(D) B533 Cooling Tower Proposal Sheet.docx

DOCX document 14 KB Posted

Attached to
B533 Cooling Tower Replacement, Naval Submarine Base New London
Solicitation number
5969258
Issued by

View the file

Other files

File Type Posted
DB Wages 27JAN2023.pdf PDF
B533 RFI Responses.pdf PDF
site visit log.pdf PDF
RFI Deadline.pdf PDF
MACC RFP NPT NLON.pdf PDF
(L) 52.204-24.pdf PDF
(O) Building Contractors Guide to Taxes.pdf PDF
(P) Limitations on Subcontracting.xls XLS spreadsheet
(N) CERT-141.pdf PDF
(M) 2016-R-0149.pdf PDF
(B) NEPA.pdf PDF
(H) Map to B135.pdf PDF
(I) Base Map.pdf PDF
(C) DB Wages 13 JAN 2023.docx DOCX document
(K) ECMS.pdf PDF
(F) Site Visit Info.docx DOCX document
(G) SECNAV Form 5512-1.pdf PDF
(E) RFI Form.pdf PDF
(J) General Requirements.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B533 Cooling Tower Proposal Sheet

$_________________ Base Bid (CLIN 0001): Design, provide, and commission new closed circuit evaporative coolers (CCEC), condenser pump, building circulation pumps, chemical-free condenser water treatment and bypass valves/piping at each floor loop for B533.

$_________________ Option (CLIN 0002): Demolish oversized/non-functional closed circuit evaporative coolers CCEC-3 and CCEC-4. Cap piping and electrical conduits at the platform. Transport, dispose of, and recycle all waste materials in accordance with local, state, and federal regulations.

NOTES:

1. Award will be made on the total sum of both CLINs 0001 and 0002.

2. The Government reserves the unilateral right to award CLIN 0002 to the contractor at the proposed price within 180 calendar days after contract award. A firm fixed proposed price is required for CLIN 0001. No provision is made for economic price adjustment. If the option is exercised at time of award, the contract completion date remains 270 calendar days after award of the contract.

3. If CLIN 0002 is exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the combined amount of both CLINs.

4. Failure to enter a price for either of the CLINs will result in the proposal being rejected as unacceptable. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

5. Evaluation of Options (JUL 1990): “Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).”