573-2_Overhaul_Repair of Hydraulic Cylinders.pdf

PDF 20 KB Posted

Attached to
DOCKSIDE REPAIRS ON NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-18-RP-TJDS
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
512-6634841_ HVAC Diagram.pdf PDF
573-6634888B Aft Crane Arrngmnts.pdf PDF
533-1_Potable Water Tank Disinfection.pdf PDF
J.2__USDL_Poster.pdf PDF
TJ-529-002A - Bilge & Ballast System Modification.pdf PDF
512-6634848_HVAC Arr & Details Flat Level Fr22 - 30.pdf PDF
TJ-512-001 HVAC ARR & DETS FAN ROOM.pdf PDF
TJ-512-6634854 HVAC Arr & Details Main Deck 50-Stern Lower Level Frs 70-92.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
101-6634845 HVAC Gen Construction Details.pdf PDF
583-6634804 Rescue Boat Davit Hydr Sys.pdf PDF
512-6634849_D_HVAC Arr & Details Lower Deck FR 0-55.pdf PDF
512-6634850 HVAC Arrngmnt Engrm.pdf PDF
RFP_EA-133M-18-RP-TJDS.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
MOA2-09(17)_TJFY18DS_Drawings.zip ZIP file
631-2D_Coating Systems for Steel Surfaces.pdf PDF
TJ-512-002 HVAC ARR & Details Upper Deck & Above .pdf PDF
300-3_General Requirements for Electrical_Electronic Items.pdf PDF
TJ-085-002F_Booklet_of_General_Plans.pdf PDF
573-6634887C Fwd Crane Arrngmnts.pdf PDF
512-6634856_HVAC Arr & Details FCSLE Deck Fr 19-50.pdf PDF
505-1B_Valve Overhaul and Tests.pdf PDF
583-6634886_Boat Handling and Stowage.pdf PDF
TJ-583-03 Davit, Rescue Boat.pdf PDF
TJ-512-6634843_Electric Heater List.pdf PDF
510-1B_HVAC Cleaning.pdf PDF
635-1_Thermal Insulation of Piping.pdf PDF
J.1_NOAA_SHIP_THOMAS_JEFFERSON_FY_18_DOCKSIDE_REPAIR_SPECIFICATION.pdf PDF
TJ-573-01 Cranes, Deck, and Boom O & M.pdf PDF
512-6634844_HVAC air handling unit list.pdf PDF
MOA2-09(17)_TJFY18DS_Standard_Specs.zip ZIP file
573-1C_Testing of Davits and Weight Handling Gear.pdf PDF
300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
573-6634808 Aft Crane Hydr Sys Arrngmnt.pdf PDF
89-5465-A1 Bathroom Module Type B.pdf PDF
512-6634853 HVAC Arrngmnt Main Deck.pdf PDF
TJ-528-007A_Plumbing and Deck Drains System Diagram.pdf PDF
J.3_Past_Performance_Information_Form.pdf PDF
573-6634807 Fwd Crane Hydr Sys Arrngmnt.pdf PDF
000-1G_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
TJ-241-01 Reduction Gear, Main Propulstion RS2719S.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-573-2

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-573-2

OVERHAUL/REPAIR OF HYDRAULIC CYLINDERS

1. SCOPE: This specification provides the minimum requirements for the overhaul and/or repair of hydraulic cylinders.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Tag out system controllers and actuators to preclude

inadvertent operation and secure the movable member to prevent movement while cylinder is removed.

3.1.1 Disconnect and cap hydraulic lines from the cylinder.

Ensure containment is provided to prevent spillage of oil.

Hydraulic lines and inlet/outlet ports shall be capped or plugged with threaded fittings to prevent leakage or contamination of the system.

3.1.2 Remove the cylinder from the ship and transport to

repair facility.

3.2 Perform the following work on the removed cylinder:

3.2.1 Completely disassemble the cylinder and clean all

parts.

3.2.2 Prepare and preserve the external painted surfaces in

accordance with the identified painting specification or as original.

3.2.3 Reassemble the cylinder under clean conditions using

new "O" rings, seals, gaskets, packing, and piston rings.

Materials used shall meet or exceed original manufacturers specifications. During reassembly lubricate the above with a product equal to Hilton's Hyper-Lube, that is compatible with the system fluid.

3.2.4 Provide and install new nuts, washers, bolts, studs and inlet and outlet fittings.

3.3 Reinstall the cylinder in its original location.

MOC-573-2

September 2000

3.4 Top off hydraulic reservoir to full mark and purge all air from the system taking care to contain any fluid bled off.

3.5 Remove tag outs.

4. QUALITY ASSURANCE

4.1 After disassembly, inspect all components for trueness of bore and rod, wear, damage, corrosion or pitting. Provide a Condition Report detailing the inspection results, contractor's corrective action recommendations, and list of additional parts, material and labor not covered by this specification, required to restore the cylinder to the manufacturers specifications.

4.2 After reassembly, bench test the assembly at system working pressure to prove smoothness of operation and tightness of sealing surfaces.

4.3 Cycle the cylinder through a minimum of four evolutions to demonstrate operation and tightness of all disturbed fittings and connections. Upon satisfactory demonstration of operation and tightness apply "Denso tape" to all connections.

END OF SPECIFICATION