- Solicitation number
- 5969258
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DB Wages 27JAN2023.pdf | ||
| B533 RFI Responses.pdf | ||
| site visit log.pdf | ||
| RFI Deadline.pdf | ||
| MACC RFP NPT NLON.pdf | ||
| (L) 52.204-24.pdf | ||
| (O) Building Contractors Guide to Taxes.pdf | ||
| (P) Limitations on Subcontracting.xls | XLS spreadsheet | |
| (N) CERT-141.pdf | ||
| (M) 2016-R-0149.pdf | ||
| (B) NEPA.pdf | ||
| (D) B533 Cooling Tower Proposal Sheet.docx | DOCX document | |
| (H) Map to B135.pdf | ||
| (I) Base Map.pdf | ||
| (C) DB Wages 13 JAN 2023.docx | DOCX document | |
| (K) ECMS.pdf | ||
| (F) Site Visit Info.docx | DOCX document | |
| (G) SECNAV Form 5512-1.pdf | ||
| (J) General Requirements.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
RFP 5900613
REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office Code
RECOMMENDATION:
Date: Signature:
From: Field Office To: Prime Contractor
REPLY:
Date: Signature:
This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.
Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT
CONSTITUTE AUTHORIZATION TO PROCEED.
copy to: File 2L
Supv Civil Engineer Construction Representative
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER
File details come from the government source that posted it. Updated .