505-1B_Valve Overhaul and Tests.pdf

PDF 27 KB Posted

Attached to
DOCKSIDE REPAIRS ON NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-18-RP-TJDS
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
512-6634841_ HVAC Diagram.pdf PDF
573-6634888B Aft Crane Arrngmnts.pdf PDF
533-1_Potable Water Tank Disinfection.pdf PDF
J.2__USDL_Poster.pdf PDF
TJ-529-002A - Bilge & Ballast System Modification.pdf PDF
512-6634848_HVAC Arr & Details Flat Level Fr22 - 30.pdf PDF
TJ-512-001 HVAC ARR & DETS FAN ROOM.pdf PDF
TJ-512-6634854 HVAC Arr & Details Main Deck 50-Stern Lower Level Frs 70-92.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
101-6634845 HVAC Gen Construction Details.pdf PDF
583-6634804 Rescue Boat Davit Hydr Sys.pdf PDF
512-6634849_D_HVAC Arr & Details Lower Deck FR 0-55.pdf PDF
512-6634850 HVAC Arrngmnt Engrm.pdf PDF
RFP_EA-133M-18-RP-TJDS.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
MOA2-09(17)_TJFY18DS_Drawings.zip ZIP file
631-2D_Coating Systems for Steel Surfaces.pdf PDF
TJ-512-002 HVAC ARR & Details Upper Deck & Above .pdf PDF
300-3_General Requirements for Electrical_Electronic Items.pdf PDF
TJ-085-002F_Booklet_of_General_Plans.pdf PDF
573-6634887C Fwd Crane Arrngmnts.pdf PDF
512-6634856_HVAC Arr & Details FCSLE Deck Fr 19-50.pdf PDF
583-6634886_Boat Handling and Stowage.pdf PDF
TJ-583-03 Davit, Rescue Boat.pdf PDF
TJ-512-6634843_Electric Heater List.pdf PDF
510-1B_HVAC Cleaning.pdf PDF
635-1_Thermal Insulation of Piping.pdf PDF
J.1_NOAA_SHIP_THOMAS_JEFFERSON_FY_18_DOCKSIDE_REPAIR_SPECIFICATION.pdf PDF
TJ-573-01 Cranes, Deck, and Boom O & M.pdf PDF
512-6634844_HVAC air handling unit list.pdf PDF
MOA2-09(17)_TJFY18DS_Standard_Specs.zip ZIP file
573-1C_Testing of Davits and Weight Handling Gear.pdf PDF
300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
573-6634808 Aft Crane Hydr Sys Arrngmnt.pdf PDF
89-5465-A1 Bathroom Module Type B.pdf PDF
512-6634853 HVAC Arrngmnt Main Deck.pdf PDF
TJ-528-007A_Plumbing and Deck Drains System Diagram.pdf PDF
573-2_Overhaul_Repair of Hydraulic Cylinders.pdf PDF
J.3_Past_Performance_Information_Form.pdf PDF
573-6634807 Fwd Crane Hydr Sys Arrngmnt.pdf PDF
000-1G_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
TJ-241-01 Reduction Gear, Main Propulstion RS2719S.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-505-1B

AUGUST 1995

SUPERSEDING

AMC-505-1A

SEPTEMBER 1990

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-505-1B

VALVE OVERHAUL AND TEST

1. SCOPE. This specification contains the general requirements for overhaul and test of valves on and for NOAA ships and boats.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 Standard Overhaul. Overhaul all specified valves as

follows:

3.1.1 Except for valves which have welded ends preventing

removal without cutting the welds, or unless otherwise specified in the detail specification or other applicable procurement document, remove all specified valves from the ship or boat to a suitable machine shop for overhaul and tests. Specified valves which are not removed from the ship or boat shall be overhauled in place. See paragraph 3.2 for special requirements for sea valve removals.

3.1.2 Tag each valve prior to removing from the ship or

boat.

3.1.3 Completely disassemble each valve. Matchmark valve

parts. Thoroughly clean bonnets, stems, discs, gates, globes, seats, bodies, and other metal parts to bright metal.

3.1.4 Deleted.

3.1.5 Clean and chase all valve stem threads. Check stems

for straightness. Straighten stems to within 0.002 inch total indicator runout (TIR). Polish stems to a 32 Root-Mean-Square (RMS) finish in way of packing surface and remove all raised edges.

3.1.6 Visually inspect all parts, including all fasteners, for deterioration and other defects. Clean, dress, and true gasket mating surfaces.

3.1.7 Check the disc-to-seat, globe-to-seat, and plug-to-

bore contact fits using the bluing transfer method. Machine, grind, lap, spot-in, and recheck contact fits as necessary to obtain the following contacts:

a. Globe, globe angle, and globe stop-check valves shall have a 360-degree continuous globe-to-seat contact with a bluing transfer line not exceeding 1/16-inch width.

b. Gate valves shall have a 360-degree continuous gate-to-seat contact with a bluing transfer line which does not exceed 3/16-inch width. The transfer line shall appear within the lower 50-percent of the gate seating surface at the top and bottom of the gate.

c. Plug valves shall have a minimum 80-percent plug-to-bore surface contact, evenly distributed over 100-percent of the area.

d. Swing-check valves shall have a 360-degree continuous disc-to-seat contact.

3.1.8 If unable to obtain the above specified contact fits

by machining, grinding, and lapping, renew the globes, plugs, discs, gates, and renewable seats. Contractor may, at their option and at no additional cost to the Government, renew globes, plugs, discs, gates, and renewable seats after initial inspections and before machining, grinding, or lapping the existing parts to obtain the required contact fits.

3.1.9 (Modified and relocated to section 3.2)

3.1.10 Reassemble each valve. Insure that discs, gates, and plugs are in the half-open position during reassembly to avoid damaging seats or bending stems. Renew all gaskets, fasteners, rubber seals, and non-metallic seats. In butterfly valves, renew boots, o-rings, o-ring fasteners, and teflon bushings. Renew valve stem packing in feed water, condensate, and steam valves with packing conforming to MIL-P-24503 and DOD- P-24583. Renew valve stem packing in all other valves with packing conforming to MIL-P-24396, Type B.

3.1.11 Prior to disassembling and overhauling a valve, the

Contractor may, at their option and at no additional cost to the Government, renew the valve with an identical valve. If this option is exercised, the new valve must be tested and meet the same acceptance criteria as prescribed herein for overhauled valves. If a valve is determined after disassembly to be nonrepairable, the Government will negotiate an equitable cost adjustment, limited to the difference between the cost of the new valve and the costs which would have been incurred had the valve been overhauled. For valves of 3-inch IPS size and below, the cost adjustment will be limited to the costs incurred associated with disassembling the valves.

3.2 Additional Sea Valve Requirements.

3.2.1 Inspect all studs, bolts, and nuts in line and bonnet

flanges of non-ferrous sea valves to determine the material. If the fasteners are not nickel-copper (Monel), submit a Condition Report giving the actual material, condition, and recommendations.

3.2.2 Coat the interior of each steel valve, excluding

seating and polished surfaces, with the same epoxy primer used on the underwater body.

3.2.3 Remove all waster pieces and spool pieces installed

between the sea valves and the ship's hull. Thoroughly clean the waster and spool pieces, and inspect for deterioration or other defective conditions. Inspect all fasteners and submit a Condition Report same as specified above for sea valves.

3.2.4 Whenever a transducer sea chest valve is required to

be removed for overhaul, extreme care must be taken to prevent damaging the transducer assembly. Remove and reinstall the transducer assembly in accordance with the transducer manufacturer's technical manual, a copy of which will be provided by the COTR within 48 hours after requested.

3.3 Tests. After reassembling or renewing, conduct hydrostatic tests of each valve as follows:

3.3.1 All tests shall be performed using clean water as the

test medium. Unless otherwise specified, the test pressure shall be 150-percent of the maximum operating pressure of the system from which the valve was removed, but not less than 50 pounds-per-square-inch-gage (psig).

3.3.2 With the valve in the open position, test each valve

body for 10 minutes. No leakage is allowed.

3.3.3 Seat each plug and butterfly valve with hand force.

Seat all other valves using the torque values listed in the following table as the maximum allowable seating force applied to the handwheel.

Total Tangential Force Handwheel Diameter (pounds) on Rim of Handwheel

2 inches and below 90 3 inches 98 4 inches 106 5 inches 112 6 inches and greater 118 plus 3 pounds for each inch above 6, not to exceed 150 pounds.

3.3.4 Test each globe, angle globe, and globe stop-check

valve by applying test pressure in the direction tending to open the valve. Test each butterfly, gate, and plug valve by applying test pressure alternately on both sides of the disc, gate, or plug. Hold test pressure for a minimum of 3 minutes if there is no evidence of leakage. If there is evidence of leakage, hold the test pressure and measure the leakage rate.

3.3.5 Test each globe stop-check valve and swing-check

valve by applying test pressure in direction tending to close the valve (back pressure) for a minimum of 5 minutes. If leakage occurs, hold the test pressure and measure the leakage rate.

Globe stop-check valves shall be tested with stems in the open position. The test back pressure for valves having a pressure rating of 150 psig and below shall be 50 psig, and for valves having a pressure rating over 150 psig shall be 100 psig.

3.3.6 The seat leakage shall not exceed the following:

a. Check valve back pressure tests -- For valves up to and including 2 inches, the leakage rate shall not exceed 25 cc/hour/inch diameter. For valves 2-1/2 to 10 inches, the leakage rate shall not exceed 50 cc/hour/inch diameter. For valves over 10 inches, the leakage rate shall not exceed 100 cc/hour/inch diameter.

b. Soft-seated valves -- No leakage shall be permitted.

c. Metal-to-metal seated valves -- For valves less than 1 inch, the leakage rate shall not exceed 10 cc/hour. For larger valves, the leakage rate shall not exceed 10 cc/hour/inch of nominal pipe size.

3.3.7 Any valve which fails a seat leakage test shall be

renewed or overhauled and retested until an acceptable test is performed.

3.4 Reinstallation. After tests have been accepted by the COTR, reinstall each valve, using new flange gaskets.

4. QUALITY ASSURANCE.

4.1 Prior to requesting the COTR to witness the final bluing

contact inspection or the final acceptance hydrostatic tests of a valve, the Contractor shall perform preliminary inspections and tests which meet the acceptance criteria stated above.

4.2 After acceptable preliminary inspections and tests have been conducted, the Contractor shall notify the COTR and conduct final acceptance bluing contact inspection and final acceptance hydrostatic tests of each valve in the COTR's presence.

END OF SPECIFICATION