(E) RFI Form.pdf

PDF 342 KB Posted

Attached to
B533 Cooling Tower Replacement, Naval Submarine Base New London
Solicitation number
5969258
Issued by

View the file

Other files

File Type Posted
DB Wages 27JAN2023.pdf PDF
B533 RFI Responses.pdf PDF
site visit log.pdf PDF
RFI Deadline.pdf PDF
MACC RFP NPT NLON.pdf PDF
(L) 52.204-24.pdf PDF
(O) Building Contractors Guide to Taxes.pdf PDF
(P) Limitations on Subcontracting.xls XLS spreadsheet
(N) CERT-141.pdf PDF
(M) 2016-R-0149.pdf PDF
(B) NEPA.pdf PDF
(D) B533 Cooling Tower Proposal Sheet.docx DOCX document
(H) Map to B135.pdf PDF
(I) Base Map.pdf PDF
(C) DB Wages 13 JAN 2023.docx DOCX document
(K) ECMS.pdf PDF
(F) Site Visit Info.docx DOCX document
(G) SECNAV Form 5512-1.pdf PDF
(J) General Requirements.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER:

RFP 5900613

REQUEST FOR INFORMATION RFI NUMBER:

CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:

COST EFFECT: INCREASE: DECREASE: NONE:

INFORMATION REQUESTED & RECOMMENDED SOLUTION:

Date Response Required By: Date: Signature:

From:

To: Field Office Code

RECOMMENDATION:

Date: Signature:

From: Field Office To: Prime Contractor

REPLY:

Date: Signature:

This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.

Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT

CONSTITUTE AUTHORIZATION TO PROCEED.

copy to: File 2L

Supv Civil Engineer Construction Representative

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.

DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER