DTMB0414 Construction Addendum 3.pdf
PDF 100 KB Posted
- Attached to
- 751/18123. DPL; Houghton Lake Flats Improvements
- Solicitation number
- RFQ-171-250000000451-4
- Issued by
- Ottawa County, Michigan
About this file
This is a Construction Bid Addendum No. 03 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Houghton Lake Flats project. The addendum, dated 7/11/2025, is distributed to all bidders with a bid opening date of 7/16/2025, and the project is being managed by professional firm Wade Trim with David Lenz as the Project Director. The document provides clarification from a pre-bid meeting regarding the project's funding and procurement requirements.
The project is partially funded by US Federal grant money and will require strict "Buy America" provisions for infrastructure, mandating the use of American Iron, Steel, Manufactured Products, and Construction Materials. Bidders must acknowledge this addendum in their bid submission, with failure to do so potentially resulting in bid rejection. The addendum becomes part of the official Contract Documents, and the project file number is 751/18123.DPL, indicating this is a specific infrastructure development initiative with specific sourcing and procurement guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 03
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
7/11/2025
PROJECT NAME
Houghton Lake Flats
FILE NUMBER
751/18123.DPL
PROFESSIONAL
Wade Trim
PROJECT DIRECTOR
David Lenz
BID OPENING DATE:
7/16/2025
The following are the answers and clarifications discussed during the pre-bid meeting.
The project is partially funded with US Federal grant money and will require “Buy America provisions for infrastructure including required use of American Iron, Steel, Manufactured Products, and Construction Materials for infrastructure.”
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE: Click to enter date
APPROVED BY:
PROJECT DIRECTOR: David Lenz DATE: 7/11/2025 http://www.michigan.gov/SIGMAVSS