2023_0908_EB5 - Add 2 Drawings.pdf
PDF 17 MB Posted
- Attached to
- Enlisted Barracks 5 NEW CONSTRUCTION
- Solicitation number
- S-24800-00007691
- Issued by
- Union County, Oregon
About this file
The document is an addendum to the solicitation for the new construction of Enlisted Barracks 5 (EB5) in Umatilla County, Oregon. The project scope includes all excavation, site utilities, landscaping, foundational and structural work, exterior envelope and waterproofing, roofing, interior framing, CMU block construction, brick veneer finishes, drywall, finishes, mechanical, plumbing, electrical, low voltage, and civil work for a new 2-story, 21,505 square foot enlisted barracks building. The addendum adds 2 new drawings to the solicitation.
The project is being procured by Umatilla County. No additional details are provided regarding pricing terms, set-asides, incumbents, funding requirements, or other salient information.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/8
/2
:3 :5
A
M
P E
R M
IT
B
ID
S E
T
O M
D E
N L
IS
T E
D B
A R
R A
C K
S E
B
O R
E G
O N
M
IL
IT
A
R Y
D E
P A
R T M
E N
T
O
R D
N A
N C
E R
D H
E R
M
IS
T O
N O
R
G002
ML
30 JUNE 2023
2201032
GENERAL
INFORMATION
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
G001 COVER SHEET
G002 GENERAL INFORMATION
G051 CODE COMPLIANCE SITE PLAN AND SUMMARY
G101 CODE COMPLIANCE PLANS
G801 DIMENSIONAL GUIDELINES
G901 SIGNAGE DETAILS
CIVIL
C0.00 COVER SHEET
C0.01 OVERALL SITE PLAN
C1.00 LAYOUT AND PAVING PLAN
C2.00 GRADING PLAN
C3.00 UTILITY PLAN
C4.00 CIVIL DETAILS
C4.01 CIVIL DETAILS
C5.00 FIRE ACCESS PLAN
C6.00 ESC COVER
C6.01 DEMO, CLEARNING, MASS GRADING, ESC PLAN
C6.02 FINAL ESC PLAN
C6.03 ESC DETAILS
LANDSCAPE
LP101 PLANTING PLAN
LP102 PLANTING DETAILS
LI101 IRRIGATION PLAN
LI102 IRRIGATION DETAILS
ARCHITECTURE
A001 SYMBOLS AND ANNOTATION
A002 ASSEMBLY INFORMATION
A051 SITE PLAN
A101 FLOOR PLAN - LEVEL 01
A102 FLOOR PLAN - LEVEL 02
A103 ATTIC DRAFTSTOPPING PLAN AND ROOF PLAN
A201 REFLECTED CEILING PLAN - LEVEL 01
A202 REFLECTED CEILING PLAN - LEVEL 02
A301 BUILDING ELEVATIONS
A401 BUILDING SECTIONS
A451 WALL SECTIONS
A501 VERTICAL CIRCULATION
A502 VERTICAL CIRCULATION DETAILS
A601 INTERIOR COMPOSITES - RESTROOMS
A602 INTERIOR COMPOSITES - LOUNGE AND VENDING
A603 INTERIOR COMPOSITES - BILLETS
A701 EXTERIOR DETAILS - RAINSCREEN
A702 EXTERIOR DETAILS - FENESTRATIONS
A703 EXTERIOR DETAILS - FENESTRATION
A704 EXTERIOR DETAILS - ROOF
A705 EXTERIOR DETAILS - ENTRY SCREEN
A801 INTERIOR DETAILS
A901 DOOR, LOUVER & WINDOW SCHEDULE
A921 ROOM FINISH SCHEDULE AND SCHEDULE OF FINISHES
STRUCTURAL
S001 DRAWING INDEX AND LIST OF ABBREVIATIONS
S002 GENERAL STRUCTURAL NOTES
S003 GENERAL STRUCTURAL NOTES
S004 SPECIAL INSPECTIONS AND TESTING
S005 SPECIAL INSPECTIONS AND TESTING
S101 FOUNDATION PLAN
S101S SLAB DIMENSION PLAN
S102 LEVEL 2 FRAMING PLAN
S103 ROOF FRAMING PLAN
S301 MASONRY WALL ELEVATIONS
S501 CONCRETE DETAILS
S502 MASONRY DETAILS
S503 MASONRY DETAILS
S701 WOOD DETAILS
MECHANICAL
M001 MECHANICAL - LEGEND
M002 MECHANICAL - SCHEDULES AND CALCULATIONS
M201 MECHANICAL - LEVEL 01 - HVAC
M202 MECHANICAL - LEVEL 02 - HVAC
M203 MECHANICAL - ROOF - HVAC
M301 MECHANICAL - LEVEL 01 - HVAC PIPING
M302 MECHANICAL - LEVEL 02 - HVAC PIPING
M401 MECHANICAL - WSHP PIPING SCHEMATIC
M402 CONTROLS SEQUENCE OF OPERATIONS
M501 MECHANICAL - DETAILS
M502 MECHANICAL - DETAILS
PLUMBING
P001 PLUMBING - LEGEND
P002 PLUMBING - SCHEDULES AND CALCULATIONS
P201 PLUMBING - LEVEL 01 - WASTE
P202 PLUMBING - LEVEL 02 - WASTE
P203 PLUMBING - ROOF - WASTE
P301 PLUMBING - LEVEL 01 - WATER
P302 PLUMBNG - LEVEL 02 - WATER
P401 PLUMBING - SOLAR HOT WATER DIAGRAM
P501 PLUMBING - ENLARGED VIEWS
P502 PLUMBING - ENLARGED VIEWS
P601 PLUMBING - DETAILS
ELECTRICAL
E001 ELECTRICAL - LEGEND
E002 ELECTRICAL - LUMINAIRE SCHEDULE
E101 ELECTRICAL - SITE PLAN
E201 ELECTRICAL - LEVEL 01 - LIGHTING
E202 ELECTRICAL - LEVEL 02 - LIGHTING
E301 ELECTRICAL - LEVEL 01 - POWER AND DATA
E302 ELECTRICAL - LEVEL 02 - POWER AND DATA
E401 ELECTRICAL - ONE-LINE DIAGRAM
E501 ELECTRICAL - SCHEDULES
E601 ELECTRICAL - DETAILS
VICINITY MAP
PROJECT
LOCATION
INTERSTATE 84 (I-84)
C E
D A
R S
T R
E E
T
D A
T E
S T R
E E
T
ORDNANCE ROAD
E L M
S T R
E E
T
G ST.
A ST.
DISCLAIMER
THE WRITTEN AGREEMENT, DRAWINGS, SPECIFICATIONS AND ANY ADDENDA COMPRISE
THE CONTRACT FOR THIS PROJECT. THEY SHALL BE TREATED AS ONE ENTITY, EQUALLY,
WITHOUT PRIORITY. ITEMS, ELEMENTS, FIXTURES, SYSTEMS AND EQUIPMENT SHOWN
SHALL BE FURNISHED AND INSTALLED EVEN THOUGH TYPICALLY SHOWN ELSEWHERE.
THEREFORE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO READ AND COMPREHEND
ALL THESE DOCUMENTS IN ORDER TO COMPLETE THE WORK. IF A CONTRACTOR CHOOSES
TO NOT THOROUGHLY REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS, THEY DO SO
AT THEIR OWN RISK AND AGREE TO FURNISH & INSTALL ALL ITEMS NOTED ABOVE AT NO
ADDITIONAL COST OR DELAY TO THE OWNER. (THE ONLY EXCEPTION TO THIS IS THAT THE
SPECIFICATIONS SHALL TAKE PRECEDENCE OVER GENERAL NOTES ON THIS SHEET.)
GENERAL NOTES
A. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING WITH
THE WORK.
B. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS. DO NOT SCALE DRAWINGS. NOTIFY
ARCHITECT OF DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
C. CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS AND METHODS AND
SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF CONSTRUCTION UNTIL FINAL LATERAL
AND VERTICAL CARRYING SYSTEMS ARE COMPLETED.
D. DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF CONCRETE, FACE OF MASONRY,
GRID/COLUMN LINE, CENTER OF ELEMENT, COUNTERTOP EDGE, OR AS NOTED.
E. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF
SUBCONTRACTORS WORK, COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS,
ACCURATE LOCATION OF STRUCTURAL MEMBERS, OPENINGS FOR MECHANICAL,
ELECTRICAL, AND MISCELLANEOUS EQUIPMENT. CONTRACTOR SHALL VERIFY
DIMENSIONS AND OPENING SIZES (CLEARANCES REQUIRED) FROM THE MANUFACTURERS
PRIOR TO CONSTRUCTION OF OR INSTALLATION OF EQUIPMENT, FURNISHINGS, AND
ACCESSORIES.
F. DETAILS NOTED AS "TYPICAL" OR "TYP" APPLY IN ALL CASES UNLESS SPECIFICALLY
REFERENCED. DETAILS THAT ARE SPECIFICALLY REFERENCED SHALL TAKE PRECEDENCE
OVER DETAILS NOTED AS "TYPICAL" OR "TYP". SPECIFIC NOTES AND DETAILS SHALL TAKE
PRECEDENCE OVER GENERAL NOTES AND DETAILS.
G. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE
PROJECT IS IN PROGRESS UNTIL PROJECT COMPLETION.
H. LOCATE EXISTING UTILITIES WHETHER INDICATED OR NOT AND PROTECT FROM DAMAGE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS ASSOCIATED WITH REPAIR OR
REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN
CONJUNCTION WITH THE EXECUTION OF THE WORK.
I. PROVIDE ACCESS PANELS AS REQUIRED. LOCATION, FINISH, AND TYPE SHALL BE
APPROVED BY ARCHITECT PRIOR TO OBTAINING AND INSTALLING. ACCESS PANEL
LOCATIONS NOT APPROVED BY ARCHITECT WILL BE SUBJECT TO MODIFICATION AT NO
ADDITIONAL COST. PROVIDE RATED ACCESS PANELS WITH THE SAME RATING AS THE
ASSEMBLY IN WHICH THEY ARE INSTALLED. ACCESS PANELS IN SHAFT WALLS, RATED
FLOOR/CEILINGS OR RATED ROOF/CEILINGS SHALL BE SMOKE SEALED.
J. PROVIDE TEMPORARY PEDESTRIAN PROTECTION, AS REQUIRED BY ACCEPTED
STANDARDS OF THE AUTHORITY HAVING JURISDICTION.
K. PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE FIRESTOPPED PER
SPECIFICATION SECTION 07 84 00 - FIRESTOPPING AND THE ACCEPTED REQUIREMENTS
OF THE AUTHORITY HAVING JURISDICTION. RATED ASSEMBLIES SHALL BE CONSTRUCTED
TO PREVENT THE MOVEMENT OF HOT FLAME OR GASES PER LOCAL CODES.
L. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED
ACCESS TO ANY WATER OR POWER FACILITIES (POWER POLES, PULL-BOXES,
TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.) OR TO THE
LOCATION OF HOOK-UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY
POWER LINES - WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE
TO COMPLY MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSES.
M. MECHANICAL EXHAUST OF BATHROOMS AND LAUNDRY FACILITIES IS REQUIRED. AIR
CHANGES AND DISTANCE OF DISCHARGE FROM OPERABLE OPENINGS SHALL BE
COMPLIANT WITH LOCAL CODES.
N. AN APPROVED GAS SHUT-OFF VALVE SHALL BE INSTALLED ON THE FUEL GAS LINE ON
THE DOWNSTREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE
EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING.
O. OBTAIN FINAL SIGN-OFF FROM PLUMBING INSPECTOR PRIOR TO ENCLOSING FIRE
SPRINKERS IN WALLS OR CEILINGS.
P. SEE STRUCTURAL DRAWINGS FOR SPECIAL INSPECTIONS ASSOCIATED WITH
STRUCTURAL WORK.
Q. ANTI-GRAFFITI COATINGS ARE REQUIRED AT THE GROUND LEVEL WHERE CONCRETE OR
MASONRY FINISHES ARE USED. REFERENCE SPECIFICATION SECTION 07 19 00.
R. MOUNT ALL OVERHEAD MOUNTED ARCHITECTURAL AND UTILITIES WEIGHING 31-LBS OR
MORE (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS SUSPENDED CEILINGS AND PIPING
NETWORKS THAT COLLECTIVELY EXCEED THAT WEIGHT) USING EITHER RIGID OR
FLEXIBLE SYSTEMS. MOUNT ALL SYSTEMS TO RESIST FORCES OF 0.5 TIMES THE
EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE EQUIPMENT
WEIGHTS IN THE DOWNWARD DIRECTION. THESE REQUIREMENTS TO NOT PRECLUDE
THE NEED TO DESIGN ARCHITECTURAL FEATURE AND EQUIPMENT MOUNTINGS FOR
FORCES REQUIRED BY OTHER CRITERIA SUCH AS SEISMIC STANDARDS.
PROJECT DIRECTORY
OREGON MILITARY DEPARTMENT
1776 MILITIA WAY SE
SALEM, OR 97309
TEL: (503) 584-3504
ATTN: MELISSA WEBBER, PROJECT MANAGER
melissa.s.webber.nfg@mail.mil
SERA ARCHITECTS
600 SW 10TH AVENUE #500
PORTLAND, OR 97205
TEL: (503) 445-7372
FAX: (503) 445-7395
ATTN: CASSANDRA TYLER
cassandrat@seradesign.com
HUMBER DESIGN GROUP, INC.
117 SE TAYLOR ST, Suite 001
PORTLAND, OR 97214
TEL: (503) 946-6632
ATTN: ALLEN SCHMITZ, PROJECT ENGINEER
allen.schmitz@hdgpdx.com
SERA ARCHITECTS
600 SW 10TH AVENUE #500
PORTLAND, OR 97205
TEL: (503) 445-7372
FAX: (503) 445-7395
ATTN: DAN JENKINS, ASLA, LEED
danj@seradesign.com
KPFF CONSULTING ENGINEERS
111 SW 5TH, SUITE 2500
PORTLAND, OR 97204
TEL: (503) 227-3251
FAX: (503) 227-7980
ATTN: JOSH RICHARDS, PE, SE
josh.richards@kpff.com
KPFF CONSULTING ENGINEERS
45 FREMONT ST, 28th FLOOR
SAN FRANCISCO, CA 94105
TEL: (415) 268-1042
ATTN: SHARON GALLANT, SE
sharon.gallant@kpff.com
OWNER
DEVELOPER:
ARCHITECT OF
RECORD:
CIVIL ENGINEER:
LANDSCAPE
ARCHITECT:
STRUCTURAL
ENGINEER:
ATFP
CONSULTING
ENGINEER:
COLEBREIT ENGINEERING
2021 NW GRANT AVENUE
CORVALLIS, OR 97330
TEL: (541) 728-3293
ATTN: ADAM BOYD, PE
adamboyd@colebreit.com
COLEBREIT ENGINEERING
2021 NW GRANT AVENUE
CORVALLIS, OR 97330
TEL: (541) 728-3293
ATTN: ADAM BOYD, PE
adamboyd@colebreit.com
COLEBREIT ENGINEERING
2021 NW GRANT AVENUE
CORVALLIS, OR 97330
TEL: (541) 728-3293
ATTN: BRUCE JESSUP, PE
bruce.jessup@colebreit.com
PROFESSIONAL ROOF CONSULTANTS INC.
1108 SE GRAND AVENUE, Suite 300
PORTLAND, OR 97214
TEL: (503) 280-8759
ATTN: THOMAS BERTRAND
thomas.bertrand@professionalroofconsultants.com
DCW COST MANAGEMENT
815 1ST AVENUE, #176
SEATTLE, WA 98104
TEL: (206) 259-2990
ATTN: TRISH DREW
trish@dcwcost.com
BANTAM ENGINEERING
7032 NE SISKIYOU ST
PORTLAND, OR 97213
TEL: (503) 888-3864
ATTN: CHRISTINE McKINLEY, PE cmckinley@bantameng.com
ENERGY
MODELER:
MECHANICAL/
PLUMBING
ENGINEER:
ELECTRICAL
ENGINEER:
BUILDING
ENVELOPE
CONSULTANTS:
COST
ESTIMATORS:
COMMISSIONING
ENGINEER:
REFERENCE SECTION 01 35 73 - DELEGATED DESIGN PROCEDURES FOR ADDITIONAL INFORMATION SEE PROJECT DRAWINGS AND SPECIFICATIONS FOR BALANCE OF DELEGATED DESIGN COMPONENTS AND SYSTEMS
DELEGATED DESIGN AND DEFERRED SUBMITTALS
Section Section Name Delegated
Design
Deferred
Submittal
Items for AHJ
Review
03 00 00 CAST-IN-PLACE CONCRETE YES NO N/A
05 50 00 METAL FABRICATIONS YES YES
05 51 00 METAL STAIRS YES YES
08 80 00 GLAZING YES YES
21 00 00 FIRE SUPPRESSION YES SEPARATE PERMIT BY DESIGN-
BUILD CONTRACTOR
28 00 00 ELECTRONIC SAFETY AND
SECURITY
YES
DESIGN-BUILD CONTRACTOR TO DESIGN "FULLY CODE COMPLIANT SYSTEM" CONCURRENTLY WITH ARCHITECT'S DOCUMENTS. SEISMIC RESTRAINT AND BRACING AND SECUREMENT OF ALL ASSOCIATED EQUIPMENT SHALL BE PROVIDED WHERE THE MOVEMENT AND OVERTURNING DUE TO SEISMIC DISPLACEMENT OF SUCH ITEMS COULD CREATE A LIFE SAFETY HAZARD EITHER BY DIRECT INJURY OR INDIRECTLY BY BLOCKING SAFE EGRESS FROM THE BUILDING.
SEPARATE FIRE PROTECTION REQUIREMENTS
GENERAL CONTRACTOR SHALL OBTAIN FIRE PROTECTION PERMITS FROM THE FIRE MARSHALL'S OFFICE FOR THE FOLLOWING ITEMS:
FIRE SPRINKLERS (PERMIT)
FIRE ALARM SYSTEMS (PERMIT)
UNDERGROUND FIRE LINES (PERMIT)
KNOX BOX
07 46 46 FIBER CEMENT SIDING YES
09 21 16 GYPSUM BOARD ASSEMBLIES YES YES SUSPENDED CEILINGS, SEISMIC BRACING
REQUIREMENTS AND JOISTED SOFFITS
09 51 00 ACOUSTICAL CEILINGS YES YES
03 45 00 PRECAST ARCHITECTURAL CONCRETE YES YES SUPPORT AND ATTACHMENT TO STRUCTURE
06 17 33 PREFABRICATED PLYWOOD I-JOISTS YES
06 17 53 SHOP FABRICATED WOOD TRUSSES YESYES
Separate
Permit
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
YES
YES
SHOP DRAWINGS AND CALCULATIONS
SHOP DRAWINGS AND CALCULATIONS
NO N/A
SHOP DRAWINGS AND CALCULATIONS
07 41 13 YES YES ATTACHMENT TO STRUCTURE;
SOLAR HOT WATER PANELS
NO
SHOP DRAWINGS AND CALCULATIONS
SUSPENDED CEILINGS AND SEISMIC
BRACING REQUIREMENTS
NO
NO SEPARATE PERMIT BY DESIGN-
BUILD CONTRACTOR
METAL ROOF PANELS
ATTACHMENT TO STRUCTURE
07 62 00 SHEET METAL FLASHING AND TRIM YES NO NO N/A
07 84 00 FIRESTOPPING YES NO SEE FIRESTOPPING TABLE ON CODE
SUMMARY SHEET
NO
10 14 00 SIGNAGE YES NO CODE REQUIRED SIGNAGE
11 24 25 FALL PROTECTION EQUIPMENT YES YES OSHA COMPLIANCENO
32 84 23 IRRIGATION SYSTEM -
UNDERGROUND SPRINKLERS
YES NO NO DESIGN BUILD SHOP DRAWINGS
NO
NO
05 41 00 LIGHT GAUGE METAL STUD FRAMING YES YES NO SUPPORT OF SUSPENDED GYPSUM CEILINGS
ALTERNATES
EB5
1. NORTH GRAVEL PARKING LOT + SITE LIGHTING
2. NOT USED
3. 24-PAIR FIBER PULL FROM BLDG 57 TO EB5
ADD 1 14 JUL 2023
ADD 2 8 SEPT 2023
ADD 1
ADD 2
1X 1X1X
X XX
SB SBSB
2X 2X2X
STOP
S T O P
S T O P
S T O P
LEGEND - CODE COMPLIANCE SYMBOLS
PROPERTY LINE
1/2 HOUR FIRE PARTITION
1 HOUR FIRE PARTITION
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE RESISTANCE RATED CONSTRUCTION
1 HOUR SMOKE BARRIER
2 HOUR FLOOR / CEILING ASSEMBLY
EXTERIOR EGRESS PATH TO ROW WITH TRAVEL WIDTH
REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR
EXITING - REFER TO ELECTRICAL DRAWINGS).
EGRESS PATH OF TRAVEL WITH TRAVEL WIDTH
REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR
EXITING - REFER TO ELECTRICAL DRAWINGS).
ACCESSIBLE ROUTE OF TRAVEL
COMMON PATH OF EGRESS TRAVEL
EXIT ACCESS DISTANCE
RATED SHAFT (WALL CONSTRUCTION TO MEET FIRE
BARRIER REQUIREMENTS)
44"
E.A. X'-XX" - (PER 1016.2)
C.P. X'-XX" - (PER 1014.3)
44"
# HR
OCCUPANT LOAD AT OPENING
CUMULATIVE OCCUPANT LOAD AT OPENING
BUILDING EXIT
BUILDING CODE APPEAL
AREA REQUIRING CARBON MONOXIDE DETECTION
AREA REQUIRING SMOKE DETECTION
SPRINKLER, SEE FIRE PROTECTION DRAWINGS
AREA NAME
MANUAL PULL STATION REQUIRED
LIGHTED EXIT SIGN - SHADING INDICATES LIGHTED FACE(S)
DIRECTION ARROW CORRESPONDS TO DIRECTION ARROW ON SIGN
LIGHTED EXIT SIGN - CEILING MOUNTED
LIGHTED EXIT SIGN - WALL MOUNTED
FIRE EXTINGUISHER (AND CABINET WHERE OCCURS)
AREA
FE
CO
EB5
2-STORY
E L
M S
T R
E E
T
S T
R E
E T
N A
M E
T B
D
F
IR
S T
R E
E T
'G' STREET
FUTURE
PARKING
FUTURE
PARKING
FUTURE
DFAC
(400)
NEW BLOCK CENTERED ON BUILDING 5049 (SIM BUILDING)
SHARED SERVICE ACCESS ROAD
TO EB5 MECH YARD & DFAC
FUTURE
OFFICER'S QUARTERS
FUTURE
OFFICER'S QUARTERS
FUTURE
OFFICER'S QUARTERS
241'-1 35/128"
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/6 /2
:3
:4
A M
P E
R M
IT
B
ID
S E
T
O M
D E
N L
IS
T
E D
B A
R R
A C
K S
E B
O
R E
G O
N M
IL
IT
A R
Y D
E P
A R
T M
E N
T
O R
D N
A N
C E
R D
H E
R M
IS
T
O N
O
R
G051
ML
30 JUNE 2023
2201032
CODE
COMPLIANCE
SITE PLAN AND
SUMMARY
BUILDING NARRATIVE
THIS NEW BARRACKS FACILITY EB5 WILL PROVIDE HOUSING FOR 160 NATIONAL GUARD ENLISTED TRAINEES FOR THE TRANSIENT TRAINING PROGRAMS AT THE RAYMOND F. REES TRAINING CENTER. THE 2-STORY BUILDING WILL BE BUILT OF AUSTERE DURABLE FINISHES INCLUDING CMU WALLS WITH A BRICK VENEER FACADE, AND A STANDING SEAM METAL ROOF. THE (8) OPEN BAY BARRACKS WHICH MAKE UP THE WINGS OF THE BUILDING WILL HOUSE 20 BILLETS EACH, AND THE 2ND LEVEL WILL ALSO INCLUDE HOUSING FOR (4) SENIOR LEADER'S QUARTERS IN THE FORM OF TWO PRIVATE ROOMS. THE CENTRAL CORE OF THE BUILDING WILL HOUSE SHARED RESTROOM AND SHOWER FACILITIES, AND A LOUNGE WILL BE LOCATED AT THE SOUTH SIDE FACING THE FUTURE DINING FACILITY WHICH THE BARRACKS WILL SHARE A SERVICE ROAD WITH. THE PROJECT IS TARGETED FOR LEED 4.0 SILVER AND WILL IMPLEMENT ROOFTOP SOLAR HOT WATER PANELS FOR HOT WATER HEATING, AND WILL INCLUDE WATER SAVING INTERIOR AND EXTERIOR MEASURES INCLUDING LOW-WATER LANDSCAPE COMPOSED OF TREES, GRAVEL, DROUGHT TOLERANT GROUNDCOVER, AND DRY CREEK BIOSWALES FOR ONSITE STORMWATER.
APPLICABLE BUILDING REGULATIONS
2022 OREGON STRUCTURAL SPECIALTY CODE (OSSC) BASED ON THE 2021 INTERNATIONAL BUILDING
CODE WITH OREGON AMENDMENTS
2021 INTERNATIONAL FIRE CODE (IFC) WITH OREGON AMENDMENTS
2021 OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC) BASED ON ASHRAE STANDARD 90.1-2019
2021 OREGON ELECTRICAL SPECIALTY CODE (OESC) BASED ON 2020 NFPA 70 NATIONAL ELECTRICAL CODE
2022 OREGON MECHANICAL SPECIALTY CODE (OMSC) BASED ON 2021 INTERNATIONAL MECHANICAL CODE
AND INTERNATIONAL FUEL GAS CODE
2021 OREGON PLUMBING SPECIALTY CODE (OPSC) BASED ON 2021 UNIFORM PLUMBING CODE
UNIFIED FACILITIES CRITERIA, DEPARTMENT OF DEFENSE
1-200-01_2019 DoD BUILDING CODE
1-200-02_2020 HIGH PERFORMANCE BULIDING STANDARD
3-201-02_2021 LANDSCAPE ARCHITECTURE
3-210-10_2021 LOW IMPACT DEVELOPMENT
3-410-01_2020 HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
3-420-01_2019 PLUMBING
4-010-01_2022 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
4-010-06_2017 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
4-021-01_2010 MASS NOTIFICATION SYSTEMS
OPERATIONAL READINESS TRAINING COMPLEX ARMY DESIGN STANDARD, SEPT 2020
ALLOWABLE AREA
ALLOWABLE AREA PER STORY (TABLE 506.2)
*R-1 AND V-B = 7,000 SF PER STORY (MOST RESTRICTIVE)
A-3 AND V-B = 18,000 SF PER STORY
S-1 AND V-B = 27,000 SF PER STORY
MIXED OCCUPANCY, MULTI-STORY BLDGS (TABLE 506.2.4): Aa = [At + (NS X If)]
CHAPTER 5
FRONTAGE INCREASE FACTORS
NORTH EAST SOUTH WEST
30' 30' 30' 30'FRONTAGE (506.2)
AREA INCREASE: FRONTAGE (SECTION 506.3.3, EQUATION 5-5)
TOTAL FRONTAGE (F) = 230' + 93' + 230' + 93' = 646' (SEE SECTION 506.3)
PERIMETER (P) = 230' + 93' + 230' + 93' = 646'
OPEN SPACE WIDTH (W) = 30' (SEE SECTION 506.3.2)
FRONTAGE INCREASE FACTOR: I =
PROPOSED BUILDING AREAS (SF)
LEVEL 01
LEVEL 02
TOTAL
OCC R-1OCC A-3
1,953 SF
1,953 SF
8,611 SF
9,190 SF
17,801 SF
1,028 SF
593 SF
1,621 SF
BUILDING IS PROVIDED WITH NFPA 13R SPRINKLER SYSTEM (S13R) PER 903 3.1.2
I f = F
P
- 0.25
W
= - 0.25
A a =
ALLOWABLE AREA PER STORY
A = ALLOWABLE AREA PER STORY
A = TABULAR AREA PER STORY, R-1, V-B, S13R (TBL 506.2) =
I = AREA INCREASE FACTOR DUE TO FRONTAGE (SEE ABOVE) =
NS = NON-SPRINKLERED, R-1, V-B =
f t a
A t + x
I f f
= + xNS 12,250 SF
< 12,250 SF ALLOWABLE
ACC S-1 TOTAL
11,592 SF
9,783 SF
21,375 SF
508 PATH
SEPARATED
ACCESSORY
NOTE 1: LEVEL 1 OCC A-3 EXCEEDS 10% AREA OF LEVEL 1 AND IS SEPARATED BY A 2-HR FIRE BARRIER.
NOTE 2: LEVEL 2 SINCE S-1 IS LESS THAN 10% FLOOR AREA, IT IS ACCESSORY TO R-1, THEREFORE THE
STORY IS EVALUATED SOLELY AS GROUP R-1
NOTE 3: LEVEL 2 OCC R-1 GOVERNS
ACTUAL AREA OCC A-3
ALLOWABLE AREA OCC A-3
ACTUAL AREA OCC R-1
ALLOWABLE AREA OCC R-1
ACTUAL AREA OCC S-1
ALLOWABLE AREA OCC S-1
18,000
8,611
12,250
1,028
27,000
0.109 + 0.703 + 0.038 = 0.850 < 1
OK
REFER TO CALC ABOVE
0.75
75%
0.75
0.75
7000 SF 7000 SF
7000 SF
7000 SF
BUILDING CONSTRUCTION
CONSTRUCTION TYPE: V-B OCCUPANCY: R-1 SPRINKLERS: S13R
CHAPTER 5, 6 & 7
BUILDING HEIGHT (PER TABLE 504.3) 60'-0" 34'-8"
ALLOWABLE PROPOSED
NUMBER OF STORIES (PER TABLE 504.4) 3 STORIES 2 STORIES
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (TABLE 601)
BUILDING ELEMENT VB
REQUIRED PROPOSED
STRUCTURAL FRAME
BEARING WALLS - EXTERIOR
INTERIOR
a. NOT LESS THAN THE FIRE RESISTANCE REQUIRED BY FIRE SEPARATION DISTANCE PER TABLE 602
b. NOT LESS THAN THE FIRE RESISTANCE REQUIRED BY SECTION 704.10
NONBEARING WALLS AND PARTITIONS - INTERIOR
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
VB
a,b b
BUILDING OCCUPANCY AND SEPARATIONS
APPLICABLE OCCUPANCY CLASSIFICATION GROUPS: A-3, R-1
ACCESSORY OCCUPANCIES: B, S-1 (508.2.4)
OCCUPANCY SEPARATION REQUIRED (508.4)
OCCUPANCY
CORRIDOR
UNIT TO UNIT
UNIT TO OTHER
OCCUPANCY SEPARATION (FIRE RATING)
1/2 HOUR FIRE PARTITION (1020.1)
1 HOUR FIRE PARTITION (420 & 708)
CHAPTER 3 & 5
OPENING PROTECTIVES TABLE 716.1(2)
R-1 TO A-3 2 HOUR FIRE BARRIER (508.4 & 707) 90 MIN
45 MIN
20 MIN
FIRE PROTECTION
FIRE EXTINGUISHERS: CLASS A/B/C/D
CHAPTER 9
AUTOMATIC SPINKLER SYSTEM
FIRE ALARM SYSTEM*
SMOKE DETECTION SYSTEM*
REQUIRED PROPOSED TYPE/CLASS
YES PER 420.4, 903.3.1.2 YES NFPA 13R
YES PER 907.2.8 YES NFPA 72
YES PER 907.2.10.1 YES NFPA 72
*PROVIDE FIRE PROTECTION PER IFC 907.
CARBON MONOXIDE ALARMS YESYES PER 915.1.2 GROUP R
CARBON MONOXIDE ALARMS: PROVIDE A CARBON MONOXIDE DETECTOR IN EACH SLEEPING ROOM, AS WELL AS THE LOUNGE COMMON AREA PER OSSC 915.1.2. A COMBINATION FIRE, SMOKE, CARBON
MONOXIDE ALARM IS PERMITTED IN A HARDWIRED DETECTION SYSTEM.
ENERGY CONSERVATION 2021 OEESC
REQUIRED PROPOSED
SYSTEM DESIGN FOR THIS PROJECT IS GOVERNED BY LEED REQUIREMENTS. REFERENCE SECTION 01 35 15
- LEED REQUIREMENTS FOR ADDITIONAL INFORMATION.
BUILDING COMPONENTS
BUILDING ENVELOPE REQUIREMENTS - CLIMATE ZONE 5B - ASHRAE 90.1-2019, 5.5 (TABLE 5.5-5)
R-30 ci
R-13.3 ci R-13.3 ci
R-30 ciROOFS - INSULATION ENTIRELY ABOVE DECK
ABOVE-GRADE WALL - MASS
SLAB-ON-GRADE FLOORS - UNHEATED R-20 FOR 24" R-20 FOR 24"
FENESTRATION (FIXED): U-VALUE 0.36
U = 0.370
0.26
U = 0.370OPAQUE DOORS - SWINGING
FLOORS - WOOD-FRAMED AND OTHER R-30 R-30
R-10 ci N/ABELOW-GRADE WALL - MASS
FENESTRATION (OPERABLE): U-VALUE
FENESTRATION (FIXED): SHADING CO-EFFICIENT (SHGC)
FENESTRATION (OPERABLE): SHGC
0.38 0.22
0.45
0.33
0.27
0.22
GENERAL INFORMATION
PERMIT APPLICANT: SERA ARCHITECTS, INC. 503.445.7372
ON BEHALF OF OREGON MILITARY DEPARTMENT
LEGAL DESCRIPTION: UMATILLA ORDNANCE DEPOT (TAX EXEMPT)
A PARCEL OF LAND SITUATED IN TOWNSHIP 4 NORTH, RANGE 27 WEST,
SECTION 15, OF THE UMATILLA COUNTY DEPOT PLAN DISTRICT, HERMISTON
OREGON, CONTAINING 19,728 ACRES WITH 7,500 ACRES ZONED FOR MILITARY
USE
ZONING: UDM (UMATILLA ARMY DEPOT MILITARY ZONE)
SEISMIC ZONE: DESIGN CATEGORY C
PROJECT ADDRESS: 78798 ORDNANCE ROAD / HERMISTON, OR 97838
INTERIOR ENVIRONMENT
OCCUPIED ROOMS: NATURAL VENTILATION PROVIDED PER 1202.5.
TOILET & BATH ROOMS: MECHANICAL VENTILATION PROVIDED PER 1202.5.2.1
NATURAL LIGHT: NET GLAZED AREA IS GREATER THAN 8% OF FLOOR AREA OF ROOM SERVED PER 1204.2
CHAPTER 12
MEANS OF EGRESS
EGRESS WIDTH PER OCCUPANT SERVED (SECTION 1005.3):
STAIRWAYS: (0.3"/OCC) = REFER TO BUILDING EXITING TABLE ON THIS SHEET
OTHER EGRESS COMPONENTS: (0.2"/OCC) = REFER TO BUILDING EXITING TABLE ON THIS SHEET
44" MINIMUM STAIRWAY WIDTH REQUIRED PER 1009.4
CHAPTER 10
NUMBER OF EXITS (1006):
TWO EXITS REQUIRED PER TABLE 1006.2.1
ILLUMINATED EXIT SIGNS: REQUIRED PER 1011.1
EXIT ACCESS (1006):
COMMON PATH OF EGRESS TRAVEL PER 1006.2.1: R-1 OR A OCCUPANCY: 75'-0"
EXIT ACCESS TRAVEL DISTANCE (1017):
OCC A,R,S-1 = 250'-0" IN A BUILDING PROVIDED WITH A SPRINKLER MEETING 903.3.1.2
EXIT ACCESS ILLUMINATION REQUIREMENT:
EGRESS LIGHTING REQUIRED ALONG THE EGRESS PATH TO THE R.O.W. PER SECTION 1008.
PERFORMANCE REQUIREMENTS:
AVERAGE OF 1fc WITH A MINIMUM OF 0.1fc AT ANY POINT ON THE EGRESS PATH AT FLOOR LEVEL LIGHT LEVEL MAY DECLINE TO AVERAGE OF 0.6fc WITH A MINUMN OF 0.06fc AT ANY POINT ON THE EGRESS
PATH AT FLOOR LEVEL AFTER 90 MINUTES OF OPERATION ON EMERGENCY POWER.
MAXIMUM TO MINIMUM ILLUMINATION UNIFORMITY RATIO OF 40 TO 1 SHALL NOT BE EXCEEDED.
POWER PROVIDED BY BATTERY INVERTERS (EMERGENCY GENERATOR) (REFERECE ELECTRICAL
DOCUMENTS)
MINIMUM PLUMBING FIXTURE REQUIREMENTS
CHAPTER 29 AND PLUMBING CODE
USE
LAVATORIES DRINKING
FOUNTAINS
1 PER
FLOOR
SHOWERS
F
0.13
0.10
2.9
0.15
M
0.52
0.10
11.9
0.15
A-3
B
R-1
(DORM)
S-1
WATER CLOSET
F
0.38
0.16
2.9
0.15
M
4.16
0.16
11.9
0.15
LOAD
104/25
119/29
RATIO RATIO
OCCUPANCY
1 PER
1 PER
1 PER
1 PER
1 PER
1 PER
1 PER
1 PER
RATIO
1 PER
1 PER
1 PER
1 PER
SUBTOTAL
REQUIRED
PROVIDED
16.37
3.59
4 2
F
M
RATIO
1 PER
3.614.9
3.2812.67
13 4
3.614.9
14 W.C.'S +
14 URINALS*
= 23.33 WC'S
4 W.C.'S 21 3 321
NOTE: THE GENDER SPLIT IS BASED ON THE DESIGN CRITERIA OF ONE OPEN BAY DEDICATED TO FEMALES DUE TO THE UNEVEN DIVISION OF GENDER IN THE NATIONAL GUARD. NON-DORMITORY AREAS HAVE BEEN
GENDER SPLIT AT 80/20.
ROOFING REQUIREMENTS
BASIC WIND SPEED: 102 MPH
WIND EXPOSURE: C (PER 1609.4.3)
FIRE CLASSIFICATION: C (PER 1505.1)
METAL ROOF PANELS: 1507.4
ROOFTOP MOUNTED SOLAR PANELS 1505.9
CHAPTER 15
CLADDING REQUIREMENTS
BASIC WIND SPEED: 102 MPH
WIND EXPOSURE: C (PER 1609.4.3)
FIRE CLASSIFICATION: PER TABLE 602
ANCHORED MASONRY VENEER: 1404.6
CHAPTER 14 & 16
SHAFTS
SHAFT CONSTRUCTION: 1-HR REQUIRED PER 713.4
CHAPTER 7
SOUND TRANSMISSION CHAPTER 12
FLOOR/CEILING ASSEMBLIES SEPARATING SLEEPING
UNITS FROM EACH OTHER AND FROM ADJACENT
PUBLIC AREAS
IIC 50 (45 FIELD) IIC 50 MIN
REQUIRED PROPOSED
INTERIOR WALL ASSEMBLIES SEPARATING
SLEEPING UNITS FROM EACH OTHER AND FROM
ADJACENT PUBLIC AREAS.
NOTES:
REFERENCE ASSEMBLIES FOR SPECIFIC ASSEMBLY SOUND TRANSMISSION INFORMATION.
STC 50 (45 FIELD) STC 50 MIN
BUILDING ELEMENT
DISABLED ACCESS REQUIREMENTS
THIS BUILDING TYPE IS CONSIDERED AN ABLE-BODIED TRAINING FACILITY AND IS NOT REQUIRED TO BE
ACCESSIBLE PER ORTC 3.1.3 (B).
UFC, ORTC
GENERAL NOTES - CODE SUMMARY
A. CODE SUMMARY KEYED NOTES APPLY TO G100 SERIES SHEETS. ALL KEYED NOTES MAY
NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS EXCEPT THOSE
NOTED.
B. ALL WORK SHOWN ON THIS SHEET IS INCLUDED IN THE CONTRACT FOR CONSTRUCTION,
WHETHER SHOWN ELSEWHERE OR NOT. CONTRACTOR SHALL MAKE ALLOWANCES FOR
CONNECTION, HOOK UP, ETC. AS REQUIRED SO THAT ITEMS, EQUIPMENT, ETC. ARE FIT
FOR INTENDED PURPOSE.
C. SEE ELECTRICAL AND MECHANICAL PLANS FOR ADDITIONAL SYMBOLS
D. PROVIDE LISTED FIRESTOP, CONTINUOUS AT PERIMETER GAPS OF ALL RATED
CONSTRUCTION AS REQUIRED TO MAINTAIN THE SPECIFIED RATING.
E. SQUARE FOOTAGE AREA CALCULATIONS ARE BASED ON THE BUILDING CODE
DEFINITIONS OF GROSS AND NET AREAS AS USED TO DETERMINE OCCUPANT LOADS
ONLY AND ARE NOT A REPRESENTATION OF LEASABLE AREA.
F. AT FIRE WALLS, BARRIERS, AND PARTITIONS ACCESSIBLE IN A CONCEALED FLOOR,
FLOOR/CEILING OR ATTIC SPACE - PROVIDE PERMANENT IDENTIFICATION WITH SIGNS OR
STENCILING, NOT LESS THAN 3" HIGH WITH A MINIMUM 3/8" STROKE IN CONTRASTING
COLOR TO SAY "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS." SIGNS SHALL
BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND AT INTERVALS NOT
EXCEEDING 30 FEET PER OSSC 703.7.
1" = 40'-0"
CODE COMPLIANCE SITE PLAN
ADD 1 14 JUL 2023
ADD 2 8 SEPT 2023
DRAFTSTOPPING
DRAFTSTOPPING IN ATTICS ARE REQUIRED PER 718.4 & 708.4.2. ALIGN DRAFTSTOPPING WITH ALL R-1 SEPARATION FIRE PARTITIONS AT 2ND FLOOR, WHERE ATTIC IS NOT SPRINKLERED. REFER TO A103 FOR
ATTIC DRAFTSTOPPING PLAN WITH ADDITIONAL INFO.
CHAPTER 7ADD 1
ADD 1
ADD 2
ADD 2
ADD 2
X
X
X
X
X
X
X
X
X
X
X
X
2X2X 2X2X2X
X
2X2X
X
2X2X 2X2X2X
1X 1X1X
X XX
SB SBSB
2X 2X2X
X
X
X
X
X
X
X
X
X
X
X
X
2X2X 2X2X2X2X2X2X2X2X2X2X
OCC:
OLF:
OT:
AREA:
1575 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
1574 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS) OCC:
OLF:
OT:
AREA:
210 SF
R-1
STAIR
OCC:
OLF:
OT:
AREA:
39 SF
S-1
MECH
OCC:
OLF:
OT:
AREA:
217 SF
S-1
STORAGE
OCC:
OLF:
OT:
AREA:
190 SF
R-1
ADMIN OFFICE
OCC:
OLF:
OT:
AREA:
85 SF
S-1
SPRINKLER
OCC:
OLF:
OT:
AREA:
77 SF
S-1
ITOCC:
OLF:
OT:
AREA:
220 SF
S-1
ELECTRICAL
OCC:
OLF:
OT:
AREA:
42 SF
S-1
MECH
OCC:
OLF:
OT:
AREA:
296 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
235 SF
S-1
MECHANICAL
OCC:
OLF:
OT:
AREA:
40 SF
S-1
MECH
OCC:
OLF:
OT:
AREA:
73 SF
S-1
JANITOR
OCC:
OLF:
OT:
AREA:
299 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
1953 SF
A-3
LOUNGE
OCC:
OLF:
OT:
AREA:
1574 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
1576 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
129 SF
R-1
VENDING/DF
OCC:
OLF:
OT:
AREA:
805 SF
R-1
CIRCULATION
OCC:
OLF:
OT:
AREA:
210 SF
R-1
STAIR
F E
F E
STAIR OCCUPANT LOAD:
REQUIRED WIDTH:
PROVIDED WIDTH:
PROVIDED STAIR CAPACITY:
REQUIRED DOOR WIDTH:
PROVIDED DOOR WIDTH:
PROVIDED DOOR CAPACITY
STAIR 2
46 * 0.15 = 7" 36"
46 * 0.3 = 14" 48"
PROVIDED CLEAR DOOR WIDTH:
PROVIDED DOOR CAPACITY: 360
72"
DOOR 3
PROVIDED CLEAR DOOR WIDTH:
PROVIDED DOOR CAPACITY: 180
36"
DOOR 1
PROVIDED CLEAR DOOR WIDTH:
PROVIDED DOOR CAPACITY: 360
72"
DOOR 4
F E
F E
STAIR OCCUPANT LOAD:
REQUIRED WIDTH:
PROVIDED WIDTH:
PROVIDED STAIR CAPACITY:
REQUIRED DOOR WIDTH:
PROVIDED DOOR WIDTH:
PROVIDED DOOR CAPACITY
STAIR 1
46 * 0.15 = 7" 36"
46 * 0.3 = 14" 48"
PROVIDED CLEAR DOOR WIDTH:
PROVIDED DOOR CAPACITY: 180
36"
DOOR 2
STAIR OCCUPANT LOAD:
REQUIRED WIDTH:
PROVIDED WIDTH:
PROVIDED STAIR CAPACITY:
REQUIRED DOOR WIDTH:
PROVIDED DOOR WIDTH:
PROVIDED DOOR CAPACITY
STAIR 3
100 * 0.15 = 15" 36"
100 * 0.3 = 30" 48"
OCC:
OLF:
OT:
AREA:
296 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
299 SF
R-1
RESTROOM
E.A. 91'-4" - (PER 1016.2)
C.P. 53'-11" - (PER 1030.8)
CO
CO
CO
PROVIDE CONDUIT
INFRASTRUCTURE
FOR FUTURE DAS
2 1 11
1 1
CO
CO
COCO
CO
MASS NOTIFICATION
INITIATING DEVICE
FE
FE
20 20
2 HOUR LID PER
ASSEMBLY FC6/A002 -
REFER TO 3/A401 & 7/A704
1/3 DIAGONAL = 71'-4" < 211'-0 1/2"
213'-6" (OSSC 1007.1.1)
211'-0 1/2"
E.A. 91'-4" - (PER 1016.2)
C.P. 53'-11" - (PER 1030.8)
ADD 2ADD 2
LEGEND - CODE COMPLIANCE SYMBOLS
PROPERTY LINE
1/2 HOUR FIRE PARTITION
1 HOUR FIRE PARTITION
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE RESISTANCE RATED CONSTRUCTION
1 HOUR SMOKE BARRIER
2 HOUR FLOOR / CEILING ASSEMBLY
EXTERIOR EGRESS PATH TO ROW WITH TRAVEL WIDTH
REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR
EXITING - REFER TO ELECTRICAL DRAWINGS).
EGRESS PATH OF TRAVEL WITH TRAVEL WIDTH
REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR
EXITING - REFER TO ELECTRICAL DRAWINGS).
ACCESSIBLE ROUTE OF TRAVEL
COMMON PATH OF EGRESS TRAVEL
EXIT ACCESS DISTANCE
RATED SHAFT (WALL CONSTRUCTION TO MEET FIRE
BARRIER REQUIREMENTS)
44"
E.A. X'-XX" - (PER 1016.2)
C.P. X'-XX" - (PER 1014.3)
44"
# HR
OCCUPANT LOAD AT OPENING
CUMULATIVE OCCUPANT LOAD AT OPENING
BUILDING EXIT
BUILDING CODE APPEAL
AREA REQUIRING CARBON MONOXIDE DETECTION
AREA REQUIRING SMOKE DETECTION
SPRINKLER, SEE FIRE PROTECTION DRAWINGS
AREA NAME
MANUAL PULL STATION REQUIRED
LIGHTED EXIT SIGN - SHADING INDICATES LIGHTED FACE(S)
DIRECTION ARROW CORRESPONDS TO DIRECTION ARROW ON SIGN
LIGHTED EXIT SIGN - CEILING MOUNTED
LIGHTED EXIT SIGN - WALL MOUNTED
FIRE EXTINGUISHER (AND CABINET WHERE OCCURS)
AREA
FE
CO
OCC:
OLF:
OT:
AREA:
265 SF
R-1
STAIR
OCC:
OLF:
OT:
AREA:
1569 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
1571 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
39 SF
S-1
MECH
OCC:
OLF:
OT:
AREA:
498 SF
R-1
SENIOR LEADER'S
QUARTERS
OCC:
OLF:
OT:
AREA:
487 SF
R-1
SENIOR LEADER'S
QUARTERS
OCC:
OLF:
OT:
AREA:
785 SF
R-1
CIRCULATION
OCC:
OLF:
OT:
AREA:
296 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
296 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
296 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
296 SF
R-1
RESTROOM
OCC:
OLF:
OT:
AREA:
317 SF
S-1
MECHANICAL
OCC:
OLF:
OT:
AREA:
47 SF
S-1
JANITOR
OCC:
OLF:
OT:
AREA:
112 SF
S-1
STORAGE
OCC:
OLF:
OT:
AREA:
39 SF
S-1
MECH
OCC:
OLF:
OT:
AREA:
39 SF
S-1
MECH
OCC:
OLF:
OT:
AREA:
1572 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
1522 SF
R-1
OPEN-BAY-BARRACK
(20 BEDS)
OCC:
OLF:
OT:
AREA:
265 SF
R-1
STAIR
F E
F E
E.A. 115'-4" - (PER 1016.2)
C.P. 55'-9" - (PER 1030.8)
F E
F E
1 HR
CO
PROVIDE CONDUIT
INFRASTRUCTURE
FOR FUTURE DAS
CO
CO
10 10 1
COCO
19 19
FE
CO
CO
2-HOUR FIRE BARRIER
BELOW TO EXTEND UP TO
LOUNGE ROOF SHEATHING
PER OSSC SECT 707.5. -
REFER TO 3/A401 & 6/A704
E.A. 115'-4" - (PER 1016.2)
C.P. 55'-9" - (PER 1030.8)
ADD 2
ADD 2
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/7
/2
:2
:1
P M
P E
R M
IT
B
ID
S
E T
O M
D E
N L
IS
T E
D B
A R
R A
C K
S E
B
O R
E G
O N
M
IL
IT
A
R Y
D E
P A
R T M
E N
T
O
R D
N A
N C
E R
D H
E R
M
IS
T O
N O
R
G101
ML
30 JUNE 2023
2201032
CODE
COMPLIANCE
PLANS
1/8" = 1'-0"
CODE COMPLIANCE PLAN - LEVEL 01
GENERAL NOTES - CODE SUMMARY
A. CODE SUMMARY KEYED NOTES APPLY TO G100 SERIES SHEETS. ALL KEYED NOTES MAY
NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS EXCEPT THOSE
NOTED.
B. ALL WORK SHOWN ON THIS SHEET IS INCLUDED IN THE CONTRACT FOR CONSTRUCTION,
WHETHER SHOWN ELSEWHERE OR NOT. CONTRACTOR SHALL MAKE ALLOWANCES FOR
CONNECTION, HOOK UP, ETC. AS REQUIRED SO THAT ITEMS, EQUIPMENT, ETC. ARE FIT
FOR INTENDED PURPOSE.
C. SEE ELECTRICAL AND MECHANICAL PLANS FOR ADDITIONAL SYMBOLS
D. PROVIDE LISTED FIRESTOP, CONTINUOUS AT PERIMETER GAPS OF ALL RATED
CONSTRUCTION AS REQUIRED TO MAINTAIN THE SPECIFIED RATING.
E. SQUARE FOOTAGE AREA CALCULATIONS ARE BASED ON THE BUILDING CODE
DEFINITIONS OF GROSS AND NET AREAS AS USED TO DETERMINE OCCUPANT LOADS
ONLY AND ARE NOT A REPRESENTATION OF LEASABLE AREA.
F. AT FIRE WALLS, BARRIERS, AND PARTITIONS ACCESSIBLE IN A CONCEALED FLOOR,
FLOOR/CEILING OR ATTIC SPACE - PROVIDE PERMANENT IDENTIFICATION WITH SIGNS OR
STENCILING, NOT LESS THAN 3" HIGH WITH A MINIMUM 3/8" STROKE IN CONTRASTING
COLOR TO SAY "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS." SIGNS SHALL
BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND AT INTERVALS NOT
EXCEEDING 30 FEET PER OSSC 703.7.
1/8" = 1'-0"
CODE COMPLIANCE PLAN - LEVEL 02
ADD 1
ADD 1 14 JUL 2023
ADD 2 8 SEPT 2023
OCCUPANT LOAD SUMMARY - LEVEL 01
NAME AREA OCC TYPE
OCC LOAD
FACTOR OCC LOAD
A-3
LOUNGE 1953 SF A-3 15 131
A-3 1953 SF 131
R-1
ADMIN OFFICE 190 SF R-1 100 2
CIRCULATION 805 SF R-1 50 17
OPEN-BAY-BARRACK (20 BEDS) 1575 SF R-1 50 32
OPEN-BAY-BARRACK (20 BEDS) 1574 SF R-1 50 32
OPEN-BAY-BARRACK (20 BEDS) 1574 SF R-1 50 32
OPEN-BAY-BARRACK (20 BEDS) 1576 SF R-1 50 32
RESTROOM 299 SF R-1 50 6
RESTROOM 296 SF R-1 50 6
RESTROOM 296 SF R-1 50 6
RESTROOM 299 SF R-1 50 6
VENDING/DF 129 SF R-1 50 3
R-1 8611 SF 174
S-1
ELECTRICAL 220 SF S-1 300 1
IT 77 SF S-1 300 1
JANITOR 73 SF S-1 300 1
MECH 39 SF S-1 300 1
MECH 42 SF S-1 300 1
MECH 40 SF S-1 300 1
MECHANICAL 235 SF S-1 300 1
SPRINKLER 85 SF S-1 300 1
STORAGE 217 SF S-1 300 1
S-1 1028 SF 9
TOTAL: 21 11592 SF 314
OCCUPANT LOAD SUMMARY - LEVEL 02
NAME AREA OCC TYPE
OCC LOAD
FACTOR OCC LOAD
R-1
CIRCULATION 785 SF R-1 50 16
OPEN-BAY-BARRACK (20 BEDS) 1522 SF R-1 50 31
OPEN-BAY-BARRACK (20 BEDS) 1569 SF R-1 50 32
OPEN-BAY-BARRACK (20 BEDS) 1571 SF R-1 50 32
OPEN-BAY-BARRACK (20 BEDS) 1572 SF R-1 50 32
RESTROOM 296 SF R-1 50 6
RESTROOM 296 SF R-1 50 6
RESTROOM 296 SF R-1 50 6
RESTROOM 296 SF R-1 50 6
SENIOR LEADER'S QUARTERS 498 SF R-1 50 10
SENIOR LEADER'S QUARTERS 487 SF R-1 50 10
R-1 9190 SF 187
S-1
JANITOR 47 SF S-1 300 1
MECH 39 SF S-1 300 1
MECH 39 SF S-1 300 1
MECH 39 SF S-1 300 1
MECHANICAL 317 SF S-1 300 2
STORAGE 112 SF S-1 300 1
S-1 593 SF 7
TOTAL: 17 9783 SF 194
STOP
S T O P
S T O P
S T O P
LEGEND - LANDSCAPE MATERIALS PLAN
FUTURE WORK, N.I.C. - REFER TO MASTERPLAN
AT/FP STANDOFF ZONE
CONCRETE SIDEWALK
GRAVEL WITH STEEL EDGING (1/4-10 CRUSHED BASALT)
SCOPE OF WORK/LEED BOUNDARY
PLANTING SCHEDULE
CRUSHED BASALT
SUN AND SHADE MIX
BLUEGRASS (45%)
RYEGRASS (45%)
RED FESCUE (10%)
SEED
BOTANICAL NAME COMMON NAME SIZE
SEEDING RATE
4-6 (PLS) lbs.
per 1000 sf
SPACINGSYMBOL DETAIL
GRAVEL 5/LP1021/4" MINUS ---
COBBLESTONE COBBLE PER CIVILPER CIVIL ---
POA PRATENSIS (45%)
LOLIUM PERENNE (45%)
FESTUCA RUBRA (10%)
ACHILLEA TOMENTOSA (25%)
FESTUCA IDAHOENSIS (75%)
WOOLLY YARROW
IDAHO FESCUE
1 GAL.
1 GAL.
12" O.C.
12" O.C.
GRAVEL LOT GRAVEL PER CIVILPER CIVIL ---
THORNLESS
HONEY LOCUST
GLEDITSIA TRIACONTHOS 1/LP1022" CALIPER 30' O.C. MIN
SEE PLANS
ADD ALTERNATE SCOPE OF WORK
ADD 2
EB5
2-STORY
E L M
S T R
E E
T
S T R
E E
T N
A M
E T
B D
F
IR
S T R
E E
T
'G' STREET
FUTURE
PARKING
FUTURE
PARKING
FUTURE
DFAC
(400)
C
EQ EQ
'-0
T
Y P
E Q
E Q
'-0
T
Y P
E Q
E Q
10'-0" 10'-0" ~94'-0" 10'-0"25'-0" 10'-0" ~94'-0" 10'-0" 10'-0"
EQ EQ
ADD ALTERNATE #1: NORTH BARRACKS
PARKING LOT + SITE LIGHTING
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/8
/2
:0 :1
A
M
P E
R M
IT
B
ID
S E
T
O M
D E
N L
IS
T E
D B
A R
R A
C K
S E
B
O R
E G
O N
M
IL
IT
A
R Y
D E
P A
R T M
E N
T
O
R D
N A
N C
E R
D H
E R
M
IS
T O
N O
R
LP101
DJ
30 JUNE 2023
2201032
PLANTING PLAN
GENERAL NOTES - PLANTING
ALL EXISTING PLANTING SOIL SHALL BE AMENDED AS RECOMMENDED IN AN APPROVED
AGRICULTURAL SOILS REPORT.
UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE INSTALLED IN ALL PLANTING
AREAS FOR ESTABLISHMENT. (COMPLY WITH LEED 4.0 REQUIREMENTS - TO BE
REMOVED/CAPPED AND ABANDONED AFTER 2-YEAR PLANTING ESTABLISHMENT PERIOD.)
REFER TO PLANTING DETAILS ON SHEET LP102
PROPOSED PLANTING WITHIN THE CANTONMENT IS REQUIRED TO MEET AT/FP STANDARDS
WITHIN THE ATFP STANDOFF ZONE IN WHICH THE ENTIRE SITE IS CONTAINED WITHIN,
LANDSCAPE MUST NOT BE ALLOWED TO CONCEAL A 6" SPHERE, AND IS EXCLUDED FROM
ANY LOCAL JURISDICTION PLANTING STANDARDS WHICH CONTRADICT THIS REQUIREMENT.
ORGANIC MATTER IS NOT ALLOWED WITHIN 3'-0" OF THE EDGE OF BUILDING PER
HANTAVIRUS REQUIREMENTS. PROVIDE GRAVEL BAND ALONG BUILDING EDGE PER PLAN.
A.
B.
C.
D.
E.
F.
1" = 20'-0"
PLANTING PLAN
ADD 1 14 JUL 2023
ADD 2 8 SEPT 2023
ADD 1
ADD 1
ADD 2
ADD 2
78 PA
NATIVE SOIL
32 93 00 - ROOTBALL
FINISH GRADE, 2" AWAY
FROM STEM OF PLANT
32 93 00 - AMENDED PLANTING SOIL
EXISTING BARK COVER
32 93 00 - GROUNDCOVER PLANT
EDGE OF PLANTING AREA/
WALK EDGE
PLANT CENTER
TRI-SPACE, AT SPECIFIED O.C.
DISTANCE-EQUIDISTANT
S P
A C
IN
G
O .C
SPACING
O.C.
SPACINGO.C.
32 93 00 - GROUNDCOVER PLANT
32 93 00 - TOPSOIL
32 93 00 - 3/16" X 4" ALUM. ANGLE EDGING
32 93 00 - SEED MIX
32 93 00 - PLANTING SOIL
ADJACENT CONDITIONS VARY,
SEE NOTES BELOW
32 15 00 - GRAVEL 1/4" MINUS, TYPICAL
NON WOVEN FILTER FABRIC
NOTES:
1. WHERE CONCRETE PVMT ABUTTS GRAVEL, TOP OF GRAVEL IS TO MEET TOP OF PVMT FLUSH
2. WHERE THE BLDG ABUTTS GRAVEL, TOP OF GRAVEL IS TO BE 1" MINIMUM BELOW BLDG FINISHED FLOOR
4"
32 93 00 - TOPPING SOIL - 2" DEPTH,
KEEP 2" AWAY FROM TRUNK
TAMP NATIVE SOIL FOR FIRM
BASE 6" DEPTH
UNDISTURBED NATIVE SOIL
SET CROWN OF ROOTBALL 2"
ABOVE FINISH GRADE AND REMOVE
CAGE, BURLAP AND TWINE FROM
TOP HALF OF ROOTBALL
(2) STAKES, AS SPECIFIED
FINISH GRADE
SCARIFY SIDES AND BOTTOM
2x ROOTBALL DIA
NOTES:
1. FURNISH (2) 2" DIA ROUND 8' TALL TREATED FIR OR HEMLOCK TREE STAKES FOR EACH DECIDUOUS TREE IN A PLANTING AREA.
2. ORIENT ALL STAKING PERPENDICULAR TO PREVAILING WIND.
3. DRIVE STAKES VERTICALLY AND AT LEAST 18" INTO UNDISTURBED NATIVE SOIL. DO NOT DRIVE STAKES THROUGH ROOT BALL.
4. TREE TIES SHALL ALLOW 4" OF SWAY IN ANY DIRECTION.
M
IN
32 90 00 - AMENDED TOPSOIL
TREE TIE STRAPPING, SECURE TO
STAKE
ROOTBALL +6" MIN
32 90 00 - PLANTS
M
IN
32 90 00 - PLANTS
SET CROWN OF ROOTBALL 1"
ABOVE FINISH GRADE
FINISH GRADE
TAMP NATIVE SOIL FOR FIRM
STABLE BASE 3" DEPTH
TOPPING SOIL - KEEP 2" AWAY
FROM STEM OF SHRUB
UNDISTURBED NATIVE SOIL
SCARIFY SIDES AND BOTTOM
2x ROOTBALL DIA
ROOTBALL
32 90 00 - AMENDED TOPSOIL
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/6 /2
:3
:4
A M
P E
R M
IT
B
ID
S E
T
O M
D E
N L
IS
T
E D
B A
R R
A C
K S
E B
O
R E
G O
N M
IL
IT
A R
Y D
E P
A R
T M
E N
T
O R
D N
A N
C E
R D
H E
R M
IS
T
O N
LP102
DJ
30 JUNE 2023
2201032
PLANTING
DETAILS
1" = 1'-0"
GROUNDCOVER PLANTING
1" = 1'-0"
PLANT SPACING TRIANGULAR
1" = 1'-0"
GRAVEL WITH STEEL EDGING
5 3/4" = 1'-0"
TREE STAKES
1" = 1'-0"
CONTAINER/B & B SHRUB
ADD 2 8 SEPT 2023
T O P
S T O P
S T O P
LEGEND - IRRIGATION EQUIPMENT
QUICK COUPLER
SMART CONTROLLER, LOCATION TBD
METER, LOCATION TBD
POINT OF CONNECTION
COMPONENTSYMBOL
MASTER VALVE, LOCATION TBD
M
C
P.O.C.
DETAIL
BACKFLOW PREVENTER, LOCATION TBDB
6/LI102
1/LI102
TBD
7/LI102
2/LI102
8/LI102
TREE DRIP LINE 9/LI102
LEGEND - IRRIGATION SCHEDULE
MP ROTATORS (UNDERGROUND IRRIGATION FOR
PLANTING ESTABLISHMENT 2-YEAR IN COMPLIANCE
WITH LEED VERSION 4.0 REQUIREMENTS)
MAINLINE
SLEEVE (UNDER HARDSCAPE, REF 4/LI102)
ADD ALTERNATE SCOPE OF WORK
EB5
2-STORY
FF: 100'-0"
(XXX.XX)
E L
M S
T R
E E
T
S T
R E
E T
N A
M E
T B
D
F
IR
S T
R E
E T
'G' STREET
FUTURE
PARKING
FUTURE
PARKING
FUTURE
DFAC
(400)
C
M
P .O
.C
B
ADD ALTERNATE #1: NORTH BARRACKS
PARKING LOT + SITE LIGHTING
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/6 /2
:3
:3
A M
P E
R M
IT
B
ID
S E
T
O M
D E
N L
IS
T
E D
B A
R R
A C
K S
E B
O
R E
G O
N M
IL
IT
A R
Y D
E P
A R
T M
E N
T
O R
D N
A N
C E
R D
H E
R M
IS
T
O N
LI101
DJ
30 JUNE 2023
2201032
IRRIGATION PLAN
GENERAL NOTES - IRRIGATION
INSTALL 1-INCH IRRIGATION MAINLINE AROUND PERIMETER OF BUILDING WITH QUICK
COUPLER VALVES AT ~100 FT. OC. POINT OF CONNECTION SHALL INCLUDE CODE
APPROVED BACKFLOW DEVICE, REMOTE CONTROL VALVE AND MANUAL SHUT OFF VALVE.
COORDINATE W/ OWNER'S REP FOR FINALIZED LOCATION OF CONTROLLER, VALVES,
METERS, AND BACKFLOW DEVICE.
PROVIDE FLOW SENSOR
REFER TO PLUMBING/CIVIL DRAWINGS FOR POC BY OTHERS.
SLEEVE LOCATIONS TO BE A MINIMUM OF 18" FROM ADJECENT HARDSCAPE AND OTHER
OBSTACLES, TYP.
ELECTRIC CONTROL VALVE(S) AND ISOLATION VALVE LOCATIONS ON THIS DRAWING ARE
APPROXIMATE. THE IRRIGATION CONTRACTOR SHALL STAKE OUT EACH ELECTRICAL
CONTROL VALVE AND ISOLATION VALVE LOCATION FOR REVIEW AND APPROVAL BY
OWNERS AUTHORIZED REPRESENTATIVE PRIOR TO INSTALLATION OF ALL VALVES.
IRRIGATION CONTROLLER LOCATION SHALL BE COORDINATED AND APPROVED WITH
OWNER'S AUTHORIZED REPRESENTATIVE. CONTROLLER SHALL BE WIRED AND INSTALLED
BY ELECTRICAL CONTRACTOR.
ALL PIPING AND WIRE SHALL BE SLEEVED UNDER PAVING. ALL SLEEVES TO BE A MINIMUM
2X DIA OF PIPE OR WIRE DIA. INSIDE WIRES SHALL BE INSTALLED IN SLEEVE SEPARATE
FROM PIPE SLEEVE. ALL MAINLINE SHALL BE ACCOMPANIED WITH A MINIMUM 2-INCH DIA.
WIRE SLEEVE. SLEEVING TO EXTEND A MINIMUM 12-INCHES BEYOND PAVING.
IRRIGATION CONTRACTOR SHALL SUBMIT DESIGN/BUILD IRRIGATION PLAN FOR
APPROVAL. REFER TO SPECIFCATIONS FOR REQUIREMENTS.
A.
B.
C.
D.
E.
F.
G.
H.
J.
1" = 20'-0"
IRRIGATION PLAN
ADD 2 8 SEPT 2023
REINFORCING BAR WHERE OCCURS,
SEE STRUCTURAL DRAWINGS
07 21 00 - XPS RIGID INSULATION
NOTES:
1. SEE STRUCTURAL FOR SIZES AND REINFORCEMENT
04 20 00 - CONCRETE BLOCK
04 20 01 - BRICK TIE
07 25 00 - WEATHER BARRIER
04 20 01 - MASONRY VENEER
R-13.3 CONTINUOUS, MIN
F O
C M
U
F O
B R
IC
K
HALF JOINT
7 5/8"
DIM POINT
MODULAR FACE OF CMU
REINFORCING BAR WHERE
OCCURS, SEE STRUCTURAL
DRAWINGS
HALF JOINT
NOTES:
1. FIRE RATED (BASED ON OSSC TABLE 720.1(2))
2. SEE STRUCTURAL FOR SIZES AND REINFORCEMENT
04 20 00 - CONCRETE BLOCK
09 30 00 - TILE AND BACKER BOARD
WHERE APPLICABLE - REF FINISH
SCHEDULE AND INTERIOR ELEVATIONS
(1) LAYER EACH SIDE
NOTES:
1. STC 30 WITH ACOUSTIC BATT INSULATION (BASED ON OR 64-8, 2-4-64)
PER ASSEMBLY TAG
DIM POINT
FACE OF STUD
09 21 16 - 5/8" GYPSUM BOARD09 21 16 - 5/8" GYPSUM BOARD
06 10 00 - WOOD FRAMING
INSULATION
PER ASSEMBLY TAG
09 30 00 - TILE AND BACKER BOARD WHERE
APPLICABLE - REF FINISH SCHEDULE AND
INTERIOR ELEVATIONS
INTERIOR
STRUCTURE
INSULATION
PER ASSEMBLY TAG
PER ASSEMBLY TAG
DIM POINT
FACE OF STUD
09 21 16 - 5/8" GYPSUM BOARD
06 10 00 - WOOD FRAMING
REQUIRED
SHIM AS
MEMBER
FRAMING
09 30 00 - TILE AND BACKER BOARD WHERE
APPLICABLE - REF FINISH SCHEDULE AND
INTERIOR ELEVATIONS
PROVIDE FIREBLOCKING WHERE
REQUIRED PER GEN NOTE H
SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
06 17 53 - PREMANUFACTRURED
WOOD ROOF TRUSS
09 21 16 - 5/8" TYPE X GYPSUM BOARD (2) LAYERS
06 10 00 - ROUGH CARPENTRY
SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
07 41 13 - STANDING SEAM METAL ROOF SYSTEM
16" FLAT PAN. COLOR: POLAR WHITE.
MANUFACTURER: MBCI, BATTON LOCK
07 41 13 - HIGH TEMPERATURE
UNDERLAYMENT
07 41 13 - HIGH TEMP ROOFING
UNDERLAYMENT PER ROOF PLAN
EXTERIOR
TRUFAST SIPTP SCREWS @ 12" o.c.
EACH WAY, WITH 1" EDGE DISTANCE
FOR ALL PANELS. MIN 1/4", MAX 3/4"
PROTRUSION PAST BOTTOM PLY
PANEL
07 41 13 - CONCEALED CLIPS PER ROOF MFR
07 41 13 - POLYISOCYANURATE BOARD
INSULATION (R-30 MIN); STAGGERED JOINTS
06 10 00 - ROUGH CARPENTRY
5/8" PT. SEE STRUCTURAL.
03 30 00 CONCRETE SLAB -
SEE STRUCTURAL
FLOOR FINISH WHERE OCCURS,
SEE FLOOR FINISH SCHEDULE
03 30 00 - VAPOR BARRIER
03 30 00 - CRUSHED AGGREGATE
BASE (CLEAN CRUSHED ROCK OR
GRAVEL THAT CONTAIN NO
DELETERIOUS MATERIALS PER
ODOT 02360.10) - COORDINATE
SUBGRADE PREPARATION WITH
GEOTECHNICAL REPORT AND
STRUCTURAL
R E
F G
E O
T E
C H
R E
P O
R T
CONTROL JOINT, 1/4" X 1" TYP
FINISH FLOOR
R E
F S
T R
U C
T U
R A
L
8"
SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
06 10 00 - OPEN WEB WOOD
FLOOR TRUSSES
06 10 00 - ROUGH CARPENTRY
SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
07 21 00 - ACOUSTIC BATT INSULATION
03 54 00 - CEMENTITIOUS UNDERLAYMENT
23 00 00 - REFER TO
MECHANICAL DWGS.
FLOOR LEVEL
FLOOR FINISH - SEE FINISH LEGEND
09 21 16 - 5/8" TYPE X GYPSUM
BOARD (2) LAYERS
NOTES:
1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)
STC/IIC: 50+ (PER ICC REPORT: ESR-1153)
REFER TO STRUCTURAL
06 10 00 - PLYWOOD SHEATHING
FLOOR FINISH - SEE FINISH LEGEND
07 21 00 - ACOUSTIC BATT
INSULATION
03 54 00 - GYPSUM BASED UNDERLAYMENT
06 17 33 - WOOD I-JOISTS
09 21 16 - RESILIENT CHANNEL FURRING
FLOOR LEVEL
REFER TO STRUCTURAL
09 21 16 - 5/8" TYPE X GYPSUM
BOARD (2) LAYERS
NOTES:
1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)
STC/IIC: 50+ (PER ICC REPORT: ESR-1153)
REFER TO STRUCTURAL
06 10 00 - PLYWOOD SHEATHING
FLOOR FINISH - SEE FINISH LEGEND
07 21 00 - ACOUSTIC BATT
INSULATION
03 54 00 - GYPSUM BASED UNDERLAYMENT
06 17 33 - WOOD I-JOISTS
FLOOR LEVEL
REFER TO STRUCTURAL
DIV 23 - DUCT WHERE OCCURS,
SEE MECHANICAL
V A
R
IE
S
SEE RCP
06 10 00 - WOOD FRAMING
09 21 16 - 5/8" TYPE X GYPSUM
BOARD (2) LAYERS
NOTES:
1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)
STC/IIC: 50+ (PER ICC REPORT: ESR-1153)
06 10 00 - PLYWOOD SHEATHING
REFER TO STRUCTURAL
07 21 00 - ACOUSTIC BATT
INSULATION
03 54 00 - GYPSUM BASED UNDERLAYMENT
09 21 16 - 5/8" TYPE X GYPSUM
BOARD (2) LAYERS
06 10 00 - WOOD FRAMING
FLOOR LEVEL
FLOOR FINISH - SEE FINISH LEGEND
09 21 16 - RESILIENT CHANNEL FURRING
NOTES:
1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)
STC/IIC: 50+ (PER ICC REPORT: ESR-1153)
06 10 00 - PLYWOOD SHEATHING
REFER TO STRUCTURAL
03 54 00 - GYPSUM BASED UNDERLAYMENT
06 10 00 - WOOD FRAMING
07 21 00 - ACOUSTIC BATT
INSULATION
DIV 23 - DUCT WHERE OCCURS,
SEE MECHANICAL
SEE RCP
V A
R
IE
S
FLOOR LEVEL
FLOOR FINISH - SEE FINISH LEGEND
09 21 16 - 5/8" TYPE X GYPSUM
BOARD (2) LAYERS
06 10 00 - WOOD FRAMING
NOTES:
1 HOUR FIRE RATED (PER ICC REPORT: ESR-1153)
STC: 50 (PER ICC REPORT: ESR-1153)
09 51 00 - ACOUSTICAL PANEL CEILING
SEE RCP
06 17 23 - PREMANUFACTURED
WOOD ROOF TRUSSES
09 51 00 - CEILING SUSPENSION SYSTEM
DIM POINT
FACE OF STUD
NOTES:
1. 1 HOUR FIRE RATED (BASED ON UL U469)
09 21 16 - 5/8" TYPE X GYPSUM BOARD
09 21 16 - C-H STUD
PER ASSEMBLY TAG
09 21 16 - 1" TYPE X GYPSUM BOARD
SHAFTLINER
INSULATION
PER ASSEMBLY TAG
09 21 16 - 1" GYPSUM SHAFTLINER
07 21 00 - BATT INSULATION
09 21 16 - C-H STUD
09 21 16 - 5/8" TYPE X GYPSUM BOARD
NOTE:
2-HOUR FIRE RATED (BASED ON AER-09038)
SEE RCP
(1) LAYER EACH SIDE
NOTES:
1. STC 30 WITH ACOUSTIC BATT INSULATION (BASED ON OR 64-8, 2-4-64)
PER ASSEMBLY TAG
DIM POINT
FACE OF STUD
09 21 16 - 5/8" GYPSUM BOARD09 21 16 - 5/8" GYPSUM BOARD
06 10 00 - WOOD FRAMING
INSULATION
PER ASSEMBLY TAG
(1) LAYER EACH SIDE
NOTES:
1. STC 30 WITH ACOUSTIC BATT INSULATION (BASED ON OR 64-8, 2-4-64)
PER ASSEMBLY TAG
DIM POINT
FACE OF STUD
09 21 16 - 5/8" GYPSUM BOARD09 21 16 - 5/8" GYPSUM BOARD
06 10 00 - WOOD FRAMING
INSULATION
PER ASSEMBLY TAG
SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
06 17 53 - PREMANUFACTRURED
WOOD ROOF TRUSS
06 10 00 - PLYWOOD SHEATHING
SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
07 41 13 - STANDING SEAM METAL ROOF SYSTEM
16" FLAT PAN. COLOR: POLAR WHITE.
MANUFACTURER: MBCI, BATTON LOCK
07 41 13 - HIGH TEMP ROOFING
UNDERLAYMENT PER ROOF PLAN
EXTERIOR
07 41 13 - CONCEALED CLIPS PER ROOF MFR
06 10 00 - PLYWOOD SHEATHING
07 46 46 - FIBER CEMENT SOFFIT
REFER TO STRUCTURAL
06 10 00 - PLYWOOD SHEATHING
FLOOR FINISH - SEE FINISH LEGEND
07 21 00 - ACOUSTIC BATT
INSULATION
03 54 00 - GYPSUM BASED UNDERLAYMENT
06 17 33 - WOOD I-JOISTS
FLOOR LEVEL
REFER TO STRUCTURAL
09 21 16 - 5/8" TYPE X GYPSUM
BOARD (2) LAYERS
NOTES:
1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)
STC/IIC: 50+ (PER ICC REPORT: ESR-1153)
09 21 16 - 5/8" TYPE X GYPSUM BOARD
09 21 16 - HAT CHANNEL FURRING
GENERAL NOTES - ASSEMBLIES
A. FIRESTOP PENETRATIONS THROUGH RATED ASSEMBLIES IN ACCORDANCE WITH SECTION
07 84 00. FIRE PARTITIONS AND FLOORS SHALL BE CAULKED AROUND PERIMETER WITH AN
UL APPROVED NON-HARDENING SEALANT AND COMPLY WITH AN APPROVED ASSEMBLY.
B. REFERENCE CODE COMPLIANCE SUMMARY AND PLANS FOR RATED WALL LOCATIONS.
C. REFERENCE STRUCTURAL FOR CONCRETE MASONRY UNIT, BEARING AND SHEAR WALL
REQUIREMENTS.
D. WOOD STUD MATERIAL THICKNESS IS DESIGN-BUILD. CONTRACTOR TO COORDINATE
WOOD STUD MATERIAL THICKNESS AND SPACING OF INDIVIDUAL WALLS TO MEET
ALLOWABLE LIMITING WALL HEIGHT CRITERIA. SIZING SHALL MEET THE REQUIREMENTS
OF THE TESTED ASSEMBLY AS APPLICABLE.
E. PROVIDE DEFLECTION HEADS AT NON-BEARING WALLS WHICH TERMINATE AT THE
UNDERSIDE OF STRUCTURE.
F. FILL FULL WIDTH AND DEPTH OF STUD CAVITY WHERE ACOUSTIC INSULATION INDICATED.
G. PROVIDE ACCESS PANELS AS REQUIRED. LOCATION, FINISH, AND TYPE SHALL BE
APPROVED BY ARCHITECT PRIOR TO PROCUREMENT AND INSTALLATION.
H. PROVIDE FIREBLOCKING AT CONCEALED SPACES INCLUDING DOUBLE STUD, STAGGERED
STUD, AND FURRING WALLS AT INTERVAL NOT TO EXCEED 10' HORIZONTALLY
ASSEMBLY TAG - KEY
123C1
FRAMING MEMBER MATERIAL
AND SIZE (WALL ONLY)
INSULATION DESIGNATION
FRAMING MEMBER SIZE DESIGNATION
1 5/8" METAL STUD
METAL FRAMING
2 1/2" METAL STUD
3 5/8" METAL STUD
4" METAL STUD
6" METAL STUD
8" METAL STUD
7/8" FURRING CHANNEL
1 1/2" FURRING CHANNEL
2 1/2" METAL C-H SHAFT WALL STUD
4" METAL C-H SHAFT WALL STUD
6" METAL C-H SHAFT WALL STUD
WOOD FRAMING*
NOMINAL 2x4, 3x4, OR 4x4 WOOD STUD
NOMINAL 2x6, 3x6, OR 4x6 WOOD STUD
NOMINAL 2x8, 3x8, OR 4x8 WOOD STUD
NOMINAL 2x10, 3x10, OR 4x10 WOOD STUD
CEMENTITIOUS WALLS**
CONCRETE
NOMINAL 4" CMU
NOMINAL 6" CMU
NOMINAL 8" CMU
NOMINAL 10" CMU
NOMINAL 12" CMU
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
V
X
*REFERENCE STRUCTURAL DOCUMENTS FOR BEARING AND SHEAR WALL REQUIREMENTS
**REFERENCE STRUCTURAL DOCUMENTS FOR BEARING AND REINFORCING REQUIREMENTS
INSULATION DESIGNATION
0 = NONE
1 = ACOUSTIC INSULATION (SECTION 07 21 00 - THERMAL INSULATION)
2 = THERMAL BATT INSULATION (SECTION 07 21 00 - THERMAL INSULATION)
3 = FOAM BOARD INSULATION (SECTION 07 21 00 - THERMAL INSULATION)
4 = SPRAY APPLIED INSULATION (SECTION 07 21 29 - SPRAYED INSULATION)
5 = MINERAL FIBER INSULATION (SECTION 07 21 00 - THERMAL INSULATION)
ASSEMBLY NUMBER
ARCHITECTURE
URBAN DESIGN + PLANNING
INTERIOR DESIGN
PORTLAND|OAKLAND
SERADESIGN.COM
CHECKED BY:
ISSUE DATE:
PROJECT NO:
REVISIONS
S E
R A
A rc hi te ct s, I nc
C o p y ri g h t p ro te c te d
S e e D e s ig n A g re e m e n t.
F o r u s e o n t h is p ro je c t o n ly
U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d
/6 /2
:3
:5
A M
P E
R M
IT
B
ID
S E
T
O M
D E
N L
IS
T
E D
B A
R R
A C
K S
E B
O
R E
G O
N M
IL
IT
A R
Y D
E P
A R
T M
E N
T
O R
D N
A N
C E
R D
H E
R M
IS
T
O N
A002
ML
30 JUNE 2023
2201032
ASSEMBLY
INFORMATION
EXTERIOR WALL
CMU PARTITION
2-HOUR RATED
WOOD PARTITION
NOT RATED
WOOD FURRING
NOT RATED
ROOF-CEILING ASSEMBLY
R1
FLOOR ASSEMBLY
F1
FLOOR-CEILING ASSEMBLY AT OWJ'S
FC1
FLOOR-CEILING ASSEMBLY AT I-JOISTS
FC2
FLOOR-CEILING ASSEMBLY AT I-JOISTS
FC3
FLOOR-CEILING ASSEMBLY AT JOISTS
FC4
FLOOR-CEILING ASSEMBLY AT JOISTS
FC5
1-HOUR RATED1-HOUR RATED1-HOUR RATED1-HOUR RATED1-HOUR RATED
ACT SUSPENDED ACOUSTIC
C1
VERTICAL SHAFT ASSEMBLY
HORIZONTAL SHAFT ASSEMBLY
C7
NTS
ASSEMBLY 103
2 NTS
ASSEMBLY 154
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .