document is an Addendum to a State and Local contract opportunity for the new construction of Enlisted Barracks 5 (EB5) in Hermiston, Oregon. The project, overseen by SERA Architects, Inc., involves the full construction of a 21,505 square foot, 2-story EB5 building, including site work, utilities, landscaping, building foundations, structure, envelope, roofing, interiors, MEP systems, and low voltage/AV. This Addendum modifies the original project manual and drawings, providing clarifications and changes to various specification sections and drawing sheets.

The key changes include updates to metal fabrications, metal stairs, tiling, television mounts, fire alarm system, earthwork, drawings, and structural elements. Specific updates are provided for elements such as insulation values, light bollard foundations, mirror sizes, and coordinating grid numbers between architectural and structural drawings. An IT fiber map is also added to clarify existing and new scope for fiber and conduit, including locations of existing junction/pull boxes.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM No. 02 - Page 1 of 3

Addendum 2- EB5

Project Name OMD EB5 Project # 2201032 Project Address

78798 Ordnance Rd Hermiston, OR 97838

Company SERA Architects, Inc.

Address 600 SW 10th Ave

Suite 500 Portland, OR 97205

Addendum # 02

Date of Issuance

08 September 2023

To: All Contract Document Holders

This Addendum forms a part of the Contract Documents and modifies the original Project Manual and Drawings, dated 07 07 2023 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification.

SPECIFICATION SECTION ATTACHMENTS:

01 10 00-Summary, 05 50 00- Metal Fabrications, 05 51 00-Metal Stairs, 09 30 00-Tiling, 11 52 70-Television Mounts, 28 31 66-Interior Fire Alarm and Mass Notification, Non-Addressable, 31 20 00-Earth Moving

DRAWING ATTACHMENTS

1. Drawing Sheet G002

2. Drawing Sheet G051

3. Drawing Sheet G101

4. Drawing Sheet LP101

5. Drawing Sheet LP102

6. Drawing Sheet LI101

7. Drawing Sheet A002

8. Drawing Sheet A051

9. Drawing Sheet A202

10. Drawing Sheet A301

11. Drawing Sheet A451

12. Drawing Sheet A502

13. Drawing Sheet A701

14. Drawing Sheet A702

15. Drawing Sheet A703

16. Drawing Sheet A704

17. Drawing Sheet A901

18. Drawing Sheet S101

19. Drawing Sheet S101S

20. Drawing Sheet S102

21. Drawing Sheet S103

22. Drawing Sheet S502

23. Drawing Sheet E002

1 of 3 4

ADDENDUM No. 02 - Page 2 of 3

PROJECT MANUAL

Division 01 – GENERAL REQUIREMENTS

01 10 00 - Summary

1. Clarify: Paragraph 1.05.A.

DIVISION 05 - METALS

05 50 00-Metal Fabrications

1. Delete: Paragraph 2.01.B.

2. Clarify: Paragraph 2.05.A and B.

05 51 00-Metal Stairs

1. Clarify: Paragraph 2.04.A.

2. Clarify: Paragraph 2.05.A.

3. Clarify: Article 2.06.

DIVISION 09 - FINISHES

09 30 00-Tiling

1. Change: Sub-Paragraph 2.02.A.1

2. Change: Paragraph 2.02.B.

DIVISION 11 - EQUIPMENT

11 52 70 – Television Mounts

1. Change: Sub-Paragraph 2.02.A.1.

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 66 – Interior Fire Alarm and Mass Notification System, Non-Addressable

1. ADD: New Section supplemental to 28 12 10 provided to capture new cybersecurity requirements for facility related control systems.

DIVISION 31 – EARTHWORKS

31 20 00-Earth Moving

1. Change: Sub-Paragraph 1.01.B.1.

DRAWINGS

G002

1. DELETE Section 01 10 00 from delegated design and deferred submittals table

G051

2. CHANGE Allowable area calculations

3. CHANGE Energy conservation building envelope requirements per ASHRAE 90.1-2019

G101

1. ADD Occupant load summary for levels 1 and 2

2. ADD Common path of egress travel on opposite side of building on level 1 and 2

3. CHANGE Common path of egress travel distance and code section to 1030.8

LP101

1. CHANGE Work limit line adjusted to show stormwater basin west of Elm Street is not in project scope

2. CHANGE Cobblestone size to PER CIVIL. Refer to civil drawings for cobble size

3. CHANGE Thornless honey locus tree size to 2” caliper on PLANTING SCHEDULE

4. DELETE Kinnikinnick from PLANTING SCHEDULE

LP102

1. DELETE Synthetic grass surfacing edge detail

2 of 3 4

ADDENDUM No. 02 - Page 3 of 3

LI101

1. CHANGE Work limit line adjusted to show stormwater basin west of Elm Street is not in project scope

A002

1. CHANGE Typical exterior wall detail to have R13.3 continuous XPS rigid insulation

2. CHANGE FC6 Floor-Ceiling Assembly at I-Joists to have hat channel furring

A051

1. ADD surface concrete pads for all light bollards

2. CHANGE Light bollards not to overhang adjacent sidewalk

3. CHANGE Keyed Note S31 for 24” Conc. pole Base & refer to struct.

4. DELETE Precast base from Site pole lighting verbiage in legend

A101 & A102

1. CLARIFY General Note E includeded describing the Campus Standard Access Control System

2. CLARIFY Card Reader clarification in Floor Plan Legend

A103

3. ADD Solar ready zones on roof plan

4. ADD Solar ready zone hatch to legend

5. ADD Section callout for detail 5/A502 at Stairs 1 & 3 on Attic Plan

A202

1. ADD Trim line showing location of 1x4 painted trim to cover top plate in public spaces

2. ADD Trim line type to legend

3. CHANGE Note C3 to reference trim detail

A301

1. CHANGE Exterior double door E107 panel types to remove glazing lites

A451

1. CHANGE Wall section stair and wall section window typical to show chair rail with clear stain finish at level 2

A502

1. CHANGE Typical guardrail detail to align with Pacific Stair R400

A601

1. ADD Detail callout for resilient flooring to resilient flooring transition between restrooms, typical

2. CHANGE Mirror size in men’s and women’s restrooms to (3) 18”x30” at 69” AFF

A603

1. CHANGE Mirror size in Sr. Leader’s restrooms to 18”x30” at 69” AFF

A701

1. CHANGE Light bollard detail to show concrete pad, anchorage kit by manufacturer, and fixture head not to overhang adjacent sidewalk

2. CHANGE Soffit detail to have R13.3 continuous XPS rigid insulation

3. CHANGE CMU wall footing detail to have fluid applied waterproofing in a location that allows for a continuous membrane

A702

1. DELETE Plan section at recessed jamb detail

A703

1. DELETE Duplicate section at HM door head detail

3 of 3 4

ADDENDUM No. 02 - Page 4 of 3

A704

1. CHANGE Detail section at rake to include fiber cement soffit

2. CHANGE Detail section at ridge to show correct specification section for plywood

A801

1. ADD Resilient flooring to resilient flooring transition detail

2. ADD Bullnose tile detail

A901

1. CHANGE Exterior double door E107 panel types to be full metal with no glazing

A921

1. ADD Senior Leader’s Quarter spaces to finish schedule

2. CLARIFY Circulation 209 space included in finish schedule as separate line item

3. CHANGE 09 30 00 Tiling finishes to Dal Tile manufacturer in arctic white and desert gray

4. CLARIFY Storage and circulation spaces by separating into individual spaces in finish schedule to clearly define flooring finish in each space

5. CLARIFY Stair spaces in finish schedule by referring to the stair areas labeled on floor plans with additional remarks on where to specifically apply flooring finishes

S101

1. CHANGE Grid numbers coordinated to match architectural

S101S

1. CHANGE Mech. yard slab pulled out to 4” from bldg. edge to accommodate 4” slab edge insulation

2. CHANGE Mech yard slab extended south to better accommodate equipment clearances.

S102

S103

S501

1. ADD Light Pole Foundation Detail 16/S501

S502

2. ADD Missing sheet of masonry details included.

E002

1. CHANGE anchorage kit at concrete walk in lieu of direct burial anchors at G1 fixtures.

EB5FiberMap

1. ADD IT Fiber Map clarifying Existing and New scope for fiber and conduit including locations of existing junction pull boxes.

END OF ADDENDUM ‘02’