This is an architectural floor plan for basement-level construction work at a building identified as 8405, specifically for the "Restore Barracks Building 8405" project. The plan is titled "Untergeschoss Basement" and shows a detailed layout of the basement level with dimensions, room designations, and construction specifications. The project is located in the Europe District and involves Smith Barracks in Baumholder, Germany.

The scope of work, indicated by yellow highlighting on the plan, includes waterproofing and drainage work along the perimeter of the basement, with specific focus on exterior areas. Key elements of the work include providing penetrations in concrete walls (marked in magenta), providing large street drain 50/50 capacity (marked in dark blue), and providing drainage channels (Metalfrinne) in front of basement doors (marked in light blue). Areas marked in green indicate work that is out of scope and will not include waterproofing and drainage work. The plan references a detail section for additional specifications and includes a legend identifying various construction materials and methods such as existing conditions, new reinforced concrete, new masonry, and new natural masonry. The document is marked as "Corrected Final" and includes scale references of 1:50 for the main plan and 1:20 for detail sections. The drawing dates and revision information indicate this is version 14 of 16 pages from the complete construction documentation set.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1470501916.LN

Text Box

1470501916.LN

Line

1470501916.LN

Text Box scope of waterproofing and drainage work

1470501916.LN

Line

1470501916.LN

Text Box out of scope, no waterproofing and drainage work

1470501916.LN

Oval

1470501916.LN

Text Box provide penetration in concrete wall

1470501916.LN

Rectangle

1470501916.LN

Rectangle

1470501916.LN

Text Box provide large street drain 50/50 provide drainage channel (Metallrinne) in front of basement doors

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Rectangle

1470501916.LN

Rectangle

Oval

Text Box

1470501916.LN

Line

1470501916.LN

Text Box scope of waterproofing and drainage work

1470501916.LN

Line

1470501916.LN

Text Box out of scope, no waterproofing and drainage work

1470501916.LN

Oval

1470501916.LN

Text Box provide penetration in concrete wall

1470501916.LN

Rectangle

1470501916.LN

Rectangle

1470501916.LN

Text Box provide large street drain 50/50 provide drainage channel (Metallrinne) in front of basement doors

1470501916.LN

Rectangle

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Rectangle

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Line

1470501916.LN

Oval

1470501916.LN

Text Box check on site and add to shop drawings, there must be an existing penetration in or under the concrete retaining wall in that area due to the existing drain

Line

Untitled

File details come from the government source that posted it. Updated .