This document is a Construction Bid Addendum No. 02 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Houghton Lake Flats project. The addendum, dated 6/26/2025, is distributed to all bidders and relates to a construction project with a bid opening date of 7/16/2025. The professional for the project is Wade Trim, and the project director is David Lenz, with a file number of 751/18123.DPL.

The key update in this addendum is that DTMB risk management has determined that Builders Risk Insurance will NOT be required for this project. Bidders are instructed that they must acknowledge this addendum in the Bid Summary and Bid Form, and failure to do so may result in bid rejection. The addendum will become part of the Contract Documents, and it is to be distributed through www.michigan.gov/SIGMAVSS as an attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 02

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

6/26/2025

PROJECT NAME

Houghton Lake Flats

FILE NUMBER

751/18123.DPL

PROFESSIONAL

Wade Trim

PROJECT DIRECTOR

David Lenz

BID OPENING DATE:

7/16/2025

The following are the answers and clarifications discussed during the pre-bid meeting.

DTMB risk management has determined that Builders Risk Insurance will NOT be required for this project.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: David Lenz DATE: 6/26/2025 http://www.michigan.gov/SIGMAVSS