SCHEDULE_OF_UNIT_PRICES.docx

DOCX document 15 KB Posted

Attached to
ZERO DECK CONSTRUCTION Federal contract opportunity
Solicitation number
DTMA95B1500001
Issued by
Department of Transportation Maritime Administration

About this file

Schedule of Unit Prices.

View the file

Other files for this federal contract opportunity

Other files attached to ZERO DECK CONSTRUCTION, newest first.
File Type Posted
Scan16.pdf PDF
Scan17.pdf PDF
Scan14.pdf PDF
Scan15a.pdf PDF
Scan13.pdf PDF
Scan14.pdf PDF
Scan12.pdf PDF
Scan11.pdf PDF
Scan10.pdf PDF
Scan9.pdf PDF
Scan7.pdf PDF
08_71_00_USMMA_05-26-2015.pdf PDF
Scan8.pdf PDF
6.docx DOCX document
Scanned_101.4.pdf PDF
Scan6A.pdf PDF
Scanrfi1.pdf PDF
Scan4.pdf PDF
DTMA95B1500001-000003_Amendment_3.pdf PDF
Scansignin.pdf PDF
DTMA95B1500001-000002_Amendment_2.pdf PDF
Zero_Deck_-_IFB_Amendment_000001.pdf PDF
NY13516_CD_SPECS_ISSUE_FOR_BIDDING_07-23-15.pdf PDF
Zero_Deck_-_IFB.pdf PDF
Zero_Deck_Design_Drawings.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF UNIT PRICES

A. Unit Price No. 1: Concrete Wall Crack Repair. Epoxy Crack Injection and Epoxy Adhesive

1. Description: Repair of interior face of concrete wall cracks and spalling of concrete according to Section 03 01 30 – Maintenance of Cast-in Place Concrete.

2. Unit of Measurement: Epoxy Crack Injection per linear feet of concrete crack repair. $________

3. Unit of Measurement: Epoxy Adhesive per square foot. $________

B. Unit Price No. 2: Concrete Wall Waterproofing. Crystalline Waterproofing.

1. Description: Waterproofing of interior face of concrete wall according to Section 03 01 30 – Maintenance of Cast-in Place Concrete.

2. Unit of Measurement: Per square foot. $________

C. Unit Price No. 3: Concrete Slab Moisture Mitigation.

1. Description: Concrete slab moisture mitigation system on “Zero Deck” slab in preparation for floor finish installation according to Section 09 05 61 – Common Work Results for Flooring Preparation.

2. Unit of Measurement: Per square foot. $________

File details come from the government source that posted it. Updated .