This document is a photographic assessment and scope of work for rehabilitation and repair services at building 8404. The project encompasses comprehensive facility improvements including structural repairs, building envelope restoration, mechanical systems upgrades, and site work around a multi-story residential or institutional structure.
Key scope items include: replacement of all wooden windows with new units; repair and repointing of masonry joints throughout exterior walls and splash guards; installation and repair of drainage systems including gutters, downspouts, and ground-level drainage around the building perimeter; repair of sunken pavement and installation of handrails in exterior circulation areas; replacement of basement doors and mud room doors with new hardware and lighting; repair of concrete elements including broken sills and step treads; removal and reinstallation of roof-mounted equipment; replacement of canopy ceilings and all associated lighting fixtures; repair of broken or missing slate roof tiles; cleaning of exterior surfaces to remove biological growth and weathering stains; installation of waterproofing in water splash zones; repair of corroded metal components and structural fasteners with replacement or re-coating as required; and general masonry cleaning and repointing of all loose joints. The photographs document existing conditions including facade deterioration, damaged doors and windows, drainage deficiencies, sunken pavement sections, corroded hardware, and moss-covered roof areas. The work scope is defined by the photographs provided, with notation that all visible deficiencies must be addressed even if not explicitly shown in the sample images.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1470501916.LN
Text Box Street facade, north side
1470501916.LN
These photos are only samples. Scope according to the SOW. Not all items/ work/ mservices are shown on the sample photos.
south side, backside of buidling south side, backside of buidling west side, right side west side, right side repair canopy repair joint of exisiting door replace all wooden windows
Basement door replace door light + emergency light
1470501916.LN
install gutter replace basement door to mud room
1470501916.LN
install drainage gutter typical 1st and 2nd floor door clean wall.
install handrail.
clean install handrail repair sunken pavement
1470501916.LN
Line
Line repair sunken pavement
1470501916.LN
Line repair sunken pavement repair sunken pavement (tripping hazard)
1470501916.LN
Line
1470501916.LN
Text Box add drainage in front of door replace small drain with street drain clean remove weeds repair add drainage around building nails in facade, remove before doing facade work clean masonry Stones of splash guard will be replaced during drainage work renew metal cover
1470501916.LN
renew all ventilation outlets remove all weeds and unwanted greenery repair masonry repair joints of masonry remove all loose joints and re-fill them. Provide a 1x1m sample surface.
replace or repair all broken pieces.
Replace corroded parts or sand and re-coat.
1470501916.LN
These photos are only samples! All broken or corroded parts must be repaired even when they are not shown on the photos.
clean steps and risers etc., remove green growth on all surfaces install cap/ cover repair broken concrete waterproofing for water splash zones repair ceiling of canopies by replacement
1470501916.LN
replace all lights repair broken or missing slate tiles replace missing slate
Clean gutters. Replace leaf guard replace broken slate repair slate repair typical basement window south side mud room door seen from inside. Repair tiles after installation of new door.
Make sure that there is a slope towards the facade after installing the round window in the staircase.
replace metal covering after installing new dormer windows current condition of dormer windows in attic repair flooring after installing new door.
If no identical baseboard can be installed, install new baseboards symmetrical on both sides.
repair tiles if broken after installation of new attic dormer windows
Polygonal Line
1470501916.LN
Text Box remove barrel remove pavement Re-install after drainage work.
replace shaft cover move container for drainage work.
Move back after completion of work.