Schedule_B-Rev._1.doc

DOC document 104 KB Posted

Attached to
FY 2018 DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
EA133M-17-RP-0181
Issued by

About this file

Schedule B-Rev. 1 in word.doc format

View the file

Other files

File Type Posted
PISCES_FY18_DS_Spec,_r._10-24-17.pdf PDF
PISCES_HOSE_SURVEY.xlsx XLSX spreadsheet
SH-081-FM10-Equipment_Removal_Routes.pdf PDF
FC05-001-01-Tank_Capacity_Curves.pdf PDF
(089)controlledenviroment-refsys.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
Schedule_B-Rev._1.pdf PDF
UPS_Installation_and_Operation_Manual_ASTE-6Z8LHV_R2_EN.pdf PDF
CO2_Report_Hiller.pdf PDF
AMENDMENT_0001.pdf PDF
FP16 Chilled Water System Diagram.pdf PDF
3010-502, R0-Hose Booklet Piping Assy 3010.pdf PDF
631-2D_Coating Systems for Steel Surfaces.pdf PDF
5020-502, R0-Hose Booklet Piping Assy 5020.pdf PDF
2010-502, R0-Hose Booklet Piping Assy 2010.pdf PDF
FE45-001-029-03ab-Electrical Installation Details.dwg DWG drawing
FA-05 Fire Control Plan.pdf PDF
(105)StoreHandlingCrane.pdf PDF
HB-085-_FA02_General_Arrangements_(6_sheets).pdf PDF
FE41-001-029-03ab-Penetration Details.dwg DWG drawing
(028)engine3508.pdf PDF
634-1B_DECK COVERINGS.pdf PDF
4030-502, R0-Hose Booklet Piping Assy 4030.pdf PDF
(029)engine3512.pdf PDF
3020-502, R1-Hose Booklet Piping Assy 3020.pdf PDF
300-3_General Requirements for Electrical Electronic Items.pdf PDF
(070)Pumps manual.pdf PDF
FP17-001-05-Seawater Washdown System Diagram.dwg DWG drawing
(012)Centerboard_AmClyde Model CB-32.pdf PDF
631-4.pdf PDF
FF03-001-00ab-Color Coordination Manual.pdf PDF
ASHRAE Standard 151 - HVAC Balancing _ Testing.pdf PDF
amc-000-1f_General Requirements for Ship Repair.pdf PDF
2020-502, R0-Hose Booklet Piping Assy 2020.pdf PDF
FP09-001-04AB-Hydraulic Diagram.dwg DWG drawing
(090)refrigeration sys_galley.pdf PDF
6001_Table_1_US_Standard_Bus_Connection_Bolt_Torque_Values.pdf PDF
FH62_Structural_Doors,_Hatches,_Manholes___Scuttles_(8_sheets).pdf PDF
FE58-001-05-Interior Communication Block Wiring Diagram.dwg DWG drawing
HB-512-_FV02_HVAC_Diagram.pdf PDF
(103)Sound Powered Phone.pdf PDF
(047) Trawling and Scientific Winch System Part 1.pdf PDF
(066) oily water separator.pdf PDF
100-1A.pdf PDF
5010-502, R0-Hose Booklet Piping Assy 5010.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
FP07 Compressed Air System Diagram.pdf PDF
FE43-001-03ab-Bonding and Grounding Details.dwg DWG drawing
dwg300- FE01 Power One- Line —
4020-502, R0-Hose Booklet Piping Assy 4020.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION M

EVALUATION FACTORS FOR AWARD

B.1 SCHEDULE OF PRICES

CLIN 0001: BASE ITEMS

SUBCLIN
SPECIFICATION WORK ITEM
SPECIFICATION WORK ITEM TITLE
QTY
UNIT
UNIT PRICE
EXTENDED PRICE
0001a
11230
TANK MAINTENANCE
1
JOB
$________
$___________
0001b
15560
HYDROGRAPHIC WINCHES 1 & 2 MAINTENANCE & HYDRAULIC SYSTEM GROOM
1
JOB
$________
$___________
0001c
12441
tHRUST BEARING RTD INSTALLATION
1
JOB
$________
$___________
0001d
15120
HVAC PLANT SYSTEM GROOM
1
JOB
$________
$___________
0001e
15051
MISCELLANEOUS PIPING REPAIRS
1
JOB
$________
$___________
0001f
12350
REWIND PROPULSION FAN MOTORS
1
JOB
$________
$___________
0001g
13001
STUFFING TUBE REPLACEMENT
1
JOB
$________
$___________
0001h
15281
MSD DISCHARGE PUMP REPLACEMENT
1
JOB
$________
$___________
0001i
12020
Annual system Grooms/Maintenance (RAACI, Teco-WestINGHOUSE, ROCKWELL)
1
JOB
$________
$___________
000j
16001
tsg rELOCATION
1
JOB
$________
$___________
0001k
15051
HYDRAULIC HOSE RENEWALS
1
JOB
$________
$___________
0001l
15122
HVAC DUCT REPAIRS
1
JOB
$________
$________
0001m
15240
AUXILIARY SEAWATER PUMP AND MOTOR OVERHAUL
1
JOB
$________
$________
0001n
15550
ANNUAL FIRE INSPECTION
1
JOB
$________
$________
0001o
15830
ANNUAL LIFE RAFT INSPECTION
1
JOB
$________
$________
0001p
15821
RESCUE BOAT DAVIT ANNUAL INSPECTION
1
JOB
$________
$________

0001q

13240
MAIN SWITCHBOARD CLEANING
1
JOB
$________
$________
0001r
16341
DECK TILE REPLACEMENT
1
JOB
$________
$________
0001s
15161
REFRIGERATION COMPRESSOR OVERHAUL
1
JOB
$________
$________
0001t
23601
BRIDGE UPS UPGRADE TO APC
1
JOB
$________
$________
0001u
15840
ABC CARGO GEAR CERTIFICATION (CRANES)
1
JOB
$________
$________

SUBTOTAL CLIN 0001 (SUBCLINS 0001a – 0001u): $______________

Page - 2 CLIN 0002: ADDITIONAL ITEM REQUIREMENTS (AIRs): These items relate to Growth Work. The Unit Price column will be used throughout the life of the contract if growth work is added to the scope of the contract [reference Commerce Acquisition Regulation (CAR) clause 1352.271-72]. If AIRs are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.

0002
40000
AIRS/Growth (estimated)

**Provide breakdown, as follows:

AIRs/Growth Labor Rate

Unit Price: $________; Quantity: 1,000; Unit of Issue: Hour; Extended Price: $____________

AIRs/Growth Material Markup/Handling Fee

Unit Price: $70,000.00; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$70,000.00 X percentage quoted]: $______________

LT

SUBTOTAL CLIN 0002: $______________

OPTION CLINS

CLIN

SPECIFICATION WORK ITEM

SPECIFICATION WORK ITEM TITLE

QTY

UNIT

UNIT PRICE

EXTENDED PRICE

56000

MAIN DECK DOOR REPAIRS

JOB

51001

01 LEVEL ISO DECK SOCKET RELOCATION

JOB

64321

SOUND POWERED PHONES SYSTEM MODIFICATIONS

JOB

55121

HVAC DUCT CLEANING

JOB

51000

CENTERBOARD MAINTENANCE

JOB

53240

MAIN SWITCHBOARD CLEANING

JOB

55931

OILY WATER SEPARATOR (OWS) MAINTENANCE AND INSPECTION

JOB

SUBTOTAL OPTION CLINS (CLINS 0003 – 0009): $______________

GRAND TOTAL ALL CLINS (BASE, AIRS, AND OPTION ITEMS, 0001 – 0009): $______________

Page - 3

EA133M-17-RP-0181

(Rev. 1)

File details come from the government source that posted it. Updated .