300-3_General Requirements for Electrical_Electronic Items.pdf

PDF 22 KB Posted

Attached to
DOCKSIDE REPAIRS ON NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-18-RP-TJDS
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
512-6634841_ HVAC Diagram.pdf PDF
573-6634888B Aft Crane Arrngmnts.pdf PDF
533-1_Potable Water Tank Disinfection.pdf PDF
J.2__USDL_Poster.pdf PDF
TJ-529-002A - Bilge & Ballast System Modification.pdf PDF
512-6634848_HVAC Arr & Details Flat Level Fr22 - 30.pdf PDF
TJ-512-001 HVAC ARR & DETS FAN ROOM.pdf PDF
TJ-512-6634854 HVAC Arr & Details Main Deck 50-Stern Lower Level Frs 70-92.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
101-6634845 HVAC Gen Construction Details.pdf PDF
583-6634804 Rescue Boat Davit Hydr Sys.pdf PDF
512-6634849_D_HVAC Arr & Details Lower Deck FR 0-55.pdf PDF
512-6634850 HVAC Arrngmnt Engrm.pdf PDF
RFP_EA-133M-18-RP-TJDS.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
MOA2-09(17)_TJFY18DS_Drawings.zip ZIP file
631-2D_Coating Systems for Steel Surfaces.pdf PDF
TJ-512-002 HVAC ARR & Details Upper Deck & Above .pdf PDF
TJ-085-002F_Booklet_of_General_Plans.pdf PDF
573-6634887C Fwd Crane Arrngmnts.pdf PDF
512-6634856_HVAC Arr & Details FCSLE Deck Fr 19-50.pdf PDF
505-1B_Valve Overhaul and Tests.pdf PDF
583-6634886_Boat Handling and Stowage.pdf PDF
TJ-583-03 Davit, Rescue Boat.pdf PDF
TJ-512-6634843_Electric Heater List.pdf PDF
510-1B_HVAC Cleaning.pdf PDF
635-1_Thermal Insulation of Piping.pdf PDF
J.1_NOAA_SHIP_THOMAS_JEFFERSON_FY_18_DOCKSIDE_REPAIR_SPECIFICATION.pdf PDF
TJ-573-01 Cranes, Deck, and Boom O & M.pdf PDF
512-6634844_HVAC air handling unit list.pdf PDF
MOA2-09(17)_TJFY18DS_Standard_Specs.zip ZIP file
573-1C_Testing of Davits and Weight Handling Gear.pdf PDF
300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
573-6634808 Aft Crane Hydr Sys Arrngmnt.pdf PDF
89-5465-A1 Bathroom Module Type B.pdf PDF
512-6634853 HVAC Arrngmnt Main Deck.pdf PDF
TJ-528-007A_Plumbing and Deck Drains System Diagram.pdf PDF
573-2_Overhaul_Repair of Hydraulic Cylinders.pdf PDF
J.3_Past_Performance_Information_Form.pdf PDF
573-6634807 Fwd Crane Hydr Sys Arrngmnt.pdf PDF
000-1G_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
TJ-241-01 Reduction Gear, Main Propulstion RS2719S.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-300-3

September 2000

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-300-3

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCES.

2.1 IEEE STD 45-1988, Recommended Practice for Electric

Installations on Shipboard (series)

2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”

3. REQUIREMENTS.

3.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of References

2.1 and 2.2, and using the best marine and shipbuilding practices.

3.2 The quality of all materials provided by the contractor

shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.

3.3 All new cabling shall be low smoke and sized for the cable’s intended use.

3.4 All machinery, piping, cabling, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired.

All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.

3.6 Any disturbed painted or varnished surfaces shall be

cleaned, painted, and/or varnished with original type and color of paint or varnish.

MOC-300-3

September 2000

3.7 Any extension of electrical cabling shall be through a

junction box. Any removal of electrical cabling shall be to the nearest junction box.

3.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.

3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.

3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with a marking system similar to that used on the ship.

3.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.

4. QUALITY ASSURANCE.

4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

END OF SPECIFICATION

Page 1
Page 2

File details come from the government source that posted it. Updated .