Scan10.pdf
PDF 86 KB Posted
- Attached to
- ZERO DECK CONSTRUCTION Federal contract opportunity
- Solicitation number
- DTMA95B1500001
About this file
Amendment 00010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Scan17.pdf | ||
| Scan16.pdf | ||
| Scan14.pdf | ||
| Scan15a.pdf | ||
| Scan13.pdf | ||
| Scan14.pdf | ||
| Scan12.pdf | ||
| Scan11.pdf | ||
| SCHEDULE_OF_UNIT_PRICES.docx | DOCX document | |
| Scan9.pdf | ||
| Scan7.pdf | ||
| 08_71_00_USMMA_05-26-2015.pdf | ||
| Scan8.pdf | ||
| Scanned_101.4.pdf | ||
| Scan6A.pdf | ||
| 6.docx | DOCX document | |
| Scanrfi1.pdf | ||
| Scan4.pdf | ||
| DTMA95B1500001-000003_Amendment_3.pdf | ||
| Scansignin.pdf | ||
| DTMA95B1500001-000002_Amendment_2.pdf | ||
| Zero_Deck_-_IFB_Amendment_000001.pdf | ||
| NY13516_CD_SPECS_ISSUE_FOR_BIDDING_07-23-15.pdf | ||
| Zero_Deck_-_IFB.pdf | ||
| Zero_Deck_Design_Drawings.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTMA95B1500001
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Kings Point NY 11024-1699
00095
300 Steamboat Road
USMMA-5206
Division of Procurement U.S.Merchant Marine Academy
Kings Point NY 11024-1699
00095
300 Steamboat Road
USMMA-5206
Division of Procurement U.S.Merchant Marine Academy
09/17/2015000010
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/07/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
BIDDERS MAY CHOOSE TO ADD AN OPTIONAL UNIT PRICE ON THE ATTACHED SHEET FOR THE ITEMS IN
SECTION 01 22 00 ITEM 3.1. SCHEDULE OF UNIT PRICES. THE QUANTITIES ARE UNKNOWN. THE
EVALUATION WILL BE SOLELY ON THE UNIT PRICE.
The bid opening has been extended to October 21, 2015, 10AM EST.
There will be a revised drawing posted in a future amendment.
Question and answer period has been extended to 5 calendar days after posting of the revised drawing or as specified in a future amendment.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bruce Markman
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DTMA95B1500001/000010
All other terms and conditions remain unchanged.
LIST OF CHANGES:
Bids due date : 2015-09-21 00:00:00 changed to
2015-10-21 00:00:00
FOB: Destination
0002 A. Unit Price No. 1: Concrete Wall Crack Repair.
Epoxy Crack Injection and Epoxy Adhesive
1. Description: Repair of interior face of concrete wall cracks and spalling of concrete according to Section 03 01 30 – Maintenance of
Cast-in Place Concrete.
2. Unit of Measurement: Epoxy Crack Injection per linear feet of concrete crack repair. $________
3. Unit of Measurement: Epoxy Adhesive per square foot. $________
(Option Line Item)
0003 B. Unit Price No. 2: Concrete Wall Waterproofing.
Crystalline Waterproofing.
1. Description: Waterproofing of interior face of concrete wall according to Section 03 01 30 –
Maintenance of Cast-in Place Concrete.
2. Unit of Measurement: Per square foot. $________ (Option Line Item)
0004 C. Unit Price No. 3: Concrete Slab Moisture Mitigation.
1. Description: Concrete slab moisture mitigation system on “Zero Deck” slab in preparation for floor finish installation according to Section 09
05 61 – Common Work Results for Flooring
Preparation.
2. Unit of Measurement: Per square foot. $________ (Option Line Item)
Douglas Pader, Contract Specialist
DOT/MARAD
U.S. Merchant Marine Academy
Kings Point, New York 11024 telephone: (516)726-5840 e-mail: paderd@usmma.edu fax: (516)773-5131
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .