(090)refrigeration sys_galley.pdf

PDF 26 MB Posted

Attached to
FY 2018 DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
EA133M-17-RP-0181
Issued by

About this file

REFERENCE DOCUMENT

View the file

Other files

File Type Posted
Schedule_B-Rev._1.doc DOC document
PISCES_HOSE_SURVEY.xlsx XLSX spreadsheet
FC05-001-01-Tank_Capacity_Curves.pdf PDF
(089)controlledenviroment-refsys.pdf PDF
(091)refrigerationsys-scientificfreezer.pdf PDF
Schedule_B-Rev._1.pdf PDF
UPS_Installation_and_Operation_Manual_ASTE-6Z8LHV_R2_EN.pdf PDF
CO2_Report_Hiller.pdf PDF
SH-081-FM10-Equipment_Removal_Routes.pdf PDF
634-1B_DECK COVERINGS.pdf PDF
(028)engine3508.pdf PDF
4030-502, R0-Hose Booklet Piping Assy 4030.pdf PDF
FH62_Structural_Doors,_Hatches,_Manholes___Scuttles_(8_sheets).pdf PDF
6001_Table_1_US_Standard_Bus_Connection_Bolt_Torque_Values.pdf PDF
100-1A.pdf PDF
5010-502, R0-Hose Booklet Piping Assy 5010.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
FP07 Compressed Air System Diagram.pdf PDF
FE43-001-03ab-Bonding and Grounding Details.dwg DWG drawing
4020-502, R0-Hose Booklet Piping Assy 4020.pdf PDF
dwg300- FE01 Power One- Line —
3010-502, R0-Hose Booklet Piping Assy 3010.pdf PDF
FP16 Chilled Water System Diagram.pdf PDF
FE41-001-029-03ab-Penetration Details.dwg DWG drawing
(070)Pumps manual.pdf PDF
300-3_General Requirements for Electrical Electronic Items.pdf PDF
ASHRAE Standard 151 - HVAC Balancing _ Testing.pdf PDF
FP09-001-04AB-Hydraulic Diagram.dwg DWG drawing
2020-502, R0-Hose Booklet Piping Assy 2020.pdf PDF
FP17-001-05-Seawater Washdown System Diagram.dwg DWG drawing
amc-000-1f_General Requirements for Ship Repair.pdf PDF
631-4.pdf PDF
(012)Centerboard_AmClyde Model CB-32.pdf PDF
FF03-001-00ab-Color Coordination Manual.pdf PDF
HB-512-_FV02_HVAC_Diagram.pdf PDF
(103)Sound Powered Phone.pdf PDF
FE58-001-05-Interior Communication Block Wiring Diagram.dwg DWG drawing
(058) Propulsion DC Motor_rev2.pdf PDF
FH03-001-10-Hull Midbody Scantlings Fr. 19-Fr. 49.dwg DWG drawing
(134)Knuckle Boom Crane.pdf PDF
HB-085-_FA02_General_Arrangements_(6_sheets).pdf PDF
(029)engine3512.pdf PDF
3020-502, R1-Hose Booklet Piping Assy 3020.pdf PDF
(066) oily water separator.pdf PDF
(047) Trawling and Scientific Winch System Part 1.pdf PDF
ATTACHMENT_J.3_Past_Performance_Information_Form.pdf PDF
ATTACHMENT_J.1__PISCES_(R_226)FY18_DS_Repairs_SPEC_SEP_2017.pdf PDF
RFP.pdf PDF
ATTACHMENT_J.5_U_S_DOL_POSTER.pdf PDF
ATTACHMENT_J.4_Past_Performance_Questionnaire.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRV40-226-090-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Refrigeration System, Galley Model: 90YR28MSF3ND1K9R

Halter Marine, Inc.

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

50-SPNA-1-00031

PUBLISHED BY DIRECTION OF NOAA

FRV40-226-090-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Model: 90YR28MSF3ND1K9R

Halter Marine, Inc.

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

PUBLISHED BY DIRECTION OF NOAA

19 SEP 2007

RECORD OF CHANGES

Change No.

Date Title and/or Brief Description Signature of Validating Officer

APPROVAL AND PROCUREMENT RECORD PAGE

APPROVAL DATA FOR: FRV40-226-090-010

TITLE OF MANUAL: Refrigeration System, Galley

APPROVAL AUTHORITY: NOAA

Contract Ship Qty Of Building Number Applicability Manuals Yard

50-SPNA-1-00031 FRV40-226 2 EA Halter Marine Inc.

REMARKS:

CERTIFICATION: It is hereby certified that FRV40-226-090-010 to be provided under contract 50-SPNA- 1-00031 has been approved by the approval data shown above.

Date:________________

CHAND, LLC

Mathews, LA 70375

CAGE CODE: 0D5X4

VALIDATION PERFORMANCE

Title of Publication

Contractor Sub-Contractor(If Performing Validation)

Halter Marine Inc.

Contract No. (s) and Purchase Orders, If Applicable

Chapter Section Paragraph Date Check here if Validation Not validated Completed

Contents of this manual have been validated and certified to be applicable to the equipment furnished under the above procurement as specified for Validation.

Name & Authority of Validating Officer: Signature of Validating Officer:

FOREWORD

This manual is intended to clearly and accurately reflect the actual configuration of the installed equipment described for the FRV40-226 Galley Refrigeration System. Users are urged to report instances noted wherein the manual does not achieve this objective.

This technical manual provides the instructions necessary to operate, to perform maintenance on and troubleshooting of the Galley Refrigeration System. The text is broken down as follows:

Section 1- Introduction

Section 2- Installation and Start-up Instructions

Section 3- Control Circuit Sequence of Operation

Section 4- Unit Performance Summary

Section 5- Unit Configuration Summary

Section 6- Unit Appendix

Section 7- Component Appendix

Section 8- Unit and Major Component Parts List

Section 9- Troubleshooting Guide

Section 10- Ship Loose Items Appendix

The Metric System and Equivalents

Linear Measure Liquid Measure

1 centiliter = 10 milliters = .34 fl. ounce 1 centimeter = 10 millimeters = .39 inch 1 deciliter = 10 centiliters = 3.38 fl. ounces 1 decimeter = 10 centimeters = 3.94 inches 1 liter = 10 deciliters = 33.81 fl. ounces 1 meter = 10 decimeters = 39.37 inches 1 dekaliter = 10 liters = 2.64 gallons 1 dekameter = 10 meters = 32.8 feet 1 hectoliter = 10 dekaliters = 26.42 gallons 1 hectometer = 10 dekameters = 328.08 feet 1 kiloliter = 10 hectoliters = 264.18 gallons 1 kilometer = 10 hectometers = 3,280.8 feet

Square Measure Weights

1 sq. centimeter = 100 sq. millimeters = .155 sq. inch 1 centigram = 10 milligrams = .15 grain 1 sq. decimeter = 100 sq. centimeters = 15.5 sq. inches 1 decigram = 10 centigrams = 1.54 grains 1 sq. meter (centare) = 100 sq. decimeters = 10.76 sq. feet 1 gram = 10 decigram = .035 ounce 1 sq. dekameter (are) = 100 sq. meters = 1,076.4 sq. feet 1 dekagram = 10 grams = .35 ounce 1 sq. hectometer (hectare) = 100 sq. dekameters = 2.47 acres 1 hectogram = 10 dekagrams = 3.52 ounces 1 sq. kilometer = 100 sq. hectometers = .386 sq. mile 1 kilogram = 10 hectograms = 2.2 pounds 1 quintal = 100 kilograms = 220.46 pounds Cubic Measure 1 metric ton = 10 quintals = 1.1 short tons

1 cu. centimeter = 1000 cu. millimeters = .06 cu. inch 1 cu. decimeter = 1000 cu. centimeters = 61.02 cu. inches 1 cu. meter = 1000 cu. decimeters = 35.31 cu. feet

Approximate Conversion Factors

To change To Multiply by To change To Multiply by inches centimeters 2.540 ounce-inches newton-meters .007062 feet meters .305 centimeters inches .394 yards meters .914 meters feet 3.280 miles kilometers 1.609 meters yards 1.094 square inches square centimeters 6.451 kilometers miles .621 square feet square meters .093 square centimeters square inches .155 square yards square meters .836 square meters square feet 10.764 square miles square kilometers 2.590 square meters square yards 1.196 acres square hectometers .405 square kilometers square miles .386 cubic feet cubic meters .028 square hectometers acres 2.471 cubic yards cubic meters .765 cubic meters cubic feet 35.315 fluid ounces milliliters 29,573 cubic meters cubic yards 1.308 pints liters .473 milliliters fluid ounces .034 quarts liters .946 liters pints 2.113 gallons liters 3.785 liters quarts 1.057 ounces grams 28.349 liters gallons .264 pounds kilograms .454 grams ounces .035 short tons metric tons .907 kilograms pounds 2.205 pound-feet newton-meters 1.356 metric tons short tons 1.102 pound-inches newton-meters .11296

Temperature (Exact)

°F Fahrenheit 5/9 (after Celsius °C temperature subtracting 32) temperature

shipstorecov.pdf
30 NOV 2002

File details come from the government source that posted it. Updated .