533-1_Potable Water Tank Disinfection.pdf

PDF 20 KB Posted

Attached to
DOCKSIDE REPAIRS ON NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-18-RP-TJDS
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
512-6634841_ HVAC Diagram.pdf PDF
573-6634888B Aft Crane Arrngmnts.pdf PDF
J.2__USDL_Poster.pdf PDF
TJ-529-002A - Bilge & Ballast System Modification.pdf PDF
512-6634848_HVAC Arr & Details Flat Level Fr22 - 30.pdf PDF
TJ-512-001 HVAC ARR & DETS FAN ROOM.pdf PDF
TJ-512-6634854 HVAC Arr & Details Main Deck 50-Stern Lower Level Frs 70-92.pdf PDF
J.4__Past_Performance_Questionnaire.pdf PDF
101-6634845 HVAC Gen Construction Details.pdf PDF
583-6634804 Rescue Boat Davit Hydr Sys.pdf PDF
512-6634849_D_HVAC Arr & Details Lower Deck FR 0-55.pdf PDF
512-6634850 HVAC Arrngmnt Engrm.pdf PDF
RFP_EA-133M-18-RP-TJDS.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
MOA2-09(17)_TJFY18DS_Drawings.zip ZIP file
631-2D_Coating Systems for Steel Surfaces.pdf PDF
TJ-512-002 HVAC ARR & Details Upper Deck & Above .pdf PDF
300-3_General Requirements for Electrical_Electronic Items.pdf PDF
TJ-085-002F_Booklet_of_General_Plans.pdf PDF
573-6634887C Fwd Crane Arrngmnts.pdf PDF
512-6634856_HVAC Arr & Details FCSLE Deck Fr 19-50.pdf PDF
505-1B_Valve Overhaul and Tests.pdf PDF
583-6634886_Boat Handling and Stowage.pdf PDF
TJ-583-03 Davit, Rescue Boat.pdf PDF
TJ-512-6634843_Electric Heater List.pdf PDF
510-1B_HVAC Cleaning.pdf PDF
635-1_Thermal Insulation of Piping.pdf PDF
J.1_NOAA_SHIP_THOMAS_JEFFERSON_FY_18_DOCKSIDE_REPAIR_SPECIFICATION.pdf PDF
TJ-573-01 Cranes, Deck, and Boom O & M.pdf PDF
512-6634844_HVAC air handling unit list.pdf PDF
MOA2-09(17)_TJFY18DS_Standard_Specs.zip ZIP file
573-1C_Testing of Davits and Weight Handling Gear.pdf PDF
300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
573-6634808 Aft Crane Hydr Sys Arrngmnt.pdf PDF
89-5465-A1 Bathroom Module Type B.pdf PDF
512-6634853 HVAC Arrngmnt Main Deck.pdf PDF
TJ-528-007A_Plumbing and Deck Drains System Diagram.pdf PDF
573-2_Overhaul_Repair of Hydraulic Cylinders.pdf PDF
J.3_Past_Performance_Information_Form.pdf PDF
573-6634807 Fwd Crane Hydr Sys Arrngmnt.pdf PDF
000-1G_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
TJ-241-01 Reduction Gear, Main Propulstion RS2719S.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-533-1

AUGUST 1991

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-533-1

POTABLE WATER TANK DISINFECTION

1. SCOPE. This specification contains the general requirements for disinfecting potable water tanks on NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 General Requirements.

3.1.1 When introducing chlorine treatment solution to a

potable water tank, ensure that the solution is diluted and is introduced only through a sounding tube or threaded connection.

Immediately after adding the treatment solution, add a rinse consisting of at least five gallons of potable water through the same sounding tube or threaded connection.

3.1.2 Isolate the tank(s) from the rest of the potable

water service system and thoroughly rinse and drain the tank interiors.

3.2 Disinfect Procedure.

3.2.1 Fill the potable water tank with potable water until

it overflows, exercising care not to pressurize the tank. As it fills, introduce sufficient chlorine solution to provide at least 100 parts-per-million (ppm) Free Available Chlorine (FAC) content in the completely filled tank.

3.2.2 Monitor the FAC content hourly for at least four

hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to the tank to bring the FAC content back up to 100 ppm and begin the four-hour period anew. Continue until the FAC content remains at or above 50 ppm for a four-hour period.

3.2.3 If more than one tank is to be disinfected, repeat

the above procedure for the other tank. At the contractor's discretion, the same water used to disinfect the first tank may be used, as long as the initial FAC content in the second tank is increased to 100 ppm at the start of the four-hour test period.

AMC-533-1

AUGUST 1991

3.2.4 Drain the tank(s) and refill with potable water.

Repeat the above tests, except that an initial FAC content of

1.0 ppm or greater shall be provided, the monitoring period shall be 30 minutes, and the minimum allowable FAC content shall be

0.2 ppm.

3.2.5 After successfully completing the 30-minute test

period, drain and refill the tank(s) with potable water until the total FAC content falls to 1.0 ppm or less.

END OF SPECIFICATION