6.docx
DOCX document 19 KB Posted
- Attached to
- ZERO DECK CONSTRUCTION Federal contract opportunity
- Solicitation number
- DTMA95B1500001
About this file
Questions and Answers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Scan17.pdf | ||
| Scan16.pdf | ||
| Scan15a.pdf | ||
| Scan14.pdf | ||
| Scan14.pdf | ||
| Scan13.pdf | ||
| Scan12.pdf | ||
| Scan11.pdf | ||
| Scan10.pdf | ||
| SCHEDULE_OF_UNIT_PRICES.docx | DOCX document | |
| Scan9.pdf | ||
| Scan7.pdf | ||
| Scan8.pdf | ||
| 08_71_00_USMMA_05-26-2015.pdf | ||
| Scanned_101.4.pdf | ||
| Scan6A.pdf | ||
| Scanrfi1.pdf | ||
| Scan4.pdf | ||
| DTMA95B1500001-000003_Amendment_3.pdf | ||
| DTMA95B1500001-000002_Amendment_2.pdf | ||
| Scansignin.pdf | ||
| Zero_Deck_-_IFB_Amendment_000001.pdf | ||
| NY13516_CD_SPECS_ISSUE_FOR_BIDDING_07-23-15.pdf | ||
| Zero_Deck_-_IFB.pdf | ||
| Zero_Deck_Design_Drawings.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPEC SECTION 105113 – METAL LOCKERS
1. Note 2.3.D and 2.3.E of spec notes unperforated and solid metal sides, but drawing A101.3 indicates perforated sides. Please clarify if the sides are unperforated or perforated.
PROVIDE PER SPECS - UNPERFORATED AND SOLID SIDES
SPEC SECTION 105629 – METAL STORAGE RACKS
1. Note 2.2.A.2 of the spec does not indicate the load carrying capacity per Shelf. Please clarify.
SHELF CAPACITY SHALL BE 560 LBS.
SPEC SECTION 105629 – METAL STORAGE RACKS
1. Detail 10 on drawing A510.0 notes new Storage Racks in Cleveland Hall Regimental Baggage Locker Room, but drawing A101.4 does not appear to show the new Storage Racks. Drawing G100.1 does appear to show new Storage Racks. Please clarify.
REFER TO REISSUED, CORRECTED DWG. A101.4 FOR STORAGE RACK LOCATIONS
SPEC SECTION 102239 – FOLDING PANEL PARTITIONS
1. Note 1.5.B of the spec references Seismic Performance according to SEI/ASCE 7. More information regarding the Seismic requirement is required. Please provide the Occupancy Category, Site Class and Seismic Importance Factor.
SUCCESSFUL CONTRACTOR SHALL REVIEW SEISMIC PERFORMANCE AS IT RELATES TO SECTION 102239 ‘FOLDING PARTITION’ WITH THE SELECTED FOLDING PARTITION MFR.
1. on DWG A001.3 - demo note 24. Extent of removal is not clear. Is it Laundry Rm only or Corridor? Demo notes for R07A, R01A are unclear, please clarify.
Keyed demolition notes are not sheet specific, they are a combination of notes for entire project. Keyed Note #24 does not apply to Rogers Hall. Refer to General Demo note ‘S’ for clarification for R07A and R01A.
1. on DWG A001.1 - demo notes for Lounge are unclear, please clarify.
Extent of demolition is window and interior wall and door in wall. Dotted line wrapping 3 sides of room are new duct work shown on the wrong dwg. Refer to dwg. A101.1 for this work
1. on DWG A001.2 - demo notes for Color Guard, Locker Room are unclear, please clarify.
Refer to General Demo note ‘S’ for clarification of demolition work in Color Guard and Locker Room.
1. on DWG A001.4 - demo notes for C10 and C15 are unclear, please clarify.
Demolition notes are not sheet specific, they are a combination of notes for entire project. Note #10 does not apply to Cleveland Hall. C15 is as described and extent as shown. Refer to General Demolition Note ‘S’.
1. Floor plan and finish schedule conflicts. Finish schedule has more new flooring areas. Please clarify.
Use NEW WORK floor plans for room quantification.
1. Demo plan conflict with finish floor schedule, e.g. there are locations on demo plan indicating existing floor plan to remain while finish schedule indicates new flooring !
Use FINISH SCHEDULE for quantification of new floor finishes.
1. Detail 2/A510 referenced on A101.1 is for heat pump enclosure, however the detail on respective page does not match!
Detail 2/A512 IS FOR THE HEAT PUMP ENCLOSURE AS INDICATED; MISLABELED ON FLOOR PLAN.
1. Are the Vending machines shown on plans in contract? If so, please provide specifications.
Vending machines are not in contract.
1. Where existing utilities prevents new CMU wall to extend to underside of deck, detail 2 on G001 is to be followed. At the walk through, majority space was not accessible. Also, several utilities are running where space to build gypsum soffit at the top is limited. To what extent the soffit construction should be quantified?
Construct soffits as indicated on Detail 2/G001 where new partitions are constructed parallel to existing utilities indicated on the drawings.
1. Substrate preparation - please provide approximate square foot area requiring shot blasting prior to new flooring installation.
Prepare substrate based on new floor finish materials indicated on the drawings per respective manufacturers recommendations as specified.
1. Quantities for crack treatment and control joint treatment are common on pages, A101.1 to A101.5. These quantities are per Jones, Barry, Rogers, Cleveland and Delano Halls or one for all Halls?
Please see response to previous RFI.
1. The new service counter with overhead grill shown on A101.1 @ Receiving J15 doesn’t correspond with the Detail called out as 1/A510.0, please provide correct detail.
See Detail 1/A512.0.
1. The “new slope top hinged doors” shown on Detail 2/A101.2, is not called out on door schedule, Please provide specs for this door & any hardware required.
See specification section 08 31013 Item 2.3.A.1.
1. Please confirm the count shown for the metal lockers @ Hockey R05 is correct.
Use locker count as indicated on the floor plan.
1. On A401.0, door schedule lists frames AL-3 @ door D15 & HM-3 @ door R17, these frames elevations are not shown, please provide elevations for these two frames.
REFER TO DWG. A401.0 DETAIL #11 FOR FRAME TYPE AL-3. DOOR R17 SHOULD HAVE A HM-1 FRAME TYPE.
1. On A401.0, there are two window elevations #1 & #2 shown in hexagon, we couldn’t find these on floor plans, please advise locations where these windows occur.
Window elevation 02 is on dwg.A101.3 - CORRIDOR R00A OFF AEROBIC S RM. AND YOGA RM.
1. On A401.0, it shows detail #11, we couldn’t find where this detail occurs on floor plans, please advise locations where it occurs.
REFER TO DWG. A401.0 DETAIL #11 FOR FRAME TYPE AL-3. DOOR R17 SHOULD HAVE A HM-1 FRAME TYPE.
1. DWG A510.0, shows three different casework labeled Uniform, Barber & Salon, we couldn’t find these on floor plans, please advise locations where these occur.
REFER TO CORRECTED FLOOR PLAN A101.4 REISSUED WITH PREVIOUS RFI.
1. DWG A601.0, shows expansion joint detail #9, we couldn’t find this on floor plans, please advise locations where it occurs.
Expansion joint is located at the west end of Corridor C00B in Cleveland Hall. TO CORRECTED FLOOR PLAN A101.4 REISSUED WITH PREVIOUS RFI.
1. During the site visit, multiple locations on different buildings where called out verbally to be “will continue to be in business during construction”, please list these locations and advise with exact requirements for temporary facilities by the contractor.
See Specification Section 01 10 00 Summary and floor plans. Temporary facilities shall be per Specification Section 01 50 00.
1. Please advise if the Laundry, Navy exchange & Seafarer @ Delano Hall would be closed or continue to be in service during construction?
Areas in question will be in continued service during construction.
1. during site visit, we noticed more than 20 large size display boards and framed photos plus a large ship model in glass box more than 12 ft long, please advise if these to be relocated during construction and where?
Items shall be relocated by the Contractor as directed by the Academy.
1. Demo Plans call for removal/relocation of furniture, please advise where these furniture to be relocated and by whom? Also, we weren’t shown all locations with furniture as most of the rooms were locked (like the Armory), however, on some of the locations we visited we noticed more furniture than called out on plans, please advise with more details so we can price properly.
Refer to General Demo note ‘S’ for clarification of demolition/REMOVAL OF FURNITURE. AND NOTE ‘Y’ FOR RELOCATION
1. Plans and Spec section 01 22 00 “Unit Prices” list several items to be unit priced, however, bid schedule doesn’t have line items for unit prices, please revise the bid schedule or provide quantities for these works to be priced within the lump sum line item on the bid schedule Please see response to previous RFI.
1. Please advise if dewatering is required during plumbing trench excavations?
Dewatering is not a requirement based on previous trenching conducted in Cleveland and Rogers Halls.
1. Please advise if the contractor to reuse soil from the trench excavation to backfill? Also advise with location to be disposed if it’s not suitable to backfill?
REFER TO DETAIL 2/A101.1 FOR BACKFILL REQUIREMENTS.
1. RFP doesn’t call Delano Hall to be in contract, however plans show work on Delano Hall, Please advise if Delano Hall renovation is in contract or not?
Delano Hall work is in contract per plans.
1. DWG A101.4 reads “Cleveland Hall Zero Deck Plan”, however, it’s a replica of demo DWG A001.4 and doesn’t show new work, please advise if this is a correct plan?
REFER TO CORRECTED FLOOR PLAN A101.4 REISSUED WITH PREVIOUS RFI.
1. DWG A501 depict new work @ Mens C12/Women C13, however, DWG A101.4 shows no such location, please advise?
REFER TO CORRECTED FLOOR PLAN A101.4 REISSUED WITH PREVIOUS RFI.
1. Do the doors, hardware, and glazing need to be Large Missile Impact rated as per para F/1.5/Sec 084113?
No the doors, hardware and glazing do not need to be large missile impact.
1. The Door schedule calls out hardware set #s, however the hardware schedule on Sec 087100 does not correspond to these numbers? Please clarify.
Refer to attached revised hardware spec. section with added hardware set numbers.
1. Section 096556 Resilient Athletic Flooring Page 5 para 2.3 and Drawing A910.0 Floor Type calls for SP-02, However Finish Schedule Drawing A910.0 does not call for SP-02 for any of the spaces listed, please clarify.
See response to previous RFI.
1. Ramps to receive a slip resistant floor, VPI PRT Per ASTM D2047 the SCOF is at least 0.5; will this value be acceptable for the slip resistant SCOF required for the ramps of this project?
See response to previous RFI.
1. Section 096519 page 4 para 2.3A.1 calls Two-Part Epoxy, please confirm this adhesive system is required at all VPI locations throughout this project (rooms and corridors)?
See response to previous RFI.
1. Rooms; J05, J07, B08, B09, B10, R02, R03, R05, R16, C06, the closets within these rooms are to receive the same floor / base finish as the room ?
See response to previous RFI.
1. B00D and B00C appear twice on Drawing A101.2, Please show us where Corridors B00E and B00F are on the floor plan Drawing A101.2 as listed on Drawing A910.0 Finish Schedule.
See response to previous RFI.
1. J08 Corridor on Drawing A910.0, remarks column calls for Slip Resistance at Ramps, we do not find a ramp at J08 on Drawing A101.1 or A901.1, please clarify.
See response to previous RFI.
1. Section 096519 page 3 para 2.1E Seamless Installation Method, does not require welded seams, please confirm.
See response to previous RFI.
1. On G001, Det #2 is referencing detail 3/S401, however the later doesn’t correlate, please clarify?
The referenced detail should be changed to 2/s401.
1. On G001, Det #4 is contradicts with detail 3/S401, please advise which one to prevail?
Use detail 4/ag001 in conjunction with detail 3/s401.
1. Please advise where detail 3/S401 is applicable?
Detail 3/s401 is applicable as noted in the title ‘NONBEARING CMU WALL LATERAL SUPPORT’.
1. Per specifications, para 1.6 on Sec 011000, the work is to be in two phases, however, during site visit, we were advised that there will be no phasing requirements, please clarify if phasing will be required?
Phasing is required per specifications.
1. Site plans doesn’t call for any new site work, please advise if there will be any site works required @ the new areaways of the laundry rooms on Jones or the multiple services exterior connections called out on plumbing drawings?
NEW SITE WORK WILL BE REQUIRED TO RETURN AREAS TO THEIR ORIGINAL STATE ONCE NEW WORK IN THESE AREAS IS FINISHED.
1. Please advise if we should follow finish schedule or the flooring finish plans, since the later call for no finishes else than @ the corridors?
FOLLOW THE ROOM FINISH SCHEDULE FOR ALL FINISHES.
File details come from the government source that posted it. Updated .