Questions_and_Answers.pdf

PDF 155 KB Posted

Attached to
Dry Dock and Repairs to NOAA Ship Henry B. Bigelow
Solicitation number
EA-133M-15-RP-0125
Issued by

About this file

Q A1

View the file

Other files

File Type Posted
HB_FY16_Dry_Dock_Spec_(09-23-15).pdf PDF
Questions_and_Answers_2.pdf PDF
SF_30_-_Amendment_0003.pdf PDF
SF_30_-_Amendment_0002.pdf PDF
HB_FY16_Dry_Dock_Spec_(09-21-15).pdf PDF
SAL_T2_Installation_Manual.pdf PDF
HB-801_FC05_Tank_Capacity_Curves.pdf PDF
Lifting_Appliances_Guide_e-Aug14_2.pdf PDF
HB-561_(FRV40-225-128-010)_Steering_Gear.pdf PDF
HB_FY16_Dry_Dock_Spec_(08-26-15).pdf PDF
Amendment_0001.pdf PDF
ADCP_Ocean_Surveyor_-_Shipboard_Installlation_Guide.pdf PDF
HB-461_FE93_Transducer_Arrangement_and_Installation.pdf PDF
ADCP_tank_detalied_drawing_124068_Revision_A.pdf PDF
ADCP_150_kHz_Ocean_Surveyor_Transducer_outline_drawing.pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust_Model_SKF_and_Michell_Bearings_(pages_01_-_50).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5_(pages_01_-_100).pdf PDF
thumb.png PNG image
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_376_-_425).pdf PDF
SKF_C_3184_KM_Bearing_Dismounting.pdf PDF
(071)Rudder.pdf PDF
Consilium_Model_SAL_R1a_Doppler_Speed_Log_Installation_Manual_(Pages_197_-_204)-2.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_76_-_150).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_226_-_300).pdf PDF
HB-244_01_(FRV40-225-006-010)_SternTube_Bearing_and_Shaft_Seal_(pages_41_-_50).pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust _Model_SKF_and_Michell_Bearing_(pages_76_-_106).pdf PDF
PPI_NBR_63421-006H_(Rev_04).pdf PDF
HB-244_01_(FRV40-225-006-010)_Stern_Tube_Bearing_and_Shaft_Seal_(pages_1-20).pdf PDF
Lifting_Appliances_Guide_e-Aug14_2.pdf PDF
Navy_MIL-D-3134J _Deck_Covering_Materials.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_426_-_478).pdf PDF
NAVSEA_Standard_Item_009-32_FY10-CH1.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_201_-_225).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_01_-_75).pdf PDF
HB-243_(FRV40-225-099-010)_Marine_Shaft_Braking_System.pdf PDF
HB-633_(FRV40-225-011-010)_Cathodic_Protection_System _Marimpress.pdf PDF
HB-244_01_(FRV40-225-006-010)_SternTube_Bearing_and_Shaft_Seal_(pages_51_-_64).pdf PDF
Consilium_Model_SAL_R1a_Doppler_Speed_Log_Installation_Manual_(Pages_106_-_196).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_301_-_375).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5_(pages_101_-_200).pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust _Model_SKF_and_Michell_Bearing_(pages_51_-_75).pdf PDF
Naval_Ships'_Technical_Manual_081 _Waterborne_Underwater_Hull_Cleaning_of_Navy_Ships.pdf PDF
SKF_Instruction_No._81489_OKC_Coupling.pdf PDF
HB-244_01_(FRV40-225-006-010)_Stern_Tube_Bearing_and_Shaft_Seal_(pages_21_-_40).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5-2_(pages_201_-_397).pdf PDF
NAVSEA_Dwg_803_2145532B_Liquid_Level_Indicator_System_(16_sheets).pdf PDF
HB-624_FE70_Impressed_Current_Cathodic_Protection_Arr_DET_Mod.pdf PDF
HB-259-001____Engine _Exhaust _Resilient_Mounts_and_Extension_Struct_Mods_84112880_83075567.pdf PDF
HB-163_FP19_Seachest_Diagram.pdf PDF
Sperry_SRD-500_Doppler_Speed_log_block_diagram.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Question 1: Several items reference the CONTRACTOR providing the services of an ABS

Representative. Normally the government agencies provide the ABS services and the

CONTRACT only schedules the inspections. In this way, the government does not end up paying a mark-up on the ABS services. Will the government consider supplying the services of the ABS Representative?

Answer 1: The contractor will provide and pay for ABS.

Question 2: Work Item 317, paragraph 3.17.4.2 says, “The Contractor shall provide the services of qualified personnel, including manufacturer’s representatives if necessary, for the duration of the dock trial”. Since having the manufacturer’s representatives present during dock trials will incur a cost, please identify those manufacturer’s representatives that the government would like to have present for Dock Trials.

Answer 2: Shaft Seal OEM, Line Shaft Bearing OEM, Steering Gear OEM

Question 3: Item 305 is titled Cathodic Protection System Inspection and Replacement. It is my understanding that there are TWO systems onboard the HENRY BIGELOW. There is a

Marimpress Impressed Current Cathodic Protection (ICCP) system that utilizes two anodes and two reference electrodes mounted in the hull. The Cathelco Anode System has eighteen anodes mounted in the sea chests and bow thruster tunnel. References (a) and (b) detail the Marimpress

ICCP system onboard the vessel. Reference (c) shows where the Cathelco anodes are located, but does not provide any system detail information. Paragraphs 3.5.4.1 thru 3.5.4.3 reference the Cathelco factory authorized field service technician and the system. But they, along with paragraphs 3.5.4.4 thru 3.5.4.12 describe the work to be completed on the Marimpress System.

Only paragraphs 3.5.4.13 and 3.5.4.14 describe work to be completed on the Cathelco system. It seems as if the work item was cut and pasted together without continuity. It is confusing and incorrect. If all the contractor has to do is replace the anodes for the Cathelco system without any operational testing, then reference ( c ) will suffice. But paragraphs 3.5.4.11 thru 3.5.4.12 reference the Marimpress system and the work item needs to be changed to reflect that.

Answer 3: The updated spec posted today September 21, 2015 includes verbiage that an Azienda

Chimica Genovese OEM rep is required to work on the Marimpress system.

Question 4: In Work Item 305, paragraph 3.5.4.5 directs the contractor to “ Open, pump out residual fuel, clean and certify safe for entry Fuel Oil Tanks 4-19-1 #2 Starboard and 4-19-2 #2

Port to gain access to the Reference Cells.” How much residual fuel will there be to remove?

How will this fuel be handled? Disposed of, or stored? Where in the specification does it task the contractor to remove the fuel down to the “residual level”? Will the crew transfer fuel from these tanks to other storage tanks onboard?

Answer 4: The ship will pump the fuel out of the tanks. Residual fuel remaining in varies with each tank. There will be approximately 100 gallons remaining but the contractor is required to remove all remain fuel even if it is more then 100 gallons. The residual fuel will be disposed.

Question 5: My subcontractors say that Aurora Pumps will not quote replacement parts for the overhaul of the main seawater and auxiliary seawater pumps in Item 313 without being provided the existing serial numbers. Can the vessel supply the serial numbers of these four pumps?

Answer 5:

1. Bilge/Ballast/Fire: S/N 1009198-2

2. Fire: S/N 1009207

3. MSW No. 1: S/N 1008163-2

4. MSW No. 2: S/N 1008163-1

5. Aux SW No. 1: S/N 1008170-2

6. Aux SW No. 2: S/N 1008170-1

File details come from the government source that posted it. Updated .