About this file
This document is a ceiling markups sheet related to the Washington County Department of Land Use and Transportation's tenant improvement project for Suite 350 of the Public Services Building in Hillsboro, Oregon. The project encompasses interior improvements to approximately 22,037 square feet on the 3rd floor, including selective demolition, construction of partition walls to create five new offices and five new phone rooms, surface patching and painting, carpet tile and rubber base replacement, and acoustical ceiling modifications. Additionally, the scope includes modifications to mechanical, electrical, low-voltage, and fire detection/suppression systems, as well as systems furniture reconfigurations with associated power and data connections. The non-mandatory pre-bid conference was scheduled for September 1, 2026 at 8:30 a.m., with bids due September 10, 2026 at 2:00 p.m. Questions must be submitted by September 8, 2026 at 5:00 p.m. The contract term is one year with an option to renew up to five years. The estimated project budget is $275,000.
All bidders must be registered with the Oregon Construction Contractors Board prior to bid submission. A bid bond, certified check, or cashier's check equal to 10 percent of the maximum allowable contract amount is required at submission, with performance and payment bonds equal to the full contract price due within 15 calendar days of award. The contract is awarded to the lowest responsive, responsible bidder. Five percent retainage applies to progress payments, with contractors offered four retainage options. Prevailing wage rates apply under ORS 279C.800-279C.870. Two bid alternates are included contingent on budget: Alternate 1 adds new acoustical ceiling tiles in all new offices and phone rooms, and Alternate 2 adds an additional layer of gypsum board with MLV sound dampening on walls dividing phone rooms and offices. The contractor must submit a forecasted project timeline within 10 calendar days of receiving the Notice of Intent to Award. After-hours work between 5:00 p.m. and 7:00 a.m. may be required based on building occupancy, to be determined at the pre-construction meeting.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .