2023_0908_EB5 - Add 2 Drawings.pdf

PDF 17 MB Posted

Attached to
Enlisted Barracks 5 NEW CONSTRUCTION
Solicitation number
S-24800-00007691
Issued by
Union County, Oregon

About this file

The document is an addendum to the solicitation for the new construction of Enlisted Barracks 5 (EB5) in Umatilla County, Oregon. The project scope includes all excavation, site utilities, landscaping, foundational and structural work, exterior envelope and waterproofing, roofing, interior framing, CMU block construction, brick veneer finishes, drywall, finishes, mechanical, plumbing, electrical, low voltage, and civil work for a new 2-story, 21,505 square foot enlisted barracks building. The addendum adds 2 new drawings to the solicitation.

The project is being procured by Umatilla County. No additional details are provided regarding pricing terms, set-asides, incumbents, funding requirements, or other salient information.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/8

/2

:3 :5

A

M

P E

R M

IT

B

ID

S E

T

O M

D E

N L

IS

T E

D B

A R

R A

C K

S E

B

O R

E G

O N

M

IL

IT

A

R Y

D E

P A

R T M

E N

T

O

R D

N A

N C

E R

D H

E R

M

IS

T O

N O

R

G002

ML

30 JUNE 2023

2201032

GENERAL

INFORMATION

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

G001 COVER SHEET

G002 GENERAL INFORMATION

G051 CODE COMPLIANCE SITE PLAN AND SUMMARY

G101 CODE COMPLIANCE PLANS

G801 DIMENSIONAL GUIDELINES

G901 SIGNAGE DETAILS

CIVIL

C0.00 COVER SHEET

C0.01 OVERALL SITE PLAN

C1.00 LAYOUT AND PAVING PLAN

C2.00 GRADING PLAN

C3.00 UTILITY PLAN

C4.00 CIVIL DETAILS

C4.01 CIVIL DETAILS

C5.00 FIRE ACCESS PLAN

C6.00 ESC COVER

C6.01 DEMO, CLEARNING, MASS GRADING, ESC PLAN

C6.02 FINAL ESC PLAN

C6.03 ESC DETAILS

LANDSCAPE

LP101 PLANTING PLAN

LP102 PLANTING DETAILS

LI101 IRRIGATION PLAN

LI102 IRRIGATION DETAILS

ARCHITECTURE

A001 SYMBOLS AND ANNOTATION

A002 ASSEMBLY INFORMATION

A051 SITE PLAN

A101 FLOOR PLAN - LEVEL 01

A102 FLOOR PLAN - LEVEL 02

A103 ATTIC DRAFTSTOPPING PLAN AND ROOF PLAN

A201 REFLECTED CEILING PLAN - LEVEL 01

A202 REFLECTED CEILING PLAN - LEVEL 02

A301 BUILDING ELEVATIONS

A401 BUILDING SECTIONS

A451 WALL SECTIONS

A501 VERTICAL CIRCULATION

A502 VERTICAL CIRCULATION DETAILS

A601 INTERIOR COMPOSITES - RESTROOMS

A602 INTERIOR COMPOSITES - LOUNGE AND VENDING

A603 INTERIOR COMPOSITES - BILLETS

A701 EXTERIOR DETAILS - RAINSCREEN

A702 EXTERIOR DETAILS - FENESTRATIONS

A703 EXTERIOR DETAILS - FENESTRATION

A704 EXTERIOR DETAILS - ROOF

A705 EXTERIOR DETAILS - ENTRY SCREEN

A801 INTERIOR DETAILS

A901 DOOR, LOUVER & WINDOW SCHEDULE

A921 ROOM FINISH SCHEDULE AND SCHEDULE OF FINISHES

STRUCTURAL

S001 DRAWING INDEX AND LIST OF ABBREVIATIONS

S002 GENERAL STRUCTURAL NOTES

S003 GENERAL STRUCTURAL NOTES

S004 SPECIAL INSPECTIONS AND TESTING

S005 SPECIAL INSPECTIONS AND TESTING

S101 FOUNDATION PLAN

S101S SLAB DIMENSION PLAN

S102 LEVEL 2 FRAMING PLAN

S103 ROOF FRAMING PLAN

S301 MASONRY WALL ELEVATIONS

S501 CONCRETE DETAILS

S502 MASONRY DETAILS

S503 MASONRY DETAILS

S701 WOOD DETAILS

MECHANICAL

M001 MECHANICAL - LEGEND

M002 MECHANICAL - SCHEDULES AND CALCULATIONS

M201 MECHANICAL - LEVEL 01 - HVAC

M202 MECHANICAL - LEVEL 02 - HVAC

M203 MECHANICAL - ROOF - HVAC

M301 MECHANICAL - LEVEL 01 - HVAC PIPING

M302 MECHANICAL - LEVEL 02 - HVAC PIPING

M401 MECHANICAL - WSHP PIPING SCHEMATIC

M402 CONTROLS SEQUENCE OF OPERATIONS

M501 MECHANICAL - DETAILS

M502 MECHANICAL - DETAILS

PLUMBING

P001 PLUMBING - LEGEND

P002 PLUMBING - SCHEDULES AND CALCULATIONS

P201 PLUMBING - LEVEL 01 - WASTE

P202 PLUMBING - LEVEL 02 - WASTE

P203 PLUMBING - ROOF - WASTE

P301 PLUMBING - LEVEL 01 - WATER

P302 PLUMBNG - LEVEL 02 - WATER

P401 PLUMBING - SOLAR HOT WATER DIAGRAM

P501 PLUMBING - ENLARGED VIEWS

P502 PLUMBING - ENLARGED VIEWS

P601 PLUMBING - DETAILS

ELECTRICAL

E001 ELECTRICAL - LEGEND

E002 ELECTRICAL - LUMINAIRE SCHEDULE

E101 ELECTRICAL - SITE PLAN

E201 ELECTRICAL - LEVEL 01 - LIGHTING

E202 ELECTRICAL - LEVEL 02 - LIGHTING

E301 ELECTRICAL - LEVEL 01 - POWER AND DATA

E302 ELECTRICAL - LEVEL 02 - POWER AND DATA

E401 ELECTRICAL - ONE-LINE DIAGRAM

E501 ELECTRICAL - SCHEDULES

E601 ELECTRICAL - DETAILS

VICINITY MAP

PROJECT

LOCATION

INTERSTATE 84 (I-84)

C E

D A

R S

T R

E E

T

D A

T E

S T R

E E

T

ORDNANCE ROAD

E L M

S T R

E E

T

G ST.

A ST.

DISCLAIMER

THE WRITTEN AGREEMENT, DRAWINGS, SPECIFICATIONS AND ANY ADDENDA COMPRISE

THE CONTRACT FOR THIS PROJECT. THEY SHALL BE TREATED AS ONE ENTITY, EQUALLY,

WITHOUT PRIORITY. ITEMS, ELEMENTS, FIXTURES, SYSTEMS AND EQUIPMENT SHOWN

SHALL BE FURNISHED AND INSTALLED EVEN THOUGH TYPICALLY SHOWN ELSEWHERE.

THEREFORE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO READ AND COMPREHEND

ALL THESE DOCUMENTS IN ORDER TO COMPLETE THE WORK. IF A CONTRACTOR CHOOSES

TO NOT THOROUGHLY REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS, THEY DO SO

AT THEIR OWN RISK AND AGREE TO FURNISH & INSTALL ALL ITEMS NOTED ABOVE AT NO

ADDITIONAL COST OR DELAY TO THE OWNER. (THE ONLY EXCEPTION TO THIS IS THAT THE

SPECIFICATIONS SHALL TAKE PRECEDENCE OVER GENERAL NOTES ON THIS SHEET.)

GENERAL NOTES

A. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING WITH

THE WORK.

B. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS. DO NOT SCALE DRAWINGS. NOTIFY

ARCHITECT OF DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.

C. CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS AND METHODS AND

SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF CONSTRUCTION UNTIL FINAL LATERAL

AND VERTICAL CARRYING SYSTEMS ARE COMPLETED.

D. DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF CONCRETE, FACE OF MASONRY,

GRID/COLUMN LINE, CENTER OF ELEMENT, COUNTERTOP EDGE, OR AS NOTED.

E. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF

SUBCONTRACTORS WORK, COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS,

ACCURATE LOCATION OF STRUCTURAL MEMBERS, OPENINGS FOR MECHANICAL,

ELECTRICAL, AND MISCELLANEOUS EQUIPMENT. CONTRACTOR SHALL VERIFY

DIMENSIONS AND OPENING SIZES (CLEARANCES REQUIRED) FROM THE MANUFACTURERS

PRIOR TO CONSTRUCTION OF OR INSTALLATION OF EQUIPMENT, FURNISHINGS, AND

ACCESSORIES.

F. DETAILS NOTED AS "TYPICAL" OR "TYP" APPLY IN ALL CASES UNLESS SPECIFICALLY

REFERENCED. DETAILS THAT ARE SPECIFICALLY REFERENCED SHALL TAKE PRECEDENCE

OVER DETAILS NOTED AS "TYPICAL" OR "TYP". SPECIFIC NOTES AND DETAILS SHALL TAKE

PRECEDENCE OVER GENERAL NOTES AND DETAILS.

G. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE

PROJECT IS IN PROGRESS UNTIL PROJECT COMPLETION.

H. LOCATE EXISTING UTILITIES WHETHER INDICATED OR NOT AND PROTECT FROM DAMAGE.

CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS ASSOCIATED WITH REPAIR OR

REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN

CONJUNCTION WITH THE EXECUTION OF THE WORK.

I. PROVIDE ACCESS PANELS AS REQUIRED. LOCATION, FINISH, AND TYPE SHALL BE

APPROVED BY ARCHITECT PRIOR TO OBTAINING AND INSTALLING. ACCESS PANEL

LOCATIONS NOT APPROVED BY ARCHITECT WILL BE SUBJECT TO MODIFICATION AT NO

ADDITIONAL COST. PROVIDE RATED ACCESS PANELS WITH THE SAME RATING AS THE

ASSEMBLY IN WHICH THEY ARE INSTALLED. ACCESS PANELS IN SHAFT WALLS, RATED

FLOOR/CEILINGS OR RATED ROOF/CEILINGS SHALL BE SMOKE SEALED.

J. PROVIDE TEMPORARY PEDESTRIAN PROTECTION, AS REQUIRED BY ACCEPTED

STANDARDS OF THE AUTHORITY HAVING JURISDICTION.

K. PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE FIRESTOPPED PER

SPECIFICATION SECTION 07 84 00 - FIRESTOPPING AND THE ACCEPTED REQUIREMENTS

OF THE AUTHORITY HAVING JURISDICTION. RATED ASSEMBLIES SHALL BE CONSTRUCTED

TO PREVENT THE MOVEMENT OF HOT FLAME OR GASES PER LOCAL CODES.

L. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED

ACCESS TO ANY WATER OR POWER FACILITIES (POWER POLES, PULL-BOXES,

TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.) OR TO THE

LOCATION OF HOOK-UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY

POWER LINES - WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE

TO COMPLY MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSES.

M. MECHANICAL EXHAUST OF BATHROOMS AND LAUNDRY FACILITIES IS REQUIRED. AIR

CHANGES AND DISTANCE OF DISCHARGE FROM OPERABLE OPENINGS SHALL BE

COMPLIANT WITH LOCAL CODES.

N. AN APPROVED GAS SHUT-OFF VALVE SHALL BE INSTALLED ON THE FUEL GAS LINE ON

THE DOWNSTREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE

EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING.

O. OBTAIN FINAL SIGN-OFF FROM PLUMBING INSPECTOR PRIOR TO ENCLOSING FIRE

SPRINKERS IN WALLS OR CEILINGS.

P. SEE STRUCTURAL DRAWINGS FOR SPECIAL INSPECTIONS ASSOCIATED WITH

STRUCTURAL WORK.

Q. ANTI-GRAFFITI COATINGS ARE REQUIRED AT THE GROUND LEVEL WHERE CONCRETE OR

MASONRY FINISHES ARE USED. REFERENCE SPECIFICATION SECTION 07 19 00.

R. MOUNT ALL OVERHEAD MOUNTED ARCHITECTURAL AND UTILITIES WEIGHING 31-LBS OR

MORE (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS SUSPENDED CEILINGS AND PIPING

NETWORKS THAT COLLECTIVELY EXCEED THAT WEIGHT) USING EITHER RIGID OR

FLEXIBLE SYSTEMS. MOUNT ALL SYSTEMS TO RESIST FORCES OF 0.5 TIMES THE

EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE EQUIPMENT

WEIGHTS IN THE DOWNWARD DIRECTION. THESE REQUIREMENTS TO NOT PRECLUDE

THE NEED TO DESIGN ARCHITECTURAL FEATURE AND EQUIPMENT MOUNTINGS FOR

FORCES REQUIRED BY OTHER CRITERIA SUCH AS SEISMIC STANDARDS.

PROJECT DIRECTORY

OREGON MILITARY DEPARTMENT

1776 MILITIA WAY SE

SALEM, OR 97309

TEL: (503) 584-3504

ATTN: MELISSA WEBBER, PROJECT MANAGER

melissa.s.webber.nfg@mail.mil

SERA ARCHITECTS

600 SW 10TH AVENUE #500

PORTLAND, OR 97205

TEL: (503) 445-7372

FAX: (503) 445-7395

ATTN: CASSANDRA TYLER

cassandrat@seradesign.com

HUMBER DESIGN GROUP, INC.

117 SE TAYLOR ST, Suite 001

PORTLAND, OR 97214

TEL: (503) 946-6632

ATTN: ALLEN SCHMITZ, PROJECT ENGINEER

allen.schmitz@hdgpdx.com

SERA ARCHITECTS

600 SW 10TH AVENUE #500

PORTLAND, OR 97205

TEL: (503) 445-7372

FAX: (503) 445-7395

ATTN: DAN JENKINS, ASLA, LEED

danj@seradesign.com

KPFF CONSULTING ENGINEERS

111 SW 5TH, SUITE 2500

PORTLAND, OR 97204

TEL: (503) 227-3251

FAX: (503) 227-7980

ATTN: JOSH RICHARDS, PE, SE

josh.richards@kpff.com

KPFF CONSULTING ENGINEERS

45 FREMONT ST, 28th FLOOR

SAN FRANCISCO, CA 94105

TEL: (415) 268-1042

ATTN: SHARON GALLANT, SE

sharon.gallant@kpff.com

OWNER

DEVELOPER:

ARCHITECT OF

RECORD:

CIVIL ENGINEER:

LANDSCAPE

ARCHITECT:

STRUCTURAL

ENGINEER:

ATFP

CONSULTING

ENGINEER:

COLEBREIT ENGINEERING

2021 NW GRANT AVENUE

CORVALLIS, OR 97330

TEL: (541) 728-3293

ATTN: ADAM BOYD, PE

adamboyd@colebreit.com

COLEBREIT ENGINEERING

2021 NW GRANT AVENUE

CORVALLIS, OR 97330

TEL: (541) 728-3293

ATTN: ADAM BOYD, PE

adamboyd@colebreit.com

COLEBREIT ENGINEERING

2021 NW GRANT AVENUE

CORVALLIS, OR 97330

TEL: (541) 728-3293

ATTN: BRUCE JESSUP, PE

bruce.jessup@colebreit.com

PROFESSIONAL ROOF CONSULTANTS INC.

1108 SE GRAND AVENUE, Suite 300

PORTLAND, OR 97214

TEL: (503) 280-8759

ATTN: THOMAS BERTRAND

thomas.bertrand@professionalroofconsultants.com

DCW COST MANAGEMENT

815 1ST AVENUE, #176

SEATTLE, WA 98104

TEL: (206) 259-2990

ATTN: TRISH DREW

trish@dcwcost.com

BANTAM ENGINEERING

7032 NE SISKIYOU ST

PORTLAND, OR 97213

TEL: (503) 888-3864

ATTN: CHRISTINE McKINLEY, PE cmckinley@bantameng.com

ENERGY

MODELER:

MECHANICAL/

PLUMBING

ENGINEER:

ELECTRICAL

ENGINEER:

BUILDING

ENVELOPE

CONSULTANTS:

COST

ESTIMATORS:

COMMISSIONING

ENGINEER:

REFERENCE SECTION 01 35 73 - DELEGATED DESIGN PROCEDURES FOR ADDITIONAL INFORMATION SEE PROJECT DRAWINGS AND SPECIFICATIONS FOR BALANCE OF DELEGATED DESIGN COMPONENTS AND SYSTEMS

DELEGATED DESIGN AND DEFERRED SUBMITTALS

Section Section Name Delegated

Design

Deferred

Submittal

Items for AHJ

Review

03 00 00 CAST-IN-PLACE CONCRETE YES NO N/A

05 50 00 METAL FABRICATIONS YES YES

05 51 00 METAL STAIRS YES YES

08 80 00 GLAZING YES YES

21 00 00 FIRE SUPPRESSION YES SEPARATE PERMIT BY DESIGN-

BUILD CONTRACTOR

28 00 00 ELECTRONIC SAFETY AND

SECURITY

YES

DESIGN-BUILD CONTRACTOR TO DESIGN "FULLY CODE COMPLIANT SYSTEM" CONCURRENTLY WITH ARCHITECT'S DOCUMENTS. SEISMIC RESTRAINT AND BRACING AND SECUREMENT OF ALL ASSOCIATED EQUIPMENT SHALL BE PROVIDED WHERE THE MOVEMENT AND OVERTURNING DUE TO SEISMIC DISPLACEMENT OF SUCH ITEMS COULD CREATE A LIFE SAFETY HAZARD EITHER BY DIRECT INJURY OR INDIRECTLY BY BLOCKING SAFE EGRESS FROM THE BUILDING.

SEPARATE FIRE PROTECTION REQUIREMENTS

GENERAL CONTRACTOR SHALL OBTAIN FIRE PROTECTION PERMITS FROM THE FIRE MARSHALL'S OFFICE FOR THE FOLLOWING ITEMS:

FIRE SPRINKLERS (PERMIT)

FIRE ALARM SYSTEMS (PERMIT)

UNDERGROUND FIRE LINES (PERMIT)

KNOX BOX

07 46 46 FIBER CEMENT SIDING YES

09 21 16 GYPSUM BOARD ASSEMBLIES YES YES SUSPENDED CEILINGS, SEISMIC BRACING

REQUIREMENTS AND JOISTED SOFFITS

09 51 00 ACOUSTICAL CEILINGS YES YES

03 45 00 PRECAST ARCHITECTURAL CONCRETE YES YES SUPPORT AND ATTACHMENT TO STRUCTURE

06 17 33 PREFABRICATED PLYWOOD I-JOISTS YES

06 17 53 SHOP FABRICATED WOOD TRUSSES YESYES

Separate

Permit

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

YES

YES

SHOP DRAWINGS AND CALCULATIONS

SHOP DRAWINGS AND CALCULATIONS

NO N/A

SHOP DRAWINGS AND CALCULATIONS

07 41 13 YES YES ATTACHMENT TO STRUCTURE;

SOLAR HOT WATER PANELS

NO

SHOP DRAWINGS AND CALCULATIONS

SUSPENDED CEILINGS AND SEISMIC

BRACING REQUIREMENTS

NO

NO SEPARATE PERMIT BY DESIGN-

BUILD CONTRACTOR

METAL ROOF PANELS

ATTACHMENT TO STRUCTURE

07 62 00 SHEET METAL FLASHING AND TRIM YES NO NO N/A

07 84 00 FIRESTOPPING YES NO SEE FIRESTOPPING TABLE ON CODE

SUMMARY SHEET

NO

10 14 00 SIGNAGE YES NO CODE REQUIRED SIGNAGE

11 24 25 FALL PROTECTION EQUIPMENT YES YES OSHA COMPLIANCENO

32 84 23 IRRIGATION SYSTEM -

UNDERGROUND SPRINKLERS

YES NO NO DESIGN BUILD SHOP DRAWINGS

NO

NO

05 41 00 LIGHT GAUGE METAL STUD FRAMING YES YES NO SUPPORT OF SUSPENDED GYPSUM CEILINGS

ALTERNATES

EB5

1. NORTH GRAVEL PARKING LOT + SITE LIGHTING

2. NOT USED

3. 24-PAIR FIBER PULL FROM BLDG 57 TO EB5

ADD 1 14 JUL 2023

ADD 2 8 SEPT 2023

ADD 1

ADD 2

1X 1X1X

X XX

SB SBSB

2X 2X2X

STOP

S T O P

S T O P

S T O P

LEGEND - CODE COMPLIANCE SYMBOLS

PROPERTY LINE

1/2 HOUR FIRE PARTITION

1 HOUR FIRE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE RESISTANCE RATED CONSTRUCTION

1 HOUR SMOKE BARRIER

2 HOUR FLOOR / CEILING ASSEMBLY

EXTERIOR EGRESS PATH TO ROW WITH TRAVEL WIDTH

REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR

EXITING - REFER TO ELECTRICAL DRAWINGS).

EGRESS PATH OF TRAVEL WITH TRAVEL WIDTH

REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR

EXITING - REFER TO ELECTRICAL DRAWINGS).

ACCESSIBLE ROUTE OF TRAVEL

COMMON PATH OF EGRESS TRAVEL

EXIT ACCESS DISTANCE

RATED SHAFT (WALL CONSTRUCTION TO MEET FIRE

BARRIER REQUIREMENTS)

44"

E.A. X'-XX" - (PER 1016.2)

C.P. X'-XX" - (PER 1014.3)

44"

# HR

OCCUPANT LOAD AT OPENING

CUMULATIVE OCCUPANT LOAD AT OPENING

BUILDING EXIT

BUILDING CODE APPEAL

AREA REQUIRING CARBON MONOXIDE DETECTION

AREA REQUIRING SMOKE DETECTION

SPRINKLER, SEE FIRE PROTECTION DRAWINGS

AREA NAME

MANUAL PULL STATION REQUIRED

LIGHTED EXIT SIGN - SHADING INDICATES LIGHTED FACE(S)

DIRECTION ARROW CORRESPONDS TO DIRECTION ARROW ON SIGN

LIGHTED EXIT SIGN - CEILING MOUNTED

LIGHTED EXIT SIGN - WALL MOUNTED

FIRE EXTINGUISHER (AND CABINET WHERE OCCURS)

AREA

FE

CO

EB5

2-STORY

E L

M S

T R

E E

T

S T

R E

E T

N A

M E

T B

D

F

IR

S T

R E

E T

'G' STREET

FUTURE

PARKING

FUTURE

PARKING

FUTURE

DFAC

(400)

NEW BLOCK CENTERED ON BUILDING 5049 (SIM BUILDING)

SHARED SERVICE ACCESS ROAD

TO EB5 MECH YARD & DFAC

FUTURE

OFFICER'S QUARTERS

FUTURE

OFFICER'S QUARTERS

FUTURE

OFFICER'S QUARTERS

241'-1 35/128"

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/6 /2

:3

:4

A M

P E

R M

IT

B

ID

S E

T

O M

D E

N L

IS

T

E D

B A

R R

A C

K S

E B

O

R E

G O

N M

IL

IT

A R

Y D

E P

A R

T M

E N

T

O R

D N

A N

C E

R D

H E

R M

IS

T

O N

O

R

G051

ML

30 JUNE 2023

2201032

CODE

COMPLIANCE

SITE PLAN AND

SUMMARY

BUILDING NARRATIVE

THIS NEW BARRACKS FACILITY EB5 WILL PROVIDE HOUSING FOR 160 NATIONAL GUARD ENLISTED TRAINEES FOR THE TRANSIENT TRAINING PROGRAMS AT THE RAYMOND F. REES TRAINING CENTER. THE 2-STORY BUILDING WILL BE BUILT OF AUSTERE DURABLE FINISHES INCLUDING CMU WALLS WITH A BRICK VENEER FACADE, AND A STANDING SEAM METAL ROOF. THE (8) OPEN BAY BARRACKS WHICH MAKE UP THE WINGS OF THE BUILDING WILL HOUSE 20 BILLETS EACH, AND THE 2ND LEVEL WILL ALSO INCLUDE HOUSING FOR (4) SENIOR LEADER'S QUARTERS IN THE FORM OF TWO PRIVATE ROOMS. THE CENTRAL CORE OF THE BUILDING WILL HOUSE SHARED RESTROOM AND SHOWER FACILITIES, AND A LOUNGE WILL BE LOCATED AT THE SOUTH SIDE FACING THE FUTURE DINING FACILITY WHICH THE BARRACKS WILL SHARE A SERVICE ROAD WITH. THE PROJECT IS TARGETED FOR LEED 4.0 SILVER AND WILL IMPLEMENT ROOFTOP SOLAR HOT WATER PANELS FOR HOT WATER HEATING, AND WILL INCLUDE WATER SAVING INTERIOR AND EXTERIOR MEASURES INCLUDING LOW-WATER LANDSCAPE COMPOSED OF TREES, GRAVEL, DROUGHT TOLERANT GROUNDCOVER, AND DRY CREEK BIOSWALES FOR ONSITE STORMWATER.

APPLICABLE BUILDING REGULATIONS

2022 OREGON STRUCTURAL SPECIALTY CODE (OSSC) BASED ON THE 2021 INTERNATIONAL BUILDING

CODE WITH OREGON AMENDMENTS

2021 INTERNATIONAL FIRE CODE (IFC) WITH OREGON AMENDMENTS

2021 OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC) BASED ON ASHRAE STANDARD 90.1-2019

2021 OREGON ELECTRICAL SPECIALTY CODE (OESC) BASED ON 2020 NFPA 70 NATIONAL ELECTRICAL CODE

2022 OREGON MECHANICAL SPECIALTY CODE (OMSC) BASED ON 2021 INTERNATIONAL MECHANICAL CODE

AND INTERNATIONAL FUEL GAS CODE

2021 OREGON PLUMBING SPECIALTY CODE (OPSC) BASED ON 2021 UNIFORM PLUMBING CODE

UNIFIED FACILITIES CRITERIA, DEPARTMENT OF DEFENSE

1-200-01_2019 DoD BUILDING CODE

1-200-02_2020 HIGH PERFORMANCE BULIDING STANDARD

3-201-02_2021 LANDSCAPE ARCHITECTURE

3-210-10_2021 LOW IMPACT DEVELOPMENT

3-410-01_2020 HEATING VENTILATION AND AIR CONDITIONING SYSTEMS

3-420-01_2019 PLUMBING

4-010-01_2022 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS

4-010-06_2017 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

4-021-01_2010 MASS NOTIFICATION SYSTEMS

OPERATIONAL READINESS TRAINING COMPLEX ARMY DESIGN STANDARD, SEPT 2020

ALLOWABLE AREA

ALLOWABLE AREA PER STORY (TABLE 506.2)

*R-1 AND V-B = 7,000 SF PER STORY (MOST RESTRICTIVE)

A-3 AND V-B = 18,000 SF PER STORY

S-1 AND V-B = 27,000 SF PER STORY

MIXED OCCUPANCY, MULTI-STORY BLDGS (TABLE 506.2.4): Aa = [At + (NS X If)]

CHAPTER 5

FRONTAGE INCREASE FACTORS

NORTH EAST SOUTH WEST

30' 30' 30' 30'FRONTAGE (506.2)

AREA INCREASE: FRONTAGE (SECTION 506.3.3, EQUATION 5-5)

TOTAL FRONTAGE (F) = 230' + 93' + 230' + 93' = 646' (SEE SECTION 506.3)

PERIMETER (P) = 230' + 93' + 230' + 93' = 646'

OPEN SPACE WIDTH (W) = 30' (SEE SECTION 506.3.2)

FRONTAGE INCREASE FACTOR: I =

PROPOSED BUILDING AREAS (SF)

LEVEL 01

LEVEL 02

TOTAL

OCC R-1OCC A-3

1,953 SF

1,953 SF

8,611 SF

9,190 SF

17,801 SF

1,028 SF

593 SF

1,621 SF

BUILDING IS PROVIDED WITH NFPA 13R SPRINKLER SYSTEM (S13R) PER 903 3.1.2

I f = F

P

- 0.25

W

= - 0.25

A a =

ALLOWABLE AREA PER STORY

A = ALLOWABLE AREA PER STORY

A = TABULAR AREA PER STORY, R-1, V-B, S13R (TBL 506.2) =

I = AREA INCREASE FACTOR DUE TO FRONTAGE (SEE ABOVE) =

NS = NON-SPRINKLERED, R-1, V-B =

f t a

A t + x

I f f

= + xNS 12,250 SF

< 12,250 SF ALLOWABLE

ACC S-1 TOTAL

11,592 SF

9,783 SF

21,375 SF

508 PATH

SEPARATED

ACCESSORY

NOTE 1: LEVEL 1 OCC A-3 EXCEEDS 10% AREA OF LEVEL 1 AND IS SEPARATED BY A 2-HR FIRE BARRIER.

NOTE 2: LEVEL 2 SINCE S-1 IS LESS THAN 10% FLOOR AREA, IT IS ACCESSORY TO R-1, THEREFORE THE

STORY IS EVALUATED SOLELY AS GROUP R-1

NOTE 3: LEVEL 2 OCC R-1 GOVERNS

ACTUAL AREA OCC A-3

ALLOWABLE AREA OCC A-3

ACTUAL AREA OCC R-1

ALLOWABLE AREA OCC R-1

ACTUAL AREA OCC S-1

ALLOWABLE AREA OCC S-1

18,000

8,611

12,250

1,028

27,000

0.109 + 0.703 + 0.038 = 0.850 < 1

OK

REFER TO CALC ABOVE

0.75

75%

0.75

0.75

7000 SF 7000 SF

7000 SF

7000 SF

BUILDING CONSTRUCTION

CONSTRUCTION TYPE: V-B OCCUPANCY: R-1 SPRINKLERS: S13R

CHAPTER 5, 6 & 7

BUILDING HEIGHT (PER TABLE 504.3) 60'-0" 34'-8"

ALLOWABLE PROPOSED

NUMBER OF STORIES (PER TABLE 504.4) 3 STORIES 2 STORIES

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (TABLE 601)

BUILDING ELEMENT VB

REQUIRED PROPOSED

STRUCTURAL FRAME

BEARING WALLS - EXTERIOR

INTERIOR

a. NOT LESS THAN THE FIRE RESISTANCE REQUIRED BY FIRE SEPARATION DISTANCE PER TABLE 602

b. NOT LESS THAN THE FIRE RESISTANCE REQUIRED BY SECTION 704.10

NONBEARING WALLS AND PARTITIONS - INTERIOR

FLOOR CONSTRUCTION

ROOF CONSTRUCTION

VB

a,b b

BUILDING OCCUPANCY AND SEPARATIONS

APPLICABLE OCCUPANCY CLASSIFICATION GROUPS: A-3, R-1

ACCESSORY OCCUPANCIES: B, S-1 (508.2.4)

OCCUPANCY SEPARATION REQUIRED (508.4)

OCCUPANCY

CORRIDOR

UNIT TO UNIT

UNIT TO OTHER

OCCUPANCY SEPARATION (FIRE RATING)

1/2 HOUR FIRE PARTITION (1020.1)

1 HOUR FIRE PARTITION (420 & 708)

CHAPTER 3 & 5

OPENING PROTECTIVES TABLE 716.1(2)

R-1 TO A-3 2 HOUR FIRE BARRIER (508.4 & 707) 90 MIN

45 MIN

20 MIN

FIRE PROTECTION

FIRE EXTINGUISHERS: CLASS A/B/C/D

CHAPTER 9

AUTOMATIC SPINKLER SYSTEM

FIRE ALARM SYSTEM*

SMOKE DETECTION SYSTEM*

REQUIRED PROPOSED TYPE/CLASS

YES PER 420.4, 903.3.1.2 YES NFPA 13R

YES PER 907.2.8 YES NFPA 72

YES PER 907.2.10.1 YES NFPA 72

*PROVIDE FIRE PROTECTION PER IFC 907.

CARBON MONOXIDE ALARMS YESYES PER 915.1.2 GROUP R

CARBON MONOXIDE ALARMS: PROVIDE A CARBON MONOXIDE DETECTOR IN EACH SLEEPING ROOM, AS WELL AS THE LOUNGE COMMON AREA PER OSSC 915.1.2. A COMBINATION FIRE, SMOKE, CARBON

MONOXIDE ALARM IS PERMITTED IN A HARDWIRED DETECTION SYSTEM.

ENERGY CONSERVATION 2021 OEESC

REQUIRED PROPOSED

SYSTEM DESIGN FOR THIS PROJECT IS GOVERNED BY LEED REQUIREMENTS. REFERENCE SECTION 01 35 15

- LEED REQUIREMENTS FOR ADDITIONAL INFORMATION.

BUILDING COMPONENTS

BUILDING ENVELOPE REQUIREMENTS - CLIMATE ZONE 5B - ASHRAE 90.1-2019, 5.5 (TABLE 5.5-5)

R-30 ci

R-13.3 ci R-13.3 ci

R-30 ciROOFS - INSULATION ENTIRELY ABOVE DECK

ABOVE-GRADE WALL - MASS

SLAB-ON-GRADE FLOORS - UNHEATED R-20 FOR 24" R-20 FOR 24"

FENESTRATION (FIXED): U-VALUE 0.36

U = 0.370

0.26

U = 0.370OPAQUE DOORS - SWINGING

FLOORS - WOOD-FRAMED AND OTHER R-30 R-30

R-10 ci N/ABELOW-GRADE WALL - MASS

FENESTRATION (OPERABLE): U-VALUE

FENESTRATION (FIXED): SHADING CO-EFFICIENT (SHGC)

FENESTRATION (OPERABLE): SHGC

0.38 0.22

0.45

0.33

0.27

0.22

GENERAL INFORMATION

PERMIT APPLICANT: SERA ARCHITECTS, INC. 503.445.7372

ON BEHALF OF OREGON MILITARY DEPARTMENT

LEGAL DESCRIPTION: UMATILLA ORDNANCE DEPOT (TAX EXEMPT)

A PARCEL OF LAND SITUATED IN TOWNSHIP 4 NORTH, RANGE 27 WEST,

SECTION 15, OF THE UMATILLA COUNTY DEPOT PLAN DISTRICT, HERMISTON

OREGON, CONTAINING 19,728 ACRES WITH 7,500 ACRES ZONED FOR MILITARY

USE

ZONING: UDM (UMATILLA ARMY DEPOT MILITARY ZONE)

SEISMIC ZONE: DESIGN CATEGORY C

PROJECT ADDRESS: 78798 ORDNANCE ROAD / HERMISTON, OR 97838

INTERIOR ENVIRONMENT

OCCUPIED ROOMS: NATURAL VENTILATION PROVIDED PER 1202.5.

TOILET & BATH ROOMS: MECHANICAL VENTILATION PROVIDED PER 1202.5.2.1

NATURAL LIGHT: NET GLAZED AREA IS GREATER THAN 8% OF FLOOR AREA OF ROOM SERVED PER 1204.2

CHAPTER 12

MEANS OF EGRESS

EGRESS WIDTH PER OCCUPANT SERVED (SECTION 1005.3):

STAIRWAYS: (0.3"/OCC) = REFER TO BUILDING EXITING TABLE ON THIS SHEET

OTHER EGRESS COMPONENTS: (0.2"/OCC) = REFER TO BUILDING EXITING TABLE ON THIS SHEET

44" MINIMUM STAIRWAY WIDTH REQUIRED PER 1009.4

CHAPTER 10

NUMBER OF EXITS (1006):

TWO EXITS REQUIRED PER TABLE 1006.2.1

ILLUMINATED EXIT SIGNS: REQUIRED PER 1011.1

EXIT ACCESS (1006):

COMMON PATH OF EGRESS TRAVEL PER 1006.2.1: R-1 OR A OCCUPANCY: 75'-0"

EXIT ACCESS TRAVEL DISTANCE (1017):

OCC A,R,S-1 = 250'-0" IN A BUILDING PROVIDED WITH A SPRINKLER MEETING 903.3.1.2

EXIT ACCESS ILLUMINATION REQUIREMENT:

EGRESS LIGHTING REQUIRED ALONG THE EGRESS PATH TO THE R.O.W. PER SECTION 1008.

PERFORMANCE REQUIREMENTS:

AVERAGE OF 1fc WITH A MINIMUM OF 0.1fc AT ANY POINT ON THE EGRESS PATH AT FLOOR LEVEL LIGHT LEVEL MAY DECLINE TO AVERAGE OF 0.6fc WITH A MINUMN OF 0.06fc AT ANY POINT ON THE EGRESS

PATH AT FLOOR LEVEL AFTER 90 MINUTES OF OPERATION ON EMERGENCY POWER.

MAXIMUM TO MINIMUM ILLUMINATION UNIFORMITY RATIO OF 40 TO 1 SHALL NOT BE EXCEEDED.

POWER PROVIDED BY BATTERY INVERTERS (EMERGENCY GENERATOR) (REFERECE ELECTRICAL

DOCUMENTS)

MINIMUM PLUMBING FIXTURE REQUIREMENTS

CHAPTER 29 AND PLUMBING CODE

USE

LAVATORIES DRINKING

FOUNTAINS

1 PER

FLOOR

SHOWERS

F

0.13

0.10

2.9

0.15

M

0.52

0.10

11.9

0.15

A-3

B

R-1

(DORM)

S-1

WATER CLOSET

F

0.38

0.16

2.9

0.15

M

4.16

0.16

11.9

0.15

LOAD

104/25

119/29

RATIO RATIO

OCCUPANCY

1 PER

1 PER

1 PER

1 PER

1 PER

1 PER

1 PER

1 PER

RATIO

1 PER

1 PER

1 PER

1 PER

SUBTOTAL

REQUIRED

PROVIDED

16.37

3.59

4 2

F

M

RATIO

1 PER

3.614.9

3.2812.67

13 4

3.614.9

14 W.C.'S +

14 URINALS*

= 23.33 WC'S

4 W.C.'S 21 3 321

NOTE: THE GENDER SPLIT IS BASED ON THE DESIGN CRITERIA OF ONE OPEN BAY DEDICATED TO FEMALES DUE TO THE UNEVEN DIVISION OF GENDER IN THE NATIONAL GUARD. NON-DORMITORY AREAS HAVE BEEN

GENDER SPLIT AT 80/20.

ROOFING REQUIREMENTS

BASIC WIND SPEED: 102 MPH

WIND EXPOSURE: C (PER 1609.4.3)

FIRE CLASSIFICATION: C (PER 1505.1)

METAL ROOF PANELS: 1507.4

ROOFTOP MOUNTED SOLAR PANELS 1505.9

CHAPTER 15

CLADDING REQUIREMENTS

BASIC WIND SPEED: 102 MPH

WIND EXPOSURE: C (PER 1609.4.3)

FIRE CLASSIFICATION: PER TABLE 602

ANCHORED MASONRY VENEER: 1404.6

CHAPTER 14 & 16

SHAFTS

SHAFT CONSTRUCTION: 1-HR REQUIRED PER 713.4

CHAPTER 7

SOUND TRANSMISSION CHAPTER 12

FLOOR/CEILING ASSEMBLIES SEPARATING SLEEPING

UNITS FROM EACH OTHER AND FROM ADJACENT

PUBLIC AREAS

IIC 50 (45 FIELD) IIC 50 MIN

REQUIRED PROPOSED

INTERIOR WALL ASSEMBLIES SEPARATING

SLEEPING UNITS FROM EACH OTHER AND FROM

ADJACENT PUBLIC AREAS.

NOTES:

REFERENCE ASSEMBLIES FOR SPECIFIC ASSEMBLY SOUND TRANSMISSION INFORMATION.

STC 50 (45 FIELD) STC 50 MIN

BUILDING ELEMENT

DISABLED ACCESS REQUIREMENTS

THIS BUILDING TYPE IS CONSIDERED AN ABLE-BODIED TRAINING FACILITY AND IS NOT REQUIRED TO BE

ACCESSIBLE PER ORTC 3.1.3 (B).

UFC, ORTC

GENERAL NOTES - CODE SUMMARY

A. CODE SUMMARY KEYED NOTES APPLY TO G100 SERIES SHEETS. ALL KEYED NOTES MAY

NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS EXCEPT THOSE

NOTED.

B. ALL WORK SHOWN ON THIS SHEET IS INCLUDED IN THE CONTRACT FOR CONSTRUCTION,

WHETHER SHOWN ELSEWHERE OR NOT. CONTRACTOR SHALL MAKE ALLOWANCES FOR

CONNECTION, HOOK UP, ETC. AS REQUIRED SO THAT ITEMS, EQUIPMENT, ETC. ARE FIT

FOR INTENDED PURPOSE.

C. SEE ELECTRICAL AND MECHANICAL PLANS FOR ADDITIONAL SYMBOLS

D. PROVIDE LISTED FIRESTOP, CONTINUOUS AT PERIMETER GAPS OF ALL RATED

CONSTRUCTION AS REQUIRED TO MAINTAIN THE SPECIFIED RATING.

E. SQUARE FOOTAGE AREA CALCULATIONS ARE BASED ON THE BUILDING CODE

DEFINITIONS OF GROSS AND NET AREAS AS USED TO DETERMINE OCCUPANT LOADS

ONLY AND ARE NOT A REPRESENTATION OF LEASABLE AREA.

F. AT FIRE WALLS, BARRIERS, AND PARTITIONS ACCESSIBLE IN A CONCEALED FLOOR,

FLOOR/CEILING OR ATTIC SPACE - PROVIDE PERMANENT IDENTIFICATION WITH SIGNS OR

STENCILING, NOT LESS THAN 3" HIGH WITH A MINIMUM 3/8" STROKE IN CONTRASTING

COLOR TO SAY "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS." SIGNS SHALL

BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND AT INTERVALS NOT

EXCEEDING 30 FEET PER OSSC 703.7.

1" = 40'-0"

CODE COMPLIANCE SITE PLAN

ADD 1 14 JUL 2023

ADD 2 8 SEPT 2023

DRAFTSTOPPING

DRAFTSTOPPING IN ATTICS ARE REQUIRED PER 718.4 & 708.4.2. ALIGN DRAFTSTOPPING WITH ALL R-1 SEPARATION FIRE PARTITIONS AT 2ND FLOOR, WHERE ATTIC IS NOT SPRINKLERED. REFER TO A103 FOR

ATTIC DRAFTSTOPPING PLAN WITH ADDITIONAL INFO.

CHAPTER 7ADD 1

ADD 1

ADD 2

ADD 2

ADD 2

X

X

X

X

X

X

X

X

X

X

X

X

2X2X 2X2X2X

X

2X2X

X

2X2X 2X2X2X

1X 1X1X

X XX

SB SBSB

2X 2X2X

X

X

X

X

X

X

X

X

X

X

X

X

2X2X 2X2X2X2X2X2X2X2X2X2X

OCC:

OLF:

OT:

AREA:

1575 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

1574 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS) OCC:

OLF:

OT:

AREA:

210 SF

R-1

STAIR

OCC:

OLF:

OT:

AREA:

39 SF

S-1

MECH

OCC:

OLF:

OT:

AREA:

217 SF

S-1

STORAGE

OCC:

OLF:

OT:

AREA:

190 SF

R-1

ADMIN OFFICE

OCC:

OLF:

OT:

AREA:

85 SF

S-1

SPRINKLER

OCC:

OLF:

OT:

AREA:

77 SF

S-1

ITOCC:

OLF:

OT:

AREA:

220 SF

S-1

ELECTRICAL

OCC:

OLF:

OT:

AREA:

42 SF

S-1

MECH

OCC:

OLF:

OT:

AREA:

296 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

235 SF

S-1

MECHANICAL

OCC:

OLF:

OT:

AREA:

40 SF

S-1

MECH

OCC:

OLF:

OT:

AREA:

73 SF

S-1

JANITOR

OCC:

OLF:

OT:

AREA:

299 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

1953 SF

A-3

LOUNGE

OCC:

OLF:

OT:

AREA:

1574 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

1576 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

129 SF

R-1

VENDING/DF

OCC:

OLF:

OT:

AREA:

805 SF

R-1

CIRCULATION

OCC:

OLF:

OT:

AREA:

210 SF

R-1

STAIR

F E

F E

STAIR OCCUPANT LOAD:

REQUIRED WIDTH:

PROVIDED WIDTH:

PROVIDED STAIR CAPACITY:

REQUIRED DOOR WIDTH:

PROVIDED DOOR WIDTH:

PROVIDED DOOR CAPACITY

STAIR 2

46 * 0.15 = 7" 36"

46 * 0.3 = 14" 48"

PROVIDED CLEAR DOOR WIDTH:

PROVIDED DOOR CAPACITY: 360

72"

DOOR 3

PROVIDED CLEAR DOOR WIDTH:

PROVIDED DOOR CAPACITY: 180

36"

DOOR 1

PROVIDED CLEAR DOOR WIDTH:

PROVIDED DOOR CAPACITY: 360

72"

DOOR 4

F E

F E

STAIR OCCUPANT LOAD:

REQUIRED WIDTH:

PROVIDED WIDTH:

PROVIDED STAIR CAPACITY:

REQUIRED DOOR WIDTH:

PROVIDED DOOR WIDTH:

PROVIDED DOOR CAPACITY

STAIR 1

46 * 0.15 = 7" 36"

46 * 0.3 = 14" 48"

PROVIDED CLEAR DOOR WIDTH:

PROVIDED DOOR CAPACITY: 180

36"

DOOR 2

STAIR OCCUPANT LOAD:

REQUIRED WIDTH:

PROVIDED WIDTH:

PROVIDED STAIR CAPACITY:

REQUIRED DOOR WIDTH:

PROVIDED DOOR WIDTH:

PROVIDED DOOR CAPACITY

STAIR 3

100 * 0.15 = 15" 36"

100 * 0.3 = 30" 48"

OCC:

OLF:

OT:

AREA:

296 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

299 SF

R-1

RESTROOM

E.A. 91'-4" - (PER 1016.2)

C.P. 53'-11" - (PER 1030.8)

CO

CO

CO

PROVIDE CONDUIT

INFRASTRUCTURE

FOR FUTURE DAS

2 1 11

1 1

CO

CO

COCO

CO

MASS NOTIFICATION

INITIATING DEVICE

FE

FE

20 20

2 HOUR LID PER

ASSEMBLY FC6/A002 -

REFER TO 3/A401 & 7/A704

1/3 DIAGONAL = 71'-4" < 211'-0 1/2"

213'-6" (OSSC 1007.1.1)

211'-0 1/2"

E.A. 91'-4" - (PER 1016.2)

C.P. 53'-11" - (PER 1030.8)

ADD 2ADD 2

LEGEND - CODE COMPLIANCE SYMBOLS

PROPERTY LINE

1/2 HOUR FIRE PARTITION

1 HOUR FIRE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE RESISTANCE RATED CONSTRUCTION

1 HOUR SMOKE BARRIER

2 HOUR FLOOR / CEILING ASSEMBLY

EXTERIOR EGRESS PATH TO ROW WITH TRAVEL WIDTH

REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR

EXITING - REFER TO ELECTRICAL DRAWINGS).

EGRESS PATH OF TRAVEL WITH TRAVEL WIDTH

REQUIRED (PROVIDE MINIMUM ILLUMINATION FOR

EXITING - REFER TO ELECTRICAL DRAWINGS).

ACCESSIBLE ROUTE OF TRAVEL

COMMON PATH OF EGRESS TRAVEL

EXIT ACCESS DISTANCE

RATED SHAFT (WALL CONSTRUCTION TO MEET FIRE

BARRIER REQUIREMENTS)

44"

E.A. X'-XX" - (PER 1016.2)

C.P. X'-XX" - (PER 1014.3)

44"

# HR

OCCUPANT LOAD AT OPENING

CUMULATIVE OCCUPANT LOAD AT OPENING

BUILDING EXIT

BUILDING CODE APPEAL

AREA REQUIRING CARBON MONOXIDE DETECTION

AREA REQUIRING SMOKE DETECTION

SPRINKLER, SEE FIRE PROTECTION DRAWINGS

AREA NAME

MANUAL PULL STATION REQUIRED

LIGHTED EXIT SIGN - SHADING INDICATES LIGHTED FACE(S)

DIRECTION ARROW CORRESPONDS TO DIRECTION ARROW ON SIGN

LIGHTED EXIT SIGN - CEILING MOUNTED

LIGHTED EXIT SIGN - WALL MOUNTED

FIRE EXTINGUISHER (AND CABINET WHERE OCCURS)

AREA

FE

CO

OCC:

OLF:

OT:

AREA:

265 SF

R-1

STAIR

OCC:

OLF:

OT:

AREA:

1569 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

1571 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

39 SF

S-1

MECH

OCC:

OLF:

OT:

AREA:

498 SF

R-1

SENIOR LEADER'S

QUARTERS

OCC:

OLF:

OT:

AREA:

487 SF

R-1

SENIOR LEADER'S

QUARTERS

OCC:

OLF:

OT:

AREA:

785 SF

R-1

CIRCULATION

OCC:

OLF:

OT:

AREA:

296 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

296 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

296 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

296 SF

R-1

RESTROOM

OCC:

OLF:

OT:

AREA:

317 SF

S-1

MECHANICAL

OCC:

OLF:

OT:

AREA:

47 SF

S-1

JANITOR

OCC:

OLF:

OT:

AREA:

112 SF

S-1

STORAGE

OCC:

OLF:

OT:

AREA:

39 SF

S-1

MECH

OCC:

OLF:

OT:

AREA:

39 SF

S-1

MECH

OCC:

OLF:

OT:

AREA:

1572 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

1522 SF

R-1

OPEN-BAY-BARRACK

(20 BEDS)

OCC:

OLF:

OT:

AREA:

265 SF

R-1

STAIR

F E

F E

E.A. 115'-4" - (PER 1016.2)

C.P. 55'-9" - (PER 1030.8)

F E

F E

1 HR

CO

PROVIDE CONDUIT

INFRASTRUCTURE

FOR FUTURE DAS

CO

CO

10 10 1

COCO

19 19

FE

CO

CO

2-HOUR FIRE BARRIER

BELOW TO EXTEND UP TO

LOUNGE ROOF SHEATHING

PER OSSC SECT 707.5. -

REFER TO 3/A401 & 6/A704

E.A. 115'-4" - (PER 1016.2)

C.P. 55'-9" - (PER 1030.8)

ADD 2

ADD 2

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/7

/2

:2

:1

P M

P E

R M

IT

B

ID

S

E T

O M

D E

N L

IS

T E

D B

A R

R A

C K

S E

B

O R

E G

O N

M

IL

IT

A

R Y

D E

P A

R T M

E N

T

O

R D

N A

N C

E R

D H

E R

M

IS

T O

N O

R

G101

ML

30 JUNE 2023

2201032

CODE

COMPLIANCE

PLANS

1/8" = 1'-0"

CODE COMPLIANCE PLAN - LEVEL 01

GENERAL NOTES - CODE SUMMARY

A. CODE SUMMARY KEYED NOTES APPLY TO G100 SERIES SHEETS. ALL KEYED NOTES MAY

NOT OCCUR ON THIS SHEET AND DO NOT APPLY TO ANY OTHER SHEETS EXCEPT THOSE

NOTED.

B. ALL WORK SHOWN ON THIS SHEET IS INCLUDED IN THE CONTRACT FOR CONSTRUCTION,

WHETHER SHOWN ELSEWHERE OR NOT. CONTRACTOR SHALL MAKE ALLOWANCES FOR

CONNECTION, HOOK UP, ETC. AS REQUIRED SO THAT ITEMS, EQUIPMENT, ETC. ARE FIT

FOR INTENDED PURPOSE.

C. SEE ELECTRICAL AND MECHANICAL PLANS FOR ADDITIONAL SYMBOLS

D. PROVIDE LISTED FIRESTOP, CONTINUOUS AT PERIMETER GAPS OF ALL RATED

CONSTRUCTION AS REQUIRED TO MAINTAIN THE SPECIFIED RATING.

E. SQUARE FOOTAGE AREA CALCULATIONS ARE BASED ON THE BUILDING CODE

DEFINITIONS OF GROSS AND NET AREAS AS USED TO DETERMINE OCCUPANT LOADS

ONLY AND ARE NOT A REPRESENTATION OF LEASABLE AREA.

F. AT FIRE WALLS, BARRIERS, AND PARTITIONS ACCESSIBLE IN A CONCEALED FLOOR,

FLOOR/CEILING OR ATTIC SPACE - PROVIDE PERMANENT IDENTIFICATION WITH SIGNS OR

STENCILING, NOT LESS THAN 3" HIGH WITH A MINIMUM 3/8" STROKE IN CONTRASTING

COLOR TO SAY "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS." SIGNS SHALL

BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND AT INTERVALS NOT

EXCEEDING 30 FEET PER OSSC 703.7.

1/8" = 1'-0"

CODE COMPLIANCE PLAN - LEVEL 02

ADD 1

ADD 1 14 JUL 2023

ADD 2 8 SEPT 2023

OCCUPANT LOAD SUMMARY - LEVEL 01

NAME AREA OCC TYPE

OCC LOAD

FACTOR OCC LOAD

A-3

LOUNGE 1953 SF A-3 15 131

A-3 1953 SF 131

R-1

ADMIN OFFICE 190 SF R-1 100 2

CIRCULATION 805 SF R-1 50 17

OPEN-BAY-BARRACK (20 BEDS) 1575 SF R-1 50 32

OPEN-BAY-BARRACK (20 BEDS) 1574 SF R-1 50 32

OPEN-BAY-BARRACK (20 BEDS) 1574 SF R-1 50 32

OPEN-BAY-BARRACK (20 BEDS) 1576 SF R-1 50 32

RESTROOM 299 SF R-1 50 6

RESTROOM 296 SF R-1 50 6

RESTROOM 296 SF R-1 50 6

RESTROOM 299 SF R-1 50 6

VENDING/DF 129 SF R-1 50 3

R-1 8611 SF 174

S-1

ELECTRICAL 220 SF S-1 300 1

IT 77 SF S-1 300 1

JANITOR 73 SF S-1 300 1

MECH 39 SF S-1 300 1

MECH 42 SF S-1 300 1

MECH 40 SF S-1 300 1

MECHANICAL 235 SF S-1 300 1

SPRINKLER 85 SF S-1 300 1

STORAGE 217 SF S-1 300 1

S-1 1028 SF 9

TOTAL: 21 11592 SF 314

OCCUPANT LOAD SUMMARY - LEVEL 02

NAME AREA OCC TYPE

OCC LOAD

FACTOR OCC LOAD

R-1

CIRCULATION 785 SF R-1 50 16

OPEN-BAY-BARRACK (20 BEDS) 1522 SF R-1 50 31

OPEN-BAY-BARRACK (20 BEDS) 1569 SF R-1 50 32

OPEN-BAY-BARRACK (20 BEDS) 1571 SF R-1 50 32

OPEN-BAY-BARRACK (20 BEDS) 1572 SF R-1 50 32

RESTROOM 296 SF R-1 50 6

RESTROOM 296 SF R-1 50 6

RESTROOM 296 SF R-1 50 6

RESTROOM 296 SF R-1 50 6

SENIOR LEADER'S QUARTERS 498 SF R-1 50 10

SENIOR LEADER'S QUARTERS 487 SF R-1 50 10

R-1 9190 SF 187

S-1

JANITOR 47 SF S-1 300 1

MECH 39 SF S-1 300 1

MECH 39 SF S-1 300 1

MECH 39 SF S-1 300 1

MECHANICAL 317 SF S-1 300 2

STORAGE 112 SF S-1 300 1

S-1 593 SF 7

TOTAL: 17 9783 SF 194

STOP

S T O P

S T O P

S T O P

LEGEND - LANDSCAPE MATERIALS PLAN

FUTURE WORK, N.I.C. - REFER TO MASTERPLAN

AT/FP STANDOFF ZONE

CONCRETE SIDEWALK

GRAVEL WITH STEEL EDGING (1/4-10 CRUSHED BASALT)

SCOPE OF WORK/LEED BOUNDARY

PLANTING SCHEDULE

CRUSHED BASALT

SUN AND SHADE MIX

BLUEGRASS (45%)

RYEGRASS (45%)

RED FESCUE (10%)

SEED

BOTANICAL NAME COMMON NAME SIZE

SEEDING RATE

4-6 (PLS) lbs.

per 1000 sf

SPACINGSYMBOL DETAIL

GRAVEL 5/LP1021/4" MINUS ---

COBBLESTONE COBBLE PER CIVILPER CIVIL ---

POA PRATENSIS (45%)

LOLIUM PERENNE (45%)

FESTUCA RUBRA (10%)

ACHILLEA TOMENTOSA (25%)

FESTUCA IDAHOENSIS (75%)

WOOLLY YARROW

IDAHO FESCUE

1 GAL.

1 GAL.

12" O.C.

12" O.C.

GRAVEL LOT GRAVEL PER CIVILPER CIVIL ---

THORNLESS

HONEY LOCUST

GLEDITSIA TRIACONTHOS 1/LP1022" CALIPER 30' O.C. MIN

SEE PLANS

ADD ALTERNATE SCOPE OF WORK

ADD 2

EB5

2-STORY

E L M

S T R

E E

T

S T R

E E

T N

A M

E T

B D

F

IR

S T R

E E

T

'G' STREET

FUTURE

PARKING

FUTURE

PARKING

FUTURE

DFAC

(400)

C

EQ EQ

'-0

T

Y P

E Q

E Q

'-0

T

Y P

E Q

E Q

10'-0" 10'-0" ~94'-0" 10'-0"25'-0" 10'-0" ~94'-0" 10'-0" 10'-0"

EQ EQ

ADD ALTERNATE #1: NORTH BARRACKS

PARKING LOT + SITE LIGHTING

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/8

/2

:0 :1

A

M

P E

R M

IT

B

ID

S E

T

O M

D E

N L

IS

T E

D B

A R

R A

C K

S E

B

O R

E G

O N

M

IL

IT

A

R Y

D E

P A

R T M

E N

T

O

R D

N A

N C

E R

D H

E R

M

IS

T O

N O

R

LP101

DJ

30 JUNE 2023

2201032

PLANTING PLAN

GENERAL NOTES - PLANTING

ALL EXISTING PLANTING SOIL SHALL BE AMENDED AS RECOMMENDED IN AN APPROVED

AGRICULTURAL SOILS REPORT.

UNDERGROUND AUTOMATIC IRRIGATION SYSTEM SHALL BE INSTALLED IN ALL PLANTING

AREAS FOR ESTABLISHMENT. (COMPLY WITH LEED 4.0 REQUIREMENTS - TO BE

REMOVED/CAPPED AND ABANDONED AFTER 2-YEAR PLANTING ESTABLISHMENT PERIOD.)

REFER TO PLANTING DETAILS ON SHEET LP102

PROPOSED PLANTING WITHIN THE CANTONMENT IS REQUIRED TO MEET AT/FP STANDARDS

WITHIN THE ATFP STANDOFF ZONE IN WHICH THE ENTIRE SITE IS CONTAINED WITHIN,

LANDSCAPE MUST NOT BE ALLOWED TO CONCEAL A 6" SPHERE, AND IS EXCLUDED FROM

ANY LOCAL JURISDICTION PLANTING STANDARDS WHICH CONTRADICT THIS REQUIREMENT.

ORGANIC MATTER IS NOT ALLOWED WITHIN 3'-0" OF THE EDGE OF BUILDING PER

HANTAVIRUS REQUIREMENTS. PROVIDE GRAVEL BAND ALONG BUILDING EDGE PER PLAN.

A.

B.

C.

D.

E.

F.

1" = 20'-0"

PLANTING PLAN

ADD 1 14 JUL 2023

ADD 2 8 SEPT 2023

ADD 1

ADD 1

ADD 2

ADD 2

78 PA

NATIVE SOIL

32 93 00 - ROOTBALL

FINISH GRADE, 2" AWAY

FROM STEM OF PLANT

32 93 00 - AMENDED PLANTING SOIL

EXISTING BARK COVER

32 93 00 - GROUNDCOVER PLANT

EDGE OF PLANTING AREA/

WALK EDGE

PLANT CENTER

TRI-SPACE, AT SPECIFIED O.C.

DISTANCE-EQUIDISTANT

S P

A C

IN

G

O .C

SPACING

O.C.

SPACINGO.C.

32 93 00 - GROUNDCOVER PLANT

32 93 00 - TOPSOIL

32 93 00 - 3/16" X 4" ALUM. ANGLE EDGING

32 93 00 - SEED MIX

32 93 00 - PLANTING SOIL

ADJACENT CONDITIONS VARY,

SEE NOTES BELOW

32 15 00 - GRAVEL 1/4" MINUS, TYPICAL

NON WOVEN FILTER FABRIC

NOTES:

1. WHERE CONCRETE PVMT ABUTTS GRAVEL, TOP OF GRAVEL IS TO MEET TOP OF PVMT FLUSH

2. WHERE THE BLDG ABUTTS GRAVEL, TOP OF GRAVEL IS TO BE 1" MINIMUM BELOW BLDG FINISHED FLOOR

4"

32 93 00 - TOPPING SOIL - 2" DEPTH,

KEEP 2" AWAY FROM TRUNK

TAMP NATIVE SOIL FOR FIRM

BASE 6" DEPTH

UNDISTURBED NATIVE SOIL

SET CROWN OF ROOTBALL 2"

ABOVE FINISH GRADE AND REMOVE

CAGE, BURLAP AND TWINE FROM

TOP HALF OF ROOTBALL

(2) STAKES, AS SPECIFIED

FINISH GRADE

SCARIFY SIDES AND BOTTOM

2x ROOTBALL DIA

NOTES:

1. FURNISH (2) 2" DIA ROUND 8' TALL TREATED FIR OR HEMLOCK TREE STAKES FOR EACH DECIDUOUS TREE IN A PLANTING AREA.

2. ORIENT ALL STAKING PERPENDICULAR TO PREVAILING WIND.

3. DRIVE STAKES VERTICALLY AND AT LEAST 18" INTO UNDISTURBED NATIVE SOIL. DO NOT DRIVE STAKES THROUGH ROOT BALL.

4. TREE TIES SHALL ALLOW 4" OF SWAY IN ANY DIRECTION.

M

IN

32 90 00 - AMENDED TOPSOIL

TREE TIE STRAPPING, SECURE TO

STAKE

ROOTBALL +6" MIN

32 90 00 - PLANTS

M

IN

32 90 00 - PLANTS

SET CROWN OF ROOTBALL 1"

ABOVE FINISH GRADE

FINISH GRADE

TAMP NATIVE SOIL FOR FIRM

STABLE BASE 3" DEPTH

TOPPING SOIL - KEEP 2" AWAY

FROM STEM OF SHRUB

UNDISTURBED NATIVE SOIL

SCARIFY SIDES AND BOTTOM

2x ROOTBALL DIA

ROOTBALL

32 90 00 - AMENDED TOPSOIL

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/6 /2

:3

:4

A M

P E

R M

IT

B

ID

S E

T

O M

D E

N L

IS

T

E D

B A

R R

A C

K S

E B

O

R E

G O

N M

IL

IT

A R

Y D

E P

A R

T M

E N

T

O R

D N

A N

C E

R D

H E

R M

IS

T

O N

LP102

DJ

30 JUNE 2023

2201032

PLANTING

DETAILS

1" = 1'-0"

GROUNDCOVER PLANTING

1" = 1'-0"

PLANT SPACING TRIANGULAR

1" = 1'-0"

GRAVEL WITH STEEL EDGING

5 3/4" = 1'-0"

TREE STAKES

1" = 1'-0"

CONTAINER/B & B SHRUB

ADD 2 8 SEPT 2023

T O P

S T O P

S T O P

LEGEND - IRRIGATION EQUIPMENT

QUICK COUPLER

SMART CONTROLLER, LOCATION TBD

METER, LOCATION TBD

POINT OF CONNECTION

COMPONENTSYMBOL

MASTER VALVE, LOCATION TBD

M

C

P.O.C.

DETAIL

BACKFLOW PREVENTER, LOCATION TBDB

6/LI102

1/LI102

TBD

7/LI102

2/LI102

8/LI102

TREE DRIP LINE 9/LI102

LEGEND - IRRIGATION SCHEDULE

MP ROTATORS (UNDERGROUND IRRIGATION FOR

PLANTING ESTABLISHMENT 2-YEAR IN COMPLIANCE

WITH LEED VERSION 4.0 REQUIREMENTS)

MAINLINE

SLEEVE (UNDER HARDSCAPE, REF 4/LI102)

ADD ALTERNATE SCOPE OF WORK

EB5

2-STORY

FF: 100'-0"

(XXX.XX)

E L

M S

T R

E E

T

S T

R E

E T

N A

M E

T B

D

F

IR

S T

R E

E T

'G' STREET

FUTURE

PARKING

FUTURE

PARKING

FUTURE

DFAC

(400)

C

M

P .O

.C

B

ADD ALTERNATE #1: NORTH BARRACKS

PARKING LOT + SITE LIGHTING

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/6 /2

:3

:3

A M

P E

R M

IT

B

ID

S E

T

O M

D E

N L

IS

T

E D

B A

R R

A C

K S

E B

O

R E

G O

N M

IL

IT

A R

Y D

E P

A R

T M

E N

T

O R

D N

A N

C E

R D

H E

R M

IS

T

O N

LI101

DJ

30 JUNE 2023

2201032

IRRIGATION PLAN

GENERAL NOTES - IRRIGATION

INSTALL 1-INCH IRRIGATION MAINLINE AROUND PERIMETER OF BUILDING WITH QUICK

COUPLER VALVES AT ~100 FT. OC. POINT OF CONNECTION SHALL INCLUDE CODE

APPROVED BACKFLOW DEVICE, REMOTE CONTROL VALVE AND MANUAL SHUT OFF VALVE.

COORDINATE W/ OWNER'S REP FOR FINALIZED LOCATION OF CONTROLLER, VALVES,

METERS, AND BACKFLOW DEVICE.

PROVIDE FLOW SENSOR

REFER TO PLUMBING/CIVIL DRAWINGS FOR POC BY OTHERS.

SLEEVE LOCATIONS TO BE A MINIMUM OF 18" FROM ADJECENT HARDSCAPE AND OTHER

OBSTACLES, TYP.

ELECTRIC CONTROL VALVE(S) AND ISOLATION VALVE LOCATIONS ON THIS DRAWING ARE

APPROXIMATE. THE IRRIGATION CONTRACTOR SHALL STAKE OUT EACH ELECTRICAL

CONTROL VALVE AND ISOLATION VALVE LOCATION FOR REVIEW AND APPROVAL BY

OWNERS AUTHORIZED REPRESENTATIVE PRIOR TO INSTALLATION OF ALL VALVES.

IRRIGATION CONTROLLER LOCATION SHALL BE COORDINATED AND APPROVED WITH

OWNER'S AUTHORIZED REPRESENTATIVE. CONTROLLER SHALL BE WIRED AND INSTALLED

BY ELECTRICAL CONTRACTOR.

ALL PIPING AND WIRE SHALL BE SLEEVED UNDER PAVING. ALL SLEEVES TO BE A MINIMUM

2X DIA OF PIPE OR WIRE DIA. INSIDE WIRES SHALL BE INSTALLED IN SLEEVE SEPARATE

FROM PIPE SLEEVE. ALL MAINLINE SHALL BE ACCOMPANIED WITH A MINIMUM 2-INCH DIA.

WIRE SLEEVE. SLEEVING TO EXTEND A MINIMUM 12-INCHES BEYOND PAVING.

IRRIGATION CONTRACTOR SHALL SUBMIT DESIGN/BUILD IRRIGATION PLAN FOR

APPROVAL. REFER TO SPECIFCATIONS FOR REQUIREMENTS.

A.

B.

C.

D.

E.

F.

G.

H.

J.

1" = 20'-0"

IRRIGATION PLAN

ADD 2 8 SEPT 2023

REINFORCING BAR WHERE OCCURS,

SEE STRUCTURAL DRAWINGS

07 21 00 - XPS RIGID INSULATION

NOTES:

1. SEE STRUCTURAL FOR SIZES AND REINFORCEMENT

04 20 00 - CONCRETE BLOCK

04 20 01 - BRICK TIE

07 25 00 - WEATHER BARRIER

04 20 01 - MASONRY VENEER

R-13.3 CONTINUOUS, MIN

F O

C M

U

F O

B R

IC

K

HALF JOINT

7 5/8"

DIM POINT

MODULAR FACE OF CMU

REINFORCING BAR WHERE

OCCURS, SEE STRUCTURAL

DRAWINGS

HALF JOINT

NOTES:

1. FIRE RATED (BASED ON OSSC TABLE 720.1(2))

2. SEE STRUCTURAL FOR SIZES AND REINFORCEMENT

04 20 00 - CONCRETE BLOCK

09 30 00 - TILE AND BACKER BOARD

WHERE APPLICABLE - REF FINISH

SCHEDULE AND INTERIOR ELEVATIONS

(1) LAYER EACH SIDE

NOTES:

1. STC 30 WITH ACOUSTIC BATT INSULATION (BASED ON OR 64-8, 2-4-64)

PER ASSEMBLY TAG

DIM POINT

FACE OF STUD

09 21 16 - 5/8" GYPSUM BOARD09 21 16 - 5/8" GYPSUM BOARD

06 10 00 - WOOD FRAMING

INSULATION

PER ASSEMBLY TAG

09 30 00 - TILE AND BACKER BOARD WHERE

APPLICABLE - REF FINISH SCHEDULE AND

INTERIOR ELEVATIONS

INTERIOR

STRUCTURE

INSULATION

PER ASSEMBLY TAG

PER ASSEMBLY TAG

DIM POINT

FACE OF STUD

09 21 16 - 5/8" GYPSUM BOARD

06 10 00 - WOOD FRAMING

REQUIRED

SHIM AS

MEMBER

FRAMING

09 30 00 - TILE AND BACKER BOARD WHERE

APPLICABLE - REF FINISH SCHEDULE AND

INTERIOR ELEVATIONS

PROVIDE FIREBLOCKING WHERE

REQUIRED PER GEN NOTE H

SEE STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION

06 17 53 - PREMANUFACTRURED

WOOD ROOF TRUSS

09 21 16 - 5/8" TYPE X GYPSUM BOARD (2) LAYERS

06 10 00 - ROUGH CARPENTRY

SEE STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION

07 41 13 - STANDING SEAM METAL ROOF SYSTEM

16" FLAT PAN. COLOR: POLAR WHITE.

MANUFACTURER: MBCI, BATTON LOCK

07 41 13 - HIGH TEMPERATURE

UNDERLAYMENT

07 41 13 - HIGH TEMP ROOFING

UNDERLAYMENT PER ROOF PLAN

EXTERIOR

TRUFAST SIPTP SCREWS @ 12" o.c.

EACH WAY, WITH 1" EDGE DISTANCE

FOR ALL PANELS. MIN 1/4", MAX 3/4"

PROTRUSION PAST BOTTOM PLY

PANEL

07 41 13 - CONCEALED CLIPS PER ROOF MFR

07 41 13 - POLYISOCYANURATE BOARD

INSULATION (R-30 MIN); STAGGERED JOINTS

06 10 00 - ROUGH CARPENTRY

5/8" PT. SEE STRUCTURAL.

03 30 00 CONCRETE SLAB -

SEE STRUCTURAL

FLOOR FINISH WHERE OCCURS,

SEE FLOOR FINISH SCHEDULE

03 30 00 - VAPOR BARRIER

03 30 00 - CRUSHED AGGREGATE

BASE (CLEAN CRUSHED ROCK OR

GRAVEL THAT CONTAIN NO

DELETERIOUS MATERIALS PER

ODOT 02360.10) - COORDINATE

SUBGRADE PREPARATION WITH

GEOTECHNICAL REPORT AND

STRUCTURAL

R E

F G

E O

T E

C H

R E

P O

R T

CONTROL JOINT, 1/4" X 1" TYP

FINISH FLOOR

R E

F S

T R

U C

T U

R A

L

8"

SEE STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION

06 10 00 - OPEN WEB WOOD

FLOOR TRUSSES

06 10 00 - ROUGH CARPENTRY

SEE STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION

07 21 00 - ACOUSTIC BATT INSULATION

03 54 00 - CEMENTITIOUS UNDERLAYMENT

23 00 00 - REFER TO

MECHANICAL DWGS.

FLOOR LEVEL

FLOOR FINISH - SEE FINISH LEGEND

09 21 16 - 5/8" TYPE X GYPSUM

BOARD (2) LAYERS

NOTES:

1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)

STC/IIC: 50+ (PER ICC REPORT: ESR-1153)

REFER TO STRUCTURAL

06 10 00 - PLYWOOD SHEATHING

FLOOR FINISH - SEE FINISH LEGEND

07 21 00 - ACOUSTIC BATT

INSULATION

03 54 00 - GYPSUM BASED UNDERLAYMENT

06 17 33 - WOOD I-JOISTS

09 21 16 - RESILIENT CHANNEL FURRING

FLOOR LEVEL

REFER TO STRUCTURAL

09 21 16 - 5/8" TYPE X GYPSUM

BOARD (2) LAYERS

NOTES:

1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)

STC/IIC: 50+ (PER ICC REPORT: ESR-1153)

REFER TO STRUCTURAL

06 10 00 - PLYWOOD SHEATHING

FLOOR FINISH - SEE FINISH LEGEND

07 21 00 - ACOUSTIC BATT

INSULATION

03 54 00 - GYPSUM BASED UNDERLAYMENT

06 17 33 - WOOD I-JOISTS

FLOOR LEVEL

REFER TO STRUCTURAL

DIV 23 - DUCT WHERE OCCURS,

SEE MECHANICAL

V A

R

IE

S

SEE RCP

06 10 00 - WOOD FRAMING

09 21 16 - 5/8" TYPE X GYPSUM

BOARD (2) LAYERS

NOTES:

1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)

STC/IIC: 50+ (PER ICC REPORT: ESR-1153)

06 10 00 - PLYWOOD SHEATHING

REFER TO STRUCTURAL

07 21 00 - ACOUSTIC BATT

INSULATION

03 54 00 - GYPSUM BASED UNDERLAYMENT

09 21 16 - 5/8" TYPE X GYPSUM

BOARD (2) LAYERS

06 10 00 - WOOD FRAMING

FLOOR LEVEL

FLOOR FINISH - SEE FINISH LEGEND

09 21 16 - RESILIENT CHANNEL FURRING

NOTES:

1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)

STC/IIC: 50+ (PER ICC REPORT: ESR-1153)

06 10 00 - PLYWOOD SHEATHING

REFER TO STRUCTURAL

03 54 00 - GYPSUM BASED UNDERLAYMENT

06 10 00 - WOOD FRAMING

07 21 00 - ACOUSTIC BATT

INSULATION

DIV 23 - DUCT WHERE OCCURS,

SEE MECHANICAL

SEE RCP

V A

R

IE

S

FLOOR LEVEL

FLOOR FINISH - SEE FINISH LEGEND

09 21 16 - 5/8" TYPE X GYPSUM

BOARD (2) LAYERS

06 10 00 - WOOD FRAMING

NOTES:

1 HOUR FIRE RATED (PER ICC REPORT: ESR-1153)

STC: 50 (PER ICC REPORT: ESR-1153)

09 51 00 - ACOUSTICAL PANEL CEILING

SEE RCP

06 17 23 - PREMANUFACTURED

WOOD ROOF TRUSSES

09 51 00 - CEILING SUSPENSION SYSTEM

DIM POINT

FACE OF STUD

NOTES:

1. 1 HOUR FIRE RATED (BASED ON UL U469)

09 21 16 - 5/8" TYPE X GYPSUM BOARD

09 21 16 - C-H STUD

PER ASSEMBLY TAG

09 21 16 - 1" TYPE X GYPSUM BOARD

SHAFTLINER

INSULATION

PER ASSEMBLY TAG

09 21 16 - 1" GYPSUM SHAFTLINER

07 21 00 - BATT INSULATION

09 21 16 - C-H STUD

09 21 16 - 5/8" TYPE X GYPSUM BOARD

NOTE:

2-HOUR FIRE RATED (BASED ON AER-09038)

SEE RCP

(1) LAYER EACH SIDE

NOTES:

1. STC 30 WITH ACOUSTIC BATT INSULATION (BASED ON OR 64-8, 2-4-64)

PER ASSEMBLY TAG

DIM POINT

FACE OF STUD

09 21 16 - 5/8" GYPSUM BOARD09 21 16 - 5/8" GYPSUM BOARD

06 10 00 - WOOD FRAMING

INSULATION

PER ASSEMBLY TAG

(1) LAYER EACH SIDE

NOTES:

1. STC 30 WITH ACOUSTIC BATT INSULATION (BASED ON OR 64-8, 2-4-64)

PER ASSEMBLY TAG

DIM POINT

FACE OF STUD

09 21 16 - 5/8" GYPSUM BOARD09 21 16 - 5/8" GYPSUM BOARD

06 10 00 - WOOD FRAMING

INSULATION

PER ASSEMBLY TAG

SEE STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION

06 17 53 - PREMANUFACTRURED

WOOD ROOF TRUSS

06 10 00 - PLYWOOD SHEATHING

SEE STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION

07 41 13 - STANDING SEAM METAL ROOF SYSTEM

16" FLAT PAN. COLOR: POLAR WHITE.

MANUFACTURER: MBCI, BATTON LOCK

07 41 13 - HIGH TEMP ROOFING

UNDERLAYMENT PER ROOF PLAN

EXTERIOR

07 41 13 - CONCEALED CLIPS PER ROOF MFR

06 10 00 - PLYWOOD SHEATHING

07 46 46 - FIBER CEMENT SOFFIT

REFER TO STRUCTURAL

06 10 00 - PLYWOOD SHEATHING

FLOOR FINISH - SEE FINISH LEGEND

07 21 00 - ACOUSTIC BATT

INSULATION

03 54 00 - GYPSUM BASED UNDERLAYMENT

06 17 33 - WOOD I-JOISTS

FLOOR LEVEL

REFER TO STRUCTURAL

09 21 16 - 5/8" TYPE X GYPSUM

BOARD (2) LAYERS

NOTES:

1 HOUR FIRE RATED (PER OSSC TABLE 721.1(3) ITEM # 21-1.1)

STC/IIC: 50+ (PER ICC REPORT: ESR-1153)

09 21 16 - 5/8" TYPE X GYPSUM BOARD

09 21 16 - HAT CHANNEL FURRING

GENERAL NOTES - ASSEMBLIES

A. FIRESTOP PENETRATIONS THROUGH RATED ASSEMBLIES IN ACCORDANCE WITH SECTION

07 84 00. FIRE PARTITIONS AND FLOORS SHALL BE CAULKED AROUND PERIMETER WITH AN

UL APPROVED NON-HARDENING SEALANT AND COMPLY WITH AN APPROVED ASSEMBLY.

B. REFERENCE CODE COMPLIANCE SUMMARY AND PLANS FOR RATED WALL LOCATIONS.

C. REFERENCE STRUCTURAL FOR CONCRETE MASONRY UNIT, BEARING AND SHEAR WALL

REQUIREMENTS.

D. WOOD STUD MATERIAL THICKNESS IS DESIGN-BUILD. CONTRACTOR TO COORDINATE

WOOD STUD MATERIAL THICKNESS AND SPACING OF INDIVIDUAL WALLS TO MEET

ALLOWABLE LIMITING WALL HEIGHT CRITERIA. SIZING SHALL MEET THE REQUIREMENTS

OF THE TESTED ASSEMBLY AS APPLICABLE.

E. PROVIDE DEFLECTION HEADS AT NON-BEARING WALLS WHICH TERMINATE AT THE

UNDERSIDE OF STRUCTURE.

F. FILL FULL WIDTH AND DEPTH OF STUD CAVITY WHERE ACOUSTIC INSULATION INDICATED.

G. PROVIDE ACCESS PANELS AS REQUIRED. LOCATION, FINISH, AND TYPE SHALL BE

APPROVED BY ARCHITECT PRIOR TO PROCUREMENT AND INSTALLATION.

H. PROVIDE FIREBLOCKING AT CONCEALED SPACES INCLUDING DOUBLE STUD, STAGGERED

STUD, AND FURRING WALLS AT INTERVAL NOT TO EXCEED 10' HORIZONTALLY

ASSEMBLY TAG - KEY

123C1

FRAMING MEMBER MATERIAL

AND SIZE (WALL ONLY)

INSULATION DESIGNATION

FRAMING MEMBER SIZE DESIGNATION

1 5/8" METAL STUD

METAL FRAMING

2 1/2" METAL STUD

3 5/8" METAL STUD

4" METAL STUD

6" METAL STUD

8" METAL STUD

7/8" FURRING CHANNEL

1 1/2" FURRING CHANNEL

2 1/2" METAL C-H SHAFT WALL STUD

4" METAL C-H SHAFT WALL STUD

6" METAL C-H SHAFT WALL STUD

WOOD FRAMING*

NOMINAL 2x4, 3x4, OR 4x4 WOOD STUD

NOMINAL 2x6, 3x6, OR 4x6 WOOD STUD

NOMINAL 2x8, 3x8, OR 4x8 WOOD STUD

NOMINAL 2x10, 3x10, OR 4x10 WOOD STUD

CEMENTITIOUS WALLS**

CONCRETE

NOMINAL 4" CMU

NOMINAL 6" CMU

NOMINAL 8" CMU

NOMINAL 10" CMU

NOMINAL 12" CMU

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

S

T

U

V

X

*REFERENCE STRUCTURAL DOCUMENTS FOR BEARING AND SHEAR WALL REQUIREMENTS

**REFERENCE STRUCTURAL DOCUMENTS FOR BEARING AND REINFORCING REQUIREMENTS

INSULATION DESIGNATION

0 = NONE

1 = ACOUSTIC INSULATION (SECTION 07 21 00 - THERMAL INSULATION)

2 = THERMAL BATT INSULATION (SECTION 07 21 00 - THERMAL INSULATION)

3 = FOAM BOARD INSULATION (SECTION 07 21 00 - THERMAL INSULATION)

4 = SPRAY APPLIED INSULATION (SECTION 07 21 29 - SPRAYED INSULATION)

5 = MINERAL FIBER INSULATION (SECTION 07 21 00 - THERMAL INSULATION)

ASSEMBLY NUMBER

ARCHITECTURE

URBAN DESIGN + PLANNING

INTERIOR DESIGN

PORTLAND|OAKLAND

SERADESIGN.COM

CHECKED BY:

ISSUE DATE:

PROJECT NO:

REVISIONS

S E

R A

A rc hi te ct s, I nc

C o p y ri g h t p ro te c te d

S e e D e s ig n A g re e m e n t.

F o r u s e o n t h is p ro je c t o n ly

U n a u th o ri z e d r e p ro d u c ti o n o f a n y p a rt o f th is m a te ri a l is p ro h ib it e d

/6 /2

:3

:5

A M

P E

R M

IT

B

ID

S E

T

O M

D E

N L

IS

T

E D

B A

R R

A C

K S

E B

O

R E

G O

N M

IL

IT

A R

Y D

E P

A R

T M

E N

T

O R

D N

A N

C E

R D

H E

R M

IS

T

O N

A002

ML

30 JUNE 2023

2201032

ASSEMBLY

INFORMATION

EXTERIOR WALL

CMU PARTITION

2-HOUR RATED

WOOD PARTITION

NOT RATED

WOOD FURRING

NOT RATED

ROOF-CEILING ASSEMBLY

R1

FLOOR ASSEMBLY

F1

FLOOR-CEILING ASSEMBLY AT OWJ'S

FC1

FLOOR-CEILING ASSEMBLY AT I-JOISTS

FC2

FLOOR-CEILING ASSEMBLY AT I-JOISTS

FC3

FLOOR-CEILING ASSEMBLY AT JOISTS

FC4

FLOOR-CEILING ASSEMBLY AT JOISTS

FC5

1-HOUR RATED1-HOUR RATED1-HOUR RATED1-HOUR RATED1-HOUR RATED

ACT SUSPENDED ACOUSTIC

C1

VERTICAL SHAFT ASSEMBLY

HORIZONTAL SHAFT ASSEMBLY

C7

NTS

ASSEMBLY 103

2 NTS

ASSEMBLY 154

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .