DTRT5717Q80108

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

V222

Cambridge MA 02142-1001 55 Broadway, V222 On-Site Contracts & SAP Branch USDOT/Volpe Center

V222

Cambridge MA 02142-1001 55 Broadway, V222 On-Site Contracts & SAP Branch USDOT/Volpe Center

07/17/2017000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/05/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 000003 is being issued to:

1. Revise the Statement of Work (attached) in it's entirety to incorporate a change in the conduit size back to 2", add reference to Attachment 2 - Fiber Routing Diagram (attached).

In addition, the period of performance for these services has been changed to Date of Award and/or Notice to Proceed through September 30, 2017.

2. Government Responses to Contractor Questions (attached)

No other changes at this time.

RECOVERY: NON-RECOVERY

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Christine Guy

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation DTRT5717Q80108 Amendment 000003

Department of Transportation Volpe National Transportation Systems Center

Remotely Piloted Aircraft (RPA) Ground Based Sense and Avoid (GBSAA) Fiber Optic Cable Installation at Springfield-Beckley Municipal Airport

Statement of Work (SOW)

Background

Currently there are several technical and operational challenges attendant to the near-term integration of critical United States Air Force (USAF) Remotely Piloted Aircraft (RPA) assets into the National Airspace System (NAS). One of the most significant, is the inability of an RPA operator to “see and avoid” other aircraft; as required by Title 14 of the Code of Federal Regulations (14CFR§91.113). The current approved mitigations strategies for the lack of a “see and avoid” capability consist of using temporary flight restrictions, ground-based visual observers, and chase aircraft. These solutions are not always practical of extendable for all USAF RPA missions.

The Volpe National Transportation Systems Center (VNTSC) has been tasked by the USAF to deliver a specialized mobile Ground Based Sense and Avoid (GBSAA) solution at the Springfield-Beckley Municipal Airport (KSGH) in Springfield, OH. GBSAA will result in a USAF material solution which will enable RPAs to operate in compliance with 14CFR§91.113 without the use of the aforementioned compliance mechanisms.

In order to receive appropriate radar data to operate in compliance with 14CFR§91.113, fiber optic cabling must be placed and wired in strategic locations throughout the airport grounds. This requires specialized equipment for drilling around sensitive airport infrastructure and underneath runways and taxiways. This is a highly specialized procedure requiring the contractor to have special permits from the FAA prior to starting the work.

This work requires laying 24 s/m fiber optic cable with conduit, along with a number of terminal vaults. Once the infrastructure is in place, testing will commence in order to assure the installation is up to the correct specifications. Prior to award of this order, a “Right of Entry” must be issued by the City of Springfield to the contractor.

SCOPE OF WORK

Task 1 – Supply and Installation of Fiber Optic Cables (CLIN 0100)

Supply and installation of 24 s/m fiber optic cable and 2” conduit and conduit pull tape, along with terminal vaults (~3-4) and patch panels (~1-2, or as required by Contracting Officer’s Representative (COR)) at Springfield-Beckley Municipal Airport (KSGH). (See attached Google Earth Boring, Fiber and Airport Diagrams and Fiber Routing Diagram) Conduit and fiber must extend from the terminal vault at the Control Tower to inside the Tacan Building (~2200’ (under taxiways and runway)). Conduit pull tape is required in every conduit segment. The GBSAA Mobile Bus will be parked next to the Tacan building. A connection vault must be built at that location inside the Tacan building. A box for an umbilical cord from the bus must be placed on the Tacan building to connect with the fiber patch panel. Fiber and conduit must be laid from the Tacan Building vault down to taxiway E1 (~1100’) and continue to Hammerhead turn at the end of Runway 33 (~1400’). A terminal vault must be built at those two additional locations. All vaults and conduit must be built and placed in accordance with City of Springfield and Airport standards and specifications, along with any final specifications determined by the COR. The contractor shall determine the number of access panels required for pulling fiber optic cable.

Depth of fiber will be determined by the COR. Total fiber and conduit is estimated at ~4700’- 5000’. All work to include labor, material and equipment necessary to perform installation. All work shall be coordinated with GBSAA Team to include work schedule.

Upon completion of all installation, contractor and GBSAA Team will conduct testing of fiber optic cables to ensure usability. This testing shall be performed no later than July 31, 2017. In addition the contractor shall provide fiber optic cable installation drawings for review and acceptance by the GBSAA Team.

Deliverables Due Date Task

24 s/m Fiber Optic Conduit and Cable Installation September 30, 2017 1

Fiber Optic Cable Testing September 30, 2017 1

Site Drawings September 30, 2017 1

WARRANTY

Contractor shall warranty all work performed under this contract for not less than 12 months from date of completion and acceptance of work.

SITE VISIT

A site visit will be scheduled for all interested parties after issuance of solicitation. Please contact Contracting Officer Christine Guy at Christine.Guy@dot.gov to be added to the list of attendees.

PLACE OF PERFORMANCE

All work shall be performed at Springfield-Beckley Municipal Airport (KSGH), 1251 W Blee Road, Springfield, Ohio, 45502.

mailto:Christine.Guy@dot.gov

AIRPORT WORK SCHEDULE

Contractor shall be allowed to work the following hours:

M-F: 7:30 AM – 6:00 PM

Sat: 9:00 AM – 5:00 PM (WITH ONE WEEK PRIOR NOTICE)

No work may be performed on Sundays

PERIOD OF PERFORMANCE

Period of performance will be from date of award and/or issuance of the notice to proceed through September 30, 2017 and is mandatory.

ACCEPTANCE CRITERIA

COR shall provide acceptance upon completion of testing and receipt of drawings.

GOVERNMENT FURNISHED EQUIPMENT AND/OR INFORMATION:

• Electrical Access

• Diagrams of Boring, Fiber and Airport

• Fiber Routing Diagram

SUSTAINABLE ACQUISITIONS REQUIREMENT

To the maximum extent possible and consistent with the Federal Acquisition Regulations Part 23, the Government requires during the performance of the work under this Statement of Work (SOW) the Contractor to provide or use products that are: energy efficient (ENERGY STAR® or Federal Energy Management Program (FEMA)-designated); water-efficient; biobased; environmentally preferable (e.g., EPEATregistered, or non-toxic or less toxic alternatives); nonozone depleting; or made with recovered materials. Unless otherwise identified in this SOW, each recovered materials or biobased product provided and delivered must meet, but may exceed, the minimum recovered materials or biobased content of an EPA- or USDA-designated product. The sustainable acquisition requirements specified herein apply only to products that are required to be: (1) delivered to the Government during contract performance; (2) acquired by the contractor for use in performing services (including construction) at a Federally controlled facility; (3) furnished by the contractor for use by the Government; or (4) specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.

ATTACHMENTS

Attachment 1 – Diagrams of Boring, Fiber and Airport Attachment 2 – Fiber Routing Diagram

DTRT5717Q80108 Amendment 000003 Fiber Optic Cable Installation at Springfield-Beckley Municipal Airport

CONTRACTOR QUESTIONS AND GOVERNMENT RESPONSES

CONTRACTOR QUESTION:

At terminal vault to be installed at Tacan building, SOW states that fiber needs to be installed into the Tacan building the to fiber patch panel to be installed on the outside of the Tacan building where bus will be parked.

A.) Once cable is inside building, what equipment and connections are needed their?

B.) I assume that contractor will need to provide umbilical cord and connect to patch panel and bus, please clarify whether that is correct?

C.) Will contractor need to provide and make any connections for the bus?

GOVERNMENT RESPONSE:

Termination of Cable Segments “A” and “B” at TACAN Shelter

Diagram attached identifying the following:

• Fiber cable Segments “A” and “B” shall terminate in a wall-mounted, 48-Port, NEMA-

3R fiber patch panel on a wall of the TACAN Shelter.

• No fiber equipment will be installed on the interior of the TACAN Shelter

• Enclosure location on TACAN Shelter wall and location of cable risers into enclosure shall be discussed during Contractors’ Site Visit

• Patch Panel shall be fitted for Type SC connectors, with sufficient connectors to land strands of (2), 24-strand SM cables (Outside Plant Cable Segments “A” and “B”)

• SC Connectors shall be individual; no duplex connectors desired

For background information, only: RV Umbilical Cable

A three-section Umbilical Cable, fabricated by others, will connect equipment in the RV (parked near TACAN Shelter) to appropriate strand ports in the TACAN Patch Panel; SC connectors will be used on the Umbilical Cable. Cable will contain (12) GCS Strands supporting RNY 33 GCS Location, (12) supporting ECHO-1 GCS Location and (12) supporting leased-line IN/OUT. Installation of umbilical will be by GBSAA Team or Air Crew.

CONTRACTOR QUESTION:

At the end of Runway 33, a terminal vault is required

A.) What other connection needs to be on that end?

GOVERNMENT RESPONSE:

ECHO-1 Patch Panel

• A 48-Port, Simplex Type-SC Patch Panel shall be furnished and installed at the ECHO-1 GCS Table location

• The panel will be mounted in a hand-hole / man-hole meeting Springfield-Beckley Airfield Specifications and sized to host patch panel

• NEMA-Rating of panel enclosure shall be appropriate to operating environment within hand-hole / man-hole

• The panel shall allow landing of 24-strand SM Cable Segments “B” and “C”

• The Contractor shall furnish and install (12) Type-SC, Simplex Patch Cables to patch

(12) strands from Segment “B” to Segment “C”; see Power Point drawing

• 3F. Contractor shall install patch panel in hand-hole / man-hole with panel door facing the sky

• The cover of the patch panel shall be placed in the OPEN Position by air crew for connection of GCS Table Umbilical Cable (background information)

• GCS Umbilical Cable shall be furnished by others ((12) strands, terminated in SC connectors)

RNY 33 Patch Panel

• A 24-Port, Simplex Type-SC Patch Panel shall be furnished and installed at the RNY 33 GCS Table location

• The panel will be mounted in a hand-hole / man-hole meeting Springfield-Beckley Airfield Specifications and sized to host patch panel

• NEMA-Rating of panel enclosure shall be appropriate to operating environment within hand-hole / man-hole

• The panel shall allow landing of 24-strand SM Cable Segment “C”

• No contractor-furnished patch cables will be required at this Panel

• Contractor shall install patch panel in hand-hole / man-hole with panel door facing the sky

• (background information) The cover of the patch panel shall be placed in the OPEN

Position by air crew for connection of GCS Table Umbilical Cable

• GCS Umbilical Cable shall be furnished by others ((12) strands, terminated in SC connectors)

Air Traffic Control Tower (ATCT) Patch Panel

• Fiber cable Segment “A” shall terminate in a wall-mounted, 24-Port, Type-SC, Simplex, NEMA-1 fiber patch panel on the wall of the ATCT Comms Room

• Locate panel near existing local TELCO Point-of-Presence T1-Line enclosure, but leave space in between for an 18” x 24” media converter enclosure; likely locations to be reviewed during Contractors’ Site Visit

• Media Converter and Type-SC Patch Cables to be furnished and installed by others

• 20-Ampere ATCT Critical Power Branch Circuit to power converter to be furnished and installed by others

• Copper connections between Local TELCO PoP and Converter to be furnished and installed by others

CONTRACTOR QUESTION:

Does the customer want the fiber to be pulled through new innerduct? If so, What size innerduct? Or would the customer prefer pulling the fiber through maxcell fabric innerduct? If so, how many cells? typically 3 cell, and there will be 2 extra cells in the case of future expansion.

GOVERNMENT RESPONSE:

Inner Duct, etc: Contractor shall decide on use of inner-duct or MaxCell (or equal) to carry 24-strand fiber cable; decision to be divulged to Awarding Authority

CONTRACTOR QUESTION:

What size manholes or handholes will be installed along the new duct bank? And, what is the total number to be installed? How far apart does the customer want each manhole/handhole?

300 feet, 400 feet...

Is the contractor to install fiber service loops in the manholes? Every other manhole? Only at each end? What size service loops? 50 feet, 100 feet...

GOVERNMENT RESPONSE:

Spacing of Hand-Holes / Man-Holes: It shall be the responsibility of each Bidder to determine an appropriate spacing of Hand-Holes / Man-Holes along the route of the conduit runs to ensure cable manufacturer’s pulling-tension specifications are not exceeded. Bidder shall divulge to Awarding Authority the quantity and spacing of hand-holes / man-holes. Hand-Holes / Man- Holes: Shall meet Springfield requirements for weight-rating, means of drainage, alignment with finished grade, etc.

CONTRACTOR QUESTION:

Could the period of performance be extended to a minimum of 60 days, but preferably 90 days after the date of award?

GOVERNMENT RESPONSE:

Period of performance has been changed to date of award and/or issuance of the notice to proceed through September 30, 2017 and is mandatory.

CONTRACTOR QUESTION:

Will the contractor be able to work weekends? Are there any work hour restrictions? Or set work hours?

GOVERNMENT RESPONSE:

Contractor shall be allowed to work the following hours:

M-F: 7:30 AM – 6:00 PM

Sat: 9:00 AM – 5:00 PM (WITH ONE WEEK PRIOR NOTICE)

No work may be performed on Sundays

CONTRACTOR QUESTION:

Do you have specific requirements as to how deep you would like the directional bore to be placed? Is it possible that, below a certain depth (the bottom of the runway / taxiway sub-surface preparation), conditions might be less predictable?

GOVERNMENT RESPONSE:

All utilities (boring or buried cable) should be placed at a minimum depth of 36 inches (per Fiber Optics Association or FOA). It is desired that the depth remain constant unless needed to miss other obstacles (e.g. utilities and pavement). When installing below pavements, it is recommended the cable be placed at a minimum depth of 48" or at least 12" below subbase materials (aggregate) if more than 48". These depths should reduce the risk of it the cable ever being accidentally dug up for any reason. The Contractor is to conduct "Private" Utilities Locates along the project corridor to ensure existing utilities are not disturbed. At no time should a directional bore be installed to go above a utility that does not meet a minimum depth of 36 inches. At these proposed depths, most utilities (within the corridor) and pavements interference would be avoided with some possible exceptions.

CONTRACTOR QUESTION:

Finally, we need the Specs on your standard Springfield hand-holes and man-holes (weight-rating, any requirements for placing a gravel drywell under to minimize flooding, etc.).

GOVERNMENT RESPONSE:

The following are the design specifications for Springfield hand-holes and man-holes:

Decks and covers subject to direct heavy airplane loadings (within the Runway or Taxiway Object Free Area) such as manhole covers, inlet grates, utility tunnel roofs, bridges, etc., should be designed for the following loadings:

a. Manhole covers for 100,000 lb. (45 000 kg) wheel loads with 250 psi (1.72 MPa) tire pressure.

b. For spans of 2 feet (0.6 m) or less in the least direction, a uniform live load of the larger of 250 psi (1.72 MPa) or the maximum tire pressure assumed for manhole cover design

c. For spans of greater than 2 feet (0.6 m) are to require specialized design instruction. Please contact the airport for details.

Decks and covers subject to all other loadings (not heavy airplane loadings or outside of the Runway or Taxiway Object Free Area) such as manhole covers, inlet grates, utility tunnel roofs, bridges, etc., should be designed for the following loadings:

a. Heavy Duty - Casting in this category exceed proof loads of 16,000lbs.

GBSAA At Springfield, OH Airfield Fiber Routing

Peter R. Kennett, PE; GBSAA Systems Engineering; 10 JULY 2017; Rev A, 11 JULY 2017

RELEASED FOR BIDDERS’ USE

Key:

24‐SM in 2” Conduit; Furnished & Installed by Contractor SM Patch Cords; Furnished & Installed by Contractor Umbilical Furnished by Others; Deployed by Air Crew at Selected GCS Location

GCS Table Umbilical Cable

ECHO‐1 GCS Location RNY 33 GCS Location

Segment “A” Segment “B” Segment “C”

#13‐24 B‐C

#1‐12: “GBSAA/E1”

#13‐24: “GBSAA/33”

#01‐12: Dark (capped)

#13‐24: “GBSAA/33”

GCS Table Umbilical Cable

TACAN OutsideWall Panel

#1‐24: Harris / FTI Leased Lines IN/OUT

RV Umbilical, 3‐Section

• FTI IN/OUT

• ECHO‐1 GCS

• RNY 33 GCS

Tower Comms Room

RV

Amendment 000003
Amendment 000003 SF30
Amendment 000003 Accepted changes SOW
WARRANTY
Site Visit
PLACE OF PERFORMANCE
Airport Work Schedule
Period of Performance

Contractor Questions and Government Responses

Fiber Routing Diagram