HB-085-_FA02_General_Arrangements_(6_sheets).pdf

PDF 879 KB Posted

Attached to
FY 2018 DOCKSIDE REPAIRS TO NOAA SHIP PISCES Federal contract opportunity
Solicitation number
EA133M-17-RP-0181
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

REFERENCE DOCUMENT

View the file

Other files for this federal contract opportunity

Other files attached to FY 2018 DOCKSIDE REPAIRS TO NOAA SHIP PISCES, newest first.
File Type Posted
Schedule_B-Rev._1.doc DOC document
PISCES_HOSE_SURVEY.xlsx XLSX spreadsheet
SH-081-FM10-Equipment_Removal_Routes.pdf PDF
FC05-001-01-Tank_Capacity_Curves.pdf PDF
(089)controlledenviroment-refsys.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
634-1B_DECK COVERINGS.pdf PDF
(028)engine3508.pdf PDF
4030-502, R0-Hose Booklet Piping Assy 4030.pdf PDF
FH62_Structural_Doors,_Hatches,_Manholes___Scuttles_(8_sheets).pdf PDF
6001_Table_1_US_Standard_Bus_Connection_Bolt_Torque_Values.pdf PDF
100-1A.pdf PDF
5010-502, R0-Hose Booklet Piping Assy 5010.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
FP07 Compressed Air System Diagram.pdf PDF
FE43-001-03ab-Bonding and Grounding Details.dwg DWG drawing
4020-502, R0-Hose Booklet Piping Assy 4020.pdf PDF
dwg300- FE01 Power One- Line —
3010-502, R0-Hose Booklet Piping Assy 3010.pdf PDF
FP16 Chilled Water System Diagram.pdf PDF
(029)engine3512.pdf PDF
3020-502, R1-Hose Booklet Piping Assy 3020.pdf PDF
(066) oily water separator.pdf PDF
(047) Trawling and Scientific Winch System Part 1.pdf PDF
(111)telescoping boom crane.pdf PDF
1010-502, R0-Hose Booklet Piping Assy 1010.pdf PDF
AMC-300-1,_Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
FE63-001-02ab-Sound Powered Telephone Directory.dwg DWG drawing
FA-05 Fire Control Plan.pdf PDF
FE41-001-029-03ab-Penetration Details.dwg DWG drawing
(070)Pumps manual.pdf PDF
300-3_General Requirements for Electrical Electronic Items.pdf PDF
ASHRAE Standard 151 - HVAC Balancing _ Testing.pdf PDF
FP09-001-04AB-Hydraulic Diagram.dwg DWG drawing
2020-502, R0-Hose Booklet Piping Assy 2020.pdf PDF
FP17-001-05-Seawater Washdown System Diagram.dwg DWG drawing
amc-000-1f_General Requirements for Ship Repair.pdf PDF
631-4.pdf PDF
(012)Centerboard_AmClyde Model CB-32.pdf PDF
FF03-001-00ab-Color Coordination Manual.pdf PDF
(090)refrigeration sys_galley.pdf PDF
HB-512-_FV02_HVAC_Diagram.pdf PDF
(103)Sound Powered Phone.pdf PDF
FE58-001-05-Interior Communication Block Wiring Diagram.dwg DWG drawing
ATTACHMENT_J.3_Past_Performance_Information_Form.pdf PDF
ATTACHMENT_J.4_Past_Performance_Questionnaire.pdf PDF
ATTACHMENT_J.6_SUBCONTRACTING_PLAN_OUTLINE.pdf PDF
ATTACHMENT_J.2__Optional_Form_(OF)_17-BidProposal_Envelope_Label.pdf PDF
ATTACHMENT_J.6_AS_WORD_DOC.doc DOC document
ATTACHMENT_J.1__PISCES_(R_226)FY18_DS_Repairs_SPEC_SEP_2017.pdf PDF
Show all 50

FY 2018 DOCKSIDE REPAIRS TO NOAA SHIP PISCES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

085- FA02, sheet 1

085- FA02, sheet 2
085- FA02, sheet 3
085- FA02, sheet 4
085- FA02, sheet 5
085- FA02, sheet 6

File details come from the government source that posted it. Updated .