DTMB0414 Construction Addendum 2.pdf
PDF 100 KB Posted
- Attached to
- 751/18123. DPL; Houghton Lake Flats Improvements
- Solicitation number
- RFQ-171-250000000451-4
- Issued by
- Ottawa County, Michigan
About this file
This document is a Construction Bid Addendum No. 02 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Houghton Lake Flats project. The addendum, dated 6/26/2025, is distributed to all bidders and relates to a construction project with a bid opening date of 7/16/2025. The professional for the project is Wade Trim, and the project director is David Lenz, with a file number of 751/18123.DPL.
The key update in this addendum is that DTMB risk management has determined that Builders Risk Insurance will NOT be required for this project. Bidders are instructed that they must acknowledge this addendum in the Bid Summary and Bid Form, and failure to do so may result in bid rejection. The addendum will become part of the Contract Documents, and it is to be distributed through www.michigan.gov/SIGMAVSS as an attachment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 02
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
6/26/2025
PROJECT NAME
Houghton Lake Flats
FILE NUMBER
751/18123.DPL
PROFESSIONAL
Wade Trim
PROJECT DIRECTOR
David Lenz
BID OPENING DATE:
7/16/2025
The following are the answers and clarifications discussed during the pre-bid meeting.
DTMB risk management has determined that Builders Risk Insurance will NOT be required for this project.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE: Click to enter date
APPROVED BY:
PROJECT DIRECTOR: David Lenz DATE: 6/26/2025 http://www.michigan.gov/SIGMAVSS