Amendment_2_-_Questions_and_Answers.xls

XLS spreadsheet 86 KB Posted

Attached to
FHA seeking expert transactional support to assist FHA in improving its property disposition capabilities.
Solicitation number
DU100H-15-R-0001
Issued by

About this file

Questions and Answers in response to Solicitation.

View the file

Other files

File Type Posted
Amendment_3_-_Best_Execution.pdf PDF
Amended_Copy_of_Best_Execution_Questions_-_DC1.xlsx XLSX spreadsheet
Revised_Price_Schedule_-_BE.pdf PDF
Amendment_Number_2.pdf PDF
DU100H-15-R-0001_Amendment.pdf PDF
QASP_-_Best_Execution.doc DOC document
Past_Performance_Information.doc DOC document
Socioeconomic_Participation_Plan.doc DOC document
DU100H-15-R-0001_rtf.doc DOC document
Past_Performance_Survey_-_Best_Execution.doc DOC document
Product_Demonstration_Script_-_Best_Execution.xls XLS spreadsheet
SF_1449_-_DU100H-15-R-0001.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

#QuestionResponse
1Are M&M contractors (Prime or Sub) Ocled?There is a potential conflict of interest for M&M contractors.
2Will this be a set-aside for 8(a)s?This requirement will not be an 8(a) set-aside.
3Is there an incumbent?If so what is their name and contract number?No. There isn't an incumbent. This is a new requirement.
4Is there a requirement for the current contractor to assist the successor with a transition in?This is a new requirement. There is not a current contractor.
5What is the expected contract award date?The anticipated award date of the Best Execution requirement is on or before January 1, 2016.
6What is the ramp-up periodThe Contractor is expected to be fully operational at the conclusion of the 90 day period.
7Is the transition-in period applicable for this contract?This is a new requirement. There isn't a transiton in period.
8How will HUD determine who gets a product demonstrationThe Product demonstrations will be assessed for offerors who submit an acceptable technical proposal/PWS in response to the and only for offerors included in the competitive range determination, if one is established.
9Is HUD going to have product demonstrations with every bidder?The Product demonstrations will only be assessed for offerors who submit an acceptable technical proposal/PWS in response to the and only for offerors included in the competitive range determination, if one is established.
10If the product demonstration, which is an evaluation factor, is to be conducted at a HUD facility will travel costs be reimbursed?Travel cost will not be reimbursed to Vendors participating in the product demonstration.
11Can the product demonstration be conducted via webinar?The product demonstration can not be conducted via webinar.
12Is the Q&A for the product demonstration to be included within the 1 hour time constraint?A Q&A will not be included as a part of the 1 hour time constraint.
13When does HUD expect the product demonstration to be scheduled? What is HUD's timeline??The Product demonstrations will be assessed for offerors who submit an acceptable technical proposal/PWS and only for offerors included in the competitive range determination, if one is established. All vendors who meet the above will be contacted.
14Are SCA wages and benefits applicable to this contract?HUD does not anticipate any labor categories falling under the Service Contract Act for this requirement. However, that is subject to change.
15Please clarify page 54 the 4th bullet: Will the contractor have delegated authority to accept offers? Who processes the offer from acceptance to closing? How does this affect HUD's Asset Managers?The Asset Manager (AM) will have the delegated authority to accept offers. The AM will process offers from acceptance to closing. This contract is an advisory service to HUD in assisting AM contractors.
16Page 8 Section 1.4: FHA "must own" please clarify if this includes proprietary software and systems?This does not include proprietary software and systems.
17We have received excellent CPARS, is it acceptable to include a copy of the most recent rating in the proposal?Vendors should submit past performance information in accordance with Attachments 1 and 2 of the solicitation.
18Is the cover letter to be included in the executive summaryThe cover letter should be included in the executive summary.
19Are there established completion deadlines for establishing the reserve price, ranking of disposition options and managing the counteroffer process for REO assets? If time deadlines have been determined, please provide the required completion deadlines for each service?The timelines for providing all services necessary to meet the SOO requirements should be provided by the offerors in their technical proposal/PWS.
20Is communication with the lenders, borrowers, trustees, etc. required for the services for loans in default (before becoming HUD REO assets?The offeror may propose this interaction in their technical proposal/PWS as part of the services offered to meet the requirements of the SOO.
21Can a sample loan and/or a sample deliverable template be provided?HUD is expecting the contractor to provide a sample loan and/or deliverable template as part of their techinical proposal/PWS.
22What is the approximate total number of properties/portfolio valueThe approximate total number of properties/portfolio is reflected in the solicitation.
23In what format will the relevant HUD date be stored in, and how will it be shared?HUD data is currently stored in the Single Family Data Warehouse and REO case management system of record. Data can be shared via excel, pdf, etc.
24Is there data regarding the georgraphic distribution of the relevant properties?There is data regarding the geographic property information and it is available.
25Are all relevant properties single-family assets, or will a portion include multi-family?Best Execution's efforts is focus soley on single family assets.
26Are there specific requirements for the requested interfaces? Are there functionalities that HUD considers essential to the final product?HUD expects the contractor to provide this information as part of their techinical proposal/PWS.
27What training and transitional activities are required by HUD?HUD expects the contractor to provide training and transitional activities information as part of their techinical proposal/PWS.
28What frequency is proposed for routine status meetings?The frequency of routine status meetings will be dependent on the performance of the contractor.
29What particular policy and economic changes are contemplated for the property disposition testing scenarios?Changes affecting the economy; the housing market; geographic market conditions; and disposition performance.
30Does HUD have a subscription to MLS/BlackKnight/other index databases and services? If not, will utilizing these sources in the development of the AVM be included in the pricing proposal?HUD does not have a subscription to these services, but the contractor is required to obtain a subscription to successfully meet the requirements of the SOO. Contractors should include this costs as part of their pricing proposal.
31Per disposition, will HUD be selling the properties in the open market or are there other disposition channels/methods?HUD currently uses the following disposition strategies - Pre-foreclosure Sale (PFS); Claim without conveyance of title/Trustee Sale (CWCOT); Note Sales; and Real Estate Owned Sales through the M&M process.
32Would an AVM company that provides AVMs to Mortgagees be a conflict of interest for this contract?AVM companies that provide AVMs to mortgagees will not be considered a conflict of interest.
33It is our understanding the clause 52.219-18 Limitations on Subcontracting (which is included in this contract) is limited to the small business set aside. Since this RFP is unrestricted, would you please clarify the contradiction?This FAR Clause is only applicable to 8(a) concerns.
34Are there any conflicts of interest in being a HUD M&M Contractor for Single Family Properties?There is a potential conflict of interest for M&M contractors
35Will the contractors AVM supercede the AM's valuation reports (BPO/Appraisal) when determining List price, price reductions, or BOA's once the asset is HUD owned?Where appropriate, HUD will determine the valuation that should be used when determining the list price and price reductions of HUD owned assets.
36Will the contractor have access to the AM's Valuation reports/bidding history/contract information, etc?HUD will provide this information, if necessary to the successful offeror.
37Will the contractor be working directly with the Assigned Asset Manager contractor or through a back channel line of communication during the counteroffer process?HUD expects the contractor to provide this information as part of their techinical proposal/PWS.
38How will the reserve be establised for the counteroffer process? Will it strictly be the fair market value or can tiers be submitted?HUD expects the contractor to provide this information as part of their techinical proposal/PWS.
39Will there be any data provided by FHA/HUD? Examples (origination docs/loan balances/BPO/Appraisal)?No
40How will the contractor's findings and recommendation be submitted for approval?HUD is expects the contractor to provide this information as part of their techinical proposal/PWS, quality control plan, and management plan.
41From page 3 to page of the RFP, it is stated that HUD requires Best Execustion Services, AVM with Comps (MMI), AVM with Comps (PD) and Asset Pricing Services for up to 400,000, 20,00. 70,000 and 70,000 properties respectively. Are these caps annual or monthly caps?The caps referenced on page 3 of the RFP are annual caps.
42In Section 1.5.II (i.s. Valuation and Disposition Services) of Part III (i.e. Statement of Objectives), it is stated from Task a to c that "Performing Audit and Reporting Services" is one of the HUD's Requirements. Could HUD provide moe description of the requirement in such services?The successful offeror is expected to assist HUD with responding to audits when appropriate. The successful offeror is expected to provide reports of activities performed.
43In Section 1.5.II (i.s. Valuation and Disposition Services) of Part III (i.e. Statement of Objectives), it is stated from Task c that "incorporating assistance process and deliverable within the existing FHA M&M framework" is one of the requirement. What does "FHA M&M framework" refer to? Is there any publicly available document to understand such framework?HUD currently uses the M&M III program to manage the marketing and maintenance of HUD owned single family assets. The M&M contruct includes a Mortgagee Compliance Monitor (MCM) responsible for oversight of servicing activities, a Field Service Manager (FSM) responsible for the ongoing maintenance and preservation of HUD properties, and an Asset Manager (AM) that is responsible for the marketing and sales of HUD-owned properties.
44In Section 1.5.II (i.s. Valuation and Disposition Services) of Part III (i.e. Statement of Objectives), it is stated from Task c that "ensuring listing accuracy and timeliness" is one of the requirement. Is the contractor responsible for listing the property or just provided reports and guidance to suggest the listing time for HUD?The contractor is responsible for providing advisory services to ensure the accuracy of listings across the entire time the asset is involved in the M&M. The contractor is not responsible for listing the property.
45In Section 1.5.II (i.s. Valuation and Disposition Services) of Part III (i.e. Statement of Objectives), it is stated from Task c that "exchanging correspondence with customers" is one of the requirement. What does "customers" refer to? Is it users outside HUD or within HUD? What is the expected frequency to exchange correspondence with customers?Customers may include users within and outside of HUD. HUD expects the contractor to define the parties that they would need to interact with to perform the requirements of the SOO as part of their techinical proposal/PWS and management plan.
46The contractor would like to clarify with HUD that tasks a to c in Section 1.5.II (i.e. Valuation and Disposition Services) of Part III (i.e. Statement of Objectives) are firm-fixed price and tasks d to g is time and material pricing scheme.Tasks( a) to( c) will be firm-fixed price CLINS. Tasks (d) to (g) is anticipated to be firm fixed price CLINS. However , that is subject to change.
47It is stated in Section 1.5.III (i.e. Operation Constraint) Part III (i.e. Statement of Objectives) that "In addition, FHA must own and be in effective ownership and possession, such as through a custodian, of all versions of the processes, models, reports, data and related documentation used in the performance of the SOO.". Could the above statement be inferred that HUD will possess the patents and copyrights of the underlying qualitative models, systems, and development data used by the contractor to provide HUD Valuation and Disposition services? Or the above statement only inferred that HUD possesses the right to understand fully the underlying models, systems and data, but will keep those information confidential?HUD will not possess the patents and copyrights of the contractors proprietary models, systems, and development data used by the contractor to provide these services. HUD possesses the right to fully understand the underlying models, systems and data, but will keep that information confidential unless forced to disclose for auditory purposes.
48The contractor understands that HUD required access to the provided valuation tool through web so that HUD's personnel can access the tool without contacting the Contractor. Will HUD submit valuation request through the Contractor Personnel? If so, what is the anticipated frequency per month of such submission?There isn't an anticipated frequency per month.
49It the contractor chooses to hand-deliver the proposal, who should the Contractor ask for at HUD's visitor reception?Proposals shall be delivered in accordance with PART VII – ADDITIONAL INFORMATION AND INSTRUCTIONS TO OFFEROR of the solicitation. If Vendors choose to hand-deliver proposals, Vendors should contact the Contract Specialist/Contracting Officer for pickup.
50At page 52 of the RFP, it is stated in the second column (the column entitlted "Volume Title") of the table that "Note: Resume and Letters of commitment are not included within the 70 page count." In the third column, it is stated that the page limit of volume I is 120 pages. The contractor would like to confirm with HUD that the page limit of volument I is 120 pages with further page limitation of each section, which is specified in the second columnAs specified in the solicitation RFP DU100H-15-R-0001, the page count as shown in Volume 1 is 120 pages.
51At page 54 of the RFP, it is stated that the Quality Control Plan shall "submit an organizational chart that reflects the independence of the quality control function." Could HUD provided additional clarification regarding the independence of the Quality Control function?The Quality Control function should be independent of the contractor staff operations performing the work
52Regarding the Product Demonstration requirement, shall the contractor demonstrate at a HUD designated facility? If so, how should the Contractor schedule with HUD for the demonstrationg?The Product Demonstration (PD) will be conducted a HUD facility. HUD will contact Vendors in reference to the PD scheduling for the PD at a time to be determined.
53Does HUD require the Contractor to provide a comprehensive model white paper describing the underlying models and stochatic methodologies?HUD does require the contractor to provide a comprehensive model white paper describing the underlying models and stochatic methodologies.
54Are CLINS 001-005 FFP?CLINS 001 to 005 are Firm-Fixed Price.
55How HUD would like us to provide labor rates for CLIN006 since this is a NTE CLIN (for both the base and option years)?The offeror should provide the labor rates for the required staff necessary to perform services for tasks (d)-(g) in PART III 1.5 II
56Can you provide HUD's current Disposition framework?HUD currently uses the following disposition strategies - Pre-foreclosure Sale (PFS); Claim without conveyance of title/Trustee Sale (CWCOT); Note Sales; and Real Estate Owned Sales through the M&M process.
57On Page 52, a PWS is listed as being a 50 page requirement. However, the PWS is not listed as being a part of the evaluation criteria?The PWS will be assessed as part of the technical proposal evaluation. The technical proposal should identify how the offers solution meets the requirements of the SOO. The PWS should identify the contracting relationship between the offeror and HUD.
58HUD states "FHA must own and be in effective ownership …". Is HUD looking for a customized AVM model or off-the-shelf model?HUD is expecting the contractor to provide this information as part of their techinical proposal/PWS. The objectives of this procurement are well described iin the provided in the SOO.
59HUD states that the contractor shall provide a user access portal established on a the web that allows for direct request without limitation and the exchange of information to HUD systems. Please clarify which CLIN we should provide pricing for this user portal. Also, are there specific systems that the user acces portal will need to interface with at HUD?The use of this portal should be priced into the services provided for CLINS 0002-0005. How the user access portal should be identified in the offeror's techinical proposal/PWS. Information interfacing with HUD systems, whether they provide information in a downloadable format or directly interfaced is to be suggested by the offeror.
60HUD refers to a 90 day transition-in period with the incumbent Contractor (if applicable). Can you provide the name of the incumbent?This is a new requirement. There is not a present incumbent for this procurement.
61In paragraph 3, HUD states that the Contractor shall have sufficient personnel on board, at no additional cost to to the Government, during the 90-day transition-in period. Will delieverables for CLINS 1-5 start the first month of the contract or after the 90 day transition-in period.This requirement does not have a transition in period, but the contractor will be required to maintain full performance of the contract at the conclusion of the 90 days.
62You refer to a performance work statement (50 pages) as part of the technical approach. Can youprovide instructions on the content and evaluation criteris for the Performance work statement section versus the technical approach section (35 pges)?The PWS shall demonstrate an understanding of the required tasks and be more detailed than the SOO. The PWS will be assessed as part of the technical proposal evaluation.
63When will the product demonstrations take place and how will the contractors be notified?The Product demonstrations will take place a date to be determined (TBD) by HUD. As well, PD will be assessed based on offerors who submit an acceptable technical proposal/PWS. Offerors will then be notified by HUD.
64HUD refers to a six month extension value to be added to the total proposed amount for evaluating pricing. Please clarify what scope of services/CLINs should be included in the six-month extension. Should the contractor provide a separate pricing table for the six-month extension?The Scope of services to be included in the six month extension will be in accordance w/the same CLIN structure for the base period and options. The Vendor should provide a separated pricing table for the six month extension. The six month extension value will be added to the total proposed amount for evaluating pricing, this amount will not be included in the total aggregate value of the resulting contract. This addition is for evaluation purposes only.
65Can the government please explain how this service is currently used in the existing process and how other valuation data is currently collected or provided?The services requested is for a new requirement, and not currently being used by HUD.
66In reviewing the RFP, we are trying to align the Part II - Supplies or Services to Part III - Statement of Objectives. Can you please map the proposed CLINS to the objectives listed in section 1.5?Below is a map for the proposed CLINS to the objectives in Section 1.5:

I - matches up with CLIN 0001

II - Outlined below:

'a' - matches up with CLIN 0003/0004 'b' - CLIN 0002 'c' - CLIN 0005 'd-g' - CLIN 0006 67 The RFP states the "FHA must own and be in effective…". Over time, our firm has invested heavily in the development of our software tools, databases, and other intellectual property that are used to support clients on similar initiatives. Can the government please confirm:

- that such proprietary systems and tools are not considered under the RFP provision, and

- that only tools, frameworks, documentation and other models developed specifically for this engagement are in scope under Operating ConstraintsHUD will not possess the patents and copyrights of the contractors proprietary models, systems, and development data. Used by the contractor to provide these services. HUD possesses the right to understand fully he underlying models, systems and data, but will keep that information confidential unless forced to disclose for auditory purposes.
68CLIN 003 refers to MMI Fund. Will Single Family loans, and properties in the General Insurance (GI ) and Special Risk Insurance (SRI) funds be excluded from the services being provided?The purpose of this procurement is to increase the effectiveness of disposition strategies for single family assets regardless of what fund the loans are associated with.
69Is P260 intended to be the system of record of all REO transaction data decisions and information exchange going forward? Does HUD anticipate the contractor bringing other workflow tools in the delivery of the targeted objectives? If so, will these tools be expected to integrate to/share data with P260 and other HUD systems?P260 is the REO case manaegement system of record. HUD is expecting the contractor to provide information regarding if/how their proposed method will interact with this system as part of their techinical proposal/PWS
70Can the government please offer clarification for the differences between CLINs 0003 and 0004? For example, what is the intended purpose of the data generated by each CLIN?The work for each CLIN is identical. The SOO outlines the need and requirements for the AVM with Comps, and HUD expects the offeror to provide a method that performs that requirement as written for each CLIN.
71Does the government anticipate the awardee will interact with the M&M contractors? For example, communication of sale offers or exchange of valuation data, etc.The government does aniticipate that the contractor will interact with M&M contractors. HUD is expecting the contractor to provide information on how the interaction will be necessary to meet the requirements of the SOO as part of their techinical proposal/PWS
72The government asks for a transition plan but it is not in the outline. What is the maximum page count and where should it be placed?The timelines for providing all services necessary to meet SOO requirements should be provided by the offerors in their technical proposal/PWS.
73While we are not expecting to subcontract more than 50% of the contract value, how will the government determine if the prime is subcontracting out more that 50% of the aggragated effort give the hybrid Fixed Price and Labor Hour structure of this contract?HUD will require subcontracting plans from all large businesses to determine to ensure subcontracting regulations are adhered to.
74Will the Government accept alternative pricing options or is the offeror constrained by the CLINs outline in the section?Alternative pricing will be accepted by the Government
75Is GSA schedule pricing acceptable as demonstration of fair and reasonable prices?GSA scheduled pricing is acceptable by the Government.
76Please confirm the contract types for CLINs 0001-0006, 0008-0013, 0015-0020, 0022-0027, 0029-0034, and CLIN 0035The travel clins are cost-reimbursable clins. CLIN 0001 will be a monthly cost. All Clins are consider fixed unit price clins other than, CLIN 0006, 0013, 0020 and 0027 will be task orders against a provided staff wages scale. CLIN 0007, 0014, 0021 and 0028 will be reimbursable expenses.
77Page 51 Proposal Organization table states 1/2 inch margins on all sides and Page 58 AS 2103 states 1 inch margins on all sides. Please clarify the required margin for this proposalThe margins should be 1 inch on all sides.
78Please confirm if font smaller than 12 point size is acceptable for tables and graphics.The font size shall be 12 point size in accordacne with PART VII – ADDITIONAL INFORMATION AND INSTRUCTIONS TO OFFEROR, Proposal Format and content.
79Does the Government have an anticipated date or date range for the required Product Demonstration? What is the Government's expectation from the offeror's proposal regarding the Product Demonstration in the Product Demonstration section of Volume 1?The date of the product demonstration is TBD. Product demonstrations will be assessed for offerors who submit an acceptable technical proposal/PWS. Offerors will be notified by HUD.
80Will the M&M be part of the process? And if so will their role change relative to ordering valuations i.e. Appraisals, AVM's and BPO's?Yes, the Asset Manager (AM) will still perform services necessary to market and sell HUD REO properties
81Is the PWS part of the proposal page count?The PWS is a part of the proposal page count.
82Federal regulations mandate that an appraisal be used to set the listing price. Is this changing?HUD regulations require that an appraisal be used as a factor for establishing the list price of a HUD REO property.
83the process you have outlined for setting the listing price does not include an inspection. Will an inspection be performed? Who will perform the inspection? Do you also require a physical inspection of the property as part of the valuation process?HUD is expecting the contractor to provide this information as part of their techinical proposal/PWS in reference to the question, " who will perform inspections and additional questions associated with inspections.
84On CLIN 001 is described as project mangement. What services do you require under this CLIN, or how do you define, "Project Management"?The services required for Project Management can be identified under PART III 1.5I of the SOO.
85CLIN 0002- 0005 describes AVMs to be delivered. You have the Cost Unit as "MO". Should this be per unit, i.e. per AVM?CLINS 0002-0005 which describes AVMs to be delivered is anticipated to be a firm-fixed price per unit cost.
86Historically, how many AVMs have you ordered in each of the past five (5) years?This is a new requirement for disposition activities. HUD cannot provide historical usage data.
87Part II, "Valuation and Disposition Services" (b) states the contractor... "Rank FHA property disposition options…". Will the contractor perform these services for every property in the REO inventory?No, the contractor will not perform these services for every property. The SOO indicates that these services will be performed for properties after a deliquency period of 120 days.
88Part II, "Valuation and Disposition Services" (b) states the contractor... "Rank FHA property disposition options…". Will contractor develop an intial disposition strategy for each asset, or is contractor expected to analayze and evaluate a preexisting disposition strategy for the asset?The contractor is expected to analyze each property according to HUD's preexisting disposition strategies.
89Part II, "Valuation and Disposition Services" (b) states the contractor... "Rank FHA property disposition options…". Will contractor have access to loan information?Yes, The contractor as part of their technical proposal/PWS should identify HUD's loan level information they require to adequately perform services to meet the requirements of the SOO.
90Par II, c states the contractor is to "Manage a counteroffer process for FHA…" Are these services now being performed by the Asset Manager contractors? If yes, how will the contractor interface with the asset managers?These services are not currently being provided by the Asset Managers (AM). The contractor will be providing advisory services to the AM to assist with HUD REO pricing and sales.
91Is this RFP the same as the Sources Sought APP-HU-2014-021, Pricing Valuation Services Contract?The RFP is not the same as the Sources Sought APP-HU-2014-021.
92Under 2.2 Contract Type - Can you indicate what services you anticipate to be firm fixed price, and time and materials and cost reimbursement?CLIN 0001 will be a monthly cost. CLIN 0002-0005 will be a Firm Fixed Unit Price CLIN per usage. CLIN 0006 will be task orders against a provided staff wages scale. CLIN 0007 will be reimbursable expenses.
93Is this a recomplete opportunity and if so, who is the incumbent?There is no incumbent for this contract.
94Can you provide the contract number?There is no incumbent for this contract.
95When do you anticipate award of this contract?Award is anticipated on or about December 30, 2015, with performance starting on January 1, 2016.
96Under CLIN 002, what time frame does FHA envision for the completion of Best Execution Services for 400,000 properties?HUD usage of the Best Execution services will be performed over the course of the year.
97Under CLIN 003 what time frame does FHA envision for the completion of 20,000 AVMsHUD usage of the services under CLIN 003 will be performed over the course of the year.
98Under CLIN 004, what time frame does FHA envision for the completion of 70,000 AVMsHUD's usage of the services under CLIN 004 will be performed over the course of the year
99Does FHA envision that CLIN 0005 will be completed simultaneously with CLIN 0004?Yes, FHA does envision CLIN 0005 will be completed simultaneously, where appropriate.
100What are travel costs under CLIN 0007 envisioned for?As specified in the solicitaion, travel cost(s) per contract period shall not exceed $20,000.00, and is envisioned for Trainings and Meetings where appropriate.
101In the option years will the services for CLINs 002 thru 005 be done on the same assets or new assets entering the portfolio?These services will be performed predominately for new assets, but may be performed for existing assets when necessary
102Under 1.4 what type of web portal is FHA envisioning?HUD is expecting the contractor to provide this information as part of their techinical proposal/PWS. The objectives of this procurement are well described iin the provided in the SOO.
103Will the costs to obtain a subscription service to a national database provider of property listing sales be considered a cost reimbursement?The Cost(s) to obtain subscription service(s) will not be considered as cost reimbursable.
104Under 1.6 does this relate to a database that is created by the contractor of the various disposition strategies based on the loan level data provided by FHA or does FHA envision some other database?The contractor is required to have access to "national housing market sales and listing data at a property level" (i.e. Nationwide MLS data that can be granulated down to the property level) to adequately perform the requirements of the SOO.
105Under Part IV #2 - the proposal has to provide a Transition-In plan. Will the transition period be 90 days?The Contractor is expected to be fully operational at the conclusion of a 90 day period. Contractor should identify the activities that will be taken to ensure that this occurs in a "Contract Implementation Plan"
106Will demonstrations be conducted pre or post award and in what timeframe?The date of Product demonstrations is TBD .
107(Part II, 2.4 Services). Please confirm the quantities provided in the CLIN tables Description (0002-0004) are annual values. For example, CLIN 0002 - Best Execustion Services for up to 400,000 properties annuallyThese are annual projected amounts.
108Statement of Objectives - 1.4 - Period and Place of Performance, p. 6: Can HUD provide an estimate or range on the number of FHA staff who will require access to the user portal on the web?The offeror's proposed method to provide services could greatly vary the required number of HUD personnel/representatives that are required to access the web portal.
109Part III. Please clarify the requirement for "Contract implementation Plan". This is the only reference to this plan in the RFP documentsThe Contractor is expected to be fully operational at the conclusion of a 90 day period. Contractor should identify the activities that will be taken to ensure that this occurs in a "Contract Implementation Plan"
110Can the government provide a list of applicable information security requirements for the automated valuation model (AVM)?The AVM should identify property information to provide a valuation. This will meet information security requirements.
111To assist offerors in developing their Transition-In plan, can the government provide information on the current contractors, their roles, as well as, the role of the government staff currently providing valuation and disposition support today?This is a new requirement. There is not an incumbent for this contract.
112Part IV , AS 2309 Small Business Subconracting Goals, Letter B, second paragraph. Is the following reference corec? "…in paragraph (d) of this provision. Should this reference be to paragrap ©?The reference "(d)" is incorrect ("…in paragraph (d) of this provision."); the reference should be "(c)".
113What is the requirement for the six-month extension? Please clarifyThe Scope of services to be included in the six month extension will be in accordance w/the same CLIN structure for the base period and options. The requirement for these services are covered under the PWS and would be extended in accordance with FAR clause 52.217-8.
114There are no instruction (or evaluation criteria) for the PWS. Can the government provide instruction instruction and evaluation criteria for the PWS? Does HUD require a specific template for the completed PWS?The PWS will be assessed as part of the technical proposal evaluation. The technical proposal should identify how the offers solution meets the requirements of the SOO. The PWS should identify the contracting relationship between the offeror and HUD that allows the contractor to provide those services.
115Recommend the Government provide a page count for the Socioeconomic Participation goals/ volume.The Socioeconomic Participation plan does not have a page count limitation.
116Table indicates 1/2 " margin versus paragraph (b) which indicates a 1 " margin?Consistent with AS 2102, the margins shall be I (one) inch in width on all sides.
117Are Resumes and Letters of Commitment included within the 120 page count for the Management and Technical Volume?Resumes and Letters of Commitment are not included in the 120 page count. See AS 2102 (c).
118Are the Executive Summary and Socioeconomic Participation Plan also exempt from the 120 page limit?The Executive Summary and the Socioeconomic Participation plan is not included in the 120 page count.
119Both sections state that the font size is 12. Can we use a smaller font size for graphics?As indicated in the "Proposal Organization" and AS 2102, the font size is 12 pitch for all submissions.
120Can the government clarify and confirm that the last 4 ( of 7 bullets) are associated with the evaluation of the key personnel and responsibilities?The last four (of 7) bullets are not associated with the evaluation of the key personnel and responsibilities.
121For planning purposes, can the government provide additional guidance on the product demonstration (e.g., when the demonstration will be conducted, how much advanced notification the offeror will receive; the number and type of Contractor representatives that may participate in the product demonstration)?Product demonstrations will be assessed for offerors who submit an acceptable technical proposal/PWS. Offerors will be notified by HUD.
122How do we get access to the HUD loan level data? Integration? Download?Vendors can get access to the HUD loan level data utilizing either method mentioned, Integration or Download. HUD will also provide the data (electronically) upon request.
123Are there ever recent appraisals or BPO's completed before the disposition process?Yes there are, depending on the disposition strategy used for an asset.
124Is HUD looking for the offeror to provide a bidding system or use the on they currently have?The Offeror must propose their strategy to either provide a bidding system or utilize one they already have.
125Please clarify the specific services being performed for best execution services for 400,000 propertiesThe overall performance objectives of this procurement are described in the solicitation’s SOO. The Offeror is required to propose their approach to the overall performance objectives of the solicitation.
126Are best execution servies for up to 400,000 properties independent of CLIN 0003/4/5 - up to 20,000 properties… or should these CLINS be included when pricing 0002Best Execution Services are independent of the other CLINs.
127For CLIN 0004/5 are these the same up to 70,000 properties or should these numbers be considered exclusive of each other for a total of up to 70,000 properties for CLIN 0004 and another 70,000 for CLIN 0005The proposed amounts for each CLIN are independent/exclusive of the other CLINs.
128Are the property counts a monthy figure or an annual figure?The property counts are an annual figure.
129Are the HUD disposition procedures currently available for public review?Yes. Information about HUD Disposition Procedures an be found by searching www.hud.gov.
130Please describe the type of data and availability of data (i.e. maitained by a HUD system, external source of data, etc. ) HUD envisions being combined with rhe Valuation based n the statement "combined with data from FHA where appropriate?The Offeror is required to provide the type of data they would need to provide AVMs as part of their technical proposal/PWS. The available data that will be provided by HUD is the data currently collected in HUD's systems.
131Is HUD's current disposition framework available for public review?Yes. Information about HUD Disposition Procedures an be found by searching www.hud.gov.
132Will HUD be performing analysis using contractor's models/data/systems as part of executing the business process or will HUD provide the contractor property information to run an analysis and provide results?HUD will provide the contractor property information to run an analysis and provide results.
133Please define what is meant by the term customers? Servicers, realtors, etc?Customers may include users within and outside of HUD. HUD is expecting the Offeror to define the parties that they would need to interact with to perform the requirements of the SOO as part of their techinical proposal/PWS and Management Plan.
134Please clarify the statement "All models and procedures.." The Contractor's model is proprietary, please describe how exactly will the contractor make all mdels and procedures available to another service provider or HUD without losing proprietary status?HUD will not possess the patents and copyrights of the Offerors' proprietary models, systems, and development data used by the contractor to provide these services. HUD has the right to understand the underlying models, systems and data, but will keep that information confidential unless compelled to disclose for auditory purposes.
135Will contractor's model output be used for HUD to make decisions or will output be the final decision for HUD?The output of the contractor's model will be used by HUD to make decisions where appropriate.
136In the Proposal Organization Section Volume I, the PWS (50 pages) is listed. Please describe what is expected in this section and how this section differs from the technical approach (35 pages) listed in the previous bullet?The Offeror proposes the PWS in response to the government’s SOO. The Offeror uses the SOO to develop their PWS. The Offeror shall propose performance standards in response to the SOO. The technical approach demonstrates the Offeror’s ability to accomplish the technical requirements of the prospective contract successfully. The resultant contract will be a performance based acquisition.
137Please describe what is meant by offeror's method to demo for customer interfaces, interactions, and ergonomics?The offeror's proposed method, if demonstrated, should identify customer interfaces, customer interactions, and ergonomical usage. The offeror will be assessed and evaluated for each.
138Regarding the Product demonstration, in what file format does the government expect the example of the Automated Valuation Model to be submitted? As a separate file? An image within the technical approach?.The Automated Valuation Model should be submitted as a separate file.
139Regarding the product Demostration, when does the government anticipate to conduct the product demonstration sessions with te offerors, and will all offerors be eligible for demonstration sessions or just the highest rated offerors?Offerors whose proposals are rated overall acceptable/satisfactory will be afforded the opportunity to demonstrate their product.
140regarding Past Performance, is the stated limit of 5 past performance references for the prime contractor and subcontractors collectively or can prime and sub each submit a set of five past performance references?If the offeror is proposing to subcontract more than 20% of the contract value, the offeror shall submit a separate chart and narrative. Therefore, both the prime and subcontractor must submit a separate chart, narrative and set of references.
141Regarding Socio Participation, is there a page limit for an offeror's subcontracting plan or would the government prefer it be included in another volume of the proposalThere is not a page limitation for the Socioeconomic Participation plan. As stated in the solicitation, the Socioeconomic Participation/Goals is to be submitted in Volume I.
142Can you please clarify whether the Contractor under this contract will be working closely with M&M program staff and contractors?Yes. The winning bidder will be working closely with M&M program staff and related M&M contractors.
143Can you please verify whether there is an incumbent on this contract?There isn't an incumbent. This is a new requirement.
144Can the government provide guidance on when responses to submitted questions will be available to potential offerors give the submission date is Sept. 29?The government anticipates responding to offerors' questions by 09/30/2015. The government will extend the solicitation response time if needed.
145Can the government clarify the property counts for pricing. Are the property counts 400K, 20K, 70K, 70K monothly amounts, such that the offeror proposals should be for 12 months of these counts for the base period and each optional periodThese are annual projected (not to exceed) amounts.
146The linkage between the SOO requirements and the CLIN is not clear. Can the government clarify that the "Best Execution" CLIN 0002 is related to determining the value of each disposition path and ranking those options per loan (up to 400K)?Yes. Best Execution, as described, is associated with CLIN 0002.
147The linkage between the SOO requirements and the CLIN is not clear. Can the government clarify that the "Asset Pricing Services" is related to offer management services for listings related to REO disposition only (up to 70,000 per month)?Yes, the Asset Pricing Service, as described, is associated with CLIN 0005.
148Are 1.5 II items (d) through (g) part of CLIN 0006 in the Base Year?Yes, Section(s) 1.5 ll, items (d) through (g) are part of CLIN 0006 in the Base Year.

Sheet2

Sheet3