Questions_and_Answers_2.pdf

PDF 29 KB Posted

Attached to
Dry Dock and Repairs to NOAA Ship Henry B. Bigelow
Solicitation number
EA-133M-15-RP-0125
Issued by

About this file

Questions and Answers 2

View the file

Other files

File Type Posted
HB_FY16_Dry_Dock_Spec_(09-23-15).pdf PDF
SF_30_-_Amendment_0003.pdf PDF
SF_30_-_Amendment_0002.pdf PDF
Questions_and_Answers.pdf PDF
HB_FY16_Dry_Dock_Spec_(09-21-15).pdf PDF
SAL_T2_Installation_Manual.pdf PDF
HB-801_FC05_Tank_Capacity_Curves.pdf PDF
Lifting_Appliances_Guide_e-Aug14_2.pdf PDF
HB-561_(FRV40-225-128-010)_Steering_Gear.pdf PDF
HB_FY16_Dry_Dock_Spec_(08-26-15).pdf PDF
Amendment_0001.pdf PDF
ADCP_Ocean_Surveyor_-_Shipboard_Installlation_Guide.pdf PDF
HB-461_FE93_Transducer_Arrangement_and_Installation.pdf PDF
ADCP_tank_detalied_drawing_124068_Revision_A.pdf PDF
ADCP_150_kHz_Ocean_Surveyor_Transducer_outline_drawing.pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust_Model_SKF_and_Michell_Bearings_(pages_01_-_50).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5_(pages_01_-_100).pdf PDF
thumb.png PNG image
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_376_-_425).pdf PDF
SKF_C_3184_KM_Bearing_Dismounting.pdf PDF
(071)Rudder.pdf PDF
Consilium_Model_SAL_R1a_Doppler_Speed_Log_Installation_Manual_(Pages_197_-_204)-2.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_76_-_150).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_226_-_300).pdf PDF
HB-244_01_(FRV40-225-006-010)_SternTube_Bearing_and_Shaft_Seal_(pages_41_-_50).pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust _Model_SKF_and_Michell_Bearing_(pages_76_-_106).pdf PDF
PPI_NBR_63421-006H_(Rev_04).pdf PDF
HB-244_01_(FRV40-225-006-010)_Stern_Tube_Bearing_and_Shaft_Seal_(pages_1-20).pdf PDF
Lifting_Appliances_Guide_e-Aug14_2.pdf PDF
Navy_MIL-D-3134J _Deck_Covering_Materials.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_426_-_478).pdf PDF
NAVSEA_Standard_Item_009-32_FY10-CH1.pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_201_-_225).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_01_-_75).pdf PDF
HB-243_(FRV40-225-099-010)_Marine_Shaft_Braking_System.pdf PDF
HB-633_(FRV40-225-011-010)_Cathodic_Protection_System _Marimpress.pdf PDF
HB-244_01_(FRV40-225-006-010)_SternTube_Bearing_and_Shaft_Seal_(pages_51_-_64).pdf PDF
Consilium_Model_SAL_R1a_Doppler_Speed_Log_Installation_Manual_(Pages_106_-_196).pdf PDF
HB-568_(FRV40-225-008-010)_Bow_Thruster_(pages_301_-_375).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5_(pages_101_-_200).pdf PDF
HB-244_02_(FRV40-225-005-010)_Bearings _Lineshaft_and_Thrust _Model_SKF_and_Michell_Bearing_(pages_51_-_75).pdf PDF
Naval_Ships'_Technical_Manual_081 _Waterborne_Underwater_Hull_Cleaning_of_Navy_Ships.pdf PDF
SKF_Instruction_No._81489_OKC_Coupling.pdf PDF
HB-244_01_(FRV40-225-006-010)_Stern_Tube_Bearing_and_Shaft_Seal_(pages_21_-_40).pdf PDF
HB-593_02_(FRV40-225-059-010)_Marine_Sanitation_Device_((MSD)_Model_MX-5-2_(pages_201_-_397).pdf PDF
NAVSEA_Dwg_803_2145532B_Liquid_Level_Indicator_System_(16_sheets).pdf PDF
HB-624_FE70_Impressed_Current_Cathodic_Protection_Arr_DET_Mod.pdf PDF
HB-259-001____Engine _Exhaust _Resilient_Mounts_and_Extension_Struct_Mods_84112880_83075567.pdf PDF
HB-163_FP19_Seachest_Diagram.pdf PDF
Sperry_SRD-500_Doppler_Speed_log_block_diagram.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Question 1: The bearing reaction requirement in item 310 is duplicated from item 309. Is this correct?

Answer 1: Item 310 deals with the thrust bearing and Item 309 has nothing to do with that.

There is not any duplication.

Question 2: On option items 507 & 508: Vertical surfaces only? Can water-blasting be used vice abrasive blasting? For estimating purposes, can square footages be provided for each item?

Answer 2: All vertical surfaces only and water blasting can be used in lieu of sandblasting on option items 507 & 508:

We do not have the square footage for this work.

Question 3: Items 315 and 504 have some duplication of tank cleaning. Please advise.

Answer 3: Items 315 and 504 do have the same tanks required to be gas freed. Only provide a price for doing the gas freeing of the tanks once.

Question 4: Item 506: For estimating purposes, can a total length / size be provided for the new insulation with a quantity of pads and 90 degree elbows involved. We will attempt to use ref HB-259-001 for estimating purposes unless NOAA can provide requested info.

Answer 4: There are currently not any insulation pads on the exhaust pipes. There are approximately eight 90 degree elbows in the system. There is approximately 400 feet of pipe total.

Question 5: My subcontractors say that Aurora Pumps will not quote replacement parts for the overhaul of the main seawater and auxiliary seawater pumps in Item 313 without being provided the existing serial numbers. Can the vessel supply the serial numbers of these four pumps?

Answer 5:

1. Bilge/Ballast/Fire: S/N 1009198-1

2. Fire: S/N 1009207

3. MSW No. 1: S/N 1008163-2

4. MSW No. 2: S/N 1008163-1

5. Aux SW No. 1: S/N 1008170-2

6. Aux SW No. 2: S/N 1008170-1

File details come from the government source that posted it. Updated .