E-filing_Instructions.pdf

PDF 753 KB Posted

Attached to
Historical Engineering Records Preservation
Solicitation number
Quote- 26 - 191
Issued by
Pinellas County, Florida

About this file

E-filing Instructions and File Naming Convention

This document is a procedural guideline issued by the City of St. Petersburg's Engineering & Capital Improvements Department (ECID) that establishes standardized protocols for consultant deliverables, project correspondence, and file naming conventions. The guidelines require all project deliverables—including reports, technical memoranda, plans, specifications, and shop drawings—to be submitted via email to the designated ECID project team and ECIDRecords@stpete.org with specific subject line formats that include the project number and submittal type or phase designation. Email subject lines must follow prescribed formats (e.g., "18xxx-xxx - Report - Draft" or "18xxx-xxx - Plans - 60%"), and all deliverables must include a brief narrative description. The document provides comprehensive file naming conventions organized by document category, including task orders/letter agreements, design files, contractor submissions, permits, shop drawings, schedules, plans, and site documentation, with all filenames incorporating date stamps in YYMMDD format followed by descriptive identifiers (e.g., "YYMMDD_Submittal XX.pdf" or "YYMMDD_Schedule.pdf").

The guidelines also identify available resources and templates maintained on the City's OneDrive, including CADD templates, COSP (Consultant On-Site Project) templates for architectural and engineering consultants, city standard details, report confirmation templates, task order templates with fee schedule appendices, technical specifications, and contractor qualification requirements. The document does not specify pricing terms, contract values, set-asides, incumbents, or funding sources, as it functions purely as administrative procedure documentation to standardize communication and file management processes for consultants working on City engineering and capital improvement projects. This guidance was last revised on August 7, 2024, and applies to all future consultant submittals and project correspondence.

View the file

Other files

File Type Posted
Historical_Engineering_Records_Preservation_(Addendum_#1_Revision).pdf PDF
Historical_Engineering_Records_Preservation_(Addendum_#1_Revision).pdf PDF
E-filing_Instructions.pdf PDF
Historical_Engineering_Records_Preservation.pdf PDF
Quote_Addendum.docx DOCX document
Quote_Addendum.docx DOCX document
Quote_Addendum.docx DOCX document
Public_Construction_Bond.docx DOCX document
Light_Construction_Agreement.docx DOCX document
Light_Construction_Agreement.docx DOCX document
Light_Construction_Agreement.docx DOCX document
Public_Construction_Bond.docx DOCX document
Public_Construction_Bond.docx DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Subcontractor_Utilization_Plan.docx DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING & CAPITAL IMPROVEMENTS DEPARTMENT

REVISED 8/7/2024

Deliverables, General Project Correspondence, and File Naming Convention

1 | P a g e

On November 1, 2018, City Council approved changes to the requirement for consultants to email

Reports including Technical Memorandums directly to Council. Effective immediately, consultants are no longer required to send these documents to Council. Instead, all deliverables (as defined in your agreement or contract) shall be emailed by a consultant to the ECID project team and to

ECIDRecords@stpete.org. *Emails including Reports or Technical Memorandums shall also contain a brief narrative/general description of the deliverable.

Additionally, when sending items to ECID, we are requesting all emails and attachments comply with our standard formats and naming conventions as follows:

Deliverables: Reports, Technical Memos, Plans, Specifications, and Shop Drawings

All deliverables shall be sent to the designated project team and ECIDRecords@stpete.org and conform to the following:

Subject line of email: Project Number – Submittal Type (Phase)

Subject line examples:

Reports Draft* 18xxx-xxx – Report – Draft

Reports Final* 18xxx-xxx – Report – Final

Technical Memorandum Draft* 18xxx-xxx – Technical Memorandum # – Draft

Technical Memorandum Final* 18xxx-xxx – Technical Memorandum # – Final

Plans 30% 18xxx-xxx – Plans – 30%

Plans 60% 18xxx-xxx – Plans – 60%

Plans 90% 18xxx-xxx – Plans – 90%

Plans 100% 18xxx-xxx – Plans – 100%

Plans Final 18xxx-xxx – Plans – Final

Specifications Draft 18xxx-xxx – Specifications – Draft

Specifications Final 18xxx-xxx – Specifications – Final

Shop Drawing No 01 18xxx-xxx – Shop Drawing No 01 – For Review

Shop Drawing No 01 18xxx-xxx – Shop Drawing No 01 – Approved

General Project Correspondence

General correspondence shall be sent to the designated project team and conform to the following:

Subject line of email: Project Number – Abbreviated Title/General Description

Subject line examples:

18xxx-xxx – NWWRF Aeration Estimate

18xxx-xxx – 6th Ave S Utility Coordination

18xxx-xxx – 46th Ave S Pre App Meeting mailto:ECIDRecords@stpete.org mailto:ECIDRecords@stpete.org mszelinsadm Highlight mszelinsadm Highlight

Deliverables, General Project Correspondence, and File Naming Convention

2 | P a g e

File Naming Convention

File naming convention shall comply with the following lists:

Task Order/Letter Agreement/CCNA

Type of Document File Naming Format

Draft Task Order YYMMDD_Consultant Name_TO Draft.pdf

Signed Task Order YYMMDD_Consultant Name_TO Signed.pdf

Signed Task Order Revision No. 1 YYMMDD_Consultant Name_TO Rev 1

Signed.pdf

Draft Letter Agreement YYMMDD_Consultant Name_LA Draft.pdf

Draft CCNA Scope YYMMDD_Consultant Name_CCNA Draft

Scope.pdf

Design Files

Type of Document File Naming Format

Meeting Sign-In Sheets (Design Review

Meetings, Public Meetings, etc.)

YYMMDD_Meeting Type_Sign-in Sheet.pdf

Submittals, as outlined in the Task

Order (Draft Technical Memorandum, 30% Plans, etc.)

YYMMDD_Submittal XX.pdf

Submittals, Utility Checklist (30% Plans, 60% Plans, etc.)

YYMMDD_Utility Check XX%.pdf

Submittal Comments, as outlined in the

Task Order (Draft Technical

Memorandum, 30% Plans, etc.)

YYMMDD_Submittal XX_Comments.pdf

Review Meeting Notes, as outlined in the Task Order (Draft Technical

Memorandum, 30% Plans, etc.)

YYMMDD_Phase XX_Comments.pdf

Estimates – To be saved in a folder YYMMDD_Estimate.pdf

Specifications – To be saved in a Folder YYMMDD_Specifications

Deliverables, General Project Correspondence, and File Naming Convention

3 | P a g e

Contractor - CMAR/Contractor Bid and Award

Type of Document File Naming Format

Recommendation of Award YYMMDD_Recommendation of Award.pdf

Permits

Type of Document File Naming Format

Permit Application YYMMDD_Agency_Application.pdf

Approved Permit YYMMDD_Agency_Permit.pdf

RFI YYMMDD_Agency RFI.pdf

RFI Response YYMMDD_Agency RFI Response.pdf

Shop Drawings

Type of Document File Naming Format

Shop Drawing Log Shop Drawing Log.pdf

Shop Drawing - Approved Shop Drawing XXX_Approved.pdf

Shop Drawing – Rejected/RFI Shop Drawing XXX_Rejected.pdf

Schedule

Type of Document File Naming Format

Project Schedule YYMMDD_Schedule.pdf

Plans

Type of Document File Naming Format

Final Plans (Signed and Sealed) YYMMDD_Final Plans.pdf

Red Line As-Builts As-Builts_Redline.pdf

Record Drawings YYMMDD_Signed_As_Builts.pdf

Construction Plans (Bidding) YYMMDD_Bid_Construction Plans.pdf

Deliverables, General Project Correspondence, and File Naming Convention

4 | P a g e

Site

Type of Document File Naming Format

Site Photos – To be saved in individual folders

YYMMDD_Description

FTP Site Information - DeptTemplates_Standards

The following templates and information are found in the City OneDrive. Please contact the Project Manager or Department Support for the link:

CADD Templates

COSP Template - Architectural Consultant - Standard

COSP Template - Engineering Consultant - Standard

City Standard Details

CADD

PDF

Deliverables and Communication with Engineering Staff

Deliverables, General Project Correspondence, and File Naming Convention

Report Confirmation (include as an introduction with all reports, memorandums, and transmittals)

Task Order Templates

Initial Task Order

Revision to Task Order

Amendment to Task Order

Appendix A - Fee Schedule - Sample

Appendix A - Fee Schedule - FDOT Sample

Technical Specifications

Sections 1 - 19

Section 20 and Pay Items

Contractor Qualifications

Parks & Recreation Background Check Language (if applicable)

Port Security - TWIC Requirement Language (if applicable)

WRD Background Check Language (if applicable)