HB-244_01_(FRV40-225-006-010)_Stern_Tube_Bearing_and_Shaft_Seal_(pages_1-20).pdf

PDF 617 KB Posted

Attached to
Dry Dock and Repairs to NOAA Ship Henry B. Bigelow
Solicitation number
EA-133M-15-RP-0125
Issued by

About this file

9

View the file

Other files

File Type Posted
HB_FY16_Dry_Dock_Spec_(09-23-15).pdf PDF
Questions_and_Answers_2.pdf PDF
SF_30_-_Amendment_0003.pdf PDF
SF_30_-_Amendment_0002.pdf PDF
Questions_and_Answers.pdf PDF
HB_FY16_Dry_Dock_Spec_(09-21-15).pdf PDF
SAL_T2_Installation_Manual.pdf PDF
HB-801_FC05_Tank_Capacity_Curves.pdf PDF
Lifting_Appliances_Guide_e-Aug14_2.pdf PDF
HB-561_(FRV40-225-128-010)_Steering_Gear.pdf PDF
HB_FY16_Dry_Dock_Spec_(08-26-15).pdf PDF
Amendment_0001.pdf PDF
ADCP_Ocean_Surveyor_-_Shipboard_Installlation_Guide.pdf PDF
HB-461_FE93_Transducer_Arrangement_and_Installation.pdf PDF
ADCP_tank_detalied_drawing_124068_Revision_A.pdf PDF
ADCP_150_kHz_Ocean_Surveyor_Transducer_outline_drawing.pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust_Model_SKF_and_Michell_Bearings_(pages_01_-_50).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5_(pages_01_-_100).pdf PDF
thumb.png PNG image
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_376_-_425).pdf PDF
SKF_C_3184_KM_Bearing_Dismounting.pdf PDF
(071)Rudder.pdf PDF
Consilium_Model_SAL_R1a_Doppler_Speed_Log_Installation_Manual_(Pages_197_-_204)-2.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_76_-_150).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_226_-_300).pdf PDF
HB-244_01_(FRV40-225-006-010)_SternTube_Bearing_and_Shaft_Seal_(pages_41_-_50).pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust _Model_SKF_and_Michell_Bearing_(pages_76_-_106).pdf PDF
PPI_NBR_63421-006H_(Rev_04).pdf PDF
Lifting_Appliances_Guide_e-Aug14_2.pdf PDF
Navy_MIL-D-3134J _Deck_Covering_Materials.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_426_-_478).pdf PDF
NAVSEA_Standard_Item_009-32_FY10-CH1.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_201_-_225).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_01_-_75).pdf PDF
HB-243_(FRV40-225-099-010)_Marine_Shaft_Braking_System.pdf PDF
HB-633_(FRV40-225-011-010)_Cathodic_Protection_System _Marimpress.pdf PDF
HB-244_01_(FRV40-225-006-010)_SternTube_Bearing_and_Shaft_Seal_(pages_51_-_64).pdf PDF
Consilium_Model_SAL_R1a_Doppler_Speed_Log_Installation_Manual_(Pages_106_-_196).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_301_-_375).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5_(pages_101_-_200).pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust _Model_SKF_and_Michell_Bearing_(pages_51_-_75).pdf PDF
Naval_Ships'_Technical_Manual_081 _Waterborne_Underwater_Hull_Cleaning_of_Navy_Ships.pdf PDF
SKF_Instruction_No._81489_OKC_Coupling.pdf PDF
HB-244_01_(FRV40-225-006-010)_Stern_Tube_Bearing_and_Shaft_Seal_(pages_21_-_40).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5-2_(pages_201_-_397).pdf PDF
NAVSEA_Dwg_803_2145532B_Liquid_Level_Indicator_System_(16_sheets).pdf PDF
HB-624_FE70_Impressed_Current_Cathodic_Protection_Arr_DET_Mod.pdf PDF
HB-259-001____Engine _Exhaust _Resilient_Mounts_and_Extension_Struct_Mods_84112880_83075567.pdf PDF
HB-163_FP19_Seachest_Diagram.pdf PDF
Sperry_SRD-500_Doppler_Speed_log_block_diagram.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRV40-225-006-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Stern Tube Bearing (Thordon Compac) and Shaft Seal (Kobelco)

Halter Marine, Inc.

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

50-SPNA-1-00031

PUBLISHED BY DIRECTION OF NOAA

FRV40-225-006-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Stern Tube Bearing (Thordon Compac) and Shaft Seal (Kobelco)

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

PUBLISHED BY DIRECTION OF NOAA

26 SEP 2005

RECORD OF CHANGES

Change No.

Date Title and/or Brief Description Signature of Validating Officer

APPROVAL AND PROCUREMENT RECORD PAGE

APPROVAL DATA FOR: FRV40-225-006-010

TITLE OF MANUAL: Stern Tube Bearing and Shaft Seal

APPROVAL AUTHORITY: NOAA

Contract Number

Ship Applicability

Qty Of Manuals

Building Yard

50-SPNA-1-00031 FRV40-225 2 EA Halter Marine Inc.

REMARKS:

CERTIFICATION: It is hereby certified that FRV40-225-006-010 to be provided under contract 50-SPNA- 1-00031 has been approved by the approval data shown above.

Date:________________ Chand, LLC Mathews, LA 70375

CAGE CODE: 0D5X4

VALIDATION PERFORMANCE

Title of Publication

Stern Tube Bearing and Shaft Seal

Contractor Sub-Contractor (If

Performing Validation)

Contract No.(s) and Purchase Orders, If Applicable

Chapter

Section Paragraph Date Validation Completed

Check here if Not Validated

Contents of this manual have been validated and certified to be applicable to the equipment furnished under the above procurement as specified for Validation.

Name & Authority of Validating Officer: Signature of Validating Officer:

FOREWORD

This manual is intended to clearly and accurately reflect the actual configuration of the installed equipment described for the FRV40-225 Stern Tube Bearing and Shaft Seal. Users are urged to report instances noted wherein the manual does not achieve this objective.

This technical manual provides the instructions necessary to operate, to perform maintenance on and troubleshooting of the Stern Tube Bearing and Shaft Seal. The text is broken down as follows:

Section 1- Overview

DanLe Section 2 - System Drawings Section 3 - Thordon Compac Information Section 4 - Installation-Operation Manual Kobelco Water Lubricated Shaft Seal (Type KW)

Section 1 - Overview

The Stern Tube Seal bearing is custom manufactured for the NOAA FRV40-225. The Thordon Compac illustrated parts list is provided in DWG#15312-1A. DWG # 1531-2A illustrates the complete assembly (with the bearing carrier) and the Compac Bearing installed. DWG # 15824 B illustrates a fully finished bearing insert.

Note that the insert is made from two pieces of material in order to achieve the finished length. The two pieces of stock are identical and can be interchangeable from the fore and aft position.

It is recommended that a Thordon Bearing representative be on-hand should a bearing need to be changed. Replacement/spare material is rough molded (RM), meaning that that it is over and under size. The Inside Diameter (ID) and Outside Diameter (OD) will need to be finished machined. The replacement/spare is offered this way to allow a "skim cut" to be taken on the shaft liner should it be needed.

At that point, the Thordon representative would then machine the bearing to fit the new undersized shaft. Due to the sensitivity to temperature changes during the machining process, it is very important that a Thordon Bearings representative be present for machining. Failure to compensate for temperature differences during the machining process can cause a bearing failure.

SECTION 2

SYSTEM DRAWINGS

File details come from the government source that posted it. Updated .