J.3_Past_Performance_Information_Form.pdf

PDF 216 KB Posted

Attached to
DOCKSIDE REPAIRS ON NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-18-RP-TJDS
Issued by

About this file

J.3 Past Performance Information Form

View the file

Other files

File Type Posted
512-6634841_ HVAC Diagram.pdf PDF
573-6634888B Aft Crane Arrngmnts.pdf PDF
533-1_Potable Water Tank Disinfection.pdf PDF
J.2__USDL_Poster.pdf PDF
TJ-529-002A - Bilge & Ballast System Modification.pdf PDF
512-6634848_HVAC Arr & Details Flat Level Fr22 - 30.pdf PDF
TJ-512-001 HVAC ARR & DETS FAN ROOM.pdf PDF
TJ-512-6634854 HVAC Arr & Details Main Deck 50-Stern Lower Level Frs 70-92.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
101-6634845 HVAC Gen Construction Details.pdf PDF
583-6634804 Rescue Boat Davit Hydr Sys.pdf PDF
512-6634849_D_HVAC Arr & Details Lower Deck FR 0-55.pdf PDF
512-6634850 HVAC Arrngmnt Engrm.pdf PDF
RFP_EA-133M-18-RP-TJDS.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
MOA2-09(17)_TJFY18DS_Drawings.zip ZIP file
631-2D_Coating Systems for Steel Surfaces.pdf PDF
TJ-512-002 HVAC ARR & Details Upper Deck & Above .pdf PDF
300-3_General Requirements for Electrical_Electronic Items.pdf PDF
TJ-085-002F_Booklet_of_General_Plans.pdf PDF
573-6634887C Fwd Crane Arrngmnts.pdf PDF
512-6634856_HVAC Arr & Details FCSLE Deck Fr 19-50.pdf PDF
505-1B_Valve Overhaul and Tests.pdf PDF
583-6634886_Boat Handling and Stowage.pdf PDF
TJ-583-03 Davit, Rescue Boat.pdf PDF
TJ-512-6634843_Electric Heater List.pdf PDF
510-1B_HVAC Cleaning.pdf PDF
635-1_Thermal Insulation of Piping.pdf PDF
J.1_NOAA_SHIP_THOMAS_JEFFERSON_FY_18_DOCKSIDE_REPAIR_SPECIFICATION.pdf PDF
TJ-573-01 Cranes, Deck, and Boom O & M.pdf PDF
512-6634844_HVAC air handling unit list.pdf PDF
MOA2-09(17)_TJFY18DS_Standard_Specs.zip ZIP file
573-1C_Testing of Davits and Weight Handling Gear.pdf PDF
300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
573-6634808 Aft Crane Hydr Sys Arrngmnt.pdf PDF
89-5465-A1 Bathroom Module Type B.pdf PDF
512-6634853 HVAC Arrngmnt Main Deck.pdf PDF
TJ-528-007A_Plumbing and Deck Drains System Diagram.pdf PDF
573-2_Overhaul_Repair of Hydraulic Cylinders.pdf PDF
573-6634807 Fwd Crane Hydr Sys Arrngmnt.pdf PDF
000-1G_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
TJ-241-01 Reduction Gear, Main Propulstion RS2719S.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION: EA-133M-18-RP-TJDS

ATTACHMENT: J.3

PAST PERFORMANCE INFORMATION FORM Form _____ of ______

CONTRACT NUMBER: AGENCY OR CLIENT:

1. Refer to Section L of Solicitation EA-133M-18-RP-00005, Instructions to Offerors, REQUIREMENTS FOR PROPOSAL CONTENT. The offeror shall complete this form in its entirety for each contract identified in the offeror’s Volume I – Past Performance Proposal.

2. Check one of the following statements:

CPARS - The referenced Contract Number has a completed CPAR and can be located in the Past Performance Information Retrieval System (PPIRS).

Past Performance Questionnaire (Fill-in Data under item 3 prior to sending to Agency/Client POC)

_______ The Point of Contact or Project Manager associated with the work completed under the referenced Contract Number has been sent this form and the Past Performance Questionnaire to complete and return to Contract Specialist, Sarah Rall prior to the closing date of the solicitation: November 24, 2017, 10:00 am EST.

EMAIL: sarah.rall@noaa.gov

3. Provide the following data in its entirety.

a. Contract Number and Client point of contact (including 2 points of contact with telephone numbers)

POC #1: __________________/Phone: ___________________

POC #2: __________________/Phone: ___________________

b. Ship Name, Hull Number: ___________________________________

c. Dollar Value of the contract (Original: $ _______________and Final: $_________________)

d. Type of service performed and whether Prime or Sub Contractor: Type: _______, Prime or Sub: _________

e. Contract performance period at the start of the contract: Start: _____________ End: __________________

f. Actual performance dates upon completion: Begun: ______________ Completed: __________________

g. Contract Type: _______________

h. Percentage of growth in contract price (Additional work divided by award price) and the extent of Subcontracting:

Growth Percentage: __________% Extent of Subcontracting: ___________________________

NOTE: It is the responsibility of the Offeror to follow‐up and to encourage references to submit the questionnaire prior to the solicitation closing date of: November 24, 2017, 10:00 am EST.

File details come from the government source that posted it. Updated .